SNo Applicant Name

1 M/s. Ramjee Leathers and Supplies Rep. by its Partner Mr. R. Dam
2 M/s. Geeyam Construction Rep. by Thiru C.R. Chandrasekaran GPA
3 M/s. Emerald Haven Projects Pvt. Ltd. Door No.119, 1st Floor Gr
4 M/s.Prestige Estate Projects Ltd. Prestige Poligen, Top Floor, No.
5 Thiru.R.Govindarajan (GPA), No.32, Ganga Nagar, 1st Street, Koda
6 Tmt.B.Preethi and Thiru.B.Kiran No.8, Mooparappan Street, T.Nagar
7 Tmt.B.Preethi and Thiru.B.Kiran No.8, Mooparappan Street, T.Nagar
8 M/s.VRB Constructions Rep. by its Proprietor R.B.Sathish, GPA for Tm
9 Thiru. K.S.Prabhakar (GPA) & 2 others, No.5, Anandha Road, Alwar
10 M/s. Tata Value Homes Ltd, Rep. by General Manager Thiru. Balaji
11 M/s.Casa Grand Builders Pvt. Ltd., Rep. by Thiru.K.R.Anerudan, No1
12 Thiru.U.Preetam Karthik, Director of M/s.India Builders (Chennai)
13 M/s.India Builders (Chennai) Ltd., Rep. by its Chairman, Thiru.J.
14 M/s.Wipro Limited., Elcot SEZ, Survey No.602/3, Sholinganallur –
15 M/s.DRA Aadithya Chennai Homes LLP (GPA), 1st Floor, Khivraj Com
16 M/s.Ramky Wavoo Developers Pvt. Ltd., Level-5, Diamond Dune, N
17 M/s.Perungudi Real Estates Private Limited, No.110, Rajiv Gandhi
18 M/s.Virgo Realtors (P) Ltd., (POA) & others, Old Door No.3, New No
19 M/s.Dawoodi Bohra Jamat Trust (Chennai), No.126 (Old No.55),
20 Thiru. S. Srinivasagan & Tmt. S. Thilagavathi 2/13, 3rd Cross Str
21 Thiru.P.Muthuvel Raj, No.1496, 16th Main Road Anna Nagar West,
22 Tmt.N.Shakuntala, New Door No.5, Old Door No.81, V.V.18th Street
23 M/s.Delphina Consultant LLP Represented by Thiru.Y.Meera Reddy
24 Thiru. K.P.Krishnaswamy & 3 others No.15, 59th Street, Ashok Naga
25 M/s. RMZ Infinity (Chennai) Private Ltd., (formerly Known as W.S.
26 Dr. M. Rajkumar & 3 others No.470, HIG 2nd Main Road, Mogappair
27 Thiru. R. Sabapathy Old Door No.15, New Door No.10 Lakshmanan S
28 Thiru.M.Babu Manohar, Old Door No.25, New Door No.23, 1st Cross
29 Thiru.G.Mannar, No.B-4, K.K. Road, 3rd Street, Ambattur, Chennai-
30 M/s.Balaji Developers represented by its Partners Tvl.1.R.Sanjeevi
31 M/s. VGN Homes Pvt Ltd., Rep by its Director Thiru. B.R. Nandaku
32 Thiru. P. Madhusudhan Reddy GPA for Tmt. V.Asha, No. 23, Thirumo
33 Tmt. R. Prabavathy, Plot No.20, Door No.2/17, RBI Colony 2nd stre
34 N.Rajendran (GPA), No.87/8, 1st Street, 1st Sector, K.K.Nagar, Chen
35 Ms.T.Dhanalakshmi C/o.M/s.Jones Foundation Pvt. Ltd., No.2, M
36 M/s. VNR Homes Private Limited No.5/20, Blue Beach Road Neelank
37 M/s. Emerald Haven Realty Limited, Represented by Thiru. V. Ganes
38 Thiru. Kodali Mallikarjuna Rao, No. 12/39, 5th Main Road, Kasturib
39 M/s.DAC Promoters, Represented by its Chief Executive Officer Tmt
40 1.M/s.Khivraj Properties LLP, 2.M/s.Cenotaph Properties LLP and 3
41 Thiru.S.Narayanan, Door No.5, Periyar Salai, Thiru Nagar, Ashok Na
42 Thiru.S.Narayanan, Door No.5, Periyar Salai, Thiru Nagar, Ashok Na
43 M/s. Gateway Office Parks Pvt. Ltd. (Formerly Shriram Properties &
44 M/s. Brivas Private Limited, No.19 Thulasi gardern, 2nd Floor, Ch
45 Thiru.Pandikadavul Unnikrishnan Jayaprakash, Plot No.5650, Door N
46 Thiru. Niddodi Krishna Bhatt, Door No. 2/12, First Trust Link Street
47 Thiru. R.N. Jayaprakash, Door No.76, “Temple Towers” 3rd Floor, N
48 M/s. Innovative Homes & Developers (p) Ltd., Rep by its Managing D
49 M/s. Vivekanandha Educational Society Rep By Sec. Thiru. M.N. V
50 Mrs.Anitha Kothari & Mr.Vinod Kothari, Door No.4A, North Usman R
51 Tmt.T.Jayalakshmi, GPA for Tvl.1.N.Lakshmi, 2.N.Balakrishnan & 3.N
52 M/s. River View Builders (LLP) Rep. by its authorized signatory Thi
53 M/s. India Builders (Chennai) Ltd Rep. by Thru J. Uttamkumar No.A
54 M/s.Chaitanya Builders & Leasing Pvt. Ltd, Rep. by its authorized
55 Thiru.U.Karuna Sesh, No.22, Rajaram Metha Nagar, Chennai 600 02
56 R.M.S. Infrastructure Pvt. Ltd., Rep. by Thiru.Murugappan Sethura
57 Thiru. S. Ragavendran GPA for Tvl.1) C.D. Mohanasundaram, 2) C.M.
58 M/s. R.K. Estates Rep. by its Partner Thiru. R. Sundararajan No.32
59 M/s. True Value Homes (India) Private Limited represented by its
60 Mr.L.Ravi Selva Amarnath & Mrs.A.Shibani, New No.3, Old No.61,
61 M/s.ARK Builders & Properties Promoters (P) LTD Rep by its M.D. Thi
62 M/s. Ananyakrishna Constructions (P) Ltd and Thiru K.R. Ananthar
63 Thiru R. Murali Babu New No.166, Old No.104/1 N.M.K. Street, Ay
64 M/s. SRM Institute of Science & Technology, No.3, Veerasamy Str
65 Tvl.B.Hariharan & Other, No.8/20E, Poes Road 2nd Street, Teynamp
66 Thiru.N.Rajendran, No.87/8, 1st Street, 1st Sector, K.K. Nagar, Chen
67 M/s. Luxebuilt Homes Pvt Ltd Door No.8/57, Luz Avenue Mylapore,
68 The E.E. & ADO, Anna Nagar Division, TNHB, Thirumangalam, Chen
69 M/s.Digient Technologies Private Limited Plot No.B11, SIDCO Road,
70 M/s. G.P. Homes Private Limited Rep. by Thiru. S.Elumalai, No.W-74
71 Mrs. Michelle Joseph No.18/35, School Street Koyambedu, Chennai
72 M/s.Kaaviya Properties Pvt. Ltd., Represented by its M.D Thiru.R
73 Thiru.J.Rangarajan, M/s.Samprathy Developers LLP, GPA of Thiru.N
74 Tmt.B.S.Kamalavadhani, No.11, M.G. Road, Bangalore - 560001.
75 Mr. M.V.M. Sasi Kumar, No.19, T.S.Krishna Nagar, Anna Nagar West
76 M/s. Sreshta Sumanth Builders Pvt. Ltd., Rep by its partner Thiru
77 M/s.Shriprop Properties Pvt.Ltd. Lakshmi Neela Rite Choice Chambe
78 M/s. KCEE Properties Pvt Ltd Rep by L.Chandrasekaran, Plot No.17,
79 Thiru.Praful Kumar Nahata, New No.56/44, Thirumalaipillai Road, A B
80 M/s.Madras Christian College, Represented by The Principal, Tamb
81 M/s. Samprathy Developers LLP Rep by Thiru. A. Arivalagan GPA fo
82 Thiru.N.Sivakumar, M/s. Sivaram Trading (India) Pvt. Ltd., Door No
83 Thiru.C.Kasturi Raj, Managing Director of M/S.Firm Foundations &
84 Thiru.P.Samuel Sankar & 3 others, No.12/2, 2nd Floor, Riberiyo Str
85 Thiru. P. Kruthivas GPA for 1. Thiru. RamKumar Kolpurath, 2. Thir
86 M/s. Casagrand Builder Pvt Ltd and M/s. Casagrande Civil Engineeri
87 M/s. Sakura Foundation, No.5, 1st Street, Subbarao Avenue, Nun
88 Thiru.B.Balamurugan, GPA of Thiru.V.Swaminathan, No.4/3, 1st Ma
89 Thiru. S. Srinivasan & 43 others Gokulam Phase – 3 Apartment Sr
90 M/s.India Builders Chennai Ltd., Rep Thiru. J. Uttam Kumar(GPA) fo
91 M/s.Classic Housing and Properties, Rep. by its Partner, Thiru.R.Ba
92 Mrs. R.Viniselvi, C/o.V.K.S. Mining Services No.224, 1st Street, 2nd
93 M/s. Maliban Estate No.5/3, Venkata Maistry Street Mannady, Che
94 M/s Mahindra Life Space Developers Pvt. Ltd Block No. A, 2nd Floo
95 Thiru. Siddartha Srinivasan (GPA) No.34/38, 3rd Main Road, R.A.Pu
96 Thiru. S. Ramesh Kumar, Flat No.304, 10th Cross street, Mangala Na
97 M/s.India Builders (Chennai) Ltd., Rep. by its Chairman, Thiru.J.
98 M/s.Nahata Homes LLP, Rep. by Thiru. Anand Kumar Nahata, GPA of
99 Tmt. H.K. Sowmya & Thiru.Raman Kuppurao No.5 Bishop Wallers Av
100 Thiru.R.Ananda raja, Plot No.219, Thiru.Vi.Ka 1st Street, Mylapore,
101 Tmt.R.Vijayalakshmi & 3 others, Door No.6/11, Plot No.15, Agasthiy
102 M/s.BSCPL Infrastructure Limited, Real Estate Division, Arasanka
103 Tmt. Mary Camala Ryan & 5 Others And M/s. KCEE Properties (P) Ltd.
104 M/s.Aaradhya Infra Represented by its Proprietor Tmt.B.Keerthana
105 Mahe Holdings LLP, Rep. by its Designated partner, Thiru..Tharun,
106 Mr.P.Kruthivas, GPA of Mrs. Meenakshi, V.Menon & others, Old No.
107 M/S.Sreerosh Properties (P) Ltd., GPA of Thiru.R.Jagadish & R.Lath
108 M/s.SPR Construction Pvt. Ltd., Rep. by Thiru.Hitesh P Kumar Kawa
109 Thiru. S. Muthu Kumar No.17/35, 2nd Main Road Gandhi Nagar, Ch
110 M/s. Amma Naana Represented by Thiru. V.R.Govindasaamy, Door
111 Tvl.B.Srinivasan, S. Geetha, S.Archana, & S.Srinath, No.3, Play Gr
112 Tmt. V. Vijayalakshmi No.10, Reddy Street Virugambakkam, Chenna
113 Thiru. S. Ramachandran and Tmt. Nalini Ramachandran No. 12A, HI
114 M/s.Sri Kirthika Builders Pvt. Ltd., Door No.7, Kondichetty Street, P
115 The Chief Executive Officer, Chennai Metropolitan Development Au
116 M/s. Madras Land, Rep by its GPA Thiru. Seyed Abdul Kader, Plot
117 M/s. Kochar Homes Pvt. Ltd., GPA of Thiru. Arjun, & Tmt. Neetu ar
118 The Executive Engineer, Foreshore Estate Division, Tamilnadu Hou
119 M/s. Madras Christian College, Rep by the Principal, Tambaram (Ea
120 Thiru. E. Joshva No.437, Sundaresan Street Gnanamoorthi Nagar A
121 M/s.VGK Builders Pvt. Ltd., Rep. by its Managing Director Thiru.H
122 M/s. Apollo Hospitals Enterprises Ltd., Rep. by Brig. K.R. Chakravar
123 M/s. VGN Property Developers Pvt. Ltd No.15, Wallace Garden, 2
124 Thiru. Harsha Skanda Sundaram and Tmt. Uma Haimavathi Sundaram
125 M/s. ASN Housing, Rep by its Partner, Thiru. B.Sunil Kumar GPA fo
126 M/s. Ruby Builders & Promoters, Rep by Thiru. Ashok Manor (GPA)
127 Tmt. B. Savithri & G. Bhuvaneshwari, New no.9, Old No.2/1, Red
128 M/S.Sreerosh Properties (P) Ltd., Rep. by its Director Mr.D.Dhiraj ,
129 Thiru R. Sabapathy No.10/15, Lakshmanan Street T. Nagar, Chennai
130 M/s. Madhav Associates Rep. by S.V.S. Kannan (GPA for Lakshman
131 M/s.Indus Alliance Foundation India Pvt. Ltd., Rep. by its MD Thir
132 Thiru. Babu Thomas, No.H-1685, 14th street,Anna Nagar,Chennai –
133 M/s. Casa Grand Builder Private Limited Rep. by Thiru. V. Vijay Ku
134 1).M/s. Ramaniyam Real Estates Pvt Ltd., 2). Thiru.M.Raja & 3). T
135 1. Thiru. B.Tolachand Nahar, 2. Thiru. B.Sumerchand Nahar 3. M/s.
136 M/s Hazel Realty Pvt. Ltd., Poonamallee - Avadi High Road, Near Ke
137 M/s Harmony Residences Pvt. Ltd.,Rep by its Director S. Ramakris
138 M/s.Green Valleys-Shelters Pvt. Ltd., Rep. by its Director, Thiru.
139 1). M/s. Alliance Business Park (P) Ltd. and 2). M/s. Alliance Pr
140 M/s.Sumanth & Co, No.8/57, Luz Avenue, Mylapore, Chennai – 600
141 M/s. Indu Housing Development (Chennai) Pvt Ltd., Rep by its Mana
142 M/s.Chennai Metro Rail Limited., Represented by Additional Gene
143 Tamil Nadu Urban Habitat Development Board Represented by Thiru.
144 M/s.Saradeuz Infrastructure Pvt. Limited Represented by its Dire
145 M/s. Chaitanya Eastlyn, Represented by partner Thiru. V.Manu Red
146 Thiru. P.R. Rangarajan & 8 others No.18/43, Jublee Road West Ma
147 M/s.Sumanth & Co, No.8/57, Luz Avenue, Mylapore, Chennai-600 0
148 Tmt.Bina R.Asrani, No.1, Sterling Road, Nungambakkam, Chennai-3
149 Thiru.Nagasamy Dhanapalan, Flat No.1A, Aria Apartment, New No.1
150 M/s. ETICA Developers Private Limited, Represented by its Managing
151 M/s. Pushkar Properties Pvt Ltd Rep by P. Kruthivas (GPA) of Thir
152 Thiru.K.S.Prabhakar (GPA) No.5, Ananda Road, Alwarpet, Chennai –
153 Tvl. Shailini Srinath & 2 others 5, Somasundaram Street T. Nagar,
154 M/s.Ocean Lifespaces India Pvt. Ltd., Represented by its Authorize
155 Thiru T. Arvind Pai (GPA) GPA for Tmt. Zubaida Moosa & 20 others
156 Thiru.A.C.Raju and Tmt C. Prema Raju, No.24, Landons Road, Kilpau
157 M/s.Khivraj Estate Pvt. Ltd., (GPA), Bharathkumar Bhavan, No. 617,
158 M/s. Oneness Developers Private Limited Rep. by its Director Thir
159 Thiru. K. Kumaravel No.1, Bharathiyar Street Kollacheri, Kundrathu
160 Thiru.R.Kannan, GPA for Tvl.Bharathi Rangarajan and 11 others, New
161 M/s.Dwarak Foundations Chennai LLP represented by its Designated
162 M/s. Livedge Constructions, Rep by its partner Mr.Hemant Kumar S
163 1. M/s. Casa Grande Milestone Pvt. Ltd., 2. M/s. Casa Grande Mile
164 Tmt. Vimala Bai Door No.30/39, Ridhi Sidhi Apartment, Thacker St
165 Tmt.Uma Ramanathan for herself and GPA for Thiru.Ashwin Ramana
166 M/s. Estate of Sir John D’monte Trust Door No.41, Plot No.41, Sa
167 Thiru.S.Rathan Machendra, No.3A/1, 1st Street, Sri Sakthi Vijayala
168 Tmt.Nandhini Suresh & others, Plot No.R-19/27, Elango Street, M
169 M/s.DLF Infocity Chennai Ltd., Door No.1/124, Shivaji Gardens,
170 Mrs. Mahboob Merlia, No.66/54, Spur Tank Road, Chetpet, Chennai
171 The General Secretary YMCA No.24/223, N.S.C. Bose Road Chennai
172 Thiru.G.Kamaraj & Tmt.S.Padma, No.3, Ramguru Nivas, 13th Cross
173 M/s. Adroit Urban Developers Pvt.Ltd., Door No.1, Bheemanna Gard
174 M/s.Casa Grand Builder Pvt. Ltd., & 3 others, No.111, 5th Floor, NP
175 M/s.Hatsun Agro Product Ltd., Represented by its Director and Aut
176 M/s. Lion Dates Impex Private Limited Rep. by its M.D Thiru. P.
177 M/s.Minerva Housing, Represented by Thiru.Collins Manford., Plot
178 Thiru.Arul Chandrasekar represented by 1.M/s.VKB Housing Private L
179 M/s.Chennai Affordable Venture LLP, Door No.55, Plot No.74, 1st A
180 Thiru. N. Sundararajan, Old No.60 & 61, New No.76&77, Avvaishan
181 M/s.VGK Builders Private Limited, Represented by its Director H.
182 Thiru.Siddartha Srinivasan GPA for Thiru. V.Ram, No.34/38, 3rd M
183 M/s. Chaitanya Eastlyn, Rep. by Thiru.V.Manu Reddy, Door No.39,
184 M/s.India Builders (Chennai) Ltd., Rep. by its Chairman, Thiru.J.
185 Thiru.M.Gopinath and Tmt. Rani Gopinath, Door No.5/1, 4th Cross S
186 M/s. Sabari Constructions and Housing Pvt. Ltd., Rep. by U. Preet
187 M/s. India Builders (Chennai) Limited, Represented by its Directo
188 M/s. Shard Fomra (Self & GPA Holder) M/s. Fomra Housing and Infra
189 M/s. The Nest, Rep by Thiru. M.Shankar Ganesh, New No.15, Old No
190 Thiru. N.R.Mohan & Tmt. M.Shoba, Block L, 94/6, 18th street, Anna
191 Thiru. T.Udayakumar, Door No.27, Plot No.27, Saravana Street, T.N
192 M/s.Priya Estate Developers Private Limited, Rep. by Tmt.R. Priyad
193 Thiru.Elred Kumar, No.21, 2nd Floor, Raja Street, Pondy Bazaar, Pa
194 Thiru. Lokesh Prabhu, S/o Mr. R.D.Munirathinam, No.1, Bajanai Koil
195 The Director, Entrepreneurship Development Institute, T.I.Building,
196 Thiru. Kishore Kumar Gokaldoss Director of M/s. K.G. Foundations
197 Thiru.N.Chandrasekharan, Door No.6/14, Solaiyappan Street, Puzh
198 Thiru.Jacob C Chacko, General Manager, M/s. MRF Limited, Post Box
199 M/s. Chennai Metro Rail Limited Rep. by Thiru K. Ravi Additiona
200 M/s. AVRN Hotels Pvt Ltd., Represented by Thiru.A.Vijayaragavan
201 M/s. Foshan Infrastructure Pvt. Ltd., Represented by its Directo
202 Tmt.Rajeswari Sekar & Tmt.Jayshree Sridhar, Door No.18, Krishna
203 Mr. R.M. Alagappan & Mr. A.L. Subbiah Plot No.201, Tagore Stree
204 Thiru.V.Balasubramaniam GPA for S.Suresh, Door No.18/10, Orchid R
205 Tvl.D.Chakravarthi & A.Kumar, No.12B, 1st Floor, Vallakottai Murug
206 Thiru.V.Kopli Sankar & Tmt.K.Vimalesuwari GPA for Tmt.Meenakshi Sa
207 Thiru.E.Krishna Reddy, Managing Partner of M/s.Krishna Construct
208 M/s.India Builders (Chennai) Ltd., Rep. by its Director, U.Preetam
209 Thiru.Dileep Bhandari No.73, Nungambakkam High Road, Nungamba
210 M/S.Firm Foundations & Housing Pvt. Ltd., Rep. by its Thiru.C.Kast
211 M/s. Steps Stone Promoters Pvt. Ltd., Rep. by its Director Thiru
212 M/s. G.P. Homes Private Limited Rep. by S. Elumalai No.W-740, Fir
213 Thiru.N.R.Krishna swamy & GPA for Thiru.N.R. Venkatesh No.8, 4th
214 The Nest represented by Managing Partner Thiru.M.Shanker Ganes
215 Thiru. A.S.Abubaker, Door No.14, Karpagam Avenue, Raja Annamal
216 M/s. NTT Communications India Net Work Services Pvt.Ltd., Represe
217 M/s.Geeyam Constructions, Rep by its Managing Partner Thiru. C.
218 Mr. D.Prasanth and Maheshwari, Door No.99, Plot No.99, 19th stree
219 Thiru Raju Gupta, (GPA holder for Tvl.Manohar Gopal and others) N
220 Tvl.S.Sivasubramaniam & S.Gnanam GPA for 1.Tmt.Senthamil Selvi
221 M/s.Akshaya Private Limited, Rep. by its Authorized Signatory Thir
222 M/s. Shri Rathna Akshaya Estates Pvt. Ltd., & Saravana Selvarathnam
223 Tmt.C.Nagalakshmi (Owner) & GPA for Thiru.C.Sriram, No.5, Ethiraj
224 Thiru. R.Dinakaran No.207, Ramakrishna Avenue, Medavakkam Mai
225 M/s. Emerald Haven Realty Developer (Paraniputhur) Pvt. Ltd Rep.
226 M/s. India Builders Chennai Ltd., Rep. by Thiru. J. Uttan Kumar G
227 Thiru.V.Saravanavijayan, Plot No.38, AGS Colony, 3rd Main Road, K
228 Thiru. Hariman Vungal No.13, Crescent Park Street T. Nagar, Chenn
229 Thiru.N.Vijaya kumar, GPA for Tvl.R.Hari narayanan and R.Sudhars
230 Tmt.S.Jayageetha & Thiru.S.Devananth, No.W-740, 1st Floor, 4th A
231 M/s.India Builders (Chennai) Ltd., Rep. by its Chairman, Thiru.J.U
232 M/s. SNP Infrastructures LLP, Rep. by M/s.Embassy Property Develo
233 Thiru. Surendera Kumar Galada No.42, Venkatnarayana Road T. Nag
234 M/s.Sri Suprabhatham Builders, Represented by Thiru.R.Ravi chandr
235 Tvl. S.Boothalingam and S.Muthiah Raju, Old No.20, Muthupandia
236 M/s. DAC Promoters, Represented by its Chief Executive Officer, T
237 Thiru.P.Kruthivas, Director of M/s. Pushkar Properties Pvt. Ltd. G
238 M/s.Rampon Infratech Pvt. Ltd., Represented by its M.D.Thiru.R.M
239 1. Tvl. Annapoorni Ramani & K.V.Ramani No.2, Sarangapani Street,
240 Mr.Abhishek R.Challani, No.3, Kalathiappa Street, Opp. To St.Andre
241 M/s. KCEE Properties Pvt. Ltd., Rep. by L. Chandrasekaran No.17, 3
242 Tmt.Bindu Mohan, Plot No.5116, 7th Street, Ram Nagar North, Puz
243 Thiru.B.Satyanarayanan Mehta & 3 others, Plot No.1, Door No.AB,
244 1. Tmt.Kantimathi Narayanan, 2. Tmt. Lalitha Ragupathi, 3. Tmt. A
245 Tamil Nadu Housing Board, Represented by Executive Engineer & Adm
246 M/s. Xerago E Biz Services Pvt. Ltd., Plot No.80 & 93, Developed Pl
247 Tamil Nadu Housing Board, Represented by Executive Engineer, Fore
248 M/s. Sai Homes, Represented by its partners 1. Thiru.A.Loganathan
249 M/s. S.R.R. Brick Works Rep. by Thiru. R.S. Munirathinam & others
250 Thiru. K. Sreenivasa Rao (GPA) Old Door No.65C, New Door No.38C
251 M/s. Etica Developers Private Limited, Represented by its Director
252 Thiru. A.T. Ansari GPA for K.G. Lakshmi & 6 others No.18/37, Maha
253 Thiru.S.Aswin, No.560-562, 7th Floor –E, Century Plaza, Anna Salai
254 M/s. India Builders (Chennai) Ltd, Rep by its Chairman, Mr.J.Uttam
255 Thiru. C. Mahendran & 4 others Old Door No.29, New No.24 West
256 Thiru. P. Elango No.7/23, North Leith Castle Road Santhome, Chenn
257 M/s. ARC Developer Rep. by M.D. Mohammed Hameed GPA of M/s. El
258 M/s.Nest Zone India Pvt. Ltd., Represented by Thiru.M.Shanker Ga
259 Thiru.Prashanth Palepu & Tmt.Roshni Lakshmi Raju, No.16/1, 25th Cr
260 1.M/s.Sagar Grandhi Exports Private Limited Represented by Grandh
261 M/s. V. Narayana Chetty No.1/18, 1st Floor, Raghuvamsh Apartmen
262 M/s. Sreshta Sumanth Builders Pvt.Ltd., Rep. by its Partner Thiru
263 Tmt. Usha Varadharajan No.9/12, Saradambal Street T. Nagar, Chen
264 M/s. S.P. Homes Pvt. Ltd & M/s. Saagar Eco Project Pvt. Ltd., No.3,
265 Thiru.G.Paari and 2 others, Door No.17/35, 2nd Main Road, Gandhi
266 M/s. India Builders (Chennai) Limited, Represented by its Director
267 M/s.Futura Tech Park Private Limited, Door No.334, Rajiv Gandhi Sa
268 M/s. Rajiv Krishna Foundation Managing Trustee A.R. Rajiv Krishna
269 M/s.RMZ Info Tech Private Limited Thiru.S.Balasubramaniam Adithya
270 M/s.Casagrande Axiom Pvt. Ltd., Represented by Thiru.Sumanth Kris
271 M/s. Sumanth & Co No. 8/57, Luz Avenue, Mylapore, Chennai-600
272 Thiru. R. Madhavan & Tmt. Radha No.2, Ammani Ammal Street R.A.
273 M/s. Jaisakthi Educational Trust No.23, Railway Colony II Street
274 Thiru. W.R. Ravi (GPA) Door No.D46, Sri Bhuvaneswari Flats 4th St
275 M/s.Tropical Realty Chennai Pvt.Ltd., Rep by Director N.Sivakumar,
276 Tmt. B. Anitha & 2 others No.1/214, Venkateswara Lane Choolaime
277 Mr. Arokiasamy & Mr.Maneemala Baskar Reddy, Plot No.6 & 9, Ku
278 M/s. Steps Stone Promoters Pvt. Ltd., Represented by its Directo
279 M/s. Gateway Office Parks Pvt. Ltd. (Formerly Shriram Properties &
280 Thiru.K.Chenniappan & Thiru.K.Kuppuswamy, No.L-95, Anna Nagar
281 The Registrar, IIT (Madras), Sardar Patel Road, Guindy, Chennai - 6
282 M/s.The Nest Represented by Thiru.M.Shanker Ganesh Ottiyambakk
283 The Executive Engineer Tamil Nadu Housing Board SAF Games Vill
284 M/s Jatf Hostel (Chennai) Trust Rep. by Trustee Shri Suresh Mutha
285 M/s. Raunaq Foundations Rep. by Thiru.Raunag Rungta GPA for Thiru
286 M/s.AIEMA Technology Centre, South Phase, SIDCO Industrial Esta
287 Mrs.Bhageerathy Ramamoorthy, Managing Trustee of Anandam Old A
288 The Chief Engineer, Tamil Nadu Slum Clearance Board, (TNSCB) No.5,
289 Thiru.V.R. Sharath Kumar & Thiru. V.R. Sanjay Kumar Plot No.96,
290 Tvl. Dr.N. Krishnan, C. Kannammal & C. Unnamalai No.10, G-1, Joh
291 M/s. Medical Research Foundation Rep. by Honorary Secretary Thi
292 M/s. Medical Research Foundation Rep. by Thiru G. Ramachandran
293 Thiru.V.Umakanthan, New No X – 41, Old No.X - 8, 3rd Main Road,
294 Tmt.Ritu Jhaver, No.18/19, Bawa Road, Alwarpet, Chennai-600 018
295 M/s.DRA Aadithya South City Projects Pvt. Ltd., Represented by it
296 M/s. India Builders (Chennai) Ltd, Rep by its Chairman, Mr.J.Uttam
297 M/s. Yashrey & Just Rental Holding LLP, Plot No.50/1, Basement C
298 M/s. Baashyam Constructions Pvt. Ltd., No.87, G.N. Chetty Road T.
299 Thiru.S.Kannan GPA for Thiru.R.Jaya prakash, No.135, 5th Main Roa
300 M/s. Etica Developers Pvt. Ltd., Rep. by Thiru. Diliban No.24, EX
301 Thiru.N.Kumar, Door No.1, Kasturi Estate 2nd Street, George Aven
302 M/s.Anirudh Foundation Pvt. Ltd., Old No.58K, New No.6K, Nutech V
303 Thiru.W.Nandakumar, No.22/12, Coats Road, T.Nagar, Chennai – 6
304 Thiru. J.Raja Ananthan, GPA of Thiru. K.Subramanian & others, Ol
305 Thiru. A.Jenix Dev Singh, No.21/3, Arunachalam Road, Kotturpuram
306 Thiru.K.Rajakulasekaran & Others, Plot No.E-113, 16th Cross Street
307 M/s.Kaveri Textiles & Readymades., Rep. by its Partners, Thiru.M
308 Tmt.K.Pushpalatha & N.Saranya Door No.14, New No.27, Mandaveli
309 M/s. Luxe Built Homes Pvt.Ltd., Represented by its Directors Tvl.
310 M/s. Rajini Foundations Pvt, ltd, GPA holder for Thiru. V.Sridhar an
311 Thiru.K.S.Veera raghavan, No.4-C, Sorrento Apartments, N.54, Bes
312 Thiru.M.S.Sampath, Door No.188, 9th Street, ‘F’ Block, Anna Nagar
313 TThe EE & ADO, TNHB, Anna Nagar Division, Thirumangalam, Chenn
314 1.M/s.James Rickshaw Industries, Represented by its Partner Tmt.A.
