You are on page 1of 1

F J

Serial number
1.0 ≥665 hydraulic buffer 150~400
1.75 ≥870 polyurethane buffer 200~350

If the traction machine touches the


wall, customer should dig a groove.
If it is an interior wall, the access door shall
Direction K2 diagrammatic sketch
be installed.
Hoistway side elevation (Maintenance platform and ladder are Direction K1 diagrammatic sketch
Top floor section plan provided by others.) 150 the top floor surface
concrete lintel
by others above the door hole
hook load-bearing 2000kg
by others
by others Reserved ring beam on
1155 990

500
Hoistway top ring beam the top of the hoistway 2-∅50 reserved hole for

300
R1 810 825

1000
by others fire button at first floor
and LOP at each floor
300

1300
by others

500
250

door hole net height 2200


300
1300

300
overspeed
governor
hook projection machine supporting beam
position reserved hole 2-600x400

hoistway net depth2438


car net depth2000
B by others

Ø440
Ø4

505
500

overhead net height


300
50 front and back

300

1400
225 230
load-bearing beams

40°
by others
overhead net height

350

500
concrete lintel
300

Ø400 Ø400 above the door hole 250

door hole net height 2200


1220
by others

door hole net


150
698 width 1200 540

90
hoistway net width 2438
door hole net height 2200

1800
net door height 2100

30

1400
The door hole net height

90
K2
Ring beam is reserved in the hoistway every 2000mm, which is done by others

net door width1000 control cabinet excludes the decorative layer


R1 reserved hole
door hole net width1200
car net width1400 265 by others
300

150 hoistway net width2438


door hole net
500 width 1200 540
hoistway lighting, lamps are set every 7m

The door hole net height hoistway net width 2438


excludes the decorative layer

finished floor

Hoistway profile 3 F 4877

Items should be completed by others 2 F 3970

293 1155 990 1. All buildings in the hoistway should meet the fire protection 1 F 3870
Steel structure hoistway requirement. It's not allowed to fix the devices and power which is
glass curtain wall irrelevant to the elevator and unrelated holes. G F 3940
traveling height

by others
by others 2. The hoistway must be vertical. The horizontal dimension of the hoistway
300

should be the minimum clearance size, and perpendicularity errors is 0 ~ floor


stops
+25mm/0 ~ 30m, 0 ~ +30mm/30m ~ 60m, 0 ~ +50mm/ above 60m. height
3. When there is a space where people can reach under the ground of pit, Technical specification
the counterweight buffer should be installed on solid pile extending to
distance between CWT rails1170

overspeed solid ground, or the customer should make inquiries of the manufacturer application machine roomless panoramic elevator
about installing counterweight safety gear.
governor
4. Before installation, safety protective enclosure with the height of not speed (m/s) 1.0
door hole net height 2200

35 less than 1.2m should be installed in all the landing door holes, and
buffer
net door height 2100

hoistway net depth2438


make sure that the enclosure should be strong enough. capacity (kg) 1350

car net depth2000


610 650 5. If necessary, it needs to install ventilation holes in the sealed shaft
speed adjustment method
(generally in the top and bottom of the hoistway). The area of the VVVF
K1
285

ventilation holes should be not less than 1% of the horizontal area of


hoistway, and it needs to set protective screening in the ventilation control system selective collective control

225
holes.
traction ratio 2:1
6 . Reserved holes of landing door and hall call box and other
1260 reserved holes should be backfilled after installation. door opening 2-panel center opening door
1100

7. It would be best if the hoistway is concrete. If the hoistway is frame


car guide rail distance1580
1220

300 structure, concrete ring beam with the height of 300mm should be door size (W x H) 1000×2100
set where guide rail brackets are installed. And concrete ring beam
150 with the height of 300mm and the same width of the hoistway car net size (W x D) 1400×2000
should be set at the top edge and bottom edge of every landing
90

door hole. If the hoistway is solid load-bearing brick structure, car net height 2300
concrete ring beam with the height of 300mm and the same width
of the hoistway should be set at the top edge and bottom edge of overhead net height 4877
finished floor every landing door hole.
30
pit depth

90 pit depth
J

8. When the distance of two adjacent landing door sills is over 11m, a 1524
Hoistway bottom hoistway lighting net door width1000 safety door, which should not be opened towards the hoisway, should
ring beam
be fixed. The width of safety door should be not less than 350mm and traveling height 11780
door hole net width1200 the height should be not less than 1800mm.
pit ladder 9. The pit should be waterproof. If there is a plash, it should be located in No. of floors and stops 4floors/ 4stops/ 4doors
car net width1400 265
500

the wall corner.


hoistway net width2438
300

10. According to requirements of technical parameters table, customer main power 380V AC 50Hz 3-phase 5-wire
should introduce main power to the position of elevator distribution
box which is marked in the entrance of machine room (1.5m above lighting source 220V AC 1KVA/set
Direction B diagrammatic sketch the ground), and fix a protection switch and lock it. The power
motor capacity (kw/set)
150KN

8.8
200KN

fluctuation range should not exceed ±7%. The null line and ground
wire of the main power should be separated. And the value of
overspeed governor grounding resistance should be not more than 4Ω. project name Computer Science Block - 1
Car rope hitch plate mounting base support, connect 14# channel beam to wall 11. Unless otherwise specified, all the loads marked in the drawing
with three M12 expansion bolts. The support top sustains the bending unit of car contract
Please consult with the site survey contain impulse correction. The strength of the hoistway wall and pit quantity
rope hitch plate mounting base support; the mounting position can be adjusted. should be capable of withstanding all the marked forces. number
personnel before installation for specific
parameters of buffer load-bearing piers. But the support shall avoid rope fastening unit. Please refer to the installation 12. Those marked "By others" in the drawing (like embedded steel Elevator civil general arrangement plan
diagram of the elevator company for details about how to avoid it. plate etc.) should be set in advance.
13. The temperature of machine room should be maintained within 5 ordered by
~ 40 ℃.Machine room should be smooth, and must be able to
designed by signed
withstand standard uniformly distributed live load of floor which is
not less than 7.0KN per square meter. When the heights of the and sealed
machine room are different and the difference is more than 500mm,
customer should set up the stairs or steps, and set the fence. drawing
Elastic cylindrical pin shall be used to fasten car rope hitch plate mounting base support and guide rail. GRON/FB19-7235a
14. Customer needs to set up a rescue duty room, and lay one cable NO.
audited by
of 6 cores to machine room (We recommend using shielded wire).
A rail bracket should be set under car rope hitch plate mounting base support. Each core wire diameter should be at least 0.75 square millimeters.
version 2019
Load bearing capacity
15. Every separation distance between floors should be ≥2600mm.
R1 70KN Sicher Elevator Co., Ltd.

You might also like