0% found this document useful (0 votes)
69 views2 pages

Manpower Planning 2023 for PT. Angkasa Mandiri

1) The document is a manpower planning report for 2023 that outlines staffing needs and recruitment plans by department and role for each month. 2) It finds a shortage of 218 staff needed in 2022 across various operational roles like operators, group leaders and support roles. 3) The recruitment plan details hiring 1 staff in January, 6 in March and 6 in April to gradually fill some of the open roles, focusing first on operational departments with critical staff shortages.

Uploaded by

ichaheri22
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views2 pages

Manpower Planning 2023 for PT. Angkasa Mandiri

1) The document is a manpower planning report for 2023 that outlines staffing needs and recruitment plans by department and role for each month. 2) It finds a shortage of 218 staff needed in 2022 across various operational roles like operators, group leaders and support roles. 3) The recruitment plan details hiring 1 staff in January, 6 in March and 6 in April to gradually fill some of the open roles, focusing first on operational departments with critical staff shortages.

Uploaded by

ichaheri22
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

PT.

ANGKASA MANDIRI
PERENCANAAN KEBUTUHAN KARYAWAN [MAN POWER PLANNING]
PERIODE TAHUN 2023

JUMLAH
JUMLAH KEBUTUHAN RENCANA PEMENUHAN KARYAWAN
TERSEDIA
NO. DEPARTEMEN / JABATAN +/- KETERANGAN
TAHUN 2022 TAHUN 2021 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