315 Thiru. T. Sathya Narayanan and Tmt. S. Shanthala Old Door No.10,
316 M/s. Bharath Promoters No.32, KB Dasan Salai SIET College Road A
317 Thiru.S.Srinivasan No.25, Shenoy Road, Nungambakkam, Chennai –
318 M/s.DRA Aadithya Chennai Homes LLP represented by its Designated
319 M/s. Opera Housing Pvt. Ltd., Rep. by its MD.Thiru.Rikin Dilip Ga
320 Thiru.R.Kannan, No.99, Market Street, Perambur, Chennai-600011.
321 Thiru.S.Sreenivasa Rao & Others, No.7,Vidyodaya 1st Main Road, T.
322 M/s. KLP Projects Pvt. Ltd., Rep by its Director Thiru Manish Kumar
323 M/s.Dawning Developers LLP, GPA of Thiru.Ahmed Buhari & 7 others
324 Thiru.K.Ruthuparna & Thiru. R.Vishnu Karthick No.P-22, New No.43,
325 M/s Pranav Foundations, Rep by its Managing Partner Thiru A.B.Sa
326 M/s. Shanmuga Arts and Science Technology & Research Academy Re
327 M/s.Sreshta Sumanth Builders Pvt. Ltd., represented by its partn
328 M/s Kimberley Builders, Rep. by its Managing Partner, Mr.V.N.De
329 Thiru.Rajkumar Chandok, GPA for Tmt.Vijayalakshmi Mani, No.B-73
330 M/s.Maaruthi Foundations Pvt. Ltd., represented by its Director Th
331 M/s.Medipride Private Limited Represented by its Director Thiru.
332 Thiru. R. Raghavan GPA M/s. Green Choice Construction Company Pv
333 Thiru.H.E.Abdul Azeez, for self & authorized Signatory of Hajee Ibr
334 Thiru K.Srinivasa Rao (GPA) Director of Srichakra Builders and D
335 Thiru.K.Dhanush, Plot No.11, New Door No.76, Old Door No.63, Po
336 M/s Navtoj Structurals, Rep by Narendar Pal Singh (GPA), No.3362,
337 M/s.RSD Foundations, New No.14-A, Old No.9A, West Club Road, S
338 M/s. Shanbagam Estate Pvt. Ltd. Rep. by its authorised signatory T
339 Thiru. B.Nagi Reddy GPA for, 1. Tmt.Sundarabai Stanley, 2. Thiru.E
340 M/s VGN Property Developers Pvt. Ltd No.153, Wallace Garden, 2
341 Thiru.C.Kasturi Raj, GPA for M/s.Vijayaraghavan & 4 othersDoor No
342 Thiru.L.Sethu Raja, GPA for R.Venkatesh, Plot No.146, 2nd Cross S
343 Thiru.T.Shanmugam, Durga Nivas, No.2, 5th Lane Indira Nagar, Adya
344 M/s.Bharat Heavy Electrical Limited, No.690, Periyar EVR Building,
345 M/s. Sreshta Sumanth Builders Pvt.Ltd., Represented by Thiru.T.
346 M/s.G.P.Homes Pvt. Ltd. Rep by Thiru.Elumalai, No. W-740, 1st Fl
347 Thiru.V.K.S.Subash, Plot No.1620, ‘J’ Block, 6th Street, 16th Main
348 M/s.Medipride Private Limited Represented by its Director Thiru.D
349 Tvl.Dr.P.Arun & Dr.B.Sivaranjani, Plot No.3, 7th Street, Nanganallur
350 M/s.Lancor Holdings Ltd., (GPOA), Represented by its Chief Executi
351 Thiru.N.N.Shankar & 6 others, Door No.D/2, 3rd floor, Alakananda
352 M/s. Prece Grip Pvt., Ltd., Represented by its authorized signatory
353 M/s.DAC Promoters, Represented by its Chief Executive Officer Tmt
354 M/s.Baker Infrastructure Pvt. Ltd. Rep by its M.D. Thiru.R.Suresh
355 M/s.Baashyaam Construction Pvt.Ltd.,(GPA) No.87, G.N.Chetty Road
356 M/s.Sree Guru Foundations Private Limited Represented by its Mana
357 M/s.Marlecha Webtech Solutions LLP, No.33, Flowers Road, Kilpauk,
358 M/s.M.P.Developers, Rep.by Partner Thiru.Pammasani Sarath Plot
359 Tmt.Elizabeth Rani & others No.1A, Chari Street, North Usman Road
360 B.Kousalya, Flat 3F, Florentina Apartments, New No.43, Old No.21,
361 M/s.Leah Moses and 2 others, New Door No.4, Old Door No.20 L,
362 The ARR Charitable Trust, Rep. by its Trustee Thiru.B.Ramachandra
363 M/s.Life Style Housing & Infrastructure, (GPA Holder for M/s.Binny
364 M/s. India Builders (Chennai) Ltd, Rep by its Chairman, Mr.J.Uttam
365 M/s. India Builders (Chennai) Ltd, Rep by its Chairman, Mr.J.Uttam
366 Thiru.T.Gokulakrishnan GPA for Tvl. 1.M.V.Rangaswamy and 2. M.V.
367 M/s.Sreshta Sumanth Builders Pvt. Ltd., Represented by Tmt.Lavan
368 Tmt.Varalakshmi Kumar No.24, Nehru Street Kanagam, TTTI Tarama
369 TThe EE & ADO, TNHB, Anna Nagar Division, 1st Floor, TNHB Compl
370 Thiru.R.Kannan Adityan, No.1, Gandhi Nagar, 4th Main Road, Adyar
371 M/s.Vigneswara Homes (P) Ltd., Represented by its MD Thiru.N.R.K
372 Thiru. B.Ramamoorthy & B.Ravindran, Flat No.1, Mahalakshmi Apar
373 M/s.Gupta & Company Represented by Thiru.Asish Gupta Door No.26
374 M/s.Hansa Estates Pvt. Ltd, Door No.19, Plot No.19, Wheat craft
375 1.Thiru.T.G.Velu mani & 2.Thiru.T.G.Sekar, Door No.3/12, Meigai Vi
376 Thiru.V.Vimal Viswanathan, No.60/5, Bajanaikoil Street, Choolaime
377 Thiru.C.Arunagiri, Door No.29/16, East Road, Near Nandi Statue,
378 Thiru.K.Sreenivasa Rao, GPA to Thiru.R.Ramachndran Old No.9, N
379 Tvl.S.Mahesh, S.Velkannan & S.Ramachandran, S-14, Phase – I, Jai
380 M/s. Chennai Affordable Venture LLP, Door No.55, Plot No.74, 1st a
381 Tvl.S.Sambathu and G.Padmaja, Door No.18/35, Plot No.35, School
382 Thiru.S.Shivasubramanian GPA For Tmt.S.MP.AR.Theivanai Achi, Do
383 Thiru.N.Rajendran (GPA), Door No.95, 1st Street, 1st Sector, K.K.Na
384 M/s VGN Property Developers Pvt. Ltd No.153, Wallace Garden, 2
385 M/s.Geeyam Constructions, Rep. by its Partner Thiru.C.Kirupa Sha
386 Thiru.R.V.Sundar & 2 others GPA for Thiru.Kandula Rajamohan Redd
387 M/s. Guru Raghavendra Foundations Pvt.Ltd. represented by Thiru
388 Thiru. R.Govindarajan GPA Holder for 1.M/s. Bombay Ammonia (Madr
389 Tmt.B.Loganayaki, Old Door No.16A, New Door No.20, Rajarathinam
390 Tamil Nadu Housing Board, Represented by The Executive Engineer
391 M/s. Prestige Estates Projects Ltd, Prestige Polygeon, Top floor #
392 Thiru.M.Ponnuswami, No.23/25, ‘AA’ Block, 3rd Street, Anna Nagar
393 Tmt.T.Santha, No.1/1, Bhooshanom Street, Ayanavaram, Chennai-2
394 M/s. Emerald Haven Realty Developer (Paraniputhur) Pvt. Ltd Rep.
395 Thiru.G.Ravikumar & 7 Others Old No.89, New No.29, Ayyappa Apa
396 Thiru.V.K.C.Jayamohan, No.81, Kutchery Road, Mylapore, Chennai –
397 M/s. Ganesan Builders Limited Represented by its Director Thiru.R
398 M/s.Pushkar Properties Pvt. Ltd. Rep. by its Director, Mr.P.Kruthiv
399 Thiru.S.Parthasarathy, Old No.2B, New No,7, West Road, West CIT
400 M/s.ZEBRONICS India Private Limited represented by its Director
401 Thiru.L.Ganesh, M/s.Suguvanam Engineers, No.3, First Floor, Secon
402 M/s. Pragau Properties Pvt.Ltd. Represented by its Director Thiru
403 Tmt.Kavitha, W/o.S.Selvam Plot No.129, 200 Feet (60 m) Radial Road,
404 Tmt.P.Lakshmi Devi, Plot No.1637, 13th Main Road, Anna Nagar, Ch
405 M.Srinivasulu Old No.3, New No.7, Halls Road, Kilpauk, Chennai –
406 M/s. Brigade Enterprises Ltd., Rep by its authorized signatory Thir
Site Address
Plot No.A-16, SIDCO Salai, SIDCO Industrial Estate, MMDA Colony,
Plot No.30, Industrial Estate Main Road, Industrial Estate Perungud
S.No.50/2 & 54/2 of Kulapakkam village, within the limits of Katta
Door No.36, Sardar Patel Road, Guindy,Chennai-600 032 in T.s.No.54
Plot No.25, 2nd River View Street, Karapakkam, Chennai-97 compris
Plot No.2, in approved sub-division Manapakkam Main Road, Manapa
Plot No.1, in approved sub-division Manapakkam Main Road, Manapa
Plot No.28, Kauveri Street, Kuberan Nagar Extension, Pallikaranai, C
New Door No.8, Old Door No.16, Sri Ram Nagar, South Street, Alwarp
S. Nos.451, 453, 455, 457/1, 457/2A, 457/3A, 457/3B, 457/3C, 457
Abutting G.N.T. Road in T.S. No.12, Old S.No.849/2, Block No.49, W
Plot No.565C, Door No.92, ‘L’ Block, 20th Street, Anna Nagar East,
Plot No.3994, New Door No.12, ‘S’ Block, 16th Street, Anna Nagar, C
Survey No.602/3 of Sholinganallur Village, Sholinganallur - Medava
IRR and ICC Composit Corridor Road, Vanuvampet, Adambakkam, Chenn
Old Door No.421, 422, 423 & 424, New Door No.50 & 51, Pantheon Ro
D.No.5/142, Rajiv Gandhi Salai (Old Mahabalipuram Road) Perungudi
Premises abutting Sithalapakkam-Karanai-Thalambur Road, Arasanka
Old Door No.3 & 4, New Door No. 19 & 20, Thandava Murthy Street, R
Plot No.168, Old Door No.16, New Door No.33, 6th Cross Street, Tr
S.No.78/2B & 79 of Adayalampattu village, Chennai within the limit
New No.5, Old No.81, Plot No.102 (Part), 2nd Main Road and 18th St
Shed No.B-16 & B-17, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai
Door No.133, 134 & 135 Velachery Road, Chennai Comprised in T.S.No
No.110, Mount Poonamallee Road, Porur, Chennai – 600 116, compris
Plot No.B-82, Door No.63/59, 7th Avenue, Ashok Nagar, Chennai – 6
Door No.90/181, Mount Poonamallee High Road, Porur, Chennai – 600
Plot No.8/120, Kavimani Salai, HIG Type, Mogappair West, Chennai-
Door No.72, (Old No.89), Plot No.B-4, K. K. Lane, 3rd Street, Amba
Plot No.1&2, Nanganallur 100 Feet Road and Lakshmi Nagar 3rd Stag
Plot No194, 195, 196, 197 & 198 in CMDA approved Layout PPD/L.O.
Door No.10, Jeevarathinam Nagar 1st Steet, Adyar, Chennai – 20. com
Plot No.20, Door No.2/17, RBI Colony 2nd Street, Thiruvanmiyur, Ch
Plot No.C, Kuberan Nagar Main Road, Madipakkam, Chennai-91 compr
Survey No. 9/4B, 10/1A, 1B1, 1B2, 2A, 2B1, 2B2A, 3A1, 3A2A, 3B1,
Door No.3, Ponniamman Koil Street, Vanagaram, Chennai comprised
Plot No.2 in layout approved No. PPD/LO.No.115/2019 in S.No.345/
Plot No.16, Door No.12/39, 5th Main Road, Kasthuribai Nagar, Adyar,
S.No.163/6A1, 163/6A2, 163/7A & 163/7B of Chitlapakkam Village,
Plot No.15-B, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai in S.No.
Plot No.54 & 55, New India Colony 3rd Street, Madipakkam, Chennai
Plot No.8, New Door No.7/4, old Door No.5, 29th Street, Nanganallu
Survey No.367/1A2, 1B, 1C & 1D of Perungalathur village, GST Roa
Door No.158/21, MMRD Road, Zamin Pallavaram in Old S.No.255/1B &
Old Door No.G-1, New Door No.G-3, ‘L’ – Block, 18th Street, Anna N
Door No. 2/12, First Trust Link Street, Mandaveli, Chennai – 60 028
Old Door No.30, New Door No.16, Conron Smith Road, Gopalapuram,
Plot No.16, Door No.14/16, 1st Street, Jeevarathinam Nagar, Adyar,C
Plot No.1554, 17th Main Road, “J” Block, Anna Nagar, Chennai Old
Plot No.22 & 23, Door No.22 & 23, Officers Colony 1st Street, 1st
Plot No.21, Manimegalai Street, Ullagaram, Chennai-600 091 compris
Old Door No.10, New Door No.29, Arcot Road (NSK Salai), Saligramam
Plot No.B-154, Door No.40, 10th Avenue / 7th Avenue, Ashok Nagar,
Door No.18/8, Waddels Road comprised in R.S.No.3129/7 & 3129/12,
Plot Nos.1, 2, 3, 6 & 7, Old Door No.139 & 139/2, New Door No.119
Plot No.1067, Ram Nagar South, 10th Main Road, Madipakkam, Chenn
Pammal Main road, in Old S.No. 77/6A1A (part) New S.No. 77/6A1A2
Plot No.A, Zacharia Colony Main Road, Kodambakkam, Chennai compris
T.S. No. 7/80,7/81,8/14, Block No. 16 of Adyar Village, River View
Plot No.24 & 36, Arch Way Street, ‘VGN Cosmopolis’ Ambattur, Chen
Old Door No.9/1, New Door No.25, Chakkarapani Street Extn., West
TNHB Block No.H-17, 8th Avenue, 46th Street, Manthopu Colony, As
Plot No.1, Balaji Nagar, ‘Ashok Nandavanam’ Phase II, Noombal, Che
Old S.No.168/1, 168/2, 169/1, 169/2, T.S. No.5/6, 5/20 Block No.5 o
Plot A4, Chandrasekaran Avenue 1st Main Road, Okkiyamthuraipakka
Plot No.B, Kuberan Nagar Main Road, Madipakkam, Chennai-91 compr
Plot No.341, Door No.101, Lakshmanaswami Salai, K.K. Nagar, Chenn
Plot No.264-A of Korattur neighborhood scheme, Korattur Periyar Na
Plot No.B-11, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai in S.No
Plot No.5 & 6, Vanagaram, Chennai comprised in S.No.136/4B2A Par
Plot No.80 (Part), State bank Colony 3rd Street, Bhaskar Colony, V
Plot No.33 & 34, Pattu Roja Street & Chembaruthi Street, Kaaviya
Plot No.1 in Approved Sub divisional PPD / LO No.16/2019 comprised
Door No.9, Harleys Road, Kilpauk, Chennai-10 comprised in R.S.No.3
Plot No.995C, 2nd Avenue, Anna Nagar West, Chennai – 40 comprisin
Old Door No. 40, New Door No.32, East Abiramapuram 3rd Street, Ch
S.No.367/1A2, 1B, 1C & 1D of Perungalathur village, GST Road, with
Plot No. B – 257, Door No.2/9, 52nd Street, Ashok Nagar, Chennai
S.No.522, 525 and 526 of Perumbakkam Village, within the Limits
Velachery Main Road in S.No.195, 196, 199 to 208, 213, 215 to 219
plot No. 8 & 9, Old door No.4/984, New Door No.8 & 9, Gandhi Stre
Plot No.B-139, Old Door No.19, New Door No.12, 10th avenue, Ashok
Plot No.W-414, New No.8, 4th Street, ‘C’ Sector, Anna Nagar West Ex
Plot No.3468, Old Door No. 38, New Door No. 1, ‘H’ Block, 2nd Stree
Plot No. 22, New Door No. 9, Old door 5, 1st Main Road, Karpagam
Kuppusamy Street, Karapakkam, Chennai comprised inS.No.43/5A3, 5A4
Old Door No.50, New Door No.6, Plot No.12, Thiruvenkadam street,
Plot No.86 of ‘C’ Type, East Park Road, Shenoy Nagar, Chennai-30 co
S. Nos.192/1A & 193/1E, Nolambur Village, Chennai – 600 095 withi
Block No.185, Kurinji Colony, 4th Avenue / 13th Main Road, Anna N
Old Door No.1, New Door No.8, Nowroji Road, Chetpet, Chennai-31 co
Ambattur Estate, Thirumangalam Road, Mogappair, Chennai-37 compris
Plot No.14, Old Door No.23, New Door No.2, Raja Veedhi, Choolaimed
Old S.Nos. 463, 465/1, 480/2, 481, 486, 487, 488, 489/1, 2, 2B1, 490
Old Door No.3, New Door No.5, Sriman Srinivasa Iyengar Road, Alwa
Plot No.99 Mettukuppam Main Road/ Bharathi street, Maduravoyal,
Plot No.11, Old Door No.26, New Door No.3, Jayalakshmi Colony, She
Old Door No.55, New Door No.3, 8th Street, ‘Y’ Block, Anna Nagar,
Plot No: 13, Door No.55, Luz Avenue, 1st street, Mylapore, Chennai
Plot No.9, 10 & 11, Mugalivakkam Main Road and Karpagambal Nagar
Door No.6/11, Plot No.15, Agasthiyar Nagar, Halls Road, Kilpauk, Ch
Old S.No.439/2A part, 239/1B1, 1B2, 1C1, 1C2, 2A1, 2A2, 2B1 & 2B
Block No.21, P.T. Rajan Road, K.K. Nagar, Chennai comprised in S. N
Plot No.149, Defence Officer Colony, 12th Cross Street, Nandamba
Plot No.55, 2nd Cross Street, Srinivasa Nagar, Kolathur, Chennai-99
Plot No.50-A, Old Door No.6, New Door No.58, Pulla Avenue, Shenoy
Plot No.16B, Old Door 5, New Door No.11, Lakshmi Street, Alagappa
Abutting Stephenson Road, New Farrens Road and Cooks Road R. S.
