GOVERNME
OF ANDHRA PRADESH
ABSTRACT
WORKS ~ Public Health Engineering Department - Tender Reforms — Engineering,
Procurement and Construction (EPC) — Implementation of Projects under EPC
system in Municipal Corporations! Municipalities and HMWS & SB - Orders -
Issued
MUNICIPAL ADMINISTRATION AND URBAN DEVELOPMENT (Al) DEPARTMENT
1.G.0.Ms.No313. M.A & U.D(A1) Department,dated: 10.05.2007,
2. From the Commissioner Vijayawada Municipal Corporation, Letter
No.1 1385/VMC/2006, Dated.01.05.2007.
3. From the Managing Director, HMWS &SB Letter No.HMWSSB/
Managing DirectoriWS & Sew Works/Pumps-Sub-Stns/EPC
Systenn/2007-08, dated 26- 05-2007.
4 Fron! 2 ‘Sthintah peta tire
Ue crahles of the Projecs k (IBM) * deciding Basic
a
a
Pevanete
Payrient
a] of ive Bud Documents / evaluation cr
nodule
Approve tie Tenders and
4 Approve fae Latension of time beyond six months / Price 10 be paid te
he Conteacter “er aditional works
| Nov contingent on she main work.
Fortngen bu: outside the scope of original contactii Managing Director, Hyderabad Metro
Hyderabad will take necessary further
HE GOVERNOR OF ANDHRA PRADESH)
PUSHPA SUBRAHMANYAM
SECRETARY TO GOVERNMENT
d Municipal Corporation.
atnam, Municipal Corperation.
The Commissioners of all Municipal Cor
Copy
The P.S to Hon'ble M(MA
The BS. PAS
The
MA &U DID
Sto Secretary #0 Gort, MAS U-D Der
nce {W&eP) Department SP/SC
mi
W, Coordn, Sections)
Forwarded by Orcer
rations in the State
masioner & Director of Municipal Administration, Hyderebad.
yt Govt, M.A. & U.D. Dent
7
Corporation ind other Corporations it
Water Supply and Sewerage Board,
acticn secordingly
(BY ORDER AND IN THE NAME OF T
‘to
The Conimissioner, Greater Hyderab
The Commissioner , Greater VishakapANNEXURE-I TO C.O.Ms. No.5,
2007
COMMITTEES FOR WORKS TAKEN UP UNDER JNNURM_AND
UIDSSMT FOR WORKS COSTING MORE THAN RS.10.00 CRORES
UNDER EPC SYSTEM FOR PUBLIC HEALTH ENGINEERING
DEPARTMENT
COMMIT Enginesr-in-ChieffPublie
‘Approxe the Technical | Health)
| Parameters such as
seope, objective _and| Director(Technical)
final deliverables of the| Hyderabad Metro Water
Project, Internal bench| Supply and Sewerage
Mark(IBM) _ /deciding | Board.
Basic Parameters
| approval of live Bid| Superintending Engineer | Convenor.
| Documents/evaluation | concemed.
| criteri, payment
|ehedle .
COMMITTEE -
[Approve the Tenders. [Principal Secretary to | Chairman.
Govt. MA.U.D Dept
Engineer-in-Chief(Public
Health)
Representative from
i Finance Department
Additional Secretary/Joint
Seoreiary to Government, |
MAUD. Dept
|
Chief Engineer, Greater!
| Hyderabad Municipal
Coxporation
Director(Technical), | |
Hyderabad Meteo Water |
Suprly and Sewerage
| Hoard
Engineer | Convenor.
| concernedto
( COMMITTEETiT
i
Approve the Extension
of time beyond six
| months/price to be paid
|to the contractor for
‘additional works: (i)
Not contingent on the
| main work. Gi)
| Contingent but outside
[the scope of original
[contract
Engineer-in-Chief(Public
Health)
Chief Engineer, Greater!
Hyderabad “Municipal
Corporation.