A. OPERATION
1 PROJECT MANAGER 0
2 DEPUTY PROJECT MANAGER 0
SUB TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
B. PRODUCTION DEPARTMENT
1 PRODUCTION DEPARTMENT HEAD 1 1 0
2 SECTION HEAD
2.1. PROD. SECT. HEAD 4 1 (3) 1 1 1
2.2. DRILL & BLAST SECT. HEAD 1 1 0
2.3. TDC SECT. HEAD 1 1 0
3 GROUP LEADER
3.1. OB GROUP LEADER 10 6 (4) 2 2
3.2. COAL GROUP LEADER 3 3 0
3.3. PIT SERVICE GROUP LEADER 10 5 (5) 3 2
3.4. MAN POWER GROUP LEADER 3 2 (1) 1
3.5. DRILL & BLAST GROUP LEADER 6 1 (5) 5
3.6. TRACK INSTRUCTOR 3 3 0
3.7. WHEEL INSTRUCTOR 3 3 0
3.8. DRILL INSTRUCTOR 1 0 (1) 1
4 OPERATOR
4.1. DUMP TRUCK OPERATOR 90 51 (39)
4.2. EXCAVATOR OPERATOR 38 29 (9)
4.3. BULLDOZER OPERATOR 30 18 (12)
4.4. MOTOR GRADER OPERATOR 8 5 (3)
4.5. OFF HIGHWAY TRUCK OPERATOR 114 (114)
4.6. SEMI DUMP TRAILER OPERATOR 0
4.7 WHEEL LOADER OPERATOR 0
4.8. DRILLING OPERATOR 11 7 (4)
4.9. WATER TRUCK OPERATOR 8 5 (3)
5 PRODUCTION ADMIN. 5 3 (2)
6 SUPPORT
6.1. CHECKER 16 13 (3)
6.2. TRAFFICMAN - DUMP MAN 18 12 (6)
6.3. PUMP MAN 8 6 (2)
6.4. HELPER DRILLING 8 6 (2)
SUB TOTAL 400 182 (218) 1 6 6 0 2 2 0 2 0 0 0 0
C. ENGINEERING DEPARTMENT
1 ENGINEERING DEPARTMENT HEAD 0
2 MINE PLAN SECTION
2.1. MINE PLAN SECT. HEAD 0
2.2. MINE PLAN OFFICER 0
3 MONITOR CONTROL SECTION
3.1. MOCO SECT. HEAD 0
3.2. MOCO OFFICER 0
3.3. CCR 0
4 MINE SURVEY SECTION
4.1. MINE SURVEY SECT. HEAD 0
4.2. SURVEYOR 0
4.3. INSTRUMENTMAN 0
4.4. RODMAN 0
5 ENGINEERING ADMIN. 0
SUB TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
D. PLANT & LOGISTIC DEPARTMENT
1 PLANT & LOGSTIC DEPARTMENT HEAD 0
2 PLANT SECTION
2.1. PLANT SECTION HEAD 0
2.1.1. WHEEL GROUP LEADER 0
2.1.1.1. MEKANIK 0
2.1.1.2. HELPER 0
2.1.2. TRACK GROUP LEADER 0
2.1.2.1. MEKANIK 0
2.1.2.2. HELPER 0
2.1.3. SARANA GROUP LEADER 0
2.1.3.1. MEKANIK 0
2.1.3.2. WELDER 0
2.1.3.3. LUBE CAR DRIVER 0
2.1.3.3. HELPER 0
2.2. TYRE SECTION HEAD 0
2.2.1. TYRE GROUP LEADER 0
2.2.1.1. TYRE MAN 0
2.3. PLANT PLANNER SECTION. 0
2.3.1. PLANNER 0
2.3.1.1. ADMIN PLANT 0
2 LOGISTIC SECTION
2.1. LOGISTIC SECTION HEAD 0
2.2. WARE HOUSE GROUP LEADER 0
2.2.1 ISSUING / RECEIVING 0
2.3. FUEL AND OIL GROUP LEADER 0
2.3.1 FUEL MAN 0
2.3.2. OIL MAN 0
2.3.3. FUEL TRUCK DRIVER 0
2.3. WARE HOUSE & FAO ADMIN. 0
2.4. INVENTORY GROUP LEADER 0
2.4.1. INVENTORY CONTROL 0
2.4.2. STOCK TAKER 0
2.5. PURCHASING GROUP LEADER 0
2.6. INVENTORY & PURCHASING ADMIN. 0
SUB TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
E. HRGA & FAT DEPARTMENT
1 HRGA & FAT DEPT. HEAD 0
2 GROUP LEADER
2.1. HRGA GROUP LEADER 0
2.2. FAT GROUP LEADER 0
2.3. COM. DEV. GROUP LEADER 0
3 HRGA ADMIN. 0
4 FAT ADMIN. 0
5 CASHIER 0
6 LIGHT VEHICLE DRIVER 0
7 SECURITY 0
SUB TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
F. HSE DEPARTMENT
1 HSE DEPARTMENT HEAD 0
2 HSE SECTION HEAD 0
3 HSE OFFICER
3.1. OPERATION & ENG. OFFICER 0
3.2. PLANT & LOG. OFFICER 0
3.3. SYSTEM & TRAINING OFFICER 0
3.4. ENVIRONMENT OFFICER 0
4 HSE ADMIN. 0
5 HSE HELPER 0
SUB TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 400 182 (218) 1 6 6 0 2 2 0 2 0 0 0 0

Solo, Maret 2023

DIBUAT OLEH, DIKETAHUI OLEH, DISETUJUI OLEH,

YUDI KARYAWIJAYA ADITYA PUTRA MAHKOTA RAJA GOPAL


PT. RIUNG MITRA LESTARI
JOB SITE BERAU - SAMBARATA
PERENCANAAN KEBUTUHAN KARYAWAN [MAN POWER PLANNING]
PERIODE TAHUN 2012

JUMLAH KEBUTUHAN JUMLAH TERSEDIA RENCANA PEMENUHAN KARYAWAN


NO. DEPARTEMEN / JABATAN +/- KETERANGAN
TAHUN 2019 TAHUN 2019 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 Keuangan 2 1 (1) 2
2 Produksi 0
Pencucian kain 5 5 0
Desain 8 4 (4) 1 1 2
Pewarnaan 5 1 (4)
0 V
0
5 HSE HELPER 0
SUB TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL #REF! #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ###

BERAU, DESEMBER 2011

DIBUAT OLEH, DIKETAHUI OLEH, DISETUJUI OLEH,

SRI WAHYUDI BUDIAWAN HENDARTO YOHANES C. WIBOWO


HRGA DEPT. HEAD PROJECT MANAGER OPERATION DIRECTOR