Plot No.798-F, Door No.16, Jeevanandam Salai, K.K. Nagar, Chennai
Plot No.22, East Coast Road, Raja Nagar, Neelangarai, Chennai – 60
Plot No. 5, Door No. 12/33, Pasumpon Muthuramalingam Road (Chami
Maxworth Nagar, Phase – II, 5th Cross Street, Kolapakkam, Chennai
Plot No. 79 & 80, New Door No. 20 & 22, Old Door No. 38 & 39, 3rd E
Plot No.6, Ramappa Nagar 2nd Cross Street, Perungudi, Chennai-600
at adjacent to EB Substation “A” Road, Koyambedu Chennai comprise
East Coast Road, Rajaji Nagar Main Road and Rajaji Nagar 1st Stre
Tharapakkam Main road, Gerugambakkam, Chennai – 122, comprised
12A & 12B (New Plot No.61), Mandaveli Street, Mandavelipakkam, Ch
Velachery Main Road in S.No.195,196,199 to 208,213,215 to 219 of I
Plot No.3 & 4, Bharathiyar Street / Archana Street, Ayanambakkam,
Plot No.7, 8, 9 & 10 in CMDA approved layout P.P.D/L.O No.128/
Old Door No.167, New Door No.14, Greams Lane (Off Greams Road),
Sivan Koil Road, Thiruverkadu, comprised in S.No.99, 101/1, 2, 102/
New Door.1, Old Door No.47-C, C.P. Ramaswamy Road, Alwarpet, Che
Plot No. 43, New Door No. 10, Old door No. 4, Isaiagam Street, Ra
Plot No. A&B, Thenmozhi Nagar, 1st cross Street, Keelkattalai, Che
Plot No.55, TTK Nagar 2nd Main Road, TTK Nagar, Peerkankaranai, C
Plot No.3477, Arignar Anna Nagar, ‘H’ Block, Door No.H-29, New No.H
Plot No. 134, 135 & 136, 5th Cross Street, Lakshmi Nagar, Porur, C
Old Door No.21, New Door No.32, Velu Street, West Mambalam, Chen
Old Door No.7, New Door No.10, Damodaran Mudali Street, Chetpet,
Plot No.2 part, 3 and 4, Vanasakthi Nagar, Extension, Korattur, Che
Plot No.1 to 8, Approved Layout Road, Thirumudivakkam, Chennai c
Plot No.31, Door No.27, 1st Main Road, Karpagam Gardens, Adayar, C
Block No.H-15, Door No.13, South Avenue and 25th East Street, Kama
T.S.No.8/1, 9/2, 9/3, 9/5, 9/6, 9/7, 9/8 and 9/10, Block No.83, War
TNHB Block no.78 (Dwaraka flats), Thirumangalam, Ambattur Estate r
TNHB Block No.185, 186 & 187, Industrial Estate Road, (Thirumangal
T.S. No.62, 64, 66 to 99, 159/2, 160 to 170, 178 and 185 to 194,
Door No.9/2, Krishnasamy Avenue, Mylapore, Chennai-600 004 compri
New Door No.3, Old Door No.7 to 12, Block –C , 4th Avenue, Besant
Anna Salai, Nandanam, Chennai bearing T.S.No.3871/1 (Part) & 3871/
Nukkampayalam Road and TNSCB Road, Perumbakkam, Chennai in S.No
S.No.208/1A & 209/2 of Perumbakkam Village, within the Limits o
Plot No.124, Old door No.11, New Door No.16, 2nd Link street, CIT
Old Door No.18, New Door No.43, Jublee Road, West Mambalam, Chen
Door No.6/13, Kesavaperumalpuram, North Avenue, Greenways Road,
Plot No.70/B, Old Door 26, New Door No.8, Temple Street, Alagappa
Plot No.8A, Old Door No.89, New Door. No.18, Redhills Road, Ambatt
Plot No.142, New Door No.50, Old Door No.114, Chamiers Road, Nan
Door No.322/172, 324/173, 4th Avenue, Anna Nagar, Chennai – 600 0
Plot No.MIG B-118, Old Door No.7, New Door No.17, Shastri Nagar 12
Old Door No.9 Part, New Door No.19 Part, Singaram Street, T. Nagar
Plot No.A19 & A20, CIPET Road, SIDCO Thiru.Vi.Ka.Industrial Estate,
Door No.748 to 755, Anna Salai, Chennai – 2, R.S. No.27/6, Block N
Railway Over Bridge Road, Kilambakkam, Chennai Comprised in Old
Village Street, Thiruvottiyur chennai-19 in Old S.No.317(part), 318(
Plot No.C, Old Door No.2, New Door No.3, Wallace Garden 3rd Stree
Kundrathur – Mangadu Road, Chennai comprised in S.No.90B/3, 90B/4
Plot No.C-183/A & C-183/B, 23rd Street, Nanganallur Co-Operative B
Plot No.53 & 54, VGP Shanthi Nagar Part-II, Paari Street, Pallikara
Old Door No.2, New Door No.3, Kamala Street, Narathapuri, Nehru
S.No.148/4, 148/5, 150/1A, 150/1B, 150/2A, 151/1, 152/5, 152/6A
Plot No.228, Gangai Amman Koil Street, Jaferkhanpet, Chennai comp
Plot No.114, Defence Officers Colony 2nd Avenue, Nandambakkam,
Plot No.12, 13&14, New Door No. 13, 100&10, Old Door No. 29, 30&3
Plot No.137, VGP Selva Nagar Extension 5th Street, Velachery, Che
Plot No.477, Old Door No.66, New Door No.14, 28th Cross street, Ind
S.Nos.55, 57, 58/1, 2, 3 of Manapakkam Village and S.Nos.55/6A1A, 56
Plot No.4, Bagirathi Ammal Street, R.A.Puram, Mylapore, Chennai co
Door No.9, 27th Street, 7th Avenue, Chennai – 600 083 comprised in
Door No.99/7/2, 100 feet Bye-Pass Road, Velachery, Chennai – 42, C
Nehru Nagar Main Road, Sholinganallur, Chennai comprised in S.No.4
S.Nos.519, 520/1, 2, 521/1, 2, 537, 539/1, 2A, 540, 541, 542 of Ma
Plot No. Commercial site No.14, TNHB Sholinganallur Neighbourhood
Old Door No.130, New door No.40, Sterling Road, Nungambakkam, C
Plot No.A (part), Senganiamman Koil Street, Maduvangarai, Chennai-
Plot No.C-1 & C-56, Thiru.Vi.Ka Industrial Estate, Guindy, Chennai i
.No.312/1, 312/2B1A & 312/2B2A1A1 of Nedukundram Village within
Door No.76 & 77, Avvai shanmugam Salai, Royapettah, Chennai-600 0
Plot No. 3&4, Annai Nagar, Vetri Vinayagar koil Street, Selaiyur, C
PPlot No.RA-163, New Door No.41, Old Door No.20, 3rd Main Road,
Old Door No.201 & 202, New Door No.376 A & B, Avvai Shanmugam Sa
Plot No.859, New Door No.91, J Blok, 13th Main road, Anna Nagar, C
Plot No.14, New Door No.64/1 & 64/2, Old Door No.55/1 & 55/2, Kas
Plot No.9, Old Door No.6, New Door No.42, Ramakrishna Street, T. N
Plot No.213W, New Door No.8, Old Door No.12, 25th Cross Street, In
S. No.1/2A1, 2A2A, 2A2B, 2A2C of Chetiyaragaram Village, Chennai
Door No.21, MES Road and Sharma Street, East Tambaram, Chennai –
Plot No.564, Old Door No.94, New door No.6, 18th street, L-Block,
Block No.138 to 148 Geethanjali Colony, Jawaharlal Nehru Salai, An
Door No.11, Bashyam Basheer Ahmed Road and Door No.9 Murray’s Ga
Ravi Main Road, Medavakkam, Chennai in S.Nos.144/1A1B, 153/1A,
Plot No.48, Gnanamurthy Main Road, Gnanamurthy Nagar, Pattarava
SIDCO Road, Industrial Estate in T.S.No.20/2, 21/2 and 22/2, Block
S. Nos.376/2, 3 and 377/1 of Palanjur Village within the limits of
Plot No.6 & 7, Door No.14 & 15, Solaiyappan Street, Puzhuthivakkam
S.No.244/1A2B2 and 244/1B2 of Vichoor village, Vichoor Main Road
Jawaharlal Nehru Salai, Kodambakkam, Chennai comprised in T.S. No
Plot No.102, East Coast Road, Injambakkam, Chennai comprised in S
New Door No.18, Old Door No.53, Beemanna Garden Street, Abiramap
Plot No.3 & 4 (part) (plot No. A & B) (cul-de-sac plot), Door No.2
Plot No.402, Door No.1, Ramasamy Salai / 5th Sector, 21st Street,
Door No.42/87, Pillaiyar Kovil Street, Velachery, Chennai in old S.No
Plot No.10, Susila Nagar, Santhoshapuram, Vengaivasal, Chennai-60
Plot No.31, Classic Retreat comprising in S.No.583/1R & 585/1A4 of
Plot No.32, 33, 34, 35, 42, 43, 44 & 45 in CMDA approved Layout P
Plot No.1365, Door No.10, I Blok, 7th street, Vallalar Kudiyiruppu,
Raja Thottam Main Road, Near TAN Avenue, Rajakilpakkam comprise
Plot No.3866, Door No.R-22/85, R-Block, 4th Main Road, Anna Nagar,
Sendhurpuram Extension, Kattupakkam, Chennai comprised in S. No
Plot No.7 & 8, Vanagaram, Chennai comprised in S.No.136/5A2A (Par
B-19, Thiru.Vi.Ka.Industrial Estate, Guindy, Chennai-600 032 Compri
Vadakkupattu Main Road, Medavakkam, Chennai-600 100 comprised
Old Door No.A1-37, New Door No.199/1, 104-A to F 4th Avenue, Shant
New Door No.1 & 2, Old Door No.151, Santhome High Road, R.A.Pura
New Door No.191, Old Door No.162/2, Royapettah High Road, Mylapo
Commercial Plot No.II lies in approved layout PPD/L.O.No.34/2018,
Old S.No.202/3, 4,5,6,7,8,9A,9B,10,11,203/10B,206/3, 206/4, T.S.N
Nukampalayam Road, Perumbakkam, Chennai – 600 119 in S.Nos.233
Rajiv Gandhi Salai (OMR) in S.No.57/2C2, 57/3A1, 57/3A2, 57/3B1,
MMRD Road , Pallavaram, Chennai-44, comprised in Old S.No. 263/1,2
Medavakkam, Chennai comprising in S.No.95/4B, 96/1A1, 96/1A2B,
Radhakrishna Avenue Road, Nanmangalam, Chennai in S.No.207/1A
S. No.141/1A, 2A, 2b2, 2b3, 142/2, 147/1A, 1B, 2, 3 4, 5, 160, 162/
Block No.184, Kurinji Colony, 4th Avenue, Anna Nagar, Chennai comp
(Earlier CMDA Approved as Nursery School Plot in approved PPD/LO
Plot No.6, 7, Old Door No.73 & 74, New No.124 & 126, G.N. Chetty R
Plot No.507A and 507B, 6th Main Road and 5th Cross Street, Sadas
Yadhawal Street, Padi Village, Ambattur, Chennai-50 comprised in S
Plot No.3247, Door No.76, ‘AJ’ Block, 3rd Street, Anna Nagar, Chenn
200 Feet Radial Road, Pallavaram, Chennai-43 Comprised in T.S. No. 1/1
Plot No.9, Door No.42, Venkata Narayana Road, T. Nagar, Chennai co
Plot No.9 & 11 (part), Door No.6, 29th Street, Nanganallur, Chenna
Door No.185/82, Plot No.121, Secretariat Colony, 6th Street, Kellys
Plot No. 10, 11 & 12 in CMDA Approved Layout PPD/LO. No.41/1999
New Door No.9, Old Door No.5, Plot No.356-W, 2nd Cross Street, Ind
Plot No.5157, 9th Street, Ram Nagar North Extension, Madipakkam,
Plot No.81, Old Door No.12, New Door No.8, North Mada Street, Sri
Door No.4, Old No.16 (as per Doc.), Door No.4/16 (as per patta), D
Plot No.798C, Door No.6 & 8, Paneer Selvam Salai, K.K. Nagar, Chen
Plot No.178, Srinivasa Nagar, Madipakkam, Chennai comprised in S.
Door No.AI 130, ‘AI’ Block, 8th Main Road, Anna Nagar, T.S. No.242
Plot No.19, Door No.34, East Abiramapuram 3rd Street, Mylapore, C
LB Road and 1st Avenue, Shastri Nagar, Adyar, Chennai in T.S.No.3/1
Plot No.80 & 93, Developed Plots Estate, Perungudi in S.No.3/1C &
Plot No.441, 4th Trust Cross Street, Mandavelipakkam, Chennai 600
Plot No.42 (part), Old Door No.20, New Door No.2/29, 5th Main Ro
S. No.24/1, 24/3A1A, 24/3A1B, 24/9, 24/10 & 26/3 of Sundaracholav
Plot No.91, Old Door No.3, New Door No.24, Kumaran Colony Main Ro
Old Door No.20, New Door No.14, 4th Seaward Road, Valmiki Nagar,
Plot No.125, Door No.2, 40 Feet Scheme Road, Mahalingapuram, Nu
Thiruvalluvar Street (Kalaivanar NSK Street) Pallavaram, Chennai i
Plot No.W-570, Park Road, Anna Nagar West Extension, Chennai-101 c
Plot No.159, New Door No.24, Old Door No.29, West Street, West CI
Plot No.1/5, Old Door No.109, New Door No.190, Lake View Road, W
Jayalakshmipuram, 2nd Street, Nungambakkam, Chennai – 600 034 co
Ragavendra Road, Chitlapakkam, Chennai comprised in S.No.136/1A2
Plot No.6, 7, 8, 9, 10, 11, 12 & 13, Nehru Nagar 11th Street, Ruk
Plot No.163, 164 & 165, Classic Retreat, 4th Street, Sholinganallur
Old Door No.120, New Door No.10, General Patters Road, Chennai com
Plot No.8, Door No.39/17, LIC Colony 1st street, Thiruvanmiyur, Ch
Plot No.15, Old Door No.12, New Door No.9, Sarathambal Street, T. N
Alapakkam Main Road, Maduravoyal Village, Chennai – 95 comprised
Plot No.234, 20th East Street, Kamaraj Nagar, Thiruvanmiyur, Chenn
Door No.B-2/1 to 6, G.O.C.H. Colony, 13th Cross Street, 6th Cross S
Rajiv Gandhi Salai (OMR), Sholinganallur, Chennai-600 119 comprised
Chettiar Agaram Road, Noombal, Chennai comprised in Old S. No.77 (
No.143, North Veeranam Salai, Dr.M.G.R. Road, Perungudi, Chennai
S.Nos.153/1, 2, 171/1, 2A, 172/1B1, 1B2, 1C1, 1C2, 172/2A, 2B, 2C
Old Door No.46, New Door No.105, Eldams Road, Teynampet, Chennai
Plot No.13, Old Door No.4A & 5, Vivekanandapuram 1st Street, Wes
Plot No.13 & 14, Old Door No.20, New Door No.3, V.O.C. Street, Pra
Plot No.16, Old Door No.1, New Door No.3, Athireyapuram 2nd Stree
Door No.9/2, Krishnaswamy Avenue, Mylapore, Chennai-600 004 in R
Plot No.10, Lakshmi Street, Venkatesh Nagar, Virugambakkam, Chenna
Plot No.6 & 9 Sakthi Srinivasan Main Road, Kumarankudil, Okkiyam
Senthurpuram Extension, Kattupakkam, Chennai comprised in S. No
S.No.367/1A2, 1B, 1C & 1D of Perungalathur village, GST Road, Che
Plot No.563, Door No.L-15/95, Anna Nagar East, Chennai-102 compri
T.S.No.1 & 2, Block No.15,16 to 27 & 29 of Guindy Park Area, Block
Ottiyambakkam Main Road, Arasankazhani, Chennai comprised in S.
Door No.1, Plot No.1, SAF Games Village Division, Koyambedu, Chenn
Door No.25, Barnaby Road, Kilpauk, Chennai -10 comprised in R.s.No
Vanagaram Ambattur Road, Ayanambakkam, Chennai comprised in Ol
S.No. 90 part and 93 part of Mannur village, SIDCO Industrial Estat
GCC regularized Plot No.1 to 5, Anna Street, Gangai Nagar, Kalliku
Abutting Jawahar Road & Subramanya Bharathi Street, Gowthamapura
Door No.2/150, Mount Poonamalle High Road, Bearing at Old S.No.
Subhasree Nagar, 1st Main Road, Anna Street, Porur, Chennai – 600
Door No.41/18, College Road, Nungambakkam, Chennai – 600 006 com
Old Door No.21, New No.24, Pycrafts Garden Road, R.S. No.87/13,
Plot No.4306, New Door No.W-11, Old Door No.W-6, 5th Main Road, An
Old Door No.44, New Door No. 191, St. Mary’s Road, Raja Annamalai
Door No.76/1, 77, & 78, Avvai Shanmugam Salai, Royapetah, Chenna
Door No.29, Ranganathan Avenue, Kilpauk, Chennai-10 comprised in
No.727, Pathari Road, Anna Salai, Thousand Lights, Chennai – 600
Plot No.12, 13 & 14, Door No.12, 13 & 14/1 & 2, R.K. Shanmugam Sal
Plot No.28 & 29 in CMDA approved layout P.P.D/L.O No.51/84, Sow
Old Door No.16, New Door No.12, Wheat Craft Road, Nungambakkam,
Door No.1, Kasturi Estate 2nd Street & George Avenue Road, Alwape
Plot No.C-91/1 & 91/2, Door No.10/1 & 10/6, 45th Street, NCBS Colo
Plot No.A & B, 1st Cross Street, Mangala Nagar, Porur, Chennai – 60
Block No.88, Magizhchi Colony, TS Krishna Nagar, Anna Nagar West,
plot No.5 & 6, new Door No.21, Old Door No.3, Arunachalam Road, Ko
Door No.12, Plot No.E-113, 16th Cross Street, Besant Nagar, Chennai
Plot No.13 & 14, M.T.H. Road, Old Township Office Road, Secretari
New No.40, Old No.71-A, Gandhi Nagar 4th Main Road, Adyar, Chenna
Old Door No.5, New Door No.9, Gopalapuram 4th Street, Chennai com
Plot No.C-499, Old Door No.6, New Door No.8, 9th Avenue, 47th str
Old Door No.6, New Door No.10, Vijay Nagar 11th Main Road, Velach
Plot No.95, Old Door No.1, New Door No.41, ‘A’ Block, 12th Street,
North Main Road, 1st Avenue, T.V.S. Nagar, 5th Main Road, Anna Na
Door No.131/84A & 131A/84A, Gandhi Road, Velachery, Chennai-600 1
Old Door No.10/1, Door No.23, Bhagavantham Street, T. Nagar, Chenn
S. No.355/1A, 1B, 356/1A, 1B, 2A, 2B1, 2B2, 357/1A2, 412/1, 2 of
Kundrathur Road, Porur, Chennai comprised in S.No.356/1C of Porur
Inner Ring Road and V.O.C. Road, Madura Vanuwampet, Chennai in T
Plot No.58, New Door no.7, Old Door No.5, Bharathi Nagar 3rd Stree
Old Door No.60part & 61, New Door No.125part & 127, Paper Mills Ro
Panchayat Road & Corporation Road, Seevaram, Chennai comprised i
Site -1 at Old Door Nos. 1A, 1B, 1/C, 1D, 1E, 1F, 1/1, 1/2, 1F/3, 1
Old S.Nos.122/2A, 2B, 123/1B, 2B, 1A2, 2A2, 1C1(part), 2C1, 1C2, 2C2
S & P Garden 7th Cross Street, Nolambur, Chennai -600 095 compris
Old Door No.2B & 2C, New Door No.120 & 121, Nelson Manickam Road,
Old Door No.38, New Door No.21, A.V.Meiyyappan Road, Arcot Road,
Plot No.23B & 24, Old Door No.4/1, New Door No.9/1, Greenways Roa
S.No.7/1, 2A1pt, 21/2, 21/3, 22/2A, 22/2B, 22/2C, 24, 25/1, 25/2, 2
Plot No.772, Ram Nagar South Extension, 7th Main Road, Madipakk
Plot No.38, Old No.3, New No.2, Dhandeeswaram 9th Cross Street, V
Plot No.120, Nehru Nagar 2nd Link Street & Nehru Nagar 7th Link S
TNHB Block Nos.S1, S2, S3, S4, S5 & S6, Ponnambalam Salai, K.K. Na
Door No.127, 128, 129, 130, 131 & 133, ‘AA’ Block, 4th Avenue, Ann
Old Door No. 1, New Door No.9, Plot No. 163, MGR Street, Kaveri Ra
New Door No.76, Old Door No.63, Plot No.11, Poes Garden, Chennai-
Plot No.5010, Old Door No.107, New Door No.21, 2nd Street, AC Bloc
Plot No.24, Annai Velankanni Nagar Annex, Mugalivakkam, Chennai
Plot No.7, 12m wide Road, Kuthambakkam, Chennai comprised in S.
Plot No.29, Door No.41 M.G.Chakarapani street, Kamaraj Nagar, 4t
Thirumalaivasan Nagar Main Road comprised in Old S.No.209/2 (part),
Plot No.3760, Door No.18/50, 15th Street, ‘Q’ Block, Anna Nagar Eas
Plot No.7, Door No.3, Appu Street, Chamundeeshwari Nagar, Pammal
Plot No.C in GCC Approved Sub-Division, Anna Nagar 1st Main Road
S.No.24/4 of Pallikaranai Village, 60 feet Road of Tambaram-Velach
Old Door No.88, New Door No.29, Raja Street, Mandaveli, Chennai-2
Plot No.2 (A,B,C), Mel Ayanambakkam Main Road, Chennai comprise
Door No.2, Plot No.4047, ‘V’ Block, 4th Main Road, Anna Nagar Chen
Plot No.127, Nehru Nagar 2nd Link Street & Nehru Nagar 6th Link S
Door No.7, Plot No.C-157, NCBS Colony, 1st Main Road, Nanganallur,
Model School Road, Sholinganallur, Chennai – 600 119 comprised in
Plot No:41A, New Door No.38, Old Door No.60, 1st Main Road, Raja
Plot No.21, Door No.17/7, Developed Plots Industrial Estate for Ele
Professors colony 1st Main Road, Professors colony, Selaiyur, East
Old Door No.35, New Door No.28, Ramanujam Street, T.Nagar, Chenna
Old Door No.148, New Door No.32, Lattice Bridge Road, Indira Nagar
Plot No.C-6, IIT Colony 3rd Main Road and Sengalani Amman Street,
No.II-23, Dr.Vikram Sarabhai Instronics Estate Road, Dr.Vikram Sar
Plot No.1,Vinayagam Avenue, Kundrathur, Chennai, comprised in Sur
Alapakkam Main Road, Maduravoyal, Chennai -600087 comprised in R
Old Door No.21, New Door No.47, Ethiraj Salai (Formerly Commander
Plot No.G, New Door No.4, Old Door No.20L, Lamech Avenue, Mayor R
S. No. 51/1part, 3part, 4part (as per Doc.), New S.No.33/1, 33/2A, 2
Arignar Anna Road, Avvai Nagar 1st, 2nd & 3rd Street and Vyasar N
Block No.92, 4th Avenue, Shanthi Colony, Anna Nagar, Chennai-40 co
Door No.151 to 156, ‘L’ Block, 1st Main Road, Anna Nagar East, Che
Plot No.47, New Door No.2, Old Door No.37, 1st street, Dhandayuth
Door No.19/24, Block No.MIG-Block E, Emerald Block, 4th Avenue, Be
Plot No.19, Old Mahabalipuram Road (Rajiv Gandhi Salai) and Raju
S.No.49part, Block No.9C of Naduvakkarai village, Chennai, within t
Plot No.17, Door No.1, B. Ramachandra Adithanar Road (Gandhi Nagar
Plot No.534 Part & 536 Part, Sivaraman Street, Rajagopalapuram L
at Plot no.2, Old Door No.58, New Door No.154, Rama Street, Nun
Door No.2/4, Mount – Poonamallee High Road, Ramapuram, Chennai
Plot No.9, 10m wide Road, Thiruvottiyur, Chennai – 600 019 in CMD
Plot No.113 in approved Layout P.P.D/L.O No.81B/2002 Riverview Re
Plot No.6, Old door No.5A, New Door No.5B, Kanniah Street, T.Naga
Door No.189, Rajiv Gandhi Salai, (Old Mahabalipuram Road) and Lal
Old door No.9, New Door No.4, Narayanan Street, Mahalingapuram
Plot No.450 part, Door No.23 (450/2) & Door No.25 (450/1), R.K.S
S.No:312/1, 312/2B1A & 312/2B2A1A1 of Nedukundram village withi
Plot No.1299, Ram Nagar, 17th Main Road, Madipakkam, Chennai - 9
Plot No.5147 & 5149, 8th Street Ram Nagar North Extension & 7th C
Kumarasamy Road, Madhananthapuram, Chennai comprised in S.No.2
Thirumalaivasan Nagar Main Road comprised in Old S.No.209/2 (part),
New Door No.2, Old Door No.52, Thiruvengadam Street & Venktakris
Old Door No.190 & 191, New Door No.90 & 92, St.Mary’s Road and C
Survey No.101/2A1,106/1 of Adayalampattu Village, Vanagaram – Am
Door No.51, N.T.Patel road, Thiruvalluvar salai, Muneeswarar stree
Plot No.4553, Door No.141, ‘Y’ Block, 3rd Street, Anna Nagar, Chenn
Nandanam Extension 10th street, Nandanam, Chennai comprised in S
Mount - Poonamallee High Road comprised in S.No.1/1, 1/2, 2, 3/1,
Plot No.20, New Door No.14, Old Door No. 45, 7th Cross Street, She
Door No.10, Mandapam Road, 4th Lane, Kilpauk, Chennai-10 comprised
Survey No.141/1A, 141/2A,141/2B2, 141/2B3, 142/2, 147/1A, 147/1B
New Door No. 29, Old Door No.89, 4th Main Road , Natesan Nagar, Vi
Medavakkam Main Road, bearing S.No.452/3 of Perumbakkam Village
New Door No.186 & 188, Old Door No.125/1 & 125/2, Venkatachalam
Plot No.3362AA, AF Block, 8th Street, Anna Nagar, Chennai-40 compr
Plot No.51, Sayee Nagar Annexe 2nd Cross Street, Sree Sayee Nag
New Door No.13, Old Door No.7, Smith Road, Royapettah, Chennai 60
Shed No.II-26, Dr.Vikram Sarabhai Instronics Estate Road, Dr.Vikra
Plot No.E138, Besant Nagar, 31st Cross street, Besant Nagar, Chenna
Plot No.129, 200 Feet (60 m) Radial Road, (Sholinganallur-Pallavara
Plot No.1637, 13th Main Road, Anna Nagar, Chennai-40 comprised in
Plot No.17 & 18, Door No.178/1, Kumaran Colony Main Road, Vadapal
S.No.118/1, 119, 120, 124/1A2A, 134, 135, 136/1,2, 137/1,2,3, 138,
Completion Certificate Issued List - 2022
Approval details
CMDA issued Planning Permission No. C/12098/45/2019 in letter N
CMDA Planning Permission No. C/12080/IT/28A&B/2019 Permit No.
CMDA Planning Permission No. . B/NHRB/195/2020 Permit No.1356
CMDA Planning Permission No. PP No. C/PP/MSB/39 A to E /2018 Pe
CMDA Planning Permission No.B/NHRB/ 394/2019 dated 15.11.2019
CMDA Planning Permission No.B/NHRB/357/2020 dt.23.10.2020 in P
CMDA Planning Permission PP No.B/NHRB/356/2020 dt.23.10.2020 i
CMDA Planning Permission No.B/ NHRB/466/2019, dt.20.12.2019 in
Planning Permission No. B/NHRB/270/ 2020 Permit No.13639 in le
CMDA issued Planning Permission No.B/NHRB/34 A to Z/2021, in L
CMDA issued Planning Permission in P.P. No. C/PP/MSB/03 (A to L)
CMDA issued Planning Permission in P.P. No. B/NHRB/206/2019, in
CMDA issued Planning Permission in P.P. No. B/NHRB/204/2019, in
Revised Planning Permission No.C/PP/MSB/79 (S1 to S113)/2016 dt.
CMDA Planning Permission No.C/PP/MSB/34 (A to I)/2018 dt.19.09.
CMDA issued Planning Permission in P.P. No. C/PP/MSB/45 A to F/2
CMDA Planning Permission No.C/PP/MSB-IT/08(S1 to S-36)/2018 dt.
CMDA Planning Permission No.C/PP/MSB/ 02 (1 to 45)/ 2017 dt.19.
CMDA issued Planning Permission in PP.No. B/Spl.Bldg /255 A-D/20
CMDA issued Planning Permission No.B/NHRB/99/ 2020 in Letter N
CMDA issued Planning Permission in P.P. No. B/Spl.Bldg /249 A to
CMDA Planning Permission No.B/NHRB/482/2019, dt.30.12.2019 in
CMDA Planning Permission No.C/13154/IT/06/2021/A&B dt.22.01.20
CMDA Planning Permission No. B/Spl Bldg/38/2019, Permit No.1242
CMDA issued Planning Permission No.C/PP/MSB/57(S-1 to S-29)/201
CMDA issued Planning Permission No.B/NHRB/80/2020, in Letter N
CMDA issued Planning Permission No.B/NHRB/337 A to C/2020 in L
CMDA issued Planning Permission in P.P. No. B/NHRB/162/2020, in
CMDA issued Planning Permission in P.P. No. B/NHRB/406/2019, in
CMDA Earlier Planning Permission No.B/Spl. Bldg./23/2018 dated
CMDA issued Planning Permission No.B/NHRB/53/2020 in letter No
CMDA Planning Permission No.B/NHRB/ 145/2020 Permit No.13514
CMDA Planning Permission No.B/NHRB/S/277/2019 Permit No.12860
CMDA Planning Permission No.B/NHRB/351/ 2020 dt.21.10.2020 in
Earlier Planning Permission No. Planning Permission No.C/PP/MSB-I
CMDA issued Planning Permission No.B/NHRB/434 A-B/2019 in Let
CMDA Planning Permission No. B/NHRB/154/2020 Permit No.13523 i
CMDA Planning Permission No. B/ NHRB/440/ 2019 Permit No. 1302
CMDA Planning Permission No.B/NHRB/343 A & B/2020 dated 20.10.
CMDA Planning Permission No.C/13188/IT/39A to D/2021 dt.17.12.
CMDA Planning Permission No.B/NHRB/423/ 2019, dt.27.11.2019 in
CMDA Planning Permission No.B/NHRB/240/2020 dated 06.08.2020 i
CMDA Planning Permission No. C/PP/MSB/02(S-01 to S-36)/2018, Pe
CMDA Planning Permission No. B/Spl.bldg/46/2019, Permit No.1242
CMDA issued Planning Permission in P.P. No. B/NHRB/478/2019, in
CMDA Planning Permission No.B/NHRB/160/2019 Permit No.12643 i
CMDA Planning Permission No. B/NHRB/397/2020, Permit No.13766
CMDA Planning Permission No. B/NHRB/403/ 2019 Permit No.12986
CMDA issued Planning Permission No. B/NHRB/36/2020 in Letter N
CMDA issued Planning Permission in P.P. No. B/NHRB/274/2020, in
CMDA Planning Permission No.B/NHRB/03 /2021 dated 06.01.2021 i
CMDA issued Planning Permission No.C/PP/MSB/20 (A to M)/2018 i
CMDA issued Planning Permission No.B/NHRB/433/2019, in Letter
CMDA issued Planning Permission in P.P. No. B/NHRB/359/2019, in
CMDA issued Planning Permission in P.P. No. C/PP/MSB/05 (A to F)
CMDA Planning Permission No.B/NHRB/02 /2020, dt.03.01.2020 in
CMDA Planning Permission No. B/NHRB/410 A to H /2019 Permit No
CMDA issued Planning Permission No.B/NHRB/218/2020 in Lr. No.
