You are on page 1of 41
HSE Procedure Manual HSE/PM i meil M/S.Megha Engineering & Infrastructures Ltd Issue: A Date: 01/02/2013 Address Ms Megha Engincring&Inastuctes Lil 5-2, Tecerat In Ett Balanapar-Hyderabad Ph 040.44336700 Fax: 040 email: afo@oigrup.com i meil Megha Engineering & Infrastructures Ltd HSE PROCEDURE MANUAL HEALTH SAFETY AND ENVIRONMENT POLICY & MANUAL (ORGANISATION SAFETY ewer, | MANAGEMENT MANUAL sareryorricer | manacen can. | REPRESENTATIVE wA0KN) | ia DESCRIPTION Dare | preraneoay | nevieweoey | arproveo Br W pe - Megha Engineering & Infrastructures Ltd Reg, if. $2, TIE, Balanagar, Hyderabad ~ 500037, Telephone: No; 040.44336700—Fax.040 44336800 i meil AUTHORITY AND RESPONSIBILITIES OF THE SAFETY ORGANISATION ‘The Company's HSE Pc + The company’s HSE policy depends above all on the qualty of its personnel and workforce, who are alpart of the system, ‘+The company is totaly committed to potcy of prevention, reduction and elimination of ‘events that could result n loss and damage te men and machinery. The company is further committd to arovide @ congenial environment and promation of personal heath ‘of workforce and sa of the company, *+ The company is futher committed to protect the intrest ofthe customer at al mes. ‘+The company is commited to ensure tha the HSE policy is implemented at all levels of the company by imolvement of employees on methods, structures, alitudes. and culture, ‘+The company's management directly conveys the message to all the company’s ett Workers and subcentracors representatives who are responsible for eaety, heath ‘and environment, + The specie objectives ofthe company's HSE policies are; Provision and meintenance of safe, heathy and productive. working environment To place paramount emphasis on the prevention of acsdents The protection of ife, equipment and property. Me teddy Managing Director’ PE pe |D se Procedure Manual | tow A “he Tae ot Comet re Oe Soa eaTE een Page Ta Sho | Sonne Te Rene] Ose | Paton a os eimnoa | 1 @ | PGP | conpy wate *|- [3 @ | pwTe [Tor Cones Cs ce ot | Pate Read tesen «|= ts 05 | PML | Dhan Us co 06 | _PMor | Heth & Salty Avene Pomlon [00 [= 7 or | PMO? | Psat sine Egupmens PE) | 00 | 8 8 | Patas | Sfey Commitee 0 . [Peat [crc ay Cc 1] Pa | Tyre eal Saiy o> |e | Pate [we Keine ® D [PMT | neta © [> p [poor i of | Pm rica Cc ve [eM | Wa em [> i oo [a | PM [Baring Asp of pe ve |_| Wo ave of fos 2o_[ Fee [aan (Wading @ Gas Gan’ | wo [=| 33 21 | PMs | Soating essing ofp as 2 | _PMi6 | Cots ety Ce a 3 [IMT | aides wo [| af aie ome as | eas as emo ay | eset [Pan BE pepe A se Procedure Manual | oe a i Rein No | Tie Record of Revision Dae amsnan Sesion Ne PHERR Page No | Page tof Bioreciange “itr change to | Section no [087 Nate oF change Revision | Este? ae Ne TREN | ue Kal RENO! ge a @ a HSE Procedure Manual Issue A Raise | a Te Distribution Li |e Sloane mor Rigs —[ Page al Tea [sno] Desenron Cony Neve 2 | eee, oT | tam mr aaa apy Tani | a Conley =] sore pet a 86 or a 3 i I WREATHS Procedure Manuat | is a Tie “eakh & Safety Awareness Promotion | REVREENE | Sein RET Fagen | Pape of ‘The objective of safety promotion iso develop and maintain awareness among al personel ofthe worksite commitments to safety and of the invidualresponsibiiy to support that csminitment 1.02 Procedure: (01.0201 Posters and signs: Posters an signs shal be apt as visuals fo accident an fee prevention, Posters sal be writen in English Hind and wil be conspicuously displayed (01.02.02 Wooklets and Brochures: “To inereae safety avareness and as part of personne safety taining safety handbooks or ‘brochures wil issu (01.02.03 VideowFilms: [MEL Safety Deparrent will conduct Safty Talk (minima wecky) tothe workforce oF ‘screening of video on sty so ast promote the safety and health of workers inthe ie. The topic of the Safety Talk or seeening of video will be decided by the MEIL Safty Department. MEL wil decide the category and typeof workers, which require atening for the talk, Record of attendance will be Kept by the safety deporiment. Respective MEIL Deparment Head and Subcontractors Management shall ensure the attendance of these MEIL will develop a procedure to recognize and ecknowledge good safety performance by individual’ teams ote subcontractors, ‘The development ofthe Safety incentive program, hich includes how itshould mn and types of awards, wil be developed with the onsensis ‘ofthe MEM, Salty Committee. The Safety incentive program willbe implemented within six ‘months ater the inauguration ofthe MEIL Safety Commitee. [SP