MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED
CORPORATE OFFICE, BANDRA
Tel(O}:022- |
Office of the Executive Director. zx: eis amend
Ill (Dist./Infra}, Plot No.G-9, | FMM MEMANVITARAN .
“Prakashgadh”, Fifth Floor, | (AGovt al Menasha Undefeking) | Fax: 022 26478544,
Bandra(E}, Mumbai-400 051
IN: vaotonmHa00ss6c183645 | Email ID: eclinfx3@gmn
Ref. No.: ED(nfra)/TechiNo. 9 | BO Date: 1 8 Ne ' aon
HOY 2
Circular
Sub: Fixing of service charges for incentivized Electric Vehicle Charging Station
in the State of Maharashtra,
Ministry of Power, Gol has issued Guidelines and standards for Charging Infrastructure for
Electrical Vehicles on dtd. 01.10.2019 for implementation of FAME-II policy and creation of
charging infrastructure for Electric Vehicle. MSEDCL is the State Nodal Agency for roll out
mechanism of Electric Vehicle charging Infrastructure in Maharashtra. Public Charging
Stations (PCS) and Fast Charging Stations (FCS) are being established in Maharashtra by
Utilities as well as private entrepreneurs.
As per dt 01.10.2019 Gol guidelines, MSEDCL being the State Nodal agency has the
responsibility to fix the services charges for PCS/FCS which have been installed with Govt.
incentives (financial or otherwise).
Accordingly Service charges for Urban area and Rural area for charging of Electric Vehicle at
Public Charging stations (PCS) / Fast Charging Stations (FCS) are in the State of Maharashtra
fixed as under : Table-1
Electric vehicle charging station Urban area | Rural area
Service charges (Per unit cost in Rs.) Rs. 3.00 Rs. 2.30
Service charges are to be levied to end user per unit cost in addition to total energy charges
including electricity duty and tax on sale of electricity. Further GST as per prevailing rates would
be applicable on the service charge.
All concemed should take note of above guidelines and follow these in true spirit
Executive Director (Infra)
MSEDCL, Mumbai