CMDA Planning Permission No. C/PP/MSB/01 (A to Z )/2019 Permit
CMDA issued Planning Permission in P.P. No. B/NHRB/284/2020, Pl
CMDA issued Planning Permission No. B/NHRB/401/2020 in letter
CMDA issued Planning Permission No.B/Spl.Bldg./88/2017, in Lett
CMDA issued Planning Permission No. B/NHRB/303/2019 in Letter
1. CMDA issued Planning Permission in P.P.No. C/PP/MSB/50 (A to R)/
CMDA Planning Permission No.B/NHRB/175/2020 dated 04.07.2020 i
CMDA Planning Permission No.B/NHRB/387/2020, dt.20.11.2020 in
CMDA issued Planning Permission No.B/Spl.Bldg./256/2018, in Let
CMDA issued Planning Permission in P.P. No. C/PP/MSB/41 (A to E)
CMDA Planning Permission No.C/13126/IT/20/2020 dt.17.06.2020 in
CMDA issued Planning Permission No.B/NHRB/382/2020, in Letter
CMDA issued Planning Permission No. PP/NHRB/429/2020 in Letter
CMDA Planning Permission No.B/NHRB/378/2019, dated 11.11.2019
CMDA issued Planning Permission in P.P. No. B/NHRB/202 A to G/20
CMDA issued Planning Permission in P.P. No. B/NHRB/319/2019, in
CMDA issued Planning Permission in P.P. No. B/Spl. Bldg./47/2019,
CMDA Planning Permission No. B/NHRB/402/2019 Permit No.12985 i
CMDA Planning Permission No. C/PP/MSB/02(S-01 to S-36)/2018, Pe
CMDA issued Planning Permission No. PP No. B/NHRB/219/2020 vide
CMDA Planning Permission No.B/Special Building/125 A to V/2017 d
CMDA Planning Permission vide No.C/12086/34 A to N/2019 dt.04.1
CMDA Planning Permission No. B/NHRB/468 A & B /2019 Permit No.
CMDA issued Planning Permission No.B/NHRB/191/2020 in letter
CMDA issued Planning Permission in P.P. No. B/NHRB/30/2020, in
CMDA issued Planning Permission in P.P. No. B/NHRB/250/2020, in
CMDA Planning Permission No. B/NHRB/286/2020 Permit No.13655 i
CMDA Planning Permission No. . B/Spl.Bldg/01 A to J /2019 Permit
CMDA Planning Permission No. C/PP/MSB/54 (A to D)/2019, Permit
CMDA issued Planning Permission in P.P. No. B/NHRB/229/2020, in
CMDA issued Planning Permission No.B/Spl. Bldg/303 A to E/2007,
CMDA issued Planning Permission No. B/NHRB/291/2020 in letter
CMDA issued Planning Permission in P.P. No. B/NHRB/400/2019, in
CMDA issued Planning Permission in P.P. No. PP/NHRB/224/2021, i
CMDA issued Planning Permission No. B/NHRB/340/2019 in letter
CMDA issued Planning Permission in P.P. No. B/Spl.Bldg/123 - 1 to
CMDA Planning Permission No. B/NHRB/432/2020, Permit No.13901
CMDA issued Planning Permission No. B/NHRB/193/A to C/2019 in l
CMDA issued Planning Permission in P.P. No. B/NHRB/430/2019, in
CMDA issued Planning Permission in P.P. No. B/NHRB/333/2019, in
CMDA Planning Permission No. B/NHRB/258/2020, Permit No.13627
CMDA Planning Permission No.B/NHRB/251/2020, dt.12.08.2020 in
CMDA issued Planning Permission in P.P. No. B/NHRB/373/2019, in
CMDA Planning Permission No.B/Special Building/273 A to E /2018
CMDA issued Planning Permission No.B/NHRB/406/2020 in Letter N
CMDA Planning Permission No.B/NHRB/81/2020, dt.27.02.2020 in P
CMDA issued Planning Permission in P.P. No. PP/NHRB/22/2021, in
CMDA issued Planning Permission in P.P. No. B/NHRB/43/2021, in
CMDA issued Planning Permission in P.P. No. B/NHRB/92/2020, Pla
CMDA issued Planning Permission in P.P. No. C/PP/MSB/04 (1 to 43
CMDA issued Planning Permission No.PP/NHRB/130/2021 in Letter
CMDA Planning Permission No. B/NHRB/426/2020, Permit No.13795
CMDA Planning Permission No. B/NHRB/386/2019 Permit No.12969 i
CMDA issued Planning Permission No. B/NHRB/353 /A to B/2020 in
CMDA Planning Permission No. B/NHRB/146/2019 Permit No.12629 i
CMDA Planning Permission No.B/Spl.Bldgs./324/2019, dated 23.10.
CMDA Planning Permission No. PP/NHRB/304/2021 in letter No. PP
CMDA Planning Permission No.B/NHRB/90 A&B/2020 vide permit No
CMDA issued Planning Permission No.B/NHRB/52/A-E/2020, in Lett
CMDA Planning Permission No. B/NHRB/178 A & B/2020, Permit No.
CMDA Planning Permission No. C/12086/34 A to N/2019 Permit No.1
CMDA issued Planning Permission No.PP/NHRB/104/2021 in Letter
CMDA Planning Permission No.B/NHRB/269/2020 dated 25.08.2020 i
CMDA issued Planning Permission No. B/Spl. Bldg/53A & B/2019 in
CMDA issued Planning Permission No.B/Spl. Bldg/83 A to P/2013 in
CMDA Planning Permission No. B/NHRB/388 A&B /2020, Permit No.1
CMDA Planning Permission No. B/NHRB/305/2020 Permit No.13674 i
CMDA Planning Permission No. B/NHRB/118 /2020, Permit No.13387
CMDA Planning Permission No. B/spl.Bldg/289/2015, Permit No.929
CMDA issued Planning Permission No. B/NHRB/315/2020, in letter
CMDA issued Planning Permission No. PP/NHRB/94/ A & B/ 2021 in
CMDA issued Planning Permission No.B/NHRB/158/2019 in Letter N
CMDA issued Planning Permission No. B/NHRB/401/2019, Planning
CMDA issued Planning Permission No. B/NHRB/31/2021, Planning P
CMDA issued Planning Permission No.PP/NHRB/376/2020, in Letter
CMDA Planning Permission No. PP/NHRB/ 121/2021 Permit No.14129
CMDA Planning Permission No.B/NHRB/ 42/2020, Permit No.13311 i
Planning Permission was issued in PP No. C/PP/MSB-IT/33 A to H/2
CMDA issued Planning Permission No. B/NHRB/69/2020, Planning P
CMDA issued Planning Permission in P.P. No. B/Spl. Bldg /37 A to
CMDA Planning Permission No. C/PP/MSB/08(S-1 to S-35)/2019, Per
CMDA Planning Permission No.B/NHRB/233/2019, Permit No.12816 i
CMDA Planning Permission No. B/NHRB/409 A&B/2020, Permit No.13
Planning Permission vide No.C/PP/MSB/ (S-01 to S-27/2020 dt.10.0
CMDA Planning Permission No.B/NHRB/207 A to B/2020 dated 17.07
CMDA Planning Permission No.B/NHRB/184 A to C/2020 dated 08.07
CMDA Planning Permission No.B/NHRB/ 33/2020, Permit No.13302 i
CMDA issued Planning Permission No.PP/NHRB/165/2021 in Letter
CMDA Planning Permission No.B/NHRB/336 A to C/2019, Permit No.
CMDA issued Planning Permission No. B/NHRB/335/2019, in letter
CMDA issued Planning Permission in P.P. No. B/NHRB/306 A & B/20
CMDA Planning Permission No. B/NHRB/370/2020, Permit No.13739
CMDA issued Planning Permission No.B/NHRB/427 A&B/2020, in Le
CMDA Planning Permission No. PP/NHRB/019/2021, Permit No.13927
CMDA issued Planning Permission No.B/Spl. Bldg./108/2017 in Let
CMDA Planning Permission No. C/PP/HRB/05/A to C/2022 dt.21.02.2
CMDA issued Planning Permission No.C/PP/MSB/21 (A to M)/2018, i
CMDA Planning Permission No.B/NHRB/ 481/A to E/2019, Permit No
CMDA issued Planning Permission in Planing Permit No. C/9659/25
CMDA issued Planning Permission No.B/NHRB/217 A & B/2020, in L
CMDA issued Planning Permission No. B/NHRB/08 A &B/2021 in Let
CMDA Planning Permission No.B/NHRB/151/2020 dated 12.06.2020 i
CMDA Planning Permission No.B/NHRB/331/2020 dated 13.10.2020 i
CMDA Planning Permission No.B/NHRB/ 86/2020, Permit No.13355 i
CMDA Planning Permission No.B/NHRB/410/2020 A to V Permit No.1
CMDA issued Planning Permission No.B/NHRB/285/2019 in Letter N
CMDA Planning Permission No.B/NHRB/64/2020 dt.11.02.2020 in Pl
CMDA Planning Permission No.B/NHRB/174 A&B/2020 Planning Perm
CMDA Planning Permission No.B/NHRB/41/2020 dated 29.01.2020 in
CMDA Planning Permission No.B/NHRB/ 365/2019, Permit No.12948
CMDA Planning Permission No.C/PP/MSB-IT/57(A to S)/2019 dt.09.1
CMDA Planning Permission No.B/NHRB/112/2020 in Planning Permit
CMDA issued Planning Permission No.PP/NHRB/49/A&B/2021 in Let
CMDA Planning Permission No.PP/NHRB/122/2022 dated 23.04.2022
CMDA Planning Permission No. B/Spl.Bldg/59 A to G/2019, Permit N
CMDA Planning Permission No.B/Spl.Bldg. /35 A - O/2019 dated 05.
CMDA Planning Permission No. PP/NHRB/115/2021 A to D in Plannin
CMDA issued Planning Permission No. B/NHRB/240/2021 in letter
CMDA Planning Permission No.B/NHRB/10/2020, dt.08.01.2020 in P
CMDA Planning Permission No.C/13200/IT/11/2020/A&B dated 30.04
CMDA Planning Permission No.PP/NHRB/80/2021 A to D in Planning
CMDA Planning Permission No.B/Spl.Bldg/130/2018, Permit No.1213
CMDA Planning Permission No. B/NHRB/05/ 2021 in Planning Permit
CMDA Planning Permission No. B/NHRB/149/ 2021 in Planning Permi
CMDA Planning Permission No. B/NHRB/441/ 2019 Permit No.13024
CMDA issued Planning Permission in P.P. No. B/NHRB/01/2020, in
CMDA Planning Permission No. B/NHRB/19/ 2020 in Planning Permit
CMDA issued Planning Permission No. B/NHRB/167/2019 in Letter
CMDA Planning Permission No.B/NHRB/ 038/2020 in Planning Permi
CMDA issued Planning Permission No. C/PP/MSB/03 (A to L)/2016 i
CMDA Planning Permission No.PP/NHRB/ 171/2021/ A & B in Planni
CMDA issued Planning Permission in P.P. No. B/NHRB/133/2021, in
CMDA issued Planning Permission No. B/NHRB/300 A to G/2021 in
CMDA Planning Permission No.B/Spl.Bldg/129 A & B/2018 in Planni
CMDA Planning Permission No.B/NHRB/62 A to C/2020 dated 11.02.
CMDA issued Planning Permission No. PP/NHRB/126/2021, in lette
CMDA Planning Permission No.C/8416/33 A To C/2013 dt.22.11.2013
CMDA issued Planning Permission No.B/Spl. Bldg./407 A to T/2012
CMDA Planning Permission No.B/NHRB/ 188 /2020 dated 10.07.2020
CMDA issued Planning Permission No. B/Spl. Bldg. /269 A to D/201
CMDA issued Planning Permission No.B/NHRB/173/2022 in Lr. No.P
CMDA Planning Permission No.B/Spl.Bldg/81 A to C/2019 in Plannin
CMDA Planning Permission No.B/NHRB/ 61/2020 in Planning Permit
CMDA Planning Permission No.B/NHRB/ 266/2020 in Planning Permi
CMDA issued Planning Permission No.B/NHRB/400/2020 in Lr. No.P
CMDA Planning Permission No.B/NHRB/156 A & B /2020 dated 16.06
CMDA Planning Permission No.PP/NHRB/118/2021, dt.20.04.2021 in
CMDA Planning Permission No.B/NHRB/316/2020 dated 28.09.2020 i
CMDA Planning Permission No.B/NHRB/443 A to D /2019 dated 10.1
CMDA issued Planning Permission in P.P. No. B/NHRB/371/2020, in
CMDA Planning Permission No.B/NHRB/329/2020 dated 09.10.2020 i
CMDA issued Planning Permission in P.P. No.PP/NHRB/453/2019, in
CMDA issued Planning Permission No. B/NHRB/262/A-C/2019 in Lett
CMDA issued Planning Permission No.PP/NHRB/420/2020, in Letter
Planning Permission No.C/13134/IT/28/2020 dated 14.10.2020 in Pl
CMDA Planning Permission No. PP/NHRB/232/2021, dated 03.08.202
CMDA issued Planning Permission in P.P. No. B/NHRB/187 A & B/2
CMDA Planning Permission No. PP/NHRB/36/ 2022 in Planning Permi
CMDA Planning Permission No.B/NHRB/171/2020, Permit No.13540 i
CMDA issued Planning Permission in P.P. No. PP/NHRB/253/2021/A
CMDA Planning Permission No. C/PP/ MSB-IT/31(A to L)/2018 in Pla
CMDA Planning Permission No.PP/NHRB/ 119/2021/A to K dated 21.
CMDA Planning Permission No.C/PP/MSB-IT/24(A to M)/2019, Permit
CMDA Planning Permission No. C/PP/MSB/39 A to L/2019 in Plannin
CMDA Planning Permission No.B/NHRB/391 A to H/2020 dated 21.11
CMDA Planning Permission No.C/INST/16 A to G/2020 dt.30.05.2020
CMDA issued Planning Permission No.B/NHRB/116 A to Z/2021 in L
CMDA issued Planning Permission No.B/NHRB/383/2020, in Letter
CMDA Planning Permission No.B/NHRB/46 /2020 dated 31.01.2020 i
CMDA issued Planning Permission No.B/Spl. Bldg/140 A-D/2015 in
CMDA Planning Permission No.B/ NHRB/95/2020 dated 10.03.2020 i
CMDA issued Planning Permission in P.P. No. PP/NHRB/421/ 2020 i
CMDA issued Planning Permission in P.P. No. B/NHRB/89/2020, in
CMDA Planning Permission No. C/PP/MSB-IT/25(S-01 to S-61) /2018
CMDA issued Planning Permission No.B/NHRB/185 A & B/2020 in Le
CMDA Planning Permission No.PP/NHRB/88/2021, dt.23.03.2021 in
CMDA issued Planning Permission in P.P. No. B/Spl.Bldg./108/2018,
CMDA Planning Permission No. PP/NHRB /86/2021 A & B, Permit No.
CMDA Planning Permission No.PP/NHRB/ 161/ 2021 in Planning Perm
CMDA Planning Permission No.B/Spl.Bldg./ 101 /2019 dated 06.06.2
CMDA Planning Permission No.PP/NHRB/ 413/2020 in Planning Perm
CMDA issued Planning Permission in P.P. No. B/NHRB/09/2021, in
CMDA issued Planning Permission No.PP/NHRB/180/2021 in Lr. No
CMDA Planning Permission B/Spl.Bldg/382/2012, dt.21.09.2012 in
CMDA issued Planning Permission in P.P. No. B/NHRB/330/20, in l
CMDA Planning Permission No.B/NHRB/ 263/2020 in Planning Permi
CMDA Planning Permission No.B/NHRB/ 215-A & B/2020 in Planning
CMDA Planning Permission No.C/9634/IT/51 A & B/ 2016 Permit No.
CMDA Planning Permission No.B/NHRB/ 181/ A & B/2020 in Plannin
CMDA Planning Permission No.B/NHRB/ 120/2020, Permit No.13389
CMDA issued Planning Permission No.B/Spl.Bldg./401 A to S/2013 i
CMDA issued Planning Permission No. B/NHRB/390/2020 in Letter
CMDA Planning Permission No.PP/NHRB/ 199/2021 in Planning Perm
CMDA issued Planning Permission No. B/NHRB/243/2021 in Lr. No.
CMDA Planning Permission No.B/NHRB/ 322 A to C/2021 in Planning
CMDA issued Planning Permission in P.P. No. B/NHRB/365/2020, in
CMDA issued Planning Permission No. B/NHRB/73/2020 in Lr. No.P
CMDA issued Planning Permission No.B/NHRB/318/2019 in Lr. No.P
CMDA issued Planning Permission No.PP/NHRB/38/2021 in Lr. No.P
CMDA Planning Permission No. B/NHRB/156 /2021 dated 18.06.2021
CMDA Planning Permission No.PP/NHRB/144/2021/A&B dated 05.05.
CMDA Planning Permission No.PP/NHRB/ 357/2021 dated 20.12.2021
CMDA issued Planning Permission No.B/NHRB/236/2020 in Lr. No.P
CMDA Planning Permission No.B/NHRB/ 260/2019 in Planning Permi
CMDA issued Planning Permission No. B/Spl.Bldg./140/2018 in Lr.
CMDA issued Planning Permission No.B/NHRB/51/ A-C/2020 in Lr.
CMDA Planning Permission No. PP/NHRB/159/ 2021 in Planning Per
CMDA Planning Permission No.B/NHRB/ 148/2020 in Planning Permi
CMDA Planning Permission vide No.C/PP/MSB-IT/25(A to F)/2019 dt
CMDA issued Planning Permission No.C/12096/43 A to E/2019 in Le
CMDA Planning Permission vide No.PP/HRB/15/2022/A to E dt.11.06.
CMDA Planning Permission vide No.B/Spl.Bldg./21 A – I/2019 dated
CMDA Planning Permission No. B/NHRB/109/ 2020 in Planning Perm
CMDA issued Planning Permission No.B.Spl. Bldg.28/2019 in Lette
CMDA issued Planning Permission No.PP/NHRB/194/2021 in Letter
CMDA issued Planning Permission No.B/NHRB/480/2019 in Lr. No.
CMDA Planning Permission No. B/NHRB/110/ 2020 in Planning Permi
CMDA issued Planning Permission No. B/NHRB/460/2019 in Lr. No.
CMDA Planning Permission No. PP/NHRB/110/ 2021 in Planning Perm
CMDA issued Planning Permission No. B/NHRB/262/A-C/2019 in Let
CMDA Planning Permission No. C/PP/MSB / 02(S-01 to S-36)/ 2018,
CMDA issued Planning Permission PP/NHRB/150/2021, Planning Pe
CMDA Planning Permission vide No.C/PP/MSB/33/ (S-1 to S-49)/2020
CMDA Planning Permission vide No.PP/NHRB/226/2021/A & B dated
CMDA issued Planning Permission No.C/PP/MSB/02 (A to M)/2020 in
CMDA issued Planning Permission in P.P. No.B/NHRB/354 A to C /2
CMDA issued Planning Permission No. B/NHRB/165 A&B/ 2020 in Lr
CMDA issued Planning Permission in P.P. No. /Spl.Buldg/26/A&B/20
CMDA issued Planning Permission in P.P. No.PP/NHRB/169/2021, P
CMDA issued Planning Permission in P.P. No.C/PP/MSB/30 (A to D)
CMDA issued Planning Permission No. B/Spl.Bldg/287 A&B/ 2015 in
CMDA issued Planning Permission No.B/NHRB/141/2020, in Letter
CMDA issued Planning Permission No. No.C/PP/MSB/18 (A to E)/201
CMDA issued Planning Permission No.C/PP/MSB/19 (A to D)/2019 in
CMDA issued Planning Permission in P.P. No.B/Spl.Bldg./220/2018,
CMDA Planning Permission No. B/NHRB/312/ 2020 in Planning Permi
CMDA Planning Permission No. B/NHRB/470/ 2019 in Planning Permi
CMDA issued Planning Permission in P.P. No. B/NHRB/346/2020, in
CMDA issued Planning Permission No.No.PP/NHRB/125/2021/A to D/
CMDA issued Planning Permission No. No.C/PP/MSB/23 (A to C)/202
CMDA Planning Permission No.PP/NHRB/280/2021 dated 15.09.2021
CMDA issued Planning Permission No. No.No.PP/NHRB/101/2021 in
CMDA Planning Permission No. PP/NHRB/102/ 2022/A &B in Plannin
CMDA Planning Permission No.B/NHRB/158 /2021 dated 21.06.2021
CMDA issued Planning Permission No. B/NHRB/271/ 2019 in Lr. No
CMDA issued Planning Permission in P.P. No.B/NHRB/140/2020in l
CMDA Planning Permission No. PP/NHRB/179/ 2021 A & B in Plannin
CMDA Planning Permission No. B/Spl.Bldg/252/2016, Permit No.110
CMDA issued Planning Permission in P.P. No.B/NHRB/309 A to D/20
CMDA Planning Permission No.PP/NHRB/ 207/2022 Planning Permit
CMDA Planning Permission No.B/NHRB/ 150/2019 in Planning Permit
CMDA issued Planning Permission No.PP/NHRB/75/2021 in letter N
CMDA Planning Permission No.PP/NHRB/ 185 /2021 dated 06.07.202
CMDA issued Planning Permission in P.P. No.B/NHRB/8/2020, in le
CMDA issued Planning Permission in P.P. No. B/NHRB/221 A to C/2
CMDA Planning Permission No.B/NHRB/183 /2021 dated 05.07.2021
CMDA issued Planning Permission No.B/NHRB/219/2019 in Lr. No.P
CMDA issued Planning Permission No.C/PP/MSB-IT/54 A to H/2013,
CMDA Planning Permission No. B/NHRB/456 (A-B)/2019 in letter N
CMDA Planning Permission No.B/NHRB/457 A&B/2019 dated 18.12.20
CMDA issued Planning Permission No.PP/NHRB/109/2021 in Lr. No
CMDA issued Planning Permission in P.P. No. B/NHRB/227/2020, in
CMDA Planning Permission No. C/9692/55-A to C/2017 dt.06.12.2017
CMDA issued Planning Permission in P.P. No.C/PP/MSB/ 36 (S-01 to
CMDA issued Planning Permission in P.P. No.C/PP/MSB/19 (A to O)/
CMDA issued Planning Permission No. C/13118/11 A-D/2020 in Lr.
CMDA issued Planning Permission in P.P. No.B/NHRB/163/2020in l
CMDA Planning Permission No. C/13169/21 A to D/2021 in letter N
CMDA Planning Permission No. B/NHRB/483/ 2019 Planning Permit
CMDA issued Planning Permission in P.P. No.P.P. No. B/Spl.Bldg/17
CMDA Planning Permission No.B/NHRB/277/2020, dated 02.09.2020
CMDA Planning Permission No.B/NHRB/447/2019, dt.10.12.2019 in
CMDA Planning Permission No.B/NHRB/216/2021 dated 28.07.2021 i
CMDA issued Planning Permission No.B/Spl. Bldg./45 A to C/2018 i
CMDA issued Planning Permission in P.P. No. B/NHRB/442 A & B/20
CMDA Planning Permission No. B/NHRB/06/2020 in letter No. PP/N
CMDA Planning Permission No. B/NHRB/334/ 2020 in Planning Perm
CMDA issued Planning Permission in P.P. No.B/NHRB/18/2021, in l
CMDA Planning Permission No.B/NHRB/56/2020 dt.06.02.2020 in Pl
P.P.No.B/NHRB/174 A to E/2019 in letter No.PP/SB/C/347/2019 dat
CMDA issued Planning Permission No.B/NHRB/424/2020 in Lr. No.
Planning Permission was issued in PP No.B/Spl.Bldg/235 - 1 to 28/2
CMDA issued Planning Permission in P.P. No.B/NHRB/360/2019, in
CMDA Planning Permission No. B/NHRB/344/ 2021 in Planning Permi
CMDA Planning Permission No. PP/NHRB/162 /2021, dated 23.06.202
CMDA Planning Permission No.C/PP/MSB/13(A to I)/2019 dt.29.03.20
CMDA Planning Permission No. B/NHRB/224/ 2019, Permit No.12807
P.P.No. B/NHRB/297/ 2019 in Letter No. PP/NHRB/C/0573/2019 dat
CMDA issued Planning Permission in P.P. No. B/NHRB/379/ 2020, i
CMDA’s Planning Permission No.PP/NHRB/214/2021 dated 28.07.202
CMDA Planning Permission No.B/NHRB/322/2020 dated 05.10.2020 i
CMDA Planning Permission vide No.C/PP/MSB/31 (A to G)/2019 dt.1
CMDA Planning Permission No. PP/NHRB/140/ 2021 in Planning Per
CMDA Planning Permission No. C/13148/IT/42 A & B/2020 in Planni
CMDA Planning Permission No. PP/NHRB/S/154/2021 A to D, Permit
CMDA Planning Permission No. P.P.No. B/NHRB/295/ 2020 in Lette
CMDA Planning Permission No. C/PP/MSB/40 (A to G)/2019, Permit
CMDA Planning Permission No.B/NHRB/314 /2020 dated 25.09.2020 i
CMDA’s Planning Permission No.C/12100/47/2019 dated 02.12.2019
CMDA issued Planning Permission in No.B/NHRB/416 A & B/2020/A t
CMDA Planning Permission No. P.P.No. B//Spl.Bldg/224 A to E/2012
CMDA issued Planning Permission in P.P. No. B/NHRB/142/2020, in
CMDA issued Planning Permission in P.P. No.B/NHRB/15/2021, in l
CMDA issued Planning Permit No. C/13198/09/2022/A to L, in lett
Planning Permission was issued in PP No.C/PP/MSB/41 (A to F)/2020
CMDA issued Planning Permission in P.P. No. B/NHRB/120/2021, in
CMDA issued Planning Permission in P.P. No. B/NHRB/91/2021, in
CMDA Planning Permission No. B/NHRB/359/ 2020 Permit No.13728
CMDA Planning Permission No. B/NHRB/208/ 2020, dt.22.07.2020 in
CMDA Planning Permission No. B/NHRB/S/249/2020, Permit No.1361
CMDA issued Planning Permission in P.P. No. B/NHRB/205 A & B/20
CMDA Planning Permission No. PP/NHRB/89/ 2021, Permit No.13997
CMDA Planning Permission No.B/NHRB/368/2019 dated 07.11.2019 i
P.P.No. B/NHRB/255/ 2020 in Letter No. PP/NHRB/C /239/ 2020 dat
CMDA issued Planning Permission NoC/PP/MSB/18 (A to C) /2020 in
CMDA issued Planning Permit No. B/NHRB/389/2020 in letter No.
CMDA’s Planning Permission No.PP/NHRB/13/2021 dated 18.01.2021
CMDA issued Planning Permission No.PP/NHRB/60/2021 in Lr.No.P
CMDA Planning Permission No. PP/NHRB/234/2022 A to D in Planni
CMDA issued Planning Permission No.PP/NHRB/267/2019 in Lr. No
CMDA issued Planning Permission No. PP/NHRB/271/2021 in Lr. No
CMDA Planning Permission No. PP/NHRB/80/ 2021/A to D dated 17.
CMDA’s Planning Permission No.B/NHRB/132/2020 dated 30.05.2020
CMDA’s Planning Permission No.PP/NHRB/438/2020 dated 29.12.202
CMDA Planning Permission No.B/NHRB/135A to D/2020 dated 29.06.