Director(Technical),
Hyderabad Meiro Water
Supply and Sewerage!
Board.
Representative trom
MAUD. Dept.
Representative from|
Finance Department.
Superintending Engineer | Convenor.
concemed. '
PUSHPA SUBRAHMANYAM.
SECRETARY TO GOVERNMENTCOMMITTEES FOR WORKS TAKEN UP _UNDER_JNNURM_AND
{ingsMir FOR WORKS COSTING MORE THAN RS.10.00-CRORES
TPC_SVSTEM FOR GREATER HYDERABAD MUNICIPAL
‘CORPORATION
CMTE [Engineerin Chiell Public |
Approve the Technical | Health) |
Parameters such 3s
cope, objective and | Director(Technical-
Til deliverables of the | Hyderabad Metro Water |
Project, Internal bench | Supply and ‘Sewerage |
| Mako) /dseiding | Board
| Basie Parameters
[approval of tive Bid] Chie? Engineer, | Greater| Convenor.
| Documentsievatuation | Hyderabad Municipal
ervera payment | Corporation
schedule.
|
CONMITE as Cd
Approve the Te Commissioner and Ex-| Chairman.
i Officio Principal Secretary
| to Govt, M.A.U.D Dept.
Engineer in-Chie((Public
Hea'th)
| Representative from
| Finance Department
Additional Secretary/Joint
Secretary to Government, |
| MAUD. Dept
| Director(Technical), |
Hyderabad Meuo Water |
Supply and Sewerage |
Board,
|
Chief Engineer, Greuter | Convenor.
Hyderabad Municipal |
Corporation. |COMMITTEF-IT
Apprave the Extension | Enginecr-in-Chief[Public
|of time beyand six | Health)
| months/price to be paid | Director(Technical),
to the contractor for| Hyderabad Metro Water
| additional works: {3)| Supply and Sewerage
| Not contingent on the| Board,
main work. )
Contingent but outside | Representative from
Fthe scope of originat| M.A.U.D. Dept
contract.
Representative from
Finance Department,
[Chief Engineer, Greater
i | Hyderabad “Municipal
Corporation.
=
Convenor.
PUSHPA SUBRAHMANY AM
SECRETARY TO GOVERNMENTANNENUREANTO G.O.Ms, NoSt4, M.A.U.D(AL DEFT. dated 12-7.2007
COMMITTEES FOR WORKS TAKEN UP UNDER. JNNURM_AND
{IpseMT FOR WORKS COSTING MORE THAN RS.10.00 “HORE:
UNDER _EPC SYSTEM FOR GREATER YISAKHA_M) INICIPAI
CORPORATION 1 VIJAYAWADA MUNICIPAL ‘CORPORATION. AND
OTHER CO RPORATIONS
COMMITTEE pnee
Approve the Technical | Health)
| Parameters such aS
| Scope, objecive ard | Director Technical Hyderabad
| Snel deliverables of the |Metro Water Supply and
| Project, Internal bench | Sewerage Board.
fef(Public |
Mark(IBM Yeciding °
Basic Chief, Engineer J) -Convenor.
Parametersiapproval of | Superintending Engineer
[live Bid | Concerned of the Corporation.
Documentelevaluation
criteria, payment
i schedule -
‘COMMITTEE
‘Approve the Tenders, | Principal Secretary 10 Govt, | Chairman.
| M.A.UD.Dept.
Engineer-in-Chief{Public
Health)
{commissioner and Director
of Municipal Administration
| Commissioner concerned |
\
Representative from Finance
| Department | |
‘Additional —_Seeretaryoint)
Secretary to Government, |
| M.A.U.D. Dept
Director(‘Technical)Hyderabad | \
Meu Water Supply end
| Sewerage Board
Chier Engineer = Convenor.
| Superintending Engineer |
' Concemed |ET
Engineer-in-Chief(Public
pprove the Extension | Health)
ime beyond six