DRAINAGE
DAVID ST.
MATCH LINE
ELEV. = 83.096
ELEV. = 83.077
ELEV. = 83.068
LEFT
SIDE
ROAD PROFILE
87.00
HORIZONTAL = 1:400 MTS
= 1:100 MTS
85.00
VERTICAL
84.00
SCALE:
83.00
DRAINAGE CROSSING
DES. CB ELEV. = 82.592
S = 0.0069
82.00
1
81.00
EDGE
80.00
0+177.50
0+132
0+160
0+174
0+175
0+140
0+160
0+180
0+200
0+130
0+150
0+170
0+190
PROJECT TITLE : PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO :
REPUBLIC OF THE PHILIPPINES
CITY OF SANTIAGO
2 OF 2
CITY ENGINEERING OFFICE CONSTRUCTION OF DRAINAGE CANAL ROLANDO D. VALDEZ
PLANNING AND DESIGN SECTION (MABINI AVE.) ENGINEER - I
DOMINADOR V. VAQUILAR JR. EUGENE B. CHILAGAN BENEDICT B. PANGANIBAN ENGR. JOSEPH S. TAN DATE:
SAN ANDRES, SANTIAGO CITY, PHILIPPINES
TEL NOS. (078) 305-2761 LOCATION: ROSARIO, SANTIAGO CITY ARTURO C. SISON III ENGINEER - II ENGINEER - II CITY ENGINEER CITY MAYOR
ENGINEERING ASSISTANT