Planning Permission was issued in PP No.B/Spl.Bldg/235 - 1 to 28/2
CMDA Planning Permission No. PP/NHRB/295/ 2021, Permit No.1440
CMDA Planning Permission No. C/PP/MSB/18 (A & B)/2021, Permit N
CMDA issued Planning Permission No. C/PP/MSB/64 A to F/2016 in
CMDA issued Planning Permission in No.B/NHRB/88 A-H/2020, in le
CMDA issued Planning Permission in P.P. No. B/NHRB/67/2020, in
CMDA Planning Permission No. B/NHRB/173 A to E /2020, Permit No
CMDA issued Planning Permission in No.C/PP/MSB-IT/38 A to AC/20
CMDA issued Planning Permission in P.P. No. B/NHRB/136/2020, in
CMDA issued Planning Permission in P.P. No. B/NHRB/20/2021, in
CMDA issued Planning Permission No.B/NHRB/116 A to Z/2021 in L
CMDA Planning Permission No. P.P.No. PP/NHRB/241/ 2021 in Lett
Planning Permission vide No.C/PP/MSB/07(A to N)/2018 dt.21.02.20
CMDA Planning Permission No. PP/NHRB/82/2021 dated 18.03.2021
CMDA issued Planning Permission in P.P. No. B/NHRB/307/2021, in
CMDA issued Planning Permission No.B/NHRB/116 A to Z/2021 in L
CMDA issued Planning Permission No.PP/NHRB/422 A & B/2019 in L
1. Earlier CMDA Planning Permission No. C/12049/IT/46/2018 date
CMDA Planning Permission No. PP/NHRB/160/2021 dated 21.06.202
1.Earlier CMDA Planning Permission vide PP No. PP/NHRB/S/317/20
CMDA issued Planning Permission in P.P. No. B/NHRB/15/2020, in
CMDA Planning Permission No. P.P.No. B/NHRB/352/ 2019 in Lette
CMDA issued Planning Permission No.C/PP/MSB/44 (S -1 to S-59)/20
Completion Certificate Issued List - 2022
Approval letter no.
PP/NHRB/IND/N/484/ 2019
PP/IND/S(B1)/0321 /2019
PP/NHRB/S(B1)/ 0316/2020
C3/(S3) /3721/2015 FSI - 2.45 (6747.96 sq mt)
PP/NHRB/S(B2)/1001/2019 WITH Approved FSI - 878.85 M2 1.997
PP/NHRB/S(B1)/0550/2020 WITH Approved FSI - 0.581 (459.13 M2)
PP/NHRB/S(B1)/0548/2020 WITH Approved FSI - 0.624 (491.59 M2)
PP/NHRB/S(B1)/0862/2019 WITH Approved FSI - 1.879 (375.78 M2)
PP/NHRB/S (B2)/0354/ 2020
PP/NHRB/C/ 65/2020
C3(N)/7359/2017
PP/SB/N/466/2019
PP/SB/N/450/2019
C3(S)/15425/2014 dated 28.12.2016WITH Approved FSI - 0.673 (19
C3(S)/16819/2017 WITH Approved FSI - 2.498 11,230.18 M2
C3(N)/14460/2013
C3(S)/3448/ 2017 WITH Approved FSI - 3.747 (1,60,384.84 M2)
C3(N)/9598/ 2015 WITH Approved FSI - 1.501 (65,788.16 M2)
PP.No. B/Spl.Bldg /255 A-D/2018
PP/NHRB/C/092/2020
B3/18005/2012 EC/N-I/10377/2016
PP/NHRB /S(B1)/0967/2019 WITH Approved FSI - 1.620 (517.26 M2
PP/IND/S(B1)/0601/2020 WITH Approved FSI - 2.696 (3906.81 M2)
B1/3027/2018 WITH Approved FSI - 2185.80 M2 1.946
C3(S)/807/ 2017
PP/NHRB/C/ 1188/2019
PP/NHRB/C/ 1088/ 2019
PP/NHRB/N/187/2020
PP/NHRB/N/785/2019
B2/8697/2017 & PP/SB/S(B1)/0184/2019 WITH Approved FSI - 2.59
PP/NHRB/C/ 1069/2019
PP/NHRB/S(B2)/0127/2020 Approved FSI 2.595
PP/SB/ S(B2)/0424 /2019 dated 01.10.2019. Approved FSI 2.05
PP/NHRB/S (B2)/0018/2020 WITH Approved FSI - 1.99%. 1,049.33
EC/SII/1898/2020 WITH Approved FSI - 3.369 (28732.72 M2).
PP/NHRB/C/ 792/2019
PP/NHRB/ S(B2)/1205/ 2019/ Approved FSI: 1.27
PP/NHRB S(B2)/ 0682/2019 Approved FSI: 1.81
PP/NHRB/S(B1)/0094/2020 WITH Approved FSI - 2.577%. 4,123.61
PP/NHRB-IND/S(B1)/1045/2019 WITH Approved FSI - 2.322%. 2,58
PP/NHRB/ S(B1)/ 0685/ 2019 WITH Approved FSI - 1.949%. 1,169.
PP/NHRB/ S(B1)/0280/ 2020 WITH Approved FSI - 2.11%. 899.80 M
C3(S)/243/ 2017 FSI: 2.528 (586015.35 m)
B1/20135/ 2018 dated 15.03.2019. Approved FSI:1.757 (1564.64 m
PP/NHRB/N/665/2019
PP/ SB/C/071/ 2019 Approved FSI 1.953 (831.21m2)
PP/NHRB/ S(B2)/262/ 2020, FSI:2.24 (1009.19m2)
PP/NHRB/ S(B1)/579/ 2019 dated 21.11.2019. Approved FSI 2.129
PP/NHRB/C/ 850/2019
PP/NHRB/N/43/2020
PP/NHRB/S(B2)/344/2020 WITH Approved FSI - 2.586%. 1461.43 M
C3(N)/10127/2017
PP/NHRB/C/ 660/2019
PP/NHRB/N/43/2020
C3(N)/21562/2018
PP/NHRB/S(B2)/0918/2019 WITH Approved FSI - 1.990%. 874.56 M
PP/NHRB/ S(B1)/0475 /2019 dated22.11. 2019. FSI:1.997 (45004.3
PP/NHRB/C/1171/2019
C3(S)/5460/2018 dated 29.01.2019. FSI:3.378 (45424.25 M2)
PP/NHRB/N/381/2020
PP/NHRB/C/ 482/2020
BC1/14166/ 2016
PP/NHRB/C/ 943/2019
C3(N)/18893/ 2012
PP/NHRB/S(B2)/0054/2020 WITH Approved FSI - 1.986%. 1946.68
No.PP/NHRB/S(B2)/0039/2020 WITH Approved FSI - 2.00%. 1237.7
BC1/14544/ 2018
C3(N)/11196/2018
PP/IND/S(B1)/0139/2020 WITH Approved FSI - 2.160%. 1612.19 M
PP/NHRB/C/556/2020
PP/NHRB/C/ 512/2020
PP/NHRB/S(B2)/0684/2019 WITH Approved FSI - 1.922%. 676.36 M
PP/SB/N/251/2019
PP/SB/N/343/2019
.B3/23132/2018
PP/NHRB/S (B2)/0532/2019 dated 20.11.2019. FSI: 2.089 (873.04m
C3(S)/243/ 2017 FSI: 2.528 (586015.35 m2)
PP/NHRB/C/ 203/2020
B1/5028/2015 WITH Approved FSI - 1.43%. 45863.81 M2
C4/7785/2017 WITH Approved FSI - 0.054 (85286.44 M2).
PP/SB/S(B2)/0567 /2019 FSI: 1.99 (1799.29m²)
PP/NHRB/C/ 1216/2019
PP/NHRB/N/869/2019
PP/NHRB/N/213/2020
PP/NHRB/S (B2)/311/2020 FSI:1.939 (638.84m²)
B2/19643/ 2018 FSI: 1.522 (34779.44m²)
C3(S)/183/ 2019 FSI: 2.76 (4888.22m²)
PP/NHRB/N/206/2020
B3/401/2007
PP/NHRB/C/ 700/2019
PP/NHRB/N/784/2019
PP/NHRB/N/0080/2021
PP/NHRB/C/ 559/2019
B3/14135/2013.EC/N-II/7370/2019
PP/NHRB/ S(B2)/591/ 2020 FSI:2.11 (992.54m²)
PP/SB/C/100/2019
PP/NHRB/N/897/2019
PP/NHRB/N/499/2019
PP/NHRB/ S(B2)/090/ 2020 FSI:2.005 (768.92m²)
PP/NHRB/S(B2)/0070/2020 WITH Approved FSI - 1.968. (1,190.72M
PP/NHRB/N/606/2019
B1/1689/2018 WITH Approved FSI - 1.498%. (10394.47 M2)
PP/NHRB/C/276/2020
PP/NHRB/S (B1)/1092/2019 WITH Approved FSI - 2.163 1265.14 M
PP/NHRB/N/632/2020
PP/NHRB/N/403/2020
PP/NHRB/N/1211/2019
C3(N)/1150/2019
PP/NHRB/C/ 39/2021
PP/NHRB/ S(B2)/1200/ 2019 FSI:0.70 (437.76m²)
PP/SB/C/ 0199/2019 FSI:2.298 (1204.11m²)
PP/NHRB/C/104/2020
PP/SB /S(B1)/237/ 2019 FSI:2.586 (1585.57m²)
PP/SB/S(B2)/076/2019 WITH Approved FSI - 2.380. (2003.67 M2)
PP/NHRB/304/2021
PP/NHRB/ S(B1)/0998/ 2019. FSI:1.733 (2917.05m²)
PP/NHRB/C/972/2019
PP/NHRB/ S(B2)/324/ 2020 FSI:1.96 (1217.52m²)
C4/7785/2017 dated 04.10.2019.
PP/NHRB/C/ 64/2021
PP/NHRB/ S(B1)/0405/ 2020 WITH Approved FSI - 2.595. (1919.95
BC1/15502/ 2018
B3/3759/2012
PP/NHRB/ S(B)/0349/ 2020 FSI: 1.335 (1057.09m²)
PP/NHRB/ S(B1)/437/ 2020 FSI:1.96 (815.49m²)
PP/NHRB/ S(B2)/1098/ 2019 FSI:2.00 (1140.21m²)
No.B2/8308/ 2015, FSI:1.28 (408.69m²)
PP/NHRB/N/167/2020
PP/NHRB/C/ 638/2020
PP/SB/C/290/2019
PP/NHRB/N/461/2019
PP/NHRB/N/366/2020
PP/NHRB/C/ 397/2020
PP/NHRB/ S(B1)/0137/ 2021 FSI:2.164 (723.65m²)
PP/NHRB/ S(B1)/1181/ 2019 FSI:2.017 (1783.62m²)
C3/5458/2011
PP/NHRB/N/1082/2019
B3/20303/2018
C3(S)/4215/ 2017 FSI: 3.55 (127467.57 m²)
B2/22498/ 2018 FSI:2.33m (1796.59m²)
PP/NHRB/ S(B2)/315/ 2020 FSI:2.292 (2292.86m²)
C3(S)/10213/ 2018 Approved FSI - 1.14 (41237.79 M2).
PP/NHRB/ S(B1)/1022/ 2019 WITH Approved FSI - 1.488. (43475.04
PP/NHRB/ S(B2)/ 1190/2019 Approved FSI - 2.006. (7062.60 M2)
PP/NHRB/ S(B1)/0940/ 2019 FSI:2.28 (1025.85m²)
PP/NHRB/C/ 140/2021
PP/SB/S(B2)/ 0410/2019 FSI:2.35 (7623.22m²)
PP/NHRB/N/793/2019
PP/NHRB/N/648/2020
PP/NHRB/ S(B1)/0501/ 2020 FSI:2.429 (1581.70m²)
PP/NHRB/C/ 129/2020
PP/NHRB/ S(B2)/549/ 2020 FSI:2.582 (1854.14m²)
BC1/5774/ 2016
C3(S)/1065/2019 Approved FSI - 3.358 (6884.82 M2)
C3(N)/753/ 2016
PP/NHRB/ S(B2)/0535/ 2019 FSI:1.53 (4134.70m²)
C4/15983/2016
PP/NHRB/C/ 1146/ 2019
PP/ NHRB/ C/ 179/2020
PP/NHRB/S (B1)/0063/2020 WITH Approved FSI - 2.46. (1094.33 M
PP/NHRB/S (B1)/0486/2020 Approved FSI - 2.597. (1038.92 M2)
PP/NHRB/ S(B2)/1213/ 2019 FSI:1.99 (820.74m²)
PP/NHRB/ S(B1)/533/ 2020 FSI:0.683 (12618.61m²)
PP/SB/C/88/ 2019
PP/NHRB/S (B1)/1006/2019 Approved FSI - 2.170. (1193.53 M2)
PP/NHRB/ S(B1)/0175/ 2020 FSI:1.992 (3128.80m²)
PP/NHRB/S (B2)/0966/2019 WITH Approved FSI - 1.970 (708.80 M2
PP/NHRB/ S(B2)/0594/ 2019 FSI:1.96 (685.98m²)
C3(S)/296/2019 WITH Approved FSI - 3.5421 (610119.09 M2)
PP/NHRB/ S(B2)/0926/ 2020 FSI:2.05 (613.04m²)
PP/NHRB/C/ 568/2020
PP/NHRB/S/685/2021 WITH Approved FSI - 1.154%. 592.96 M2
B1/16476/ 2018 FSI:1.862 (8892.27m²)
BC1/17735/ 2018 Approved FSI - 1.659. (29927.30 M2)
PP/NHRB/ S(B1)/0074/ 2021 FSI:1.785 (8478.35m²)
PP/NHRB/C/ 1072/2019
PP/NHRB/S (B1)/0965/2019 WITH Approved FSI - 1.979. (1061.50
PP/IND/S(B1) /0470/2021 WITH Approved FSI - 2.756%. 3648.87 M
PP/NHRB/ S(B2)/0626/ 2020 FSI:2.26 (11615.87m²)
BC1/10937/ 2015 FSI:1.545 (1496.92m²)
PP/NHRB/ S(B1)/0408/ 2020 FSI:2.59 (1675.12m²)
PP/NHRB/ S(B1)/0223/ 2021 FSI:1.958 (794.78m²)
PP/NHRB/ S(B1)/0619/ 2019 FSI:1.999 (1670.83 m²)
PP/NHRB/N/875/2019
PP/NHRB/ S(B1)/0717/ 2019 FSI:1.634 (393.79 m²)
PP/SB/C/270/2019
PP/NHRB/ S(B1)/1196/ 2019 FSI:1.987 (753.40m²)
C3(N)/16411/2013 & EC/C-1/4053/2021
PP/NHRB/ S(B2)/683/ 2020 FSI:2.789 (3390.05m²)
PP/NHRB/N/29/2021
PP/NHRB/N/13/2020
B2/5125/ 2018 FSI:0.782 (1311.63m²)
PP/NHRB/S (B1)/0534/2019 WITH Approved FSI - 2.449. 6261.60 M
PP/NHRB/N/0682/2020
C4/11293/2013 WITH Approved FSI - 0.350. 2673.98 M2
BC1/2458/ 2011 & EC/C-II/11038/2015
PP/NHRB/S (B2)/0195/ 2020 WITH Approved FSI 1.950. 877.09 M2
B3/16516/2016
PP/NHRB/C/ 229/2022
B2/13102/ 2018 FSI:0.756 (3004.95m²)
S(B1)/1210/ 2019 FSI:2.068 (897.72m²)
PP/NHRB/ S(B2)/374/ 2020 FSI:1.997 (1803.24m²)
PP/NHRB/C/ 225/2020
PP/NHRB/S (B2)/1135/2019 WITH Approved FSI - 2.581. (1499.76
PP/NHRB/S (B2)/0177 /2021 WITH Approved FSI - 1.996%. 952.41
PP/NHRB/ S(B1)/0032/2020 WITH Approved FSI - 2.593. 1426.28 M
PP/NHRB/S (B2)/0832/ 2019 WITH Approved FSI - 1.999%. (12276.
PP/NHRB/N/232/2020
PP/NHRB/S(B2)/448/2020 WITH Approved FSI 2.485. 3995.84 M2
PP/NHRB/N/802/2019
PP/ SB/C/61/2019
PP/NHRB/C/ 587/2020
PP/IND/S(B2) /0426/2020 WITH Approved FSI - 2.330 1915.20 M2
PP/NHRB/S(B2)/0148/2020 WITH Approved FSI - 2.592. 3570.12 M
PP/NHRB/N/1046/2019
PP/NHRB/ S(B2)/0444/ 2021 FSI:0.834 (449.69m²)
PP/NHRB/ S(B2)/0064/ 2020 FSI:1.91 (857.52m²)
PP/NHRB/N/171/2021
C3(S)/14500/ 2016 FSI:3.362 (44551.09m²)
PP/NHRB/S (B1)/0678/ 2020 WITH Approved FSI 1.827. 11472.60
EC/SII/8628/2019WITH Approved FSI - 2.51. 36834.95 M2
C3(S)/14500/ 2016 FSI:3.01 (60721.19m²)
PP/NHRB/S(B2)/0436/2020 WITH Approved FSI - 2.240. 13333.29
PP/INST/S(B1)/0834/2019 WITH Approved FSI - 1.524 10673.81 M2
PP/NHRB/C/ 171/2020
PP/NHRB/C/ 984/2019
PP/NHRB/S(B2)/0647/2019 WITH Approved FSI 2.110. 1315.25 M2
BC1/2325/ 2015
PP/NHRB/S(B2)/0980/2019 WITH Approved FSI 1.990. 872.84 M2
PP/NHRB/N/0605/2020
PP/NHRB/N/58/2020
C3(S)/9316/ 2017. FSI:2.088 (2,48,546.31m²)
PP/NHRB/C/ 472/2019
PP/NHRB/S(B2)/689/2020 WITH Approved FSI - 2.051. 12379.51 M
B3/11520/2017
PP/NHRB/ S(B1)/0101/ 2021 FSI:2.479 (2489.91m²)
PP/NHRB/ S(B1)/0114/ 2021 FSI:1.983 (732.68m²)
PP/SB/S(B1)/ 0257/2019 WITH Approved FSI - 2.180. 972.25 M2
PP/NHRB/ S(B2)/602/ 2020 FSI:2.29 (1149.04m²)
PP/NHRB/N/513/2020
PP/NHRB/C/ 227/2021
B1/19975 /2011 WITH Approved FSI 1.460. 765.27 M2
PP/NHRB/N/415/2020
PP/NHRB/ S(B1)/369/ 2020 FSI:2.002 (897.87m²)
PP/NHRB/ S(B1)/1143/ 2019 FSI:1.853 (2844.92m²)
C2/5260/ 2016 FSI:1.293 (3088.35m²)
PP/NHRB/ S(B1)/325/ 2020 FSI:1.935 (1013.64m²)
PP/NHRB/ S(B1)/074/ 2020 FSI:1.998 (1119.05m²)
B3/18003/ 2012 & EC/C-II/11038/2015
PP/NHRB/C/ 719/2019
PP/NHRB/ S(B2)/0249/ 2021 FSI:1.969 (1280.76m²)
PP/NHRB/C/ 325/2021
PP/NHRB/ S(B1)/1187/ 2019 FSI:1.975 (5115.17m²)
PP/NHRB/N/398/2020
PP/NHRB/S (B1)/34/2020
PP/NHRB/C/0554/ 2019
PP/NHRB/C/ 606/2020
PP/NHRB/S(B1)/0183/2021 WITH Approved FSI - 2.575. 2881.84 M
PP/NHRB/S(B1)/0116/2021 WITH Approved FSI - 1.987. 3378.64 M
PP/NHRB/S(B1)/0221/2021 WITH Approved FSI - 2.411. 3973.00 M
PP/SB/C/191/2019
PP/NHRB/ S(B1)/0409/ 2019 FSI:2.389 (1597.82m²)
BC1/5035/ 2018
PP/NHRB/C/ 0266/2019
PP/NHRB/ S(B2)/0184/ 2021 FSI:1.94 (686.08m²)
PP/NHRB/ S(B1)/1155/ 2019 FSI:1.868 (997.53m²)
C3(S)/17070/ 2017 WITH Approved FSI - 2.409 (53482.16 M2)
PP/INST/C/ 211/2019
C3(S)/401/2021WITH Approved FSI - 2.631 161638.05 M2
No.B2/12038/ 2018 WITH Approved FSI 1.260. 23255.99 M2
PP/NHRB/ S(B2)/746/ 2019 FSI:2.55 (1701.15m²)
BC1/12005/ 2018
PP/NHRB/C/ 262/2021
PP/NHRB/C/ 635/2019
PP/NHRB/ S(B1)/0868/ 2019 FSI:2.528 (1949.52m²)
PP/SB/C/345/2019
PP/NHRB/ S(B2)/0028/ 2021 FSI:2.29 (1287.22m²)
PP/ SB/C/61/2019
C3(S)/243/ 2017 FSI: 2.528 (586015.35 m²)
PP/NHRB/150/2021
C3(S)/17073/2018 WITH Approved FSI 92902.98 M2
PP/NHRB/S(B2)/0653/2020 WITH Approved FSI - AREA 6625.66 M2
C3(S)/436/ 2019
PP/NHRB/N/347/2020
PP/NHRB/C/ 788/2019
B3/6651/2014
PP/NHRB/N/88/2021
C3(N)/12660/2018
BC1/4670/ 2015
PP/NHRB/C/ 1167/2019
C3(N)/12803/2017
C3(N)/4165/ 2018
B3/1496/2018
PP/NHRB/ S(B2)/0393/ 2020 FSI:1.87 (636.10m²)
PP/NHRB/ S(B2)/0823/ 2019 FSI:1.746 (1.377.46m²)
PP/NHRB/N/284/2020
PP/ NHRB /C/592/2020,
C3(S)/83/2020
PP/NHRB/S(B2)/0364/2021 WITH Approved FSI - 2.545. 1221.56 M
PP/NHRB/C/641/2020
PP/NHRB/ S(B2)/0079/ 2022 FSI:1.632 (1819.84m²)
PP/NHRB/S(B2)/0008/2021 WITH Approved FSI - 2.350. 1021.80 M
PP/NHRB/C/668/2019
PP/NHRB/N/158/2020
PP/NHRB/ S(B2)/0578/ 2020 dated 05.07.2021. FSI:2.10 (2744.06m²
B1/20206/ 2015 dated 04.11.2016. FSI:1.481 (701.60m²)
PP/NHRB/N/957/2019
PP/NHRB/ S(B2)/0166/ 2022 FSI:1.372 (404.79m²)
PP/SB/C/086/ 2019 dated 15.07.2019. FSI:1.567 (697.95m²)
PP/NHRB/C/588/2020 dt 18.03.2021.
