WORK QUALITY ASSURANCE
DONGaI SENORO ao Effective Date: 5 October 2016 Version: 1 Page: 1 of 2
CORRESPONDENCE Security Classification: [XXX]
Document Tite Emergency Alarms Announcement
Document No. IFLOPE-WQA-COR-COR-2016-0010
STANDING ORDER
OBJECTIVES
‘The purpose of this document is to provide guide line for emergency alarm announcement. DSLNG hes 3
types of emergency alarms and 1 clear alarm. Each alarm is provided with distinctive alarm tone in order to
differentiate fire alarm, gas leak alarm, evacuation alarm and all clear alarm. To ensure all staff and
contractor personnel who are asked for specific role and responsibilty ere familiar with those alarm tones,
weekly test alarm is mandatory.
2. DESCRIPTION
‘The Shift Supervisor is responsible to ensure the alarm testing Is carried out at 11:00 AM every Friday. Test
willbe initiated by Panel Operator in the MCR and shall be broadcasted via PAGA system to all areas. Prior
to the alarm testing, announcement shall be made through PAGA system in English and Bahasa as below:
Testing, Testing, Testing
Test, Test, Test
This is fire alarm test, no action required. | repeat, this is fire alarm test, no action required
Ini adalah fre alarm test, tidak diperlukan tindakan. Saya ulangi, ini adaish fire alarm test, tidak diperlukan
tindakan
This is gas leak alarm test, no action required. | repeat, this is gas leak alarm test, no action
required
Ini adalah gas alarm tes, tidak diperlukan tindakan. Saya ulangi, ini adalch gas alarm tes, tidak dipertukan
tindakan,
This is evacuation alarm test, no action required. | repeat, this is evacuation alarm test, no action
required
Ini adalah evakuasi alarm tes, tidak diperlukan tindakan, Saya ulangi, ini adalah evakuasi alarm tes, tidak
diperlukan tindakan.
This is all clear alarm test, no action required. | repeat, this is all clear alarm test, no action required
Ini adalah all clear alarm tes, tidak diperlukan tindakan. Saya ulangi, ini adalah ail clear alarm tes, tidak
dipertukan tindakan.WORK QUALITY ASSURANCE
DONGG! SENORO ao Effective Date: § October 2016 Version: 4 Page: 2 of 2
CORRESPONDENCE ‘Security Classification: [XXX]
Document Title, Emergency Alarms Announcement
Document No. IFL-OPE-WQA-COR-COR-2016-0010
Emergency alarm test is now complete. | repeat, emergency alarm test is now complete. All further
alarms are to be treated as real alarm. Thank you for your cooperation.
Emergency alarm tes dinyatakan selesai. Saya ulangi, emergency alarm tes sudah dinyatakan selesai
Alarm yang muncul setelah tes ini di kondisikan sebegai alarm yang sebenamya. Terima kasih atas
kerjasamanya,
Prepared by, Approved by,
‘Ahmad Budiarjo | Johar Ahad Kong Thee Ho Helfia Nil Chalis
OPS Superintendent OPS Manager
Date: 07 jen Bory Date: 5 Jom 20