peli] Hse Procedure Manuat | sve 4 Revise Wo | 0 ‘Tite Personal Prostive Equipment (Ppt | RSE [9 Seon Ne PMO Page No_[ Page fof 1 Pessonal protest equipment (PPE) includes protective equipment forthe eye, face, ‘nad, and extremis. These powetive equipments may be such items as protective clothing, respiratory devices protective shields, and barsers When this equipment is needed because of| al hazards, radioloyissl bards, or ‘mechani iritans whict may cause injury or impiment to any pat of the worker's body, by hazardous processes, environmental hazards, chen Wearallreguied PP? forthe job or task: Inspect al PP for wear or damage prior to ss ‘Toke care of and clem PPE when necessary Do ot use PPE for which workor hs not reosived ening, ‘Workers working in areas where overhead stuctres, equipment, or stored materials create @ Inca shall wear har hats and be reuired to wea them a al times, Workers wearing prescription eyeglasses should use hardened safety glass lense, (Goggles sal te wor during climbing, iting, or potential contact with chemi -Appeoved ear protecton shall be worn when require. Res exoweds safe exposure levels vey tor shall be worn ithe concentration of ds, oxic umes, o& other ar cantaminants ‘Safey fl body haveses sal be used when working surfaces ar above 1.8m ¥ "arplugs or earmuts should be provided to those working st place with high noise areal shove 90s, Proper Sal shows or oot, n good rps, shall be worn onthe obits, Workers stall wear suitable work clothing consisting fa east ong pants. Rubber boots must be wom when doing concrete werk, Alocays wear life jskts when working ver, or adicent to deep water > Use only applicable It marked sfery equipment, HEAT) Se Procedure Manuar | wos A Revisen No | oa “ive Safety Commitice ee Seon No Pais Page No | Page | of 2 ‘The existing Safty proce in various sitesplants hve bea reviewed and tis proposed ‘0 constitute individual conmitees sites plant evel consisting ofa chairmen, scretary and ‘members in order o bring Salty awareness among employees and implementation of statutory & safety norms, Role & responsibil 8) Chairperson: To summon and prescribe ove the meeting of Safty comitc. He / She has absolute authority ‘over the member fr impoove the safety the other members come the representatives. > Develop the Saetycommitee meeting agentes Cooedinate end cond odely meetings Establish necessary deadlines to subsommite assignments Provide appropriate ad timely fellow-up on prablems and recommendations developed by the commie, ve Serve asa communication ison Between manggement and the commie, Promote heli and safety by personal example ‘Mus have the confidence of ther commitee members, employees and management Health and safety management and applicable ILHR/OSHA standards, vyvvy [Note:The chaperson maybe appointed by management or (preferably) elected by naority ve ofthe membership. 1) Scoretary: > To corzanze th safety committe mectng aid proper minutes Present othe commie stats of al inspection reports an incidents & investigation “To prepare individual safe eponts he has o prescribe over the safety commitee meting “To main, record and disseminate mites of sch meeting A employees and sypervisors vevy ively promote heath an sfey by hither personal example ad communication with Note: The Secretary shou be appointed by the Chisperson or elected by members of the Commitee fora one year tm. Rosating this post perio to give all members an opportunity For this pst is also recommended (PE WARETE| Se Procedure Manual | ise A Revision No] Tite Safely Committee ee he Sean Pao Page No | Page 2 of 2 © Members: “Toassist the chaimon in he Fld safety management and provide constant surveillance on ater ating to safety. Allie committee members must attend he commitee meetings and discuss ll the sit / unt problems and must have submit the repost inthe meetings > each commitee member should be made up of individuals from various seus a levels ‘of organization representing administration, As lected members they are required to tend ll aftymstngs or range a deputy to ated and vot ince absence pose & objectives of Safety Committee Meeting: ‘Heath and Safety Commies should be established foe the Following purposes: 1 Objective of safety commie meeting are to educate & improve safety awareness among employees and workers. ‘To coomlinate and contol hxzandos ad improve working condition of the subcontractors, Review the subeommitoe minutes and sai To advice the purchasing & stores det in ensuring high quality as available of PPE. ‘To increase and runtin the interes of employe in heath and safety issues ‘To convince managers, supervisors and employees trough awareness and taining actives that they ste primarily esponsble forte prevention of workplace accidents. 