PP/NHRB/ S(B1)/0076/2021 WITH Approved FSI - 1.884. 727.28 M2
PP/NHRB/N/620/2019
PP/NHRB/N/222/2020
PP/NHRB/S(B1) /0358/2020 WITH Approved FSI - 1.981. 1817.09 M
PP/SB/C/394/2019
C3/13278/ 2012 & Renewed EC/C-I/14428/2016
PP/NHRB/C/595/2019
PP/NHRB/S (B1)/0598/2019 WITH Approved FSI - 1.980. 2506.07 M
PP/NHRB/C/608/2020
PP/NHRB/N/1043/2019
C4/17205/2016 dated 06.12.2017 WITH Approved FSI - 1.185. 515
C3(N)/941/2017
C3(N)/7611/2017
PP/INST/C/079/2019
PP/NHRB/N/161/2020
PP/INST/C/ 687/2020
PP/NHRB/ S(B1)/0987/ 2019 dated 30.12.2019. FSI:2.37 (1479.60m²
B3/6579/2012, and Renewed in EC/N-II/8402/2019
PP/NHRB/ S(B2)/0042/ 2020 WITH Approved FSI - 2.368. 1065.80
PP/NHRB/S (B2)/0721/2019 WITH Approved FSI - 1.990%. 861.81
PP/NHRB/S(B2)/0319/ 2021 WITH Approved FSI - 1.980. 593.42 M2
BC1/572/ 2017
PP/NHRB/N/404/2019
PP/NHRB/C/881/2019
PP/NHRB/ S(B2)/0451/ 2020 dated 14.10.2020. FSI:1.557 (885.65m²
PP/NHRB/N/677/2020
PP/NHRB/S (B1)/0581/2019 WITH Approved FSI - 1.830%. 419.94
PP/SB/C/347/2019
PP/NHRB/C/218/2020
B3/5410/2011 B3/16425/2012 EC/N-II/1083/2016
PP/NHRB/N/526/2019
PP/NHRB/ S(B1)/0435/ 2021 dated 03.12.2021. FSI:1.993 (697.73m²
PP/NHRB/ S(B1)/0162/ 2021 WITH Approved FSI - Area - 6171.21 M
C3(S)/1140/ 2019 WITH Approved FSI - 2.24 6171.21 M2
PP/SB/S(B2)/0326/ 2019 dated 30.08.2019. FSI:1.894 (836.91m²)
PP/NHRB/C/0573/2019
PP/NHRB/N/211/2020
PP/NHRB/ S (B1)/0318/2021 WITH Approved FSI - 1.995. 598.50 M
PP/NHRB/S/0400/2020 WITH Approved FSI - Area - 1167.79 M2 1.9
C3(S)/14707/ 2017 WITH Approved FSI - 1.942 (28036.01 M2)
PP/NHRB/ S(B2)/0132/ 2021 dated 04.05.2021. FSI:2.449 (1092.09
PP/IND /S(B1)/0389/2020 dated 29.12.2020. FSI:2.79 (5310.26m²)
PP/NHRB/ S(B1)/00698/ 2020 dated 17.06.2021. FSI:2.839 (5657.7
PP/NHRB/C/1225/2019
C3(S)/11405/ 2018 dated 22.08.2019. FSI:4.10 (24425.65m²)
PP/NHRB/S (B1)/0159/2020 WITH Approved FSI - 2.799. 2519.44 M
PP/IND/S(B1)/ 0226/2019 WITH Approved FSI - 2.514. 1336.02 M2
PP/ NHRB /C/281/2020
BC1/8579/2010
PP/NHRB/N/1164/2019
PP/NHRB/N/462/2020
PP/INST/N/366/2021
CMDA/PP/MSB/N/81/2019
PP/NHRB/N/896/2019
PP/NHRB/N/378/2020
PP/NHRB/ S(B1)/0401/ 2020, dated 31.10.2020. FSI:1.79 (461.56m²
PP/NHRB/ S(B1)/205/ 2020 dated 22.07.2020. FSI:2.608 (2602.80m²
PP/NHRB/ S(B2)/0178/ 2020 dated 12.08.2020. FSI:1.566 (626.69m²
PP/NHRB/N/145/2020
PP/NHRB/ S(B2)/0639/ 2020 dated 24.03.2021. FSI:1.55 (1904.35m²
PP/NHRB/ S(B1)/ 569/2019 WITH Approved FSI - 2.201 1100.65 M2
PP/NHRB/C /239/ 2020
C3(N)/0096/2019
PP/NHRB/N/952/2019
PP/NHRB/ S(B1)/0673/ 2020 WITH Approved FSI 2.233. 991.60 M2
PP/NHRB/C/679/2020
PP/NHRB/ S(B1)/0682/ 2021 FSI:1.093 (10733.07m²)
PP/NHRB/C/375/2019
PP/NHRB/C/342/2021
PP/NHRB/ S(B2)/0626/ 2020. FSI:2.26 (11615.87m²)
PP/NHRB/S(B2)/0900/2019 WITH Approved FSI 2.54 1133.26 M2
PP/NHRB/ S(B2)/0500/ 2020 WITH Approved FSI 2.097 1869.90 M2
PP/NHRB/ S(B2) /0891/ 2019 WITH Approved FSI - 2.030. 3,288.96
B3/5410/2011 B3/16425/2012 EC/N-II/1083/2016
PP/NHRB/ S(B2)/0348/ 2021 dated 23.09.2021. FSI:2.314 (1350.41
C3(S)/055/2021 dated 29.03.2021. FSI:3.829 (7976.70m²)
C3(N)/ 4155/ 2014
PP/NHRB/C/610/2019
PP/NHRB/N/1009/2019
PP/NHRB/ S(B2)/0275 /2019 dated 02.07.2020. FSI:1.96 (4039.54m²
C3(N)/4606/2011
PP/NHRB/N/963/2019
PP/NHRB/N/246/2020
PP/NHRB/C/171/2020
PP/NHRB/C/196/2021
C3(S)/5447/ 2016 WITH Approved FSI - 2.236 8787.41 M
PP/NHRB/S(B1)/0664/2020. FSI:2.095 (1183.80m²)
PP/NHRB/C/224/2021
PP/NHRB/C/171/ 2022
PP/SB/S(B1)/0363/201
No.PP/IND/S/689/2019 dated 11.02.2020. FSI:1.995 (1197.06m²)
PP/NHRB/S(B2)/0576/2020. FSI:2.496 (1648.95m²)
No.PP/NHRB/S(B2)/0234/2022 dated 16.09.2022.WITH Approved FSI
PP/NHRB/C/899/2019
PP/NHRB/C/503/2019
C3(N)/5457/2018
Completion Certificate / Partial Completion Certificate issued for
Stilt floor + 2 floors + 3rd Floor (Part) Leather Goods making Industr
Stilt Floor+4 Floors IT/ITES use building
Ground Floor + 1st Floor (part) commercial use Club House buildin
Double basement Floor (Mechanical parking) Ground Floor 9 Floor C
Stilt floor + 5 Floors Residential building with 10 dwelling units
Ground Floor (4.95m height) Shop use Commercial Building
Ground Floor (4.95m height) Shop use Commercial Building
Stilt Floor + 3 Floors (12.0 m height) Residential Building with 6 Dwe
Stilt Floor+4Floors residential building with 12 dwelling units
Group Development 5 Blocks comprising Block Nos.7, 8, 9 & 16 (LIG)
MSB Group Development consisting 4 blocks of Combined Basement Flo
Stilt floor + 3 floors Residential Building with 6 dwelling units
Stilt floor + 3 floors Residential Building with 6 dwelling units
Construction of Administrative Block : Ground floor; SDB -1 : Ground
Multistoryed Group Development Building: Combined Basement Floor +
Multi Storied building of Stilt Floor + 1st Floor to 11th Floor + 12 F
Tower III: 1st Floor to 7th Floor - Guest Rooms, Cafetaria, Meeting
Block 6 & 7 (LIG) with Stilt Floor + 7 Floors with 249 Dwelling Un
Block - 4 of Prayer Hall and Multipurpose Hall of Stilt floor(part)/G
Stilt + 4 floors Residential building with 8 dwelling units
Group Development of one Block [Block-1] of Stilt floor + 4 Floors ou
Stilt Floor + 4 Floors Residential Building with 2 Dwelling Units
Construction of Double Basement Floor + Stilt Floor (Part) / Ground
Stilt Floor+4 Floors residential building with 18 dwelling units
Additional construction MSB Block -2 consists of Triple Basement Floo
Stilt + 4 Floors Residential Building with 8 Dwelling Units with avai
Construction of Basement Floor Stilt Floor + 2 Floors Commercial (
Stilt floor + 3 Floors office (Commercial building)
Stilt floor + 3 Floors Residential building with 7 dwelling units (as p
Construction of Stilt Floor + 5 Floors Residential Building with 25 D
Stilt + 5 floors Residential building with 15 Dwelling Units
Stilt Floor + 5 Floors residential building with 15 dwelling units ava
Stilt Floor + 5 Floors residential building with 5 dwelling units avai
Construction of Stilt Floor + 2 Floors + 3rd Floor (Part) Residential
Construction of Combined Double Basement Floor for Block 1 to 3, Bl
Stilt + 5 floors Residential building with 40 Dwelling Units with ava
Ground Floor (Part) + 3 Floors Club House Commercial Building
Stilt Floor + 3 floors with 6 dwelling units of Residential building
Construction of Stilt Floor + 4Floors + 5th Floor (part) (18.30m he
Construction of Basement Floor (Part) + Stilt Floor (Part) / Ground F
Construction of Stilt Floor + 3 Floors Residential Building with 16 Dw
Construction of Stilt Floor + 5 Floors (18.0m Height) Residential Bu
Block: 25: Combined Double Basement Floor + Ground Floor + 11 floo
Basement floor + Stilt floor + 4 floors commercial (office) building
Stilt floor + 3 floors Residential Building with 1 dwelling unit cum
Stilt Floor + 3 Floors residential building with 6 dwelling unit
Stilt + 3 Floors + 4th Floor (part) office use Commercial Building av
Stilt Floor + 4 Floors Residential Building with 11 dwelling units av
Stilt Floor + 4 Floors Office Building with availing Premium FSI
Stilt Floor + 5 Floors Residential Building with 15 dwelling units
Construction of Stilt Floor + 5 Floors Residential Building with 20 D
Multi-Storied building with Tower 1 & 2 with combined Basement Fl
Stilt Floor + 4 Floors Residential Building with 8 dwelling units
Stilt floor + 4 floors Residential Building with 8 dwelling units
Multi Storied building of Triple Basement Floor + Ground Floor + 7
Construction of Stilt Floor + 3 Floors Residential Building with 15 Dw
Group Development comprising of 7 Blocks, Typical block A,B,C & D con
Stilt floor + 5 floors Residential Building with 10 dwelling units wit
combined 4 Basement Floor + Tower I : Ground Floor + 18 floors resid
Stilt floor + 3 floors Commercial (Office) Building
Ground Floor (Part) / Stilt Floor (Part) + 5 Floors Residential build
Stilt Floor + 4 Floors Residential Building with 8 Dwelling Units
Stilt Floor + 3 Floors Residential Building with 8 dwelling units
Additional constructions & alterations to the earlier existing approv
Construction of Stilt Floor + 3 Floors + 4th Floor (part) with Servic
Construction of Stilt Floor + 2 Floors + 3rd Floor (Part) Residential
Stilt Floor + 3 Floors Residential Building with 6 dwelling units
Stilt Floor + 7 Floors Multi Storied residential building with 49 dwell
Construction of Basement Floor (Part) + Stilt Floor + 4 Floors IT/ITE
Stilt Floor + 3 Floors Residential Building with 12 dwelling units
Stilt Floor + 3 Floors Residential Building with 4 dwelling units (6
Construction of Stilt Floor + 4 Floors with 8 Dwelling Units of residen
Group Development of 3 Blocks (Block – A, B and C) of Stilt Floor +
Basement Floor + Ground Floor (Shop) + 3 Floors (Office) + 4th Floor
Stilt + 4 floors office (Commercial) building
Stilt floor + 3floors + 4th floor (part) + 5th floor (part) with 5 dwel
Block No.10,12,13, & 15 consisting of Combined Double Basement Floo
Stilt + 4 Floors Residential Building with 7 dwelling units (as per a
Construction of Block 4: Stilt Floor + 4 Floors with 56 Dwelling Units
Construction of Six Blocks of International Guest House Block No.5
Stilt floor + 2 floors + 3floor (part) with 16 dwelling units Residentia
Ground floor (part)/ Stilt (part) + 4 Floors Commercial (Office) build
Stilt floor + 3 floors Residential Building with 6 dwelling units
Stilt Floor + 4 Floor + 5th Floor (part) residential building with 4 dwe
Stilt floor + 4 floors Residential building with 4 dwelling units
Stilt floor + 4 floors residential building with one Block consists of
High Rise Residential building consist of extended Basement Floor + S
Stilt Floor + 4 Floors Residential building with 6 dwelling units (as p
Stilt Floor + 4 Floors Residential Building with 44 dwelling units
Stilt Floor + 4 Floors Residential Building with 8 dwelling units
Stilt Floor + 4 Floors Residential building with 4 dwelling units
Group Development of Block – 1 - Ground Floor Commercial (Shop) bu
Stilt Floor + 3 Floors Residential Building with 9 dwelling units
2 Blocks of Block – A (LIG) consisting of Ground Floor + 3 Floors res
Stilt Floor + 3 floors with 6 dwelling units availing with Premium FSI
Stilt + 4 Floors Residential cum commercial building (Retail space at
Stilt floor + 4 floors Residential Building with 4 dwelling units
Stilt Floor + 4 Floors Residential building with 4 dwelling units
Stilt Floor + 4 floors Residential building with 4 dwelling units avai
Construction of Stilt Floor + 3 Floors Residential Building with 15 Dw
Stilt floor + 3 floors Residential Building with 6 dwelling units
Construction of Stilt Floor + 3 Floors + 4th Floor Part Residential bu
Stilt Floor + 5 Floors Residential Building with 10 dwelling units ava
Construction of Stilt Floor + 3 Floors (12.0m Height) Residential Bui
Stilt floor + 3 Floors Residential building with 12 dwelling units
Stilt floor + 4 floors Residential Building with 7 dwelling units
Stilt floor + 5 Floors Residential building with 10 dwelling units
HRB Group Development of Block – 1 - (Tower A) - Combined Stilt floo
Stilt Floor + 5 Floors Residential Building with 5 dwelling units avai
Ground floor + 1st Floor Daily or Weekly market serving local needs
Stilt + 5 floors, Commercial building (Business office) availing with
Stilt Floor + 4 Floors Residential Building with 28 dwelling units ava
Stilt floor + 5 floors Residential building with 10 dwelling units ava
Construction of Stilt Floor + 5 Floors Residential Building with 15 D
Ground Floor + 2 Floors Worker Dining and Resting Hall
Basement Floor(parking) + Ground Floor + 2 Floors Commercial Build
Group development of 4 Blocks comprising stilt floor + 5 floors resid
Stilt Floor + 3 floors Residential building with 9 dwelling units
Block No.125 Boyd Business School consists of Ground Floor + 1st Fl
Stilt Floor + 3 Floors Residential Building with 9 dwelling units
Construction of Stilt Floor + 4 Floors + 5th Floor (Part) Residential
Stilt Floor + 4 Floors Commercial (Corporate Office Building)
Special Building / Group Development of Block A, consists of Stilt Fl
Stilt Floor + 4 floors office use commercial building and meter Roo
Stilt floor + 3 floors Residential building with 9 dwelling units.
Stilt Floor + 2 floors + 3rd Floor (part) with 11 dwelling units Reside
Stilt + 3 floors Residential Building with 6 dwelling units.
Stilt floor + 5 Floors Residential building with 10 dwelling units
Basement Floor + Stilt Floor + 3 floors Cottage Industry cum Residen
Stilt Floor + 3 Floors Residential Building with 6 dwelling units
Stilt Floor + 3 floors + 4th Floor (part) + 5th Floor (part) [as per app
Stilt floor + 2 floors + 3rd Floor part Residential building with 16 dw
Ground Floor + 1st Floor Residential Building with 9 dwelling units
Stilt floor + 5floors residential building with 5 dwelling units availi
Stilt Floor + 4 floors Residential Building with 12 dwelling units Ava
one Block (Block-A) of combined Basement Floor + Stilt floor + 14 fl
Stilt Floor + 4 floors residential building with 12 dwelling units wit
Stilt floor + 4 Floors Residential building with 28 dwelling units
Combined Double Basement floor in Block No: 4 consists of stilt floor
Stilt Floor + 4 floors + 5th floor (part) Residential Building with 9 d
Stilt Floor + 4 floors residential building with 16 dwelling units ava
Basement Floor + Ground Floor + 5 Floors + 6th Floor (part) to 12th
Construction of Group Development comprising of 12 Blocks; Typical
Construction of 2 Blocks Stilt Floor + 4Floors + 5th Floor (part) 79
Stilt Floor + 4 floors Residential Building with 5 dwelling units avai
Stilt Floor + 4 Floors Residential Building with 8 dwelling units
combined Basement floor Block No:1 Consists of Stilt floor + 4 floors
Stilt Floor + 3 Floor + 4th Floor (part) Residential building with 3 dw
Stilt Floor + 3 Floors Commercial building (1st & 2nd floor – Shop, 3r
Stilt floor + 5 Floors Residential building with 10 dwelling units Ava
Stilt + 4 Floors Residential Building with 16 dwelling units
Stilt Floor + 4 floors residential building with 10 dwelling units ava
Stilt Floor + 3 Floors Residential Building with 5 dwelling units
Extended Basement Floor + Stilt Floor + 1st Floor (Mechanical Park
Combined Double Basement Floor with Two Blocks; Block – 1 compris
Basement Floor + Ground Floor + 2floors + 3rd floor part Commercial
Ground floor + 2 floors School Building
Stilt Floor + 4 Floors + 5th Floor (Part) service apartment with 23 d
Stilt floor part/ Ground floor part (Show room) + 1st floor (show roo
Construction of Stilt Floor + 5 Floors (18.0m Height) Residential Bu
Construction of Stilt Floor + 4 Floors + 5th Floor (Part) (18.0m heig
Stilt Floor + 3 floors Residential building with 11 dwelling units
Group Development consisting of 22 Blocks; Block No.1 to 20 consist
Stilt (Part) + Ground Floor (Part) + 2 Floors + 3rd Floor (Part) shop
Construction of Stilt Floor + 3 Floors Residential Building with 6 Dw
Stilt Floor + 4Floors Commercial Building (Office Use)
Construction of Stilt Floor + 4 Floors Residential Building with 8 Dwe
Stilt Floor + 3 floors Residential building with 6 dwelling units.
Construction of Block 15: (additional construction): Ground Floor +
Stilt Floor + 4 Floor Residential building with 4 dwelling units Avail
Stilt + 2 Floors Office (Commercial) Building
Construction of Stilt Floor + 2 Floors (Office Use 592.96m2) Commer
Stilt Floor (part) / Ground floor (part) + 2floors + 3rd floor (part)
Construction of Group Development of Residential Building of 3 Blocks
Stilt floor (part) / Ground Floor (part) + 3 floors Commercial Building
Existing Office Cum Residential Building of Stilt Floor + 2 Floors (of
Construction of Stilt Floor + 3 Floors (12.0m height) Residential Bui
Construction of Basement Floor + Stilt Floor + 4 Floors IT/ITES Buil
Group Development consisting of 2 Blocks; Block-A: Stilt floor + 5 fl
Stilt floor + 3 Floors + 4th Floor (part) Bank cum residential buildin
Stilt floor + 4 floors + 5th floor (part) Residential building with 19
Stilt floor + 4 Floors Residential Building with 4 dwelling units.
Stilt Floor + 5 Floors Residential Building with 10 Dwelling Units.
Ground floor part (office) + Stilt floor + 3 floors + 4th floor part Res
Stilt floor + 3 Floors Commercial building (office use)
Stilt Floor + 4 Floors residential building with 8 Dwelling Units
Stilt Floor + 4 Floors Residential building with 5 dwelling units.
MSB Combined Basement + Combined Stilt and Tower -1: 1st Floor to
Stilt Floor + 5 Floors Residential building with 34 dwelling units w
Stilt Floor + 5 floors Residential building with 3 dwelling units avai
Completed construction of Existing Group development of 2 Blocks of
Ground Floor + 2 Floors + 3rd floor (part) Residential building with 1
Construction of Group Development comprising of 2 Blocks; Block-A con
Stilt Floor + 3 floors Residential cum office building
Construction of Academic Administrative Block with GF+FF and Hos
Group Development with 4 Blocks A, B, C & D out of 16 Blocks (Block
Construction of Stilt Floor + 4 Floors with 9 Dwelling Units of Reside
Group development of 3 Blocks, Block – 1 of Ground Floor + Messani
Ground Floor + 1st Floor Commercial Building (Restaurants 5 Nos.)
Stilt Floor + 2 Floors Cinema Theatre with (5 screens) fully Air condit
Stilt Floor + 4 Floors Residential Building with 6 dwelling units avai
Stilt Floor + 5 Floors Residential building with 7 dwelling units.
Stilt Floor + 4 Floors Residential Building with 8 Dwelling Units
Construction of Stilt Floor + 4 Floors with 28 Dwelling Units afforda
Construction of Stilt Floor + 2 Floors + 3rd Floor (Part) (12.0m Heig
Construction of Stilt Floor + 4 Floors + 5th Floor (Part) Residential
Construction of Group Development comprising of 6 Blocks; Block 1 t
Stilt floor + 5 floors Residential building with 5 dwelling units
Construction of Stilt Floor + 5 Floors Residential Building with 40 D
Stilt Floor + 4 floors Residential building with 8 dwelling units with
Group Development of Residential Building with Block B having Stilt +
Stilt Floor + 3 Floors Residential Building with 12 dwelling units
Construction of Basement Floor (Part) + Stilt Floor + 4Floors IT/ITE
Construction of Stilt Floor + 5 Floors Residential Building with 45
Stilt floor + 4 floors Office building (Commercial)
Ground floor + 2 Floors Commercial Building (office use)
Stilt Floor + 4 floors Commercial building (office use)
Basement Floor + Silt Floor + 2 Floors Office building (2nd Floor Ste
Combined Triple Basement floors for Block 1 & 2 with Ground floor +
Construction of Group Development comprising of 2 Blocks; Block-A
Construction of Combined Double Basement - Block-B: Stilt Floor + 1
Construction of Double Basement Floor (Car Parking) + Ground Floor
Construction of Stilt Floor + 4Floors + 5th Floor (part) Residential
Construction of Ground Floor + 1st Floor + 2nd Floor (part) + 3rd Fl
Group Development of Block – J: Ground Floor + 3 Floors Commercial
Stilt Floor + 4 Floors Residential Building with 8 dwelling units
Construction of Stilt Floor + 4 Floors with 12 Dwelling Units with P
Basement Floor + Stilt Floor + 4 Floors Commercial (Office) Building
Construction of Stilt Floor + 4 Floors Residential Building with 8 Dwe
Stilt floor + 3 Floors Residential building with 15 dwelling units
Stilt Floor + 5 Floors Residential building with 5 dwelling units
of Block No. 5, Combined Triple Basement Floor + Ground Floor +9 F
Basement Floor + Stilt + 3 Floors + 4th Floor (Part) Shop cum Office
Construction of Stilt Floor + 3 Floor Residential Building (12.0m hei
Stilt floor + 3 floors Residential Building with 6 dwelling units
Stilt Floor + 4 Floors +5th Floor (Pt) Residential Building with 25 Dw
Stilt Floor + 4 Floors Residential Building with 4 dwelling units.
Construction of Stilt Floor + 4 Floors Residential Building with 12 D
Stilt Floor + 4 Floors Residential building with 8 dwelling units avai
Stilt Floor + 3 Floors Residential building with 5 dwelling units
Stilt Floor + 5 Floors Residential Building with 5 Dwelling Units wit
Construction of Stilt Floor + 3 Floors Residential Building with 7 Dwe
Stilt Floor + 4 Floors + 5th Floor (part) Office (Commercial) building
Stilt Floor + 3 Floors + 4th Floor (part) Residential Building with 4
Stilt Floor + 4 Floors Commercial building (office use).
Stilt Floor + 2 Floors + 3rd Floor (part) IT/ITES Building.
Stilt Floor + 4 Floors Residential building with 8 dwelling units.
Stilt Floor + 3 floors Residential building with 12 dwelling units.
Blocks 6 & 9 (Out of 12 Blocks) Block – 6: Stilt Floor + 4 Floors Res
Stilt floor + 4 Floors Residential building with 8 dwelling units with
Stilt Floor + 3 Floors + 4th Floor (part) Residential Building with 7 d
Stilt Floor + 5 Floors Residential building with 7 Dwelling Units (10
Stilt Floor + 5 Floors Residential Building with 55 dwelling units.
Stilt Floor + 4 Floors Residential building with 8 dwelling units
Stilt Floor + 4 Floors (15.0m Height) Residential building with 8 Dwe
Stilt Floor + 3 Floors Residential Building with 12 Dwelling Units
Stilt Floor + 5 Floors Residential Building with 14 Dwelling Units (1
Construction of Stilt Floor + 5 Floors with 18.30m height Residentia
Construction of Stilt Floor + 3 Floors Office Use Commercial Buildin
Construction of Group Development comprising of 2 Blocks; Block-A &
Stilt Floor + 4 Floors Office cum Service Apartments with 16 Dwellin
Basement Floor (part) + Stilt Floor + 5 Floors Residential Building
Stilt + 3 Floors Residential building with 4 Dwelling Units
Stilt Floor + 3 Floors + 4th Floor (Part) + 5th Floor (Part) Commercia
Stilt Floor + 4 Floors Residential Building with 8 dwelling Units.
Stilt Floor + 4 Floors Residential Building with 8 dwelling Units.
Construction of Block C consisting Stilt Floor (part)/Ground Floor (
Ground Floor + 2 Floors Higher Secondary School Building
Additional Construction of 2 Staircases to the existing Campus-3A & 3
Construction of Stilt Floor + 4 Floors Residential Building Group De
Stilt Floor + 5 Floors Residential Building with 9 dwelling Units avai
Stilt Floor + 3 Floors + 4th Floor (Part) Office Building
Stilt Floor + 4 Floors Clinic cum Residential Building with 3 Dwelling
Stilt Floor + 3 Floors Residential Building with 5 Dwelling Units (6
Stilt Floor + 4 Floors +5th Floor (part) Residential Building with 12
Stilt Floor + 3 Floors Residential building with 6 Dwelling Units
Stilt Floor + 4 Floors office use & Residential Building with 11 dwell
Group Development of Residential Building with Block A having Stilt
Block No.26 consisting of Combined Double Basement Floor + Ground
Stilt Floor + 4 Floors Residential building with 4 dwelling units
Construction of Mandakini Hostel Block : Ground Floor + 9 Floors
Construction of Affordable Housing consisting of Stilt Floor + 5 Flo
High Rise Group Development Building Block – A: Stilt Floor + 19 Flo
Ground Floor (part)+ 1st Floor (part) Residential building with 2 dwe
Stilt Floor + 4 Floors + 5th Floor (part) Office Cum Residential Buildi
Stilt floor + 4 Floors office building
Stilt Floor(part) / Ground Floor (part) + 2 Floors Residential Ser
4 Blocks of Block - M of GF + 3F residential building with 48 dwelling
Stilt Floor + 3 Floors + 4th Floor (part) (Stilt Floor – Parking / Non
Stilt Floor + 4 Floors Residential Building with 20 dwelling units av
Additional construction of Fire Escape Ramp to the existing Hospit
Additional construction of common Fire Escape Ramp to the existing
Stilt floor + 3 floors Residential Building with 5 dwelling units
Stilt Floor + 5 Floors Commercial Building (office use)
Stilt Floor + 5 Floors office use building.
Stilt Floor + 4 Floors Office building
Completed construction consists of Basement Floor + Ground Floor (Pa
Basement Floor (Part) + Stilt Floor (Basement Floor to Stilt Floor M
Construction of Stilt Floor + 5 Floors Residential Building with 15
Stilt Floor + 5 Floors Residential Building with 9 Dwelling Units (1
Stilt Floor (part)/Ground Floor (part) + 3 Floor Residential Building
Construction of Stilt Floor + 5 Floors Residential Building with 10 D
Stilt Floor + 3 Floors Residential Building with 8 Dwelling Units
Stilt Floor + 4 floors Residential building with 8 dwelling units
Basement Floor + Stilt Floor + 4 Floors + 5th Floor (part) Residentia
Basement Floor (part) + Stilt Floor + 4 floors Residential building wi
Basement floor + Stilt Floor (part) / Ground Floor (part) + 2 Floors
Stilt Floor + 2 Floors + 3rd Floor part Commercial building (Restaura
Stilt Floor + 3 Floors Residential building with 6 dwelling units.
Stilt Floor + 4 Floors Residential Building with 8 Dwelling Units
Construction of Stilt Floor + 4 Floors Residential Building with 8 Dw
Stilt Floor + First Floor and Second Floor (Shop) + Third Floor and F
Group development of Block – 1 of Stilt Floor + 5 Floors residential b
Construction of Stilt Floor + 4 Floors (15.0M Height) Residential Bui
Stilt Floor + 5 Floors Residential Building with 8 Dwelling Units wit
Block – A (out of 7 Blocks) comprising Stilt Floor + 7 Floors with 56
Stilt Floor (part) / Ground Floor (part) + 3 Floors Commercial (kal
Construction of Basement Floor + Stilt Floor + 3 Floors + 4th Floor
Stilt Floor + 5 Floors Residential Building with 5 Dwelling Units
Stilt Floor (part) / Ground Floor (part) + 2 Floors + 3rd Floor part O
Construction of Ground Floor + 2 Floors Higher Secondary School Bu
Group Development of MSB Tower -‘Q’ in Site -1 consisting of Combine
MSB Group Development having 4 Blocks with Combined Double Basement
Ground Floor + 2 Floors Higher Secondary School Building
Stilt Floor + 4 Floors Residential building with 12 dwelling units
Institutional Building with 2 Blocks , Block – 1 Ground Floor + 2 Floo
Stilt Floor + 5 Floors Residential Building with 10 Dwelling Units av
Ground floor + 3 floors club House (Second floor and Third floor -
Construction of Stilt Floor + 5 Floors Residential Building with 15 D
Construction of Stilt Floor + 3 Floors Residential Building with 7 Dwe
Construction of Stilt Floor + 3 Floors Office Use Commercial Buildin
Stilt Floor + 4 Floors Residential Building with 56 Dwelling Units
Basement Floor + Ground Floor + 3 Floors Commercial building
Stilt Floor + 3 Floors Residential building with 6 Dwelling Units
Stilt Floor (part) / Ground floor (part) + 3 Floors Residential buildin
Stilt Floor + 5 Floors Residential building with 5 dwelling units
Construction of Stilt Floor + 3 Floors with 6 Dwelling Units Residenti
Group development of Block A having Ground Floor + 2 floors Reside
Stilt + 4 floors, Residential building with 8 dwelling units
Group Development of one Block of (Tower-6) Stilt + 4 floors Reside
Stilt Floor + 5 Floors Residential building with 9 dwelling units
Stilt Floor + 2 Floors + 3rd Floor (part) Residential Building with 10
Construction of Stilt Floor + 4 Floors Residential Building with 8 D
Construction of Basement Floor + Stilt Floor + 1st Floor to 6th Floor
Stilt Floor + 3 Floors Residential building with 6 dwelling units.
Stilt Floor + 4 Floors, Residential Building with 28 Dwelling Units
Basement Floor + Stilt Floor + 4 Floors Office building (Commercial)
Construction of Stilt Floor + 3 Floors Office Use Commercial Buildi
Construction of Basement Floor + Stilt Floor + 3 Floors + 4th Floor
Construction of Block E: Stilt Floor + 4 Floors – Club House with G
Stilt Floor + 5 Floors with 5 dwelling units availing premium FSI of R
Basement Floor + Stilt Floor + 4 Floors IT/ITES use building availing
Stilt Floor + 4 Floors + 5th Floor (part) with Residential building
Stilt Floor + 5 Floors, Residential Building with 9 Dwelling Units wi
Multistoried Residential Building consist of Triple Basement Floor (2
Construction of Stilt Floor + 5 Floors Residential Building with 23 d
Construction Stilt Floor + 4 Floors IT/ITES Building
Stilt Floor + 3 Floors residential building with 39 dwelling units
Block – A consist of Basement Floor + Stilt Floor + 4 Floors Office C
Stilt floor + 3 floors Residential Building with 6 dwelling units
Stilt Floor + 5 Floors Residential building with 5 dwelling units
Block – E of Ground floor College Building
MSB Group Development having 3 Blocks, Block – A & B – Stilt Floor +
Stilt Floor + 4 Floors Residential building with 6 dwelling units cum O
Stilt Floor + 4 Floors Residential building of with 8 dwelling units
Stilt floor + 4 floors Residential building with 4 dwelling units.
