You are on page 1of 4
PRANEETH ASSOCIATES, Construction and Project Management, No: 16, Rajiv Gandhi Nagar, Nandhivaram, Guduvanjeri, Chennai ~ 603202. Mobile: 7418777129,7418777130, shana@praneethassociates.com, www.praneethassociates.com COMPOUND WALL QUOTATION To: Arunachala import Private Limited, No; 5 first floor, 3" street, Dr. Radhakrishna salai, Mylapore, Chennai ~ 600004, ‘ompound wall quote for Part B -5’ submission regarding, Date: 02.03.2023 - i DESCRIPTION OF WORK ary | unt | rate | amount Construction of compound wall 3"x 3" footing or 10" ple if required in water seapage areas alone | with 9" x9" column for 5' below the ground 1. | level Followed bya plinth beam of 9"x1"and "| 1100 | RFT | 3600 | 3960000 ‘column above ground level with brickwork for height and grade beam at the top level with 9" x9" and plastering on both sides. ‘Terms and Conditions: +1, Work will be commenced with hin three days from the date of work order. 2, Water and electricity tobe supplied by you atthe site at free of cost 3, all materials wll be arranged by us. 4, GST is additional cost. 5, 50% advance payment al long with the order. 6. 40% payment during execution based on RA bills. 7. 10% payment after completion 8. For additional work, additional charges willbe calculated, Thanks and Regards Dhanasekar Praneeth Associates, Guduvanjeri, Chennai - 603202, PRANEETH ASSOCIATES, 6, Rajiv Gandhi Nagar, Nandhivaram, Construction and Project Management, Ni Guduvanjeri, Chennai ~ 603202.Mobile: 7418777129,7418777130, dhana@praneethassociates.com, winw.praneethassociates.com COMPOUND WALL QUOTATION 92.03.2023 To: Arunachala Import Private Limited, No; 5, first floor, 3" street, Dr. Radhakrishna salai, Mylapore, ‘Chennai - 600008. Sub: Compound wall quote for Part A- 10" submission regarding, ic a DESCRIPTION OF WoRK ary | un | rare ]amounr Construction of compound wall 3x31 footing or 10" pile F required in water seapage areas alone with 9" x9" column for 5° below the ground level, Followed by a plinth beam of 9" x1" : and 5' column above ground level with brickwork for 10° see RET 5400 | se40000 height and grade beam at the top level wth 9"x9" and plastering on both sides Tarbed fencing at the top level ofthe compound wall for! if height as per specifications u1oo | RFT | 250, | 275000 TOTALAMOUNT aan Terms and Conditions: 41, Work will be commenced within three days from the date of work order, >, water and electricity to be supplied by you at the site at free of cost 3, all materials will be arranged by us. 4. GST is additional cost. 5. 80% advance payment along with the order 6. 4056 payment during execution based on RA bill. 7. 10% payment after completion 8. For additional work, additional charges will be calculated. Thanks and Regards Dhanasekar Praneeth Associates, Guduvanjeri,

You might also like