7. To help make healt and safety activities an integral prof the organizations operating procedures, culture and programs. 8. To provide an opperunty for the re discussion of health possible soluios. 9. To inform and edwate employees and supervisors about health and safety issues, new ound, sxe ding te 10 To hop reduce the sk of workplace injuries and illnesses. 1H. To help insur compliance with federal and late health and safety standards 12, Reviewing and recommending traning and educational safety progras fr all employees. 13, Reviewing accident sepots for rends and problem ares, 1. Involving other employes/departmens in various projets and fuetons to ei everyone's responsi for health nd safes safety problems and [BB AMEE) Hse Procedure Manat | sw | a Saat mar teat letra safety requirement are divided int Fur major ares > Theclecrie equipment and installations used to provide let power and fight on jobsite > Safay-eted work asics which cover hazard that may aris fom the use of electricity at joss, and hazards hat may aise when employees accidentally contact energies Ties, iret or nec, st are shove or below ground, orate pasing through oF near the Jobsites > Safty related maintenance an snvironmental considerations; end > Safety requirements br special equipment wi king in nearness of Caderground Cables Damage to lve underground cables duting excavation work isthe cause of number oFacients siting in injuries nd dimupion of supplies. On ceasions such acigents have ben fatal ‘Wis essential tha al thse involve, particulerly machine operators are aware ofthe hazards Before excavation work commences > Bnsure that employees have proper safe work proces an aequate supervision > Check pans to establish eble routes, depth and voltage > Use cable location devices where necessary During Excavation > » Regard al buried cables as live. Do not assume pot-nded cables ae dead or discussed ‘and digging shall be employed when nearing the assumed ie ofthe cable, "Excavators and power oos should not be used within $m ofthe indicated line ocable pone cables shall be xupported and prose agin damage. Ty should not be used ashand and foaholds 9 Disteibution All wing shall confirm to specified regulation. Temporary wiring causes acide and shall be ‘voided. All switchgears sal be fiely accessible and beng lacked in the “OFF”, Whether sheds shall protect all elects! istalations. All electrical installations shall be provided with ELCB. ype shock guar HSE Procedure Manual | tse a Ti eral aey kate | a iio wate agen Tage Main distribution wait For the contol and distribution of elctricty on site 41S Volt ‘Trae Phase, and 240Vlt single phase AC. uttets units Uses, portale tol, loodiaing and extension outlets tobe protested by ELCs Extension outlet, Uses portable tool, ol ghting sid hand lamps. Markings All supply, distribution and uansformer nits shall be marked with the warning sign with the ‘word “DANGER™ and indcating highest voltage likely tobe presen arthing grounding All metalwork of the disibuion systems and Fixed appliances not carrying current shall be effectively earthed eg. ‘The metalic sheath and smoring ofthe incoming supply cables, ‘The carth terminal supplied by the Supply Authority ‘A separate cat electode system. Periodic maintenance, ispesti Pits shall be cared et), and testing (th meager inssument for checking of eath Plugs: Socket Outlets: Ceuplers ‘Only components bath single and tree-phse spplies and is intended to prevent pugs designed for one voltage being comected to sockets of another. This i achieved by ferent positions of| -eyway in plug and socket Accesses shall be mark with maximum rated operating vokage and eure, Buried cable > Cables shal be buried 05 m below ground > Protected with tiles o-coversalln dt > Benchmark to indicaw rout (EE AWHERE| HSE Procedure Manual | = ‘ Tie ete Step Ze | Sea 7a race t asm god > These ae only permited foe short period of time > Additonal reinforce sleeve protection required > To prevent tripping brands ables shall be clerly marked tallatons Inselations stall bei ‘Any work or alterations shall be cad ony in presence of competent engineer. cordance with plans drawn up by competent engineer. “Theinstalaion shal contin to electra regulations very instalation hall be este in acondance with electrical regulations. Records