PRANEETH ASSOCIATES,
Construction and Project Management, No: 16, Rajiv Gandhi Nagar, Nandhivaram,
Guduvanjeri, Chennai ~ 603202. Mobile: 7418777129,7418777130,
shana@praneethassociates.com, www.praneethassociates.com
COMPOUND WALL QUOTATION
To:
Arunachala import Private Limited,
No; 5 first floor, 3" street,
Dr. Radhakrishna salai, Mylapore,
Chennai ~ 600004,
‘ompound wall quote for Part B -5’ submission regarding,
Date: 02.03.2023 -
i DESCRIPTION OF WORK ary | unt | rate | amount
Construction of compound wall 3"x 3" footing or
10" ple if required in water seapage areas alone |
with 9" x9" column for 5' below the ground
1. | level Followed bya plinth beam of 9"x1"and "| 1100 | RFT | 3600 | 3960000
‘column above ground level with brickwork for
height and grade beam at the top level with 9"
x9" and plastering on both sides.
‘Terms and Conditions:
+1, Work will be commenced with
hin three days from the date of work order.
2, Water and electricity tobe supplied by you atthe site at free of cost
3, all materials wll be arranged by us.
4, GST is additional cost.
5, 50% advance payment al
long with the order.6. 40% payment during execution based on RA bills.
7. 10% payment after completion
8. For additional work, additional charges willbe calculated,
Thanks and Regards
Dhanasekar
Praneeth Associates, Guduvanjeri,
Chennai - 603202,PRANEETH ASSOCIATES,
6, Rajiv Gandhi Nagar, Nandhivaram,
Construction and Project Management, Ni
Guduvanjeri, Chennai ~ 603202.Mobile: 7418777129,7418777130,
dhana@praneethassociates.com, winw.praneethassociates.com
COMPOUND WALL QUOTATION
92.03.2023
To:
Arunachala Import Private Limited,
No; 5, first floor, 3" street,
Dr. Radhakrishna salai, Mylapore,
‘Chennai - 600008.
Sub: Compound wall quote for Part A- 10" submission regarding,
ic
a DESCRIPTION OF WoRK ary | un | rare ]amounr
Construction of compound wall 3x31 footing or 10" pile F
required in water seapage areas alone with 9" x9" column for
5° below the ground level, Followed by a plinth beam of 9" x1"
: and 5' column above ground level with brickwork for 10° see RET 5400 | se40000
height and grade beam at the top level wth 9"x9" and
plastering on both sides
Tarbed fencing at the top level ofthe compound wall for!
if height as per specifications u1oo | RFT | 250, | 275000
TOTALAMOUNT aan
Terms and Conditions:
41, Work will be commenced within three days from the date of work order,
>, water and electricity to be supplied by you at the site at free of cost
3, all materials will be arranged by us.4. GST is additional cost.
5. 80% advance payment along with the order
6. 4056 payment during execution based on RA bill.
7. 10% payment after completion
8. For additional work, additional charges will be calculated.
Thanks and Regards
Dhanasekar
Praneeth Associates, Guduvanjeri,