‘SONDEX HEAT EXCHANGER INDIA PVT LTD
1/1 GIDC Savi, .0. Maenjusar, Ta. Sali 991.775,
Dat: Vadodara, Gujarat Indi
2667 - 267000.
INSPECTION REPORT. pate:
LARSEN & TOUBRO LIMITED (RAGHUNATHPUR
[rHERMAL POWER STATION - DVC)
eC |
sno, (owe. v0, SIRES
location KOLKATA
customer ante
No, or paves (sa Freectow encanta [STALIN JUSTIN DURATP_—_]
PRESSURE (Bar) workina: [— 6 }*rsrina
HEAD CONDITION poor = [—_avernce, [Jooon, [)
PoUoWER CONDON Poor Feroz, Jo000 | [7
me (G HOLT CONDITION _
core 28 ove Jcueannn loco /
OPERATING PARAMETERS. PRIMARY SECONDARY
are moo/tuicanss 38316] 06mm 38316] 06mm
coaskerie Moe NBRAT NBR ET.
LINER oe Ed 3
Lune conDron OKAY ‘OKAY
NATURE OF WORK: INSPECTION FOR PHE DAMAGE
(Starr pate : 16-12-2021 [EOHPLEFION Dare 17-12202T
‘NO OF DAYS 12 DAY
[OVERALL ACTIVITIES & OBSERVATION
|VISITED THE SITE_LARSEN & TOUBRO LIMITED (RAGHUNATHPUR THERMAL POWER STATION - DVC) @ 16-12-2021
(CHECKED PLATE HEAT EXCHANGER FOR OUTSIDE DAMAGE CONDITION.
1) PAINTING REQUIRED FOR PLATE HEAT EXCHANGER,
|EXTERNAL DAMAGE OCCURRED & SAME WAS MENTIONED BELOW.
1) CARING BAR HAVING BEND & COMPLETE SET NEEDS TO BE REPLACED BY NEW ONE,
'2) ROLLER ASSEMBLY DAMAGED & COMPLETE SET NEEDS TO BE REPLACED BY NEW ONE.
\VISITED THE SITE_LARSEN & TOUBRO LIMITED (RAGHUNATHPUR THERMAL POWER STATION - DVC) @ 17-12-2021
[PHE WAS DISMANTLED & CHECKED ALL THE PLATES & GASKET CONDITION FOUND OKAY.
HYDRO NOT TAKEN DUE TO UNAVAILABILITY OF SOURCES
RECOMMENDATION
1) CUSTOMER ADVISED TO DO HYDRO TEST, BEFORE TAKEN INTO ONLINE,
2) CUSTOMER RECOMMENDED TO FLUSH OUT COMPLETE SYSTEM BEFORE STARTING THE OPERATION,
OR, SONDEX HEAT EXCHANGER INDIA PUT 17D oR psn & aflumo gyerrED
STALIN JUSTIN DURAI P 9 Va
peBs Ce
agSONDEX HEAT EXCHANGER INDIA PVT LTD
E/1 GIDC Sav, P.O. Menjuser Tal. : Sali 391 775 sugucrng an
Dit Vadodare, Out india ono < Las
102667 - 257000,
ENT pare = 1742.21
[LARSEN & TOUBRO LIMITED (RAGHUNATHPOR
[HERMAL POWER STATION - DVC)
wooen no SQ rar non, 2805
sno. owe. no, [SERSTOREE
locanon KOLKATA
CUSTOMER NAME
NO, OF PLATES: OF —__]INSPECION ENGINEER ‘STALIN JUSTIN DURAI P
PRESSURE (Bar) workna: ["——s——}rastwwa:
tno conpiion voor [——]wwereno [Joon | [——>}
otowse conomton rook = (————Javermoe, LS Jo000 | >
ow
"HOHTENING BOLT CONDITION NO ue eueananix sooo 7
OPERATING PARAMETERS: PRIMARY ‘SECONDARY
PATE Moc/THICKNESS SISO SOS
Gasuer rvPE MOC NBRET NBRET
tava woe 38 38
time CONDITION OKAY ‘OKAT
MATURE OF WORK: INSPECTION FOR PHE DAMAGE
[Brawn pare: 16.12.2021 [Courceniow Dare aoa 1
YO OF DAYS 2 DAY
[OVERALL ACTIVITIES & OBSERVATION:
|VISITED THE SITE_LARSEN & TOUBRO LIMITED (RAGHUNATHPUR THERMAL POWER STATION - DVC) @ 16-12-2021
|CHECKED PLATE HEAT EXCHANGER FOR OUTSIDE DAMAGE CONDITION
1) PAINTING REQUIRED FOR PLATE HEAT EXCHANGER.
EXTERNAL DAMAGE OCCURRED & SAME WAS MENTIONED BELOW.
1) CARING BAR HAVING BEND & COMPLETE SET NEEDS TO BE REPLACED BY NEW ONE,
|2) ROLLER ASSEMBLY DAMAGED & COMPLETE SET NEEDS TO BE REPLACED BY NEW ONE.
| VISITED THE SITE_LARSEN & TOUBRO LIMITED (RAGHUNATHPUR THERMAL POWER STATION - DVC) @ 17-12-2021,
PHE WAS DISMANTLED & CHECKED ALL THE PLATES & GASKET CONDITION FOUND OKAY.
HYDRO'S NOT TAKEN DUE TO UNAVAILABILITY OF SOUR
RECOMMENDATION
1) CUSTOMER ADVISED TO DO HYDRO TEST, BEFORE TAKEN INTO ONLINE.
2) CUSTOMER RECOMMENDED TO FLUSH OUT COMPLETE SYSTEM BEFORE STARTING THE OPERATION.
‘CUSTOMER REMARKS:
FOR, BONDEX HEAT EXCHANGER INDIA PVT LTD FOR LARSER & ame
stan" JUSTIN DURALP RLY
Pp