of testingand inspection along wth ceriiation shall be maintain, ‘Testing and inspection stall include Visual inspection Cootincy of inl eect conductor Continuity of protective condvetor Barth elocroderesstance Inston resistance Polarity Earth aut loop impedance Operation of wesidual eaten device ‘Weekly inspection shall be made on whole sytem including all potable tools and records stall be maintained vyvyyvyey ‘Shall operate on 240 Volts lexble cords shall be kept as shor as possible Frequently checked fr damage and repaired. Damaged cable tall be replced ‘Long ailing leas over the ground or floor sal be avoided. Drums and rel hl be inspected regularly fr overheating, which can cause ire Al potable tools shall be of double insulation type vvyvyry BE WARE]ME] HSE Procedure Manuat | bse A 5 Revision o_[ Tile Plectrcal Safety Due | OST1017 Seon Ne Pao Page No | Page of 7 Fess: Fuses usally blow fora reson, The reason shal he dissovered before a fis is epice > Nils, srews, wire oF siver paper never be used to replace Fes Cis illegal ws well as very dangerous Lighting > Lighting is esded fr sfey; productivity secur. Level of Iumination > iMluminaton is measred in units f lumens (or ax), which the mount of light ie aling on ome square meter, Light meters are uses to check Ives of ilmination, lamination shall be measured atthe sects! work plice net atthe Hight fiting. There are factors tat ean affect the efficleney of Viging > Amount of daylight ville Cleanliness and maintenance oF ght tings and refletors > Reflections form walls ceilings > Distance of ight source fom work tea > 1Pthe distance fom the source is doubled the illumination willbe reduced to one quater (verse saat law). > Maina the LUX levels during the day & ni ant / She Lighelng ‘Ave lighting Allarea shal youve let frm atleast vo diretions > Fitings mounted on polos, towers an high masts must be seuraly stayed > Fitiags shall be spcad at nt more than two or tre times the mounting height, >» 240V is generally accepted for fixed Nooightng, mounted wel above ground > Dus and dirt on ligts can absorp to 20% of their output and cleaning is often cost fective ia mains ning adequate levels of lging fr both working and safety © me || use Procedure Manuat | tse a t Revision No_| Wo Title Blectricat Safety SbaNe | Oa Seaon We Pao Page No [Page 5 of 7 Safety Checklist, Cables > Disubution cables mst not cause a hazard at openings, passage, ladders, ais ee, > sure tht cables we not lying on the ground unprotected frm physical damage ar wet -ondiions > Cables must not hang rectly from ails, ee. which may ease insulation damage Ensure hat ables ar protected from ees of sharp objets, > Suspended cables shill not carey any weight, Rods or catenary wire sl support tht, > Isthoreand adequate supply of extension sabes fr plat use > Remove all unapproved junctions end makeshift sepins Plugete See that covers, te arena damaged > Ensure thatthe splash poof covers are actualy wed Check thatthe correct pigs are Fite especialy by sub-contactons > Mast be suitable for the plant conditions. > > See that plugs have not ben fered ino the wrong sackets (Chock thatthe correct connections have been made; color Coding shall he distinctive Check thatthe cable ips are used and that the eth cables fied! with some sack otha it {isthe lato be pale ot > No improvised junctions, sls, matches, iver paper sts 3 Ensure hath eorret ype an rating of fase a ited, > Have earth leakage crit beakers ited? >> Ensue that competet electrician fits any made up leads extensions ee Power Tools > Chock fordoubl insuon > Ite wool ited withthe coreet pigs type and size? > Ave cabo teitng ead not et or ayes > se cable protected fiom excessive flexing by rubber sleeve where the cable enters the tol? > Areall screws in place and secure? > Ensure tha there are nc racks o pieces missing on the machine. > Is the chuck in god cowlition andi the corect hey attached? > Check hat any bit retaining mechanism is in working onder BE GREAT] HSE Procedure Manual | ss: A Ti eral Say Reine | SS aa Tapeh [Pape eo Checklist for Operatives > Disoonnest machine before adjusting or working on > Disconnect machine when notin use. Check thatthe calor cong ae correct Ensure that cables ae ndeguate Do not use “Unocal cables te ‘Do not make makes repairs Report defects immediately 0 the competent person Fall connection corr including waterproofing. Do not carey mashine by cable >» > > > > Keep chine clan an fie from dampness > > > Do.ot starr stop machine une load [No work to tke place