Stilt Floor + 4 Floors + 5th Floor (part) Residential Building with 18
Ground Floor + 2 Floors Commercial (office) building.
Stilt Floor + 4 Floors Residential building with 16 dwelling units
Stilt Floor + 4 Floors Commercial Cum Residential Building with 1 Dw
Construction of Stilt Floor + 5 Floors Residential Building with 10 D
Stilt floor + 4 floors Residential building with 4 dwelling units
High Rise Building for Commercial (Office) use consists of Extend
Stilt floor + 3 floors + 4th floor (pt) residential building with 31 dwel
Construction of Stilt Floor + 3 Floors (12.0m height) Residential Bu
Completed construction of Non High Rise Building consists of Stilt
Block 1: consisting Basement floor + Ground floor + 2 floors – Shop
Completed construction of Non High Rise Building consists of Stil
Completed construction of Non High Rise Building consists of Baseme
Group Development at 1 Block, Block C consisting Stilt Floor + 5 Flo
Construction of Stilt floor + 5 Floors with 15 dwelling units of Resi
Construction of Stilt Floor + 3 Floors + 4th Floor (part) (16.75 m He
Construction of Stilt Floor + 5 Floors with 32 Dwelling Units of Resi
Group Development of one Block of Tower-18 in Stilt + 4 floors Resi
Stilt Floor + 5 Floors Residential Building with 10 Dwelling Units av
Basement floor + Stilt Floor + 18 Floors Residential Building with 3
Completed construction of High Rise Building Block A: Stilt Floor (p
Group development of residential building with 3 blocks Block 1&2 con
Stilt floor + 3 Floors Residential building with 3 dwelling units in
Stilt Floor + 4 Floors Residential building with 32 dwelling units.
MSB Group Development of 8 Blocks consists of 536 dwelling units (
BF + Stilt Floor + 4 Floors (part) Office building (Commercial)
Stilt Floor + 3 Floors Residential building with 16 dwelling units
Completed construction of Group Development of Block – B: Stilt Floo
Stilt floor + 4 floors Residential building with 8 dwelling units avai
Construction of Basement Floor (parking) + Stilt Floor + 7 Floors C
Stilt Floor + 4 Floors Residential Building with 8 dwelling units avai
Stilt floor + 4 Floors Residential building with 6 dwelling units
Completed construction of Non High Rise Building consists of Stilt Fl
Stilt Floor + 3 Floors + 4th Floor (part) Office use Commercial Buildi
Stilt Floor + 4 Floors IT/ITES Office Use Commercial Building
Stilt Floor + 4 Floors + 5th Floor (part) Residential building with 12
Construction of Basement Floor (parking) + Stilt Floor (part) (parkin
Stilt Floor + 3 Floors Residential building with 6 dwelling units
Stilt Floor + 5 Floors Commercial Building (Office)
Group Development of Commercial Block - 2 consist of Ground Floor
CMDA Lr. No. & Dt.
CMDA/CC/IND/C/0318/ 2021
CMDA/CC/NHRB/ S /355/2021
CMDA/CC/NHRB/ S /334/2021
Letter No. CMDA/CC/NHRB/S/0206/2021.
Letter No. CMDA/CC/NHRB/S/0379/2021.
Letter No. CMDA/CC/NHRB/S/0375/2021.
Letter No. CMDA/CC/NHRB/S/0374/2021.
Letter No. CMDA/CC/NHRB/S/0378/2021.
Letter No. CMDA/CC/NHRB/S/0342 /2021.
CMDA/CC/NHRB/C/0297/ 2021
CMDA/CC/NHRB/N-II/293/2021
CMDA/CC/NHRB/N-I/390/2021
CMDA/CC/NHRB/N-I/391/2021
Letter No. CMDA/CC/HRB/S/0258/ 2021.
Letter No. CMDA/CC/HRB/S/340/2021.
Letter No. CMDA/CC/NHRB/N-I/347/2021
Letter No. CMDA/CC/ HRB/S/0321/ 2021.
Letter No. CMDA/CC/ HRB/S/0327/ 2021.
CMDA/CC/NHRB/N-I/257/2021
CMDA/CC/NHRB/C/0397/ 2021
CMDA/CC/NHRB/N-II/265/2021
Letter No. CMDA/CC/NHRB/S/0384/2021.
Letter No. CMDA/CC/IND/S/ 0381/2021.
Letter No. CMDA/CC/NHRB/S/0376/2021.
CMDA/CC/NHRB/C/0362/ 2021
CMDA/CC/NHRB/C/003/ 2022
CMDA/CC/NHRB/C/008/ 2022
CMDA/CC/NHRB/N-II/383/2021
CMDA/CC/NHRB/N-II/395/2021
Letter No. CMDA/CC/ NHRB/S/0398/ 2021.
CMDA/CC/NHRB/C/0353/ 2021
CMDA/C C/NHRB/S/394/2021
CMDA/C C/NHRB/S/ 0011/2022.
Letter No. CMDA/CC/ NHRB/S/ 0002/2022.
Letter No. CMDA/CC/HRB/S/0283/ 2021.
CMDA/CC/NHRB/C/0358/ 2021
CMDA/C C/NHRB/ S/323/2021
CMDA/C C/NHRB/ S/396/2021
Letter No. CMDA/CC/ NHRB/S/ 0388/2021.
Letter No. CMDA/CC/ IND/S/ 0010/2022.
Letter No. CMDA/CC/ NHRB/S/ 0012/2022.
Letter No. CMDA/CC/ NHRB/S/ 0013/2022.
CMDA/CC/ HRB/ 043/S/0246/ 2021
CMDA/C C/NHRB/S/ 312/2021
CMDA/CC/NHRB/N-I/386/2021
CMDA/C C/NHRB/S/ 392 /2021
CMDA/C C/NHRB/ S/0006/2022
CMDA/C C/NHRB/S/ 368/2021
CMDA/CC/NHRB/C/052/ 2022
CMDA/CC/NHRB/N-I/33/2022
Letter No. CMDA/CC/ NHRB/S/ 0020/2022.
CMDA/CC/HRB/C/306/ 2021
CMDA/CC/NHRB/C/051/ 2022
CMDA/CC/NHRB/N-I/043/2022
CMDA/CC/HRB/N-I/ 377/2021
Letter No. CMDA/CC/ NHRB/S/ 0050/2022.
CMDA/C C/NHRB/S/ 0001/2022
CMDA /CC/NHRB/C/22/2022
CMDA/C C/HRB/S/326/2021
CMDA/CC/NHRB/N-II/34/2022
CMDA/CC/NHRB/C/399/ 2021
CMDA/CC/NHRB/C/370/ 2022
CMDA/CC/NHRB/C/025/ 2022
CMDA/CC/HRB/C-I/156/2021
Letter No. CMDA/CC/ NHRB/S/ 0053/2022.
Letter No. CMDA/CC/ NHRB/S/ 0005/2022.
CMDA/CC/NHRB/C/047/ 2022
CMDA/CC/HRB/N-II/401/2021
Letter No. CMDA/CC/ IND/S/ 0031/2022.
CMDA/CC/NHRB/C/0040/2022
CMDA/CC/NHRB/C/026/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0039/2022.
CMDA/CC/NHRB/N-II/349/2021
CMDA/CC/NHRB/N-I/42/2022
CMDA/CC/NHRB/N-I/029/2022
CMDA/CC/ NHRB/S/ 048/2022
CMDA/CC/ HRB/S/356/ 2021
CMDA/CC/NHRB/C/064/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0009/2022.
Letter No. CMDA/CC/ NHRB/S/0232/ 2021.
CMDA/CC/ NHRB/S/387 /2021.
CMDA/CC/NHRB/C/070/ 2022
CMDA/CC/NHRB/N - I/83/2022
CMDA/CC/NHRB/N-I/37/2022
CMDA/CC/ NHRB/S/071 /2022
CMDA/C C/NHRB/S/ 296/2021
CMDA/CC/ HRB/S/014 /2022
CMDA/CC/NHRB/N - I/84/2022
CMDA/CC/NHRB/C/120/ 2022
CMDA/CC/NHRB/C/094/ 2022
CMDA/CC/NHRB/N - I/73/2022
CMDA/CC/NHRB/N-II/57/2022
CMDA/CC/NHRB/C/061/ 2022
CMDA/CC/NHRB/N-II/80/2022
CMDA/CC/ NHRB/S/098 /2022
CMDA/CC/NHRB/C/062/ 2022
CMDA/CC/NHRB/N-I/124/2022
CMDA/CC/NHRB/N - I/78/2022
CMDA/CC/ NHRB/S/032 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0088/2022.
CMDA/CC/NHRB/N - I/121/2022
Letter No. CMDA/CC/ NHRB/S/ 0065/2022.
CMDA/CC/NHRB/C/113/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0027/2022.
CMDA/CC/NHRB/N - I/104/2022
CMDA/CC/NHRB/N-I/128/2022
CMDA/CC/NHRB/N-I/107/2022
CMDA/CC/HRB/N-I/116/2022
CMDA/CC/NHRB/C/115/ 2022
CMDA/CC/ NHRB/S/017 /2022.
CMDA/CC/ NHRB/S/054 /2022.
CMDA/CC/NHRB/C/089/ 2022
CMDA/CC/ NHRB/S/056 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0112/2022.
CMDA/CC/NHRB/C/166/ 2022
CMDA/CC/ NHRB/S/019 /2022.
CMDA/CC/NHRB/C/ 108 / 2022
CMDA/CC/ NHRB/S/093 /2022.
CMDA/CC/ INST/S/096/2022
CMDA/CC/NHRB/C/91/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0090/2022.
CMDA/CC/NHRB/C/142/ 2022
EC/C-II/14835/2018
CMDA/CC/ NHRB/S/077 /2022.
CMDA/CC/ NHRB/S/066 /2022.
CMDA/CC/ NHRB/S/041 /2022.
CMDA/CC/ NHRB/S/393 /2021.
CMDA/CC/NHRB/N-I/120/2022
CMDA/CC/NHRB/C/0106/ 2022
CMDA/CC/NHRB/C/117/ 2022
CMDA/CC/NHRB/N-I/125/2022
CMDA/CC/NHRB/N-II /160/2022
CMDA/CC/NHRB/C/0129/ 2022
CMDA/CC/ NHRB/S/145/2022.
CMDA/CC/ NHRB/S/103 /2022.
CMDA/CC/HRB/N-II/ 173/2022
CMDA/CC/NHRB/N-II /147/2022
CMDA/CC/NHRB/N-II/82/2022
CMDA/CC/ HRB/S/087/ 2022.
CMDA/CC/ NHRB/S/102/2022.
CMDA/CC/ NHRB/S/130 /2022.
Letter No. CMDA/CC/HRB/S/0007/ 2022.
Letter No. CMDA/CC/ NHRB/S/ 0188/2022.
Letter No. CMDA/CC/ NHRB/S/ 0111/2022.
CMDA/CC/ NHRB/S/095 /2022.
CMDA/CC/NHRB/C/180/ 2022
CMDA/CC/ NHRB/S/101/2022.
CMDA/CC/NHRB/N-I/ 105/2022
CMDA/CC/NHRB/N-II/99/2022
CMDA/CC/ NHRB/S/157 /2022.
CMDA/CC/NHRB/C/0161/ 2022
CMDA/CC/ NHRB/S/148 /2022.
CMDA/CC/NHRB/C/162/ 2022
Letter No. CMDA/CC/HRB/S/0127/2022.
CMDA/CC/HRB/C/0164/ 2022
CMDA/CC/ NHRB/S/016 /2022.
CMDA/CC/INST/N-II/138/2022
CMDA/CC/NHRB/C/0149/ 2022
CMDA/CC/NHRB/C/0140/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0023/2022.
Letter No. CMDA/CC/ NHRB/S/ 0150/2022.
CMDA/CC/ NHRB/S/151 /2022.
CMDA/CC/ NHRB/S/045 /2022.
CMDA/CC/NHRB/C/0175/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0131/2022.
CMDA/CC/ NHRB/S/400/2021.
Letter No. CMDA/CC/ NHRB/S/ 0179/2022.
CMDA/CC/ NHRB/S/118 /2022.
Letter No. CMDA/CC/ HRB/S/ 0143/2022.
CMDA/CC/ NHRB/S/119 /2022.
CMDA/CC/NHRB/C/0184/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0203/2022.
CMDA/CC/ NHRB/S/063 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0114/2022.
CMDA/CC/ NHRB/S/176 /2022.
CMDA/CC/NHRB/C/0206/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0122/2022.
Letter No. CMDA/CC/ NHRB/S/ 0182/2021.
CMDA/CC/ NHRB/S/163 /2022.
CMDA/CC/ NHRB/S/049 /2022.
CMDA/CC/ NHRB/S/187 /2022.
CMDA/CC/ NHRB/S/207 /2022.
CMDA/CC/ NHRB/S/181 /2022.
CMDA/CC/NHRB/N-I/158/2022
CMDA/CC/ NHRB/S/197 /2022.
CMDA/CC/NHRB/C/0123/ 2022
CMDA/CC/ NHRB/S/198 /2022.
CMDA/CC/HRB/C/0126/ 2022
CMDA/CC/ NHRB/S/168 /2022.
CMDA/CC/NHRB/N/233/2022
CMDA/CC/NHRB/N-I/190/2022
CMDA/CC/ NHRB/S/186 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0200/2022.
CMDA/CC/NHRB/N-II/219/2022
Letter No. CMDA/CC/ NHRB/S/ 0210/2022.
CMDA/CC/NHRB/C/044/ 2022
Letter No. CMDA/CC/NHRB/S/ 0211/2022
CMDA/CC/NHRB/N-II/76/2022
CMDA/CC/NHRB/C/242/ 2022
CMDA/CC/ NHRB/S/060 /2022.
CMDA/CC/ NHRB/S/232 /2022.
CMDA/CC/ NHRB/S/205 /2022.
CMDA/CC/NHRB/C/224/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0174/2022.
Letter No. CMDA/CC/ NHRB/S/ 0237/2022.
Letter No. CMDA/CC/ NHRB/S/ 0217/2022.
Letter No. CMDA/CC/ NHRB/S/ 0191/2022.
CMDA/CC/NHRB/N-I/254/2022
CMDA/CC/ S/0199 /2022.
CMDA/CC/NHRB/N-I/252/2022
CMDA/CC/NHRB/C/0192/ 2022
CMDA/CC/NHRB/C/092/ 2022
Letter No. CMDA/CC/ IT/S/ 0239/2022.
Letter No. CMDA/CC/ NHRB/S/ 0225/2022.
CMDA/CC/NHRB/N-I/155/2022
CMDA/CC/ NHRB/S/227 /2022.
CMDA/CC/ NHRB/S/110 /2022.
CMDA/CC/NHRB/N-II/257/2022
CMDA/CC/ HRB/S/226 /2022.
CMDA/CC/ S/0189 /2022.
Letter No. CMDA/CC/ HRB/S/ 0194/2022.
CMDA/CC/ HRB/S/178 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0243/2022.
Letter No. CMDA/CC/ INST/S/ 0085/2022.
CMDA/CC/NHRB/C/0216/ 2022
CMDA/CC/NHRB/C/0255/ 2022
Letter No. CMDA/CC/ IND/S/ 0223/2022.
CMDA/CC/NHRB/C/0146/ 2022
CMDA/CC/ S/0136 /2022.
CMDA/CC/NHRB/N-II/264/2022
CMDA/CC/NHRB/N-I/266/2022
CMDA/CC/ HRB/S/171 /2022.
CMDA/CC/NHRB/C/222/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0018/2022.
CMDA/CC/HRB/N-I/261/2022
CMDA/CC/ NHRB/S/218 /2022.
CMDA/CC/ NHRB/S/245 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0256/2022.
CMDA/CC/ NHRB/S/244 /2022.
CMDA/CC/NHRB/N-I/267/2022
CMDA/CC/NHRB/C/259/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0240/2022.
CMDA/CC/NHRB/N-I/270/2022
CMDA/CC/ NHRB/S/231 /2022.
CMDA/CC/ NHRB/S/195 /2022.
CMDA/CC/ NHRB/S/169 /2022.
CMDA/CC/ NHRB/S/165 /2022.
CMDA/CC/ NHRB/S/153 /2022.
CMDA/CC/NHRB/C/202/ 2022
CMDA/CC/NHRB/C/0144/ 2022
CMDA/CC/ NHRB/S/246 /2022.
CMDA/CC/NHRB/C/0278/ 2022
CMDA/CC/ NHRB/S/167 /2022.
CMDA/CC/NHRB/N-II/293/2022
CMDA/CC/NHRB/C/0271/ 2022
CMDA/CC/NHRB/C/0288/ 2022
CMDA/CC/NHRB/C/0262/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0263/2022.
Letter No. CMDA/CC/ NHRB/S/ 0249/2022.
Letter No. CMDA/CC/ NHRB/S/ 0265/2022.
CMDA/CC/NHRB/C/0284/ 2022
CMDA/CC/ NHRB/S/247 /2022.
CMDA/CC/NHRB/C/220/ 2022
CMDA/CC/NHRB/C/286/ 2022
CMDA/CC/ NHRB/S/282 /2022.
CMDA/CC/ NHRB/S/272 /2022.
Letter No. CMDA/ CC/ HRB/S/ 0159/ 2022.
CMDA/CC/INST/C/208/ 2022
Letter No. CMDA/CC/ HRB/S/ 0276/2022.
Letter No. CMDA/CC/ NHRB/S/ 0241/2022.
CMDA/CC/ NHRB/S/258 /2022.
CMDA/CC/NHRB/C/086/ 2022
CMDA/CC/NHRB/C/0295/ 2022
CMDA/CC/NHRB/C/0269/ 2022
CMDA/CC/ NHRB/S/214 /2022.
CMDA/CC/NHRB/C/298/ 2022
CMDA/CC/ NHRB/S/234 /2022.
CMDA/CC/NHRB/C/0283/ 2022
CMDA/CC/ HRB/S/295/ 2021
CMDA/CC/NHRB/N-I/333/2022
Letter No. CMDA/ CC/ HRB/S/ 0209/ 2022.
Letter No. CMDA/CC/ NHRB/S/ 027/2022.
CMDA/CC/NHRB/C/0281/ 2022
CMDA/CC/NHRB/N-I/193/2022
CMDA/CC/NHRB/C/0291/ 2022
CMDA/CC/NHRB/N-II/274/2022
CMDA/CC/NHRB/N-II/318/2022
CMDA/CC/HRB/N-I/350/2022
CMDA/CC/NHRB/C/0303/ 2022
CMDA/CC/NHRB/C/0135/ 2022
CMDA/CC/HRB/C/228/ 2022
CMDA/CC/HRB/C/229/ 2022
CMDA/CC/HRB/N-I/326/2022
CMDA/CC/ NHRB/S/299 /2022.
CMDA/CC/ NHRB/S/312 /2022.
CMDA/CC/NHRB/N-I/310/2022
CMDA/CC/NHRB/C/ /315/ 2022
CMDA/CC/HRB/C/296/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0334/2022.
CMDA/CC/HRB/C/304/ 2022
CMDA/CC/ NHRB/S/285 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0317/2022.
CMDA/CC/NHRB/C-I/325/2022
CMDA/CC/NHRB/N-II/201/2022
CMDA/CC/ NHRB/S/280 /2022.
CMDA/CC/ NHRB/S/253 /2022.
CMDA/CC/NHRB/N-II/316/2022
CMDA/CC/ NHRB/S/290 /2022.
CMDA/CC/ NHRB/S/248 /2022.
CMDA/CC/NHRB/C/341/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0342/2022.
CMDA/CC/NHRB/N-I/322/2022
CMDA/CC/NHRB/N-II/306/2022
Letter No. CMDA/CC/ NHRB/S/ 0300/2022.
CMDA/CC/NHRB/C/305/ 2022
CMDA/CC/HRB/C/177/ 2022
CMDA/CC/HRB/C/344/ 2022
Letter No. CMDA/CC/ NHRB/S/ 0313/2022.
CMDA/CC/NHRB/C/346/2022
CMDA/CC/NHRB/N-I/331/2022
Letter No. CMDA/CC/ NHRB/S/ 0292/2022.
CMDA/CC/NHRB/N-I/353/2022
CMDA/CC/NHRB/N-II/297/2022
CMDA/CC/INST/C/0330/2022
CMDA/CC/NHRB/N-I/359/2022
CMDA/ CC/INST/C/0356/2022
CMDA/CC/ NHRB/S/307 /2022.
CMDA/CC/NHRB/N-II/268/2022
Letter No. CMDA/CC/ NHRB/S/ 0302/2022.
Letter No. CMDA/CC/ NHRB/S/ 0347/2022.
Letter No. CMDA/CC/ NHRB/S/ 0324/2022.
CMDA/CC/NHRB/C/275/ 2022
CMDA/CC/NHRB/N-I/343/2022
CMDA/CC/NHRB/C/0352/2022
CMDA/CC/ NHRB/S/308 /2022.
CMDA/CC/NHRB/N-I/363/2022
Letter No. CMDA/CC/ NHRB/S/ 0375/2022.
CMDA/CC/NHRB/C/340/2022
CMDA/CC/NHRB/C/361/2022
CMDA/CC/NHRB/N-II/ 215/2022
CMDA/CC/NHRB/N-I/378/2022
CMDA/CC/ NHRB/S/260 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0376/2022.
Letter No. CMDA/CC/ HRB/S/ 0388/2022.
CMDA/CC/ NHRB/S/336 /2022.
CMDA/CC/NHRB/C/382/2022
CMDA/CC/NHRB/N-I/387/2022
Letter No. CMDA/CC/ NHRB/S/ 0389/2022.
Letter No. CMDA/CC/ NHRB/S/ 0348/2022.
Letter No. CMDA/CC/ HRB/S/ 0301/2022.
CMDA/CC/ NHRB/S/339 /2022.
CMDA/CC/ NHRB/S/349 /2022.
CMDA/CC/ NHRB/S/320 /2022.
CMDA/CC/NHRB/C/0380/2022
CMDA/CC/ HRB/S/329 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0354/2022.
Letter No. CMDA/CC/ NHRB/S/ 0385/2022.
CMDA/CC/NHRB/C-I/358/2022
CMDA/CC/NHRB/C/0221/ 2022
CMDA/CC/NHRB/N-I/327/2022
CMDA/CC/NHRB/N-I/367/2022
CMDA/CC/INST/N-II/373/2022
CMDA/CC/HRB/N-I/ 323/2022
CMDA/CC/NHRB/N-I/396/2022
CMDA/CC/NHRB/N-I/401/2022
CMDA/CC/ NHRB/S/357 /2022.
CMDA/CC/ NHRB/S/370 /2022.
CMDA/CC/ NHRB/S/345 /2022.
CMDA/CC/HRB/N-I/364/2022
CMDA/CC/ NHRB/S/335 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0369/2022.
CMDA/CC/NHRB/C/397/2022
CMDA/CC/HRB/C/0351/ 2022
CMDA/CC/NHRB/N-II/383/2022
Letter No. CMDA/CC/ NHRB/S/ 0394/2022.
CMDA/CC/HRB/C/0390/ 2022
CMDA/CC/ NHRB/S/362 /2022.
CMDA/CC/NHRB/C/0411/ 2022
CMDA/CC/HRB/C/0405/ 2022
CMDA/CC/ NHRB/S/368 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0410/2022.
Letter No. CMDA/CC/ NHRB/S/ 0400/2022.
Letter No. CMDA/CC/ NHRB/S/ 0386/2022.
CMDA/CC/NHRB/N-II/ 332/2022
CMDA/CC/ NHRB/S/384 /2022.
CMDA/CC/ HRB/S/415 /2022.
CMDA/CC/HRB/C/0379/ 2022
CMDA/CC/NHRB/C/402/2022
CMDA/CC/NHRB/N-I/392/2022
CMDA/CC/ NHRB/S/374 /2022.
CMDA/CC/HRB/C/4841/2015
CMDA/CC/NHRB/N-I/438/2022
CMDA/CC/NHRB/N-I/424/2022
CMDA/CC/NHRB/C/0403/ 2022
CMDA/CC/NHRB/C/0428/2022
Letter No. CMDA/CC/ HRB/S/ 0398/2022.
CMDA/CC/ NHRB/S/429 /2022.
CMDA/CC/NHRB/N-I/446/2022
CMDA/CC/NHRB/C/0417/ 2022
CMDA/CC/NHRB/C/0448/2022
CMDA/CC/ NHRB/S/413 /2022.
CMDA/CC/ NHRB/S/0338 /2022.
Letter No. CMDA/CC/ NHRB/S/ 0399/2022.
CMDA/CC/NHRB/N-I/393/2022
CMDA/CC/NHRB/C/0416/ 2022
CMDA/CC/HRB/C/0408/ 2022
Completion Certificate No. & Dt.
