Serial number
1.0 ≥665 hydraulic buffer 150~400
1.75 ≥870 polyurethane buffer 200~350
500
Hoistway top ring beam the top of the hoistway 2-∅50 reserved hole for
300
R1 810 825
1000
by others fire button at first floor
and LOP at each floor
300
1300
by others
500
250
300
overspeed
governor
hook projection machine supporting beam
position reserved hole 2-600x400
Ø440
Ø4
505
500
300
1400
225 230
load-bearing beams
40°
by others
overhead net height
350
500
concrete lintel
300
90
hoistway net width 2438
door hole net height 2200
1800
net door height 2100
30
1400
The door hole net height
90
K2
Ring beam is reserved in the hoistway every 2000mm, which is done by others
finished floor
293 1155 990 1. All buildings in the hoistway should meet the fire protection 1 F 3870
Steel structure hoistway requirement. It's not allowed to fix the devices and power which is
glass curtain wall irrelevant to the elevator and unrelated holes. G F 3940
traveling height
by others
by others 2. The hoistway must be vertical. The horizontal dimension of the hoistway
300
overspeed solid ground, or the customer should make inquiries of the manufacturer application machine roomless panoramic elevator
about installing counterweight safety gear.
governor
4. Before installation, safety protective enclosure with the height of not speed (m/s) 1.0
door hole net height 2200
35 less than 1.2m should be installed in all the landing door holes, and
buffer
net door height 2100
225
holes.
traction ratio 2:1
6 . Reserved holes of landing door and hall call box and other
1260 reserved holes should be backfilled after installation. door opening 2-panel center opening door
1100
300 structure, concrete ring beam with the height of 300mm should be door size (W x H) 1000×2100
set where guide rail brackets are installed. And concrete ring beam
150 with the height of 300mm and the same width of the hoistway car net size (W x D) 1400×2000
should be set at the top edge and bottom edge of every landing
90
door hole. If the hoistway is solid load-bearing brick structure, car net height 2300
concrete ring beam with the height of 300mm and the same width
of the hoistway should be set at the top edge and bottom edge of overhead net height 4877
finished floor every landing door hole.
30
pit depth
90 pit depth
J
8. When the distance of two adjacent landing door sills is over 11m, a 1524
Hoistway bottom hoistway lighting net door width1000 safety door, which should not be opened towards the hoisway, should
ring beam
be fixed. The width of safety door should be not less than 350mm and traveling height 11780
door hole net width1200 the height should be not less than 1800mm.
pit ladder 9. The pit should be waterproof. If there is a plash, it should be located in No. of floors and stops 4floors/ 4stops/ 4doors
car net width1400 265
500
10. According to requirements of technical parameters table, customer main power 380V AC 50Hz 3-phase 5-wire
should introduce main power to the position of elevator distribution
box which is marked in the entrance of machine room (1.5m above lighting source 220V AC 1KVA/set
Direction B diagrammatic sketch the ground), and fix a protection switch and lock it. The power
motor capacity (kw/set)
150KN
8.8
200KN
fluctuation range should not exceed ±7%. The null line and ground
wire of the main power should be separated. And the value of
overspeed governor grounding resistance should be not more than 4Ω. project name Computer Science Block - 1
Car rope hitch plate mounting base support, connect 14# channel beam to wall 11. Unless otherwise specified, all the loads marked in the drawing
with three M12 expansion bolts. The support top sustains the bending unit of car contract
Please consult with the site survey contain impulse correction. The strength of the hoistway wall and pit quantity
rope hitch plate mounting base support; the mounting position can be adjusted. should be capable of withstanding all the marked forces. number
personnel before installation for specific
parameters of buffer load-bearing piers. But the support shall avoid rope fastening unit. Please refer to the installation 12. Those marked "By others" in the drawing (like embedded steel Elevator civil general arrangement plan
diagram of the elevator company for details about how to avoid it. plate etc.) should be set in advance.
13. The temperature of machine room should be maintained within 5 ordered by
~ 40 ℃.Machine room should be smooth, and must be able to
designed by signed
withstand standard uniformly distributed live load of floor which is
not less than 7.0KN per square meter. When the heights of the and sealed
machine room are different and the difference is more than 500mm,
customer should set up the stairs or steps, and set the fence. drawing
Elastic cylindrical pin shall be used to fasten car rope hitch plate mounting base support and guide rail. GRON/FB19-7235a
14. Customer needs to set up a rescue duty room, and lay one cable NO.
audited by
of 6 cores to machine room (We recommend using shielded wire).
A rail bracket should be set under car rope hitch plate mounting base support. Each core wire diameter should be at least 0.75 square millimeters.
version 2019
Load bearing capacity
15. Every separation distance between floors should be ≥2600mm.
R1 70KN Sicher Elevator Co., Ltd.