within 9m of averead ines on wood, cverete or steel pols, Within 15m of overhead ineson sto owers, Unt the Eletrelty Bod is consulted for advise. Lighting Maintenance: > sot antag the concer lighting cect beaker. Distance measied horizontally at ground level from dvelly below the atermost contr. > Tie he Inder to the ground supply: hold sho ladder firmly by anther person, o avoid slipping of tar > Use safety belt ifthe heights more than 3 meters > Proper cre shouldbe taken while removing light tings, wire guards, wel lass ee. 10 280 fling om ovation, >> Proper cre should taken while removing broken lamps while replacing the holders and chokes, Original eo code ast follow while removing the chokes. Handle carefully the used bulbs Ite trek inp, donot restart without eiminaton of Fat to avoid hazard HSE Procedure Manual | ise a i Revision Wa “Tite lecrical Safety He ‘Sesion Ne PMO Page No ‘Temporary Connections ‘Where temporary comections ae envisaged, ase corect size cable. In ease of 230V tat boards wed, 3-ore cable and third ore shoul be ered “Temporary cable should be li fom above 3 meters and properly id them, Any joints ae required the sume sal be properly insulated, When the job is completed as carly a possible, removed th lemporary connections and store rope, Cie only 24V hand lamps, where 230¥ hand / flood lamps are required, the same shall be installed above 3 meters ‘Use only 3 core cable fo sinle phase power and thie core should be earthed 1 metal pat ‘Ensure welding machines are properly covered io avo any water ey. Ensue cath wel ‘Do nt run welding cable onthe Hive power cables. ngeables jolts are propely made [BD EERERE| Se Procedure Manuat | soe A i Transporation, Veksl & Road Satay | Revo Wo {00 us " fey ae | av022013 SesioaNo Pa Fag No Page af Only eporteequipmen for which they are trained and authorize > Merial should be prover loaded considering us weight, dimension, capacity ofthe carte, cone gravity ofthe lsd clearance required for at, ee ‘od mist be properly asked ote tore wenspartaton Vehicle sould bein good working condition Allthe vehicles must have ffcient rakes, hoens tights The transport vehicle shoul! not be overland, No mater should sot be project above the height ofthe side pane’ or beyond the side. Red caution fags or ed amps in the night shou ‘be dislayed on he projet end 2» ‘The vehicle should aot ply beyond the permsible sped Timi. Spe limit inside ftory / site ‘reises sho be sre followed, > ‘The drver shoul abseve the instructions fr erasing the lve eossng overtaking an taking > None should gt up or gt down om a moving vehicle Men shoud nt sit on 1 sdos of the panes or onthe top of dives cabin, "Men sould ot sit athe load or ovr the Jad where thee is possibility of rolling o oing ‘orshiting de to siden application of breaks. > Follow the Manufactrrs recommendation fo tyre pressure, fue and ai a ‘etane no in ease of pol, ube quality, loading et > Carty ot maintenance as por Menuficture recommendations fr maintenance as per Mana ‘Checklists: always purshase Fuel, adiives lubes and spaes tobe purchased from Company storied outs only Ensure that rear mio, hoe, back hor, hand brake aren working condition ‘Do not use mobile phones while diving Possess documents like Driving Livenss, Cenifeate of Registration, Fitness Cerfiate, Pallaton under Conirol Certifiat et. Ensure that the person diving isnt coor blind [Ensure that no othe pason sits onthe vehicle except dives “Whenever reversing the vehicle ensures that there i aay someone to guide the moveren of vehi, > Always park the veil in such a way tat the font ices towards the main exitonay > In case of leakage in el sytem, vehicles shall not be parked within 6 m of any source of ignition rf, Never park vehicles nea to sourees of high heat > Neverbe near the vehile never use of mobile phone during fel refilling > Never drive if abilities are impaced by, for example, alcoho, poor vision or heering, i health ‘ordrugs whether presoibed or nt Foot quality vy vy BD mpell | se Procedure Manuat =e te Housekeeping Date o10272013 Seaionne Pas Page No | Pages 1 of 2 ‘Good housekeeping i an important element of acideat prevention. Ht should be planned a he begining ofthe jb and creilly supervised unt the ial cleanup. It is recommend to have a regular clean up in all cure jobsites, However housekeeping should be the concem of all supervisors and engineers in their area of working and nt let For the cleanup ee. In any ease housekeeping should be apart of daily routine with clean up being a continuous