Completion Certificate No.EC/ Central -I/001/2022 dated:05-01-2022
EC/South-I /002/ 2022 dated 05-01-2022
EC/South-I/ 003 /2022 dated 05.-01-2022
EC/South-I / / 004 /2021 dated . 07.10.2021
EC/South-II / / 005 /2022 dated 10.01.2022
EC/South-II / / 006 /2022 dated 11.01.2022
EC/South-II / / 007 /2022 dated 11.01.2022
EC/South-II / / 008 /2022 dated 11.01.2022
EC/South-I / 009 / 2022 dated 11.01.2022
Completion Certificate No. EC/ Central -II/10/2022 dated:.11-01-2022
Completion Certificate No. EC/ North -II/ 11/2022 dated 12-01-2022
Completion Certificate No. EC/ North -I/ 12 /2022 dated 12-01-2022
Completion Certificate No. EC/ North -I/13/2022 dated 12-01-2022
EC/South-II / / 014 /2022 dated 12.01.2022
EC/South-II / / 015 /2022 dated 12 .01.2022
Completion Certificate No. EC/ North -I/ 16 /2022 dated 13-01-2022
EC/South-II / / 017 /2022 dated 12.01.2022
EC/South-II / / 018 /2022 dated 12.01.2022
Final Completion Certificate No. EC/ North -I/ 19 /2022 dated 19-01-2022
Completion Certificate No. EC/ Central -I/20/2022 dated:20-01-2022
1st Partial Completion Certificate No. EC/ North -II/ 21 /2022 dated 20-01-2022
EC/South-II / / 022 /2022 dated 24.01.2022
EC/South-II / / 023 /2022 dated 24 .01.2022
EC/South-I/024/2022 dated 25.01.2021
Completion Certificate No. EC/ Central -I/25 /2022 dated:25-01-2022
Completion Certificate No. EC/ Central -II/26 /2022 dated:31-01-2022
Completion Certificate No. EC/ Central -II/27 /2022 dated:31-01-2022
Completion Certificate No. EC/ North -II/28/2022 dated 02-02-2022
Completion Certificate No. EC/ North -II/29/2022 dated 02-02-2022
EC/South-II/ / 030 /2022 dated. 02.02.2022
Completion Certificate No. EC/ Central -II/31 /2022 dated:03-02-2022
EC/South- I/ 032/2021 dated 03.02.2022
EC/South- I/ 033/2022 dated 03.02.2022
EC/South-II/ / 034 /2022 dated. 07.02.2022
EC/South-II / / 035 /2022 dated 07.02.2022
Completion Certificate No. EC/ Central -I/36 /2022 dated:08-02-2022
EC/South- I/ 037 /2022 dated 10.02.2022
EC/South- I / 038 /2022 dated 10.02.2022
EC/South-II/ / 039 / 2022 dated. 10.02.2022
EC/South-II/ / 040 /2022 dated. 11.02.2022
EC/South-II/ / 041 /2022 dated. 15.02.2022
EC/South-II/ / 042 /2022 dated. 15.02.2022
EC/South- I/ 043/2022 dated 15.02.2022
EC/South- I/ 044/2022 dated 16.02.2022
Completion Certificate No. EC/ North -I/45/2022 dated 17-02-2022
EC/South- I/ /046/2021 dated 23.02.2022
EC/South- I / 047 /2022 dated 25.02.2022
EC/South- I/ /048/2022 dated 25. 02.2022
Completion Certificate No. EC/ Central -I/49 /2022 dated:28-02-2022
Completion Certificate No. EC/ North -I/ 50/2022 dated 01-03-2022
EC/South-II/ / 051 /2022 dated. 28.02.2022
Completion Certificate No. EC/ Central -II/52 /2022 dated:28-02-2022
Completion Certificate No. EC/ Central -II/53 /2022 dated:28-02-2022
Completion Certificate No. EC/ North -I/54/2022 dated 02-03-2022
Completion Certificate No. EC/ North -I/55/2022 dated 03-03-2022
EC/South-II/ / 056 /2022 dated. 02.03.2022
EC/South- I/ /057/2022 dated 02.03.2022
Completion Certificate No. EC/ Central -II/ 58/2022 dated 02-03-2022
EC/South- I/ /059/2022 dated 02.03.2022
Completion Certificate No. EC/ North -II/ 60/2022 dated 07-03-2022
Completion Certificate No. EC/ Central -II/61/2022 dated: 03-03-2022
Completion Certificate No. EC/ Central -II/62 /2022 dated:03-03-2022
Completion Certificate No. EC/ Central -II/63 /2022 dated:04-03-2022
Completion Certificate No. EC/ Central -I/ 64 /2022 dated 03.03.2022
EC/South-II/ / 065 /2022 dated 08.03.2022
EC/South-II/ / 066 /2022 dated. 11.03.2022
Completion Certificate No. EC/ Central -II/67 /2022 dated:07-03-2022
Completion Certificate No. EC/ North -II/068/2022 dated 09-03-2022
EC/South-II/ / 069/2022 dated. 08.03.2022
Completion Certificate No.EC/ Central -I/70/2022 dated:. 09.03.2022
Completion Certificate No. EC/ Central -II/71 /2022 dated:09-03-2022
EC/South-II/ / 072 /2022 dated. 10.03.2022
Completion Certificate No. EC/ North -II/073/2022 dated 14-03-2022
Completion Certificate No. EC/ North -I/ 074/2022 dated 15-03-2022
Completion Certificate No. EC/ North -I/075/2022 dated 15-03-2022
EC/South- I/ /076/2022 dated 15.03.2022
EC/South- I/ / 077/2022 dated 15 .03.2022
Completion Certificate No. EC/ Central -II/78 /2022 dated:23-03-2022
EC/South-II/ / 079 /2022 dated. 23.03.2022
EC/South-I / / 080 /2022 dated 23.03.2022
EC/South- I/ / 081 /2022 dated 28.03.2022
Completion Certificate No. EC/ Central -II/82 /2022 dated:25-03-2022
Completion Certificate No. EC/ North -I/083/2022 dated 29-03-2022
Completion Certificate No. EC/ North -I/84/2022 dated 29-03-2022
EC/South- I/ /085/2022 dated 28.03.2022
EC/South- I/ /086/2022 dated 28.03.2022
EC/South- I/ /087/2022 dated 30.03.2022
Completion Certificate No. EC/ North -I/088/2022 dated 04-04-2022
Completion Certificate No. EC/ Central -I/89 /2022 dated:01-04-2022
Completion Certificate No. EC/ Central -I/90 /2022 dated:04-04-2022
Completion Certificate No. EC/ North -I/091/2022 dated 05-04-2022
1st Partial Completion Certificate No. EC/ North -II/ 092/2022 dated 05-04-2022
Completion Certificate No. EC/ Central -I/93 /2022 dated:07-04-2022
Final Completion Certificate No. EC/ North II/094/2022 dated 12-04-2022
EC/South- I/ /095/2022 dated 12.04.2022
Completion Certificate No. EC/ Central -I /96/2022 dated: 19-04-2022
Completion Certificate No. EC/ North -I/97/2022 dated 21-04-2022
Completion Certificate No. EC/ North -I/98/2022 dated 20-04-2022
EC/South- I/ /099/2022 dated 21.04.2022
EC/South-II/ / 100 /2022 dated. 21.04.2022
Completion Certificate No. EC/ North -I/ 101 /2022 dated 21-04-2022
EC/South-II/ / 102 /2022 dated. 21.04.2022
Completion Certificate No. EC/ Central -II/103/2022 dated: 25-04-2022
EC/South-II/ 104/2022 dated. 25.04.2022
Completion Certificate No. EC/ North -I/105/2022 dated 22-04-2022
Completion Certificate No. EC/ North -I/ 106/2022 dated 22-04-2022
Completion Certificate No. EC/ North -I/107/2022 dated 26-04-2022
2nd partial Completion Certificate No. EC/ North -I/108/2022 dated 25.04.2022 -04-2022
Completion Certificate No. EC/ Central -II/109 /2022 dated:28-04-2022
EC/South- I/ /110 /2022 dated 25.04.2022
EC/South- I/ /111/2022 dated 25.04.2022
Completion Certificate No. EC/ Central -I /112/2022 dated: 27-04-2022
EC/South- I/ /113/2022 dated 26.04.2022
EC/South-II/ 114 /2022 dated. 27.04.2022
Completion Certificate No. EC/ Central -I/115/2022 dated: 28-04-2022
EC/South- I/ /116/2022 dated 27.04.2022
Completion Certificate No. EC/ Central -I /117/2022 dated: 29-04-2022
EC/South- I/ /118/2022 dated 28.04.2022
EC/South- I/ / 119/2022 dated 28.04.2022
Completion Certificate No. EC/ Central -II/121 /2022 dated:05-05-2022
EC/South-II/ 122 /2022 dated. 05.05.2022
Completion Certificate No. EC/ Central -I /123/2022 dated:02-05-2022
4th Partial Completion Certificate No. EC/ Central -II/124 /2022 dated:06-05-2022
EC/South- I/ /125/2022 dated 09.05.2022
EC/South- I/ /126/2022 dated 09.05.2022
EC/South- I/ /127/2022 dated 09.05.2022
EC/South- I/ /128/2022 dated 09.05.2022
Completion Certificate No. EC/ North -I/129/2022 dated 10-05-2022
Completion Certificate No. EC/ Central -I /130/2022 dated:10-05-2022
Completion Certificate No. EC/ Central -II/131 /2022 dated:11-05-2022
Completion Certificate No. EC/ North -I/132/2022 dated 12-05-2022
Completion Certificate No. EC/ North -I/133/2022 dated 12-05-2022
Completion Certificate No. EC/ Central -I /134/2022 dated:17-05-2022
EC/South- I/ /135/2022 dated 18.05.2022
EC/South- I/ /136/2022 dated 18.05.2022
Final Completion Certificate No. EC/ North -II/ 137/2022 dated 19-05-2022
Completion Certificate No. EC/ North -II/ 138/2022 dated 19-05-2022
Completion Certificate No. EC/ North -II/139/2022 dated 19-05-2022
EC/South- I/ /140/2022 dated 19.05.2022
EC/South- I/ /141/2022 dated 19.05.2022
EC/South- I/ /142/2022 dated 19.05.2022
EC/South-I /143/ /2022 dated 19.05.2022
EC/South-II/ / 144 /2022 dated. 20.05.2022
EC/South-II/ / 145 /2022 dated. 23.05.2022
EC/South- I/ / 146 /2022 dated 13.05.2022
Completion Certificate No. EC/ Central -II/147 /2022 dated:24-05-2022
EC/South- I/ / 148 /2022 dated 25.05.2022
Completion Certificate No. EC/ North -I/149 /2022 dated 25-05-2022
Completion Certificate No. EC/ North -II/ 150/2022 dated 25-05-2022
EC/South- I/ /151/2022 dated 25.05.2022
Completion Certificate No. EC/ Central -I/152 /2022 dated:26-05-2022
EC/South- I/ / 153 /2022 dated 31.05.2022
Completion Certificate No. EC/ Central -II/154 /2022 dated:30-05-2022
EC/South-II / 155 /2022 dated 31.05.2022
Completion Certificate No. EC/ Central -I/156 /2022 dated:01-06-2022
EC/South- I/ / 157 /2022 dated 01.06.2022
Completion Certificate in CC. No. EC/North - II / 158 /2022 dt. 03.06.2022
Completion Certificate No. EC/ Central -I/159 /2022 dated:06-06-2022
Completion Certificate No. EC/ Central -I/160 /2022 dated:06-06-2022
EC/South-II / 161/ 2022 dated. 06.06.2022
EC/South-II / 162 /2022 dated. 07.06.2022
EC/South- I/ / 163 /2022 dated 09.06.2022
EC/South- I/ / 164 /2022 dated 08.06.2022
Completion Certificate No. EC/ Central -II/165 /2022 dated:13-06-2022
EC/South-II / 166 /2022 dated. 13.06.2022
EC/South- I/ / 167 /2022 dated 14.06.2022
EC/South-II / 168 /2022 dated. 16.06.2022
EC/South- I/ / 169 /2022 dated 16.06.2022
EC/South-II / 170 /2022 dated. 17.06.2022
EC/South- I/ / 171 /2022 dated 17.06.2022
Completion Certificate No. EC/ Central -II/172 /2022 dated:17-06-2022
EC/South-II /173 / 2022 dated. 20.06.2022
EC/South- I/ / 174 /2022 dated 21.06.2022
EC/South-II / 175 /2022 dated. 21.06.2022
EC/South- I/ / 176 /2022 dated 23.06.2022
Completion Certificate No. EC/ Central -I/177 /2022 dated:24-06-2022
EC/South-II / 178 /2022 dated. 24.06.2022
EC/South-II / 179 / 2022 dated. 28.06.2022
EC/South- I/ / 180 /2022 dated 27.06.2022
EC/South- I/ / 181 /2022 dated 29.06.2022
EC/South- I/ / 182 /2022 dated 29.06.2022
EC/South- I/ / 183 /2022 dated 29.06.2022
EC/South- I/ / 184 /2022 dated 29.06.2022
Completion Certificate No. EC/ North -I/ 185/2022 dated 30-06-2022
EC/South- I/ / 186 /2022 dated 30.06.2022
Completion Certificate No. EC/ Central -II/187 /2022 dated:01-07-2022
EC/South- I/ / 188 /2022 dated 30.06.2022
Completion Certificate No. EC/ Central -I/189/2022 dated:30-06-2022
EC/South- I/ / 190 /2022 dated 01.07.2022
Completion Certificate No. EC/ North -I/191/2022 dated 04-07-2022
Completion Certificate No. EC/ North -I/ 192 /2022 dated 06-07-2022
EC/South- I/ / 193 /2022 dated 06.07.2022
EC/South-II /194 / 2022 dated. 06.07.2022
Completion Certificate No. EC/ North -II/ 195/2022 dated 07-07-2022
EC/South-II / 196 / 2022 dated. 07.07.2022
Completion Certificate No. EC/ Central -II/197 /2022 dated:07-07-2022
EC/South-II / 198 /2022 dated. 08.07.2022
Completion Certificate No. EC/ North -II/ 199/2022 dated 08-07-2022
Completion Certificate No. EC/ Central -II/200 /2022 dated:08-07-2022
EC/South- I/ / 201 /2022 dated 08 .07.2022
EC/South- I/ / 202 /2022 dated 08.07.2022
EC/South- I/ / 203 /2022 dated 08.07.2022
Completion Certificate No. EC/ Central -II/204 /2022 dated:08-07-2022
EC/South-II / 205 /2022 Dated. 08.07.2022
EC/South-II / 206 / 2022 dated. 08.07.2022
EC/South-II /207 / 2022 dated. 08.07.2022
EC/South-II/ / 208 /2022 dated. 08.07.2022
Completion Certificate No. EC/ North -I/ 210/2022 dated 11-07-2022
EC/South-II / 211 /2022 dated. 13.07.2022
Completion Certificate No. EC/ North -I/212 /2022 dated 14-07-2022
1st Partial Completion Certificate No. EC/ Central -I/213 /2022 dated:15-07-2022
Completion Certificate No. EC/ Central -I/214 /2022 dated:15-07-2022
EC/South-II / 215/2022 dated. 18.07.2022
EC/South-II / 216/ 2022 dated. 18.07.2022
Completion Certificate No. EC/ North -I/217/2022 dated 19-07-2022
EC/South- I/ / 218 /2022 dated 19.07.2022
EC/South- I/ / 219 /2022 dated 22.07.2022
Completion Certificate No..EC/North-II /220/2022, dated: 21-07-2022
EC/South- I/ / 221 /2022 dated 22.07.2022
EC/South-II / 222 /2022 dated. 22.07.2022
EC/South-II / 223 / 2022 dated. 22.07.2022
EC/South- I/ / 224 /2022 dated 22.07.2022
EC/South-II / 225 / 2022 dated. 22.07.2022
EC/South-II/ / 226 /2022 dated. 22.07.2022
2nd Partial Completion Certificate No. EC/ Central -I/227 /2022 dated:25-07-2022
Completion Certificate No. EC/ Central -I/228 /2022 dated:25-07-2022
EC/South-II /229 /2022 dated. 26.07.2022
Completion Certificate No. EC/ Central -I/230 /2022 dated:25-07-2022
EC/South-II / 231 /2022 dated. 26.07.2022
Completion Certificate No..EC/North-II /232/2022, dated: 26-07-2022
Completion Certificate No. EC/ North -I/ 233/2022 dated 27-07-2022
EC/South- I/ / 234 /2022 dated . 27 .07.2022
Completion Certificate No. EC/ Central -II/235 /2022 dated:29-07-2022
EC/South-II/ 236 /2022 dated. 27.07.2022
Completion Certificate No. EC/ North -I/237/2022 dated 27-07-2022
EC/South- I/ / 238 /2022 dated 29.07.2022
EC/South- I/ / 239/2022 dated 29.07.2022
EC/South-II / 240 / 2022 dated. 29.07.2022
EC/South- I/ / 241 /2022 dated 01.08.2022
Completion Certificate No. EC/ North -I/242/2022 dated 01-08-2022
Completion Certificate No. EC/ Central -II/243 /2022 dated:01-08-2022
EC/South-II / 244 /2022 dated. 02.08.2022
Completion Certificate No. EC/ North -I/ 245/2022 dated 03-08-2022
EC/South- I/ / 246 /2022 dated 03.08.2022
EC/South- I/ / 247 /2022 dated 04.08.2022
EC/South- I/ / 248 /2022 dated 05.08.2022
EC/South- I/ / 249 /2022 dated 05.08.2022
EC/South- I/ / 250 /2022 dated 11.08.2022
4th Partial Completion Certificate No. EC/ Central -II/251 /2022 dated:10-08-2022
Completion Certificate No. EC/ Central -I/252 /2022 dated:12-08-2022
EC/South- I/ / 253 /2022 dated 11.08.2022
Completion Certificate No. EC/ Central -I/254 /2022 dated:12-08-2022
EC/South- I/ / 255 /2022 dated 11.08.2022
Completion Certificate No. EC/ North -II/ 257/2022 dated 12-08-2022
Completion Certificate No. EC/ Central -II/258 /2022 dated:12-08-2022
Completion Certificate No. EC/ Central -I/259 /2022 dated:17-08-2022
Completion Certificate No. EC/ Central -I/260 /2022 dated:22-08-2022
EC/South-II / 261 / 2022 dated. 22.08.2022
EC/South-II /262/ 2022 dated. 22.08.2022
EC/South-II / 263 / 2022 dated. 22.08.2022
Completion Certificate No. EC/ Central -I/264 /2022 dated:24-08-2022
EC/South- I/ / 265 /2022 dated 25.08.2022
Completion Certificate No. EC/ Central -II/266 /2022 dated:26-08-2022
Completion Certificate No. EC/ Central -I/267 /2022 dated:26-08-2022
EC/South- I/ / 268 /2022 dated 26.08.2022
EC/South- I/ / 269 /2022 dated 26.08.2022
EC/South-II / 270 /2022 dated. 27.08.2022
Completion Certificate No. EC/ Central -II/271 /2022 dated:30-08-2022
EC/South-II/ / 272 /2022 dated. 30.08.2022
EC/South-II / 273 /2022 dated. 30.08.2022
EC/South- I/ / 274 /2022 dated 30.08.2022
Completion Certificate No. EC/ Central -II/275 /2022 dated: 30-08-2022
Completion Certificate No. EC/ Central -II/276 /2022 dated:30-08-2022
Completion Certificate No. EC/ Central -I/277 /2022 dated:30-08-2022
EC/South- I/ / 278 /2022 dated 30.08.2022
Completion Certificate No. EC/ Central -II/279 /2022 dated:01-09-2022
EC/South- I/ / 280 /2022 dated 02.09.2022
Completion Certificate No. EC/ Central -I/281 /2022 dated:02-09-2022
EC/South- I/ / 282 /2022 dated 05.09.2022
Completion Certificate No. EC/ North -I/ 283 /2022 dated 06-09-2022
EC/South-II / 284 /2022 dated. 06.09.2022
EC/South-II / 285 / 2022 dated. 09.09.2022
Completion Certificate No. EC/ Central -I/286 /2022 dated:07-09-2022
Completion Certificate No. EC/ North -I/287/2022 dated 09-09-2022
Completion Certificate No. EC/ Central -II/288 /2022 dated:12-09-2022
Completion Certificate No. EC/ North -II/ 289/2022 dated 09-09-2022
Completion Certificate No. EC/ North -II/ 290/2022 dated 09-09-2022
Completion Certificate No. EC/ North -I/291/2022 dated 12-09-2022
Completion Certificate No. EC/ Central -II/292 /2022 dated:13-09-2022
Completion Certificate No. EC/ Central -I/293 /2022 dated 13-09-2022
Completion Certificate No. EC/ Central -I/294. /2022 dated:17-09-2022
Completion Certificate No. EC/ Central -I/295. /2022 dated:17-09-2022
Completion Certificate No. EC/ North -I/ 296 /2022 dated 17-09-2022
EC/South- I/ / 297 /2022 dated 20.09.2022
EC/South- I/ / 298 /2022 dated 20.09.2022
Completion Certificate No. EC/ North -I/ 299/2022 dated 17-09-2022
Completion Certificate No. EC/ Central -I/300 /2022 dated:17-09-2022
Completion Certificate No. EC/ Central -II/301 /2022 dated:20-09-2022
EC/South-II / 302/ 2022 dated. 20.09.2022
Completion Certificate No. EC/ Central -I/303 /2022 dated:20-09-2022
EC/South- I/ / 304 /2022 dated 20.09.2022
EC/South-II / 305 / 2022 dated. 21.09.2022
Completion Certificate No. EC/ Central -I/ 306/2022 dated 21-09-2022
Completion Certificate No. EC/ North -II/ 307/2022 dated 22-09-2022
EC/South- I/ / 308 /2022 dated 26.09.2022
EC/South- I/ / 309 /2022 dated 26.09.2022
Completion Certificate No. EC/ North -II/ 310 /2022 dated 22-09-2022
EC/South- I/ / 311 /2022 dated 26.09.2022
EC/South- I/ / 312 /2022 dated 26.09.2022
Completion Certificate No. EC/ Central -II/313 /2022 dated: 26-09-2022
EC/South-II /314/ 2022 dated. 27.09.2022
Completion Certificate No. EC/ North -I/ 315/2022 dated 28-09-2022
Completion Certificate No. EC/ North -II/316/2022 dated 27-09-2022
EC/South-II / 317/ 2022 dated. 28.09.2022
Completion Certificate No. EC/ Central -I/318 /2022 dated: 29-09-2022
2nd Partial Completion Certificate No. EC/ Central -I/319 /2022 dated: 29-06-2022
Completion Certificate No. EC/ Central -I/320 /2022 dated: 30-09-2022
EC/South-II / 321 / 2022 dated. 30.09.2022
Completion Certificate No. EC/ Central -II/322/2022 dated 03-10-2022
Completion Certificate No. EC/ North -I/ 323 /2022 dated 03-10-2022
EC/South-II/ / 324 /2022 dated. 30.09.2022
8th Partial Completion Certificate No. EC/ North -I/325/2022 dated 03-10-2022
Completion Certificate No. EC/ North -II/ 326 /2022 dated 06-10-2022
Completion Certificate No. EC/ Central -I/327 /2022 dated: 06-10-2022
Completion Certificate No. EC/ North -I/328/2022 dated 06-10-2022
Completion Certificate No. EC/ Central -I/329/2022 dated: 07-10-2022
EC/South- I/ / 330 /2022 dated 12.10.2022
2nd Partial Completion Certificate No. EC/ North -II/ 331/2022 dated 10-10-2022
EC/South-II / 332 / 2022 dated. 10.10.2022
EC/South-II/ / 333 /2022 dated. 10.10.2022
EC/South-II / 334 / 2022 dated. 10.10.2022
Completion Certificate No. EC/ Central -II/335 /2022 dated: 10-10-2022
Completion Certificate No. EC/ North -I/337/2022 dated 12-10-2022
Completion Certificate No. EC/ Central -I/ 338/2022 dated:13-10-2022
EC/South- I/ / 339 /2022 dated 14.10.2022
Completion Certificate No. EC/ North -I/340/2022 dated 14-10-2022
EC/South-II/ / 341 /2022 dated. 20.10.2022
Completion Certificate No. EC/ Central -II/ 342 /2022 dated 20-10-2022
Completion Certificate No. EC/ Central -I/ 343/2022 dated 21-10-2022
4th Partial Completion Certificate No. EC/ North -II/344/2022 dated 26-10-2022
Completion Certificate No. EC/ North -I/ 345/2022 dated 21-10-2022
EC/South- I/ / 346 /2022 dated 21.10.2022
EC/South-II/ / 347/2022 dated. 26 .10.2022
EC/South-II/ / 348 /2022 dated. 27.10.2022
EC/South- I/ / 349 /2022 dated 28.10.2022
Completion Certificate No. EC/ Central -II/ 350 /2022 dated 28-10-2022
Completion Certificate No. EC/ North -I/351/2022 dated 28-10-2022
EC/South-II/ / 352/2022 dated. 28.10.2022
EC/South-II/ / 353 /2022 dated. 28.10.2022
EC/South-II / 354 /2022 dated. 28.10.2022
EC/South- I/ / 355 /2022 dated 31.10.2022
EC/South- I/ /356/2022 dated 02.11.2022
EC/South- I/ / 357 /2022 dated 02.11.2022
Completion Certificate No. EC/ Central -II/358 /2022 dated: 07-11-2022
EC/South- I/ / 359 /2022 dated 04.11.2022
EC/South-II / 360 / 2022 dated. 07.11.2022
EC/South-II/ / 361 /2022 dated. 07.11.2022
Completion Certificate No. EC/ Central-I/ 362 /2022 dated 08-11-2022
Final Completion Certificate No. EC/Central-I/363/2022 dated: 08-11-2022
Completion Certificate No. EC/ North -I/ 364 /2022 dated 08-11-2022
Completion Certificate No. EC/ North -I/ 365 /2022 dated 10-11-2022
Partial Completion Certificate No. EC/ North -II/ 366/2022 dated 10-11-2022
Completion Certificate No. EC/ North -I/ 367 /2022 dated 11-11-2022
Completion Certificate No. EC/ North -I/ 368 /2022 dated 16-11-2022
Completion Certificate No. EC/ North -I/369/2022 dated 16-11-2022
EC/South- I/ / 370 /2022 dated 18.11.2022
EC/South- I/ / 371 /2022 dated 18.11.2022
EC/South- I/ / 372 /2022 dated 18.11.2022
Completion Certificate No. EC/ North -I//373/2022 dated 22-11-2022
EC/South- I/ / 374/2022 dated 18.11.2022
EC/South-II / 375 /2022 dated. 18.11.2022
Completion Certificate No. EC/ Central -I/376/2022 dated 22-11-2022
Completion Certificate No. EC/ Central -II/377 /2022 dated:28-11-2022
Completion Certificate No. EC/ North -II/ 378 /2022 dated 28-11-2022
EC/South-II/ / 379 /2022 dated. 29.11.2022
Completion Certificate No. EC/ Central -II/ 380 /2022 dated: 28-11-2022
EC/South- I/ / 381 /2022 dated 30.11.2022
Completion Certificate No. EC/ Central -I/ 382/2022 dated:01-12-2022
Completion Certificate No. EC/ Central -II/ 383/2022 dated: 01-12-2022
EC/South- I/ / 384 /2022 dated .01.12.2022
EC/South-II/ / 385 /2022 dated. 01.12.2022
EC/South-II/ / 386 /2022 dated. 05.12.2022
EC/South-II/ / 387 /2022 dated. 05.12.2022
5th Partial Completion Certificate No. EC/ North -II/388/2022 dated 2602-12-2022
EC/South- I/ / 389 /2022 dated 05.12.2022
EC/South- I/ / 390 /2022 dated 02.12.2022
Partial Completion Certificate No. EC/ Central -I/ 391 /2022 dated: 02-12-2022
Completion Certificate No. EC/ Central-I/392 /2022 dated 05-12-2022
Completion Certificate No. EC/ North -I/ 393 /2022 dated 06-12-2022
EC/South- I/ / 394 /2022 dated 07.12.2022
Completion Certificate No. EC/ Central-I/395/2022 dated 08-12-2022
Completion Certificate No. EC/ North -I/396/2022 dated 16-12-2022
Completion Certificate No. EC/ North -I/397/2022 dated 19-12-2022
3rd Partial Completion Certificate No. EC/ Central -I/ 398 /2022 dated: 21-12-2022
Completion Certificate No. EC/ Central -I/ 399/2022 dated: 21-12-2022
EC/South-II/ /400/2022 dated. .12.2022
EC/South- I/ / 401 /2022 dated 21..12.2022
Completion Certificate No. EC/ North -I/ 402 /2022 dated 21-12-2022
Completion Certificate No. EC/ Central -I/ 403 /2022 dated: 23-12-2022
Completion Certificate No. EC/ Central -I/ 404/2022 dated: 23-12-2022
EC/South- II/ / 405 /2022 dated 23.12.2022
EC/South- I/ / 406/2022 dated 02.01.2023
EC/South-II / 408 / 2022 Dt.05.01.2022
Completion Certificate No. EC/ North -I/409/2022 dated 26-12-2022
Completion Certificate No. EC/Central-I/ 410/2022 dated: 29-12-2022
3rd partial Completion Certificate No. EC/ Central -I/ 411 /2022 dated: 29-12-2022