procedire Maing the Wook Ae Saf Novara Remedy ‘Wed seven succes Cleanup reper spits Irmprope ighing Keep areas wel it ‘Winter weather ‘Wear the right shoes Wrong eos Use job-apropriate oot Poor housekeeping Clean cutee Big nds Carry sate loads Not enough sme Slow down ‘Mos workers fen trip o: stumble over unexpected objets in thir way; thas, the importance of housckeoping is key ttegy i the prevention of sis, tis, and fall Honsskecning Mowsskeeping do's Keepeverthing a work nis proper pice Put things away aller use Have adequate lighing or use a ashlgh Walk and change directions slowly, especially when carrying anything. Make sure the ts head ona wrench isin pood shape and won’ sip when you pal on BM PME ME) Se Procedure Manual | tse A Revision No | 06 Tite Housekeeping Dac | ona Sesion Ne Pato | Page Na | Page 3 of 2 keeping Dos > Don’t eave machites, ooo ater materials onthe lor. > Don’t block walkways or ails wth machines or eauipment > Dow euse “cheat” ona wrench; got larger wrench with lage head or handle fu ood it > Don't leave cords power cables, or airhosesin walkways, Dow plece anything on sts. Don't eve drawers open > Don't cay or push loads that block your vision, Simple rules for housckeeping- ‘Storage area: - ll material shouldbe miniaind in neat stockpiles with well aid ses and walk ways for nse of acces. There shal not be any projections inthe walk ways 2 Work areas: loose materials, saps, tls, ete. shall not be allowed ta be Tying inthe working areas especial important at height where the loose materials ae ad fll down Spills oF oi & grease sould be removed immediately. An eflective means of preventing loose pieces lying dangerously at heght inthe provision a suitable receptacles for waste an seap pieces 3. Scrap yard: wooden scrap yard shouldbe well away fm any gas cutting or welding ‘operation and No Seoking sell be strictly ensured there Alter combustible ea isposes off safely then and there the vicinity of ladders, ramps, stars, ele. this is more ction wats, wooden boxes, and empty punt as sal be 4 Lighting: Adoquse lighting should be provided in and around all wor arcs, passage vay, sais adders & other areas used by personel ‘5. Openings in Moors: All openings in Noors where our workmen ate ible to work oreven pass through shall be either lose or barricades. If thy ae closed visible warning sgn shal be hop to indeate the opening below the cover BE ETT) Use Procedure Manuat | A Tile Bcavation Ravin No | 0 Drie |- 077022073] Sion No Pao Page No | Page Fo | Fxcavation, Piling & other related works. 1. Sides ofall excavations must be sloped oa se angle not stop then she angle of repose ofthe panculr sil. Angl of repose for various soils ae given in tale2. is not posi Aislodgement of cart or any materials shal be securoly supported by timber or any oer let give a proper slope the sides of excavation, where theres danger ofall or ype of shoring. Where the excavation f being carried out with Pocin tep down procedure should be followed 2. No excavation or cath work below the foundation level of any adjoining buildings in an cxistng plant factry shal be taken up unless adequate steps are taken to prevent darnage to the evising srt 43. very accessible pnt ofan excavation, pit or opening in the ground int which there is danger of person fang, shal be suitable fenced with arr up toa beght of hee fet as close to the edge af the excavation of practicable 4. Gating shal be dns frm top to botom, No underesting of side of excavation shall be towed, 5. Allnarow trenches I fst of more depth shall tall imes be supplied witha est one leer Fr each 100-in length o faction thor of ade shouldbe extended from Bottom {o the tench tat least hee above the surface of the ground. 6, Theside of trench which are SR or more in dep shel be stepped back to give suitable slope or securely hed by planking, struting and tracing so as to avoid the danger of side collapse. 7. Before stating any exsvaton of any dseiption nth existing plant / cory area premises, permission in wing (WORK PERMIT) must be obtsined fom the Electrical Divison, Civil Engincerng & Design Department of the clients to avi any damage tothe underground eletri cables or ppaine 4. No loose materia Toe stall be place or stacked nea the ee of any excevaton 0.88 to endangor the lives of person working below 9, Excavation area mist be properly fenced and marked with the suitable warning boards Fight atl Ges. 10, Allworkmen working isi the tench pit sh ecessary wear sfty helmets and thease ‘who ar working inthe slopes or benches ofthe pit shall use safety bel aso HSE Procedure Manual | ise a te LASTING oe i Date otO2/2013 Sai a Pero | Page Tat “The tanspotatio, storage, handling & use of explosives ae governed by explosive act. Stit compliance wit the sare ad th local Law & regulations are abo tobe vefeed while dealing with he explosives. “The following four unsafe acts are trict Forbin while handling explosives 1. The we of posession of intoxicants on or around the jo, 2. Horse play o patil jokes 3. Smoke or use of pen Fgh 4 Use of mobile phves, Blasting records: “The fllrng records have to maintain inal uaves while handing the explosives. Blasting record for each blast indicating, 8, Date tow of bst, 1b, Number of hoes Type of explosives used 44 Amount of charge per hole & «Firing pattern & sequence. ‘An inventory ofall explosive rseved, paca in removed fom & retumed to storage magazines mainsined erent atl Lines Only icnsod biastr shal be allowed to han explosives B. Transportation Explosives should mt be card inthe sime Vehicle with detonators unis the Seconators ‘are carried in a separate approved container The vehicle shoud be equipped with « non spirking metal or wooden Moor the sides shoul! be high eng to prevent the explosives from fling aff or equipped with lose body. Hf any open body trick, @ fre & water prof tarpaulin shall be used to cover explosives. ‘© Two fire extinguishers must he provided inthe vice BG pepe) Hse Procedure Manuat | tse 4 Ti BLASTING Revision No“| ‘e Dae | o7m2073 Sesion No PAO Tage no [Page 2 of 4. Congested ali should be avoided while transporting the explosives. Unnecessary parking at hotels, garages ling sations, et, shoud be avoided © Unauthorized peroas or flammable & comosive substances shall tbe allowed in the tuck cartyng exposives, ‘Smoking is not allowed in & around the vehicle carrying explosives, . Storage 1. Explosives should be sired only in approved storage magazines however small the vant shal be: b. While aking explesives for actual usage it shall ot be placed near the source of ato ‘Smoking or poswesing crotches et. near the magazine i prohibited. 6. Manufacturer shouldbe conse, ifmitoalycerne from deteriorated explosive as leaked ‘onto the floor of amagazine. The floor should be desensitized with an agent approved for ‘hat purpose by the anasto ©, Detonators shoul aver he stored in the se magazine wih any other explosives, Leaves, grass, bush or debris shall not be allowed to accumulate within 25% of an ‘explosive magazine, D. Using Explosives. 1, Explosives boxes ass) should nt be open using metalic os bh Replace the coverof the ese aller the roguied quantities of explosive have sen taken ‘© Smoking or any oe sources of ie ate prohibited within rave of 100 fet fom the Place where the explosives are being hanled or used (Only the se and thing else sl he insert inthe ago on fhe Wasting ep plosives caps o fases shall not be arid inthe pocket of clothing Children or Unstbrized persons ar totally prohibited nthe basting are, Deterorted or danaged explosive caps another ascetsoves shall not he use it shal be retuned othe manafictred. 1h. Incensty ofthe chuge to housed rst be well alla and safe enough to prevent any damage to nearby sructures du to shock & vibration resulting fom he explosion The (BD WAREAE| HSE Procedure Manus tone A even No | oo Lo BLASTING ac TE Sesion ir Tags | Page 3 of charge canbe covered with blasting mas, sed conveyor belts & sand bags to prevent splinters fying off especially in runing plans E. Drilling & loading 8. Before dling is rtd, posible presence of unfred explosives should be careflly checked, Never dri ia the buts fold holes, Before loading the canton ofthe holes shouldbe checked either with wooden ping poles or measuring tape. Especially ht matevas of anykiod ike boken dil bit ete are very hazardous, ‘6. Nofoles should he lnded excep those that are tobe Fired inthe next ound of basing oles loaded duting one sift shouldbe fied on the same shift. 44. Toavoid miss ithe detonator shouldbe completely inserted length wise inthe care, Fistenadn such @ mane that it canna aceidentlly bo pled out «Cap crimp of proper design should be used fo rimming blasting aps onto fse- not the teathor knife Thediameter ofthe ole drilled should beat east Smm more than the dia ofthe cate. {Blasting shall be carried out only during lean hoor~Say during lunchtime, night hours ‘or after taking the work perma Warning signals ‘A standad wating signal andall ler sigoal shouldbe used before & afer fring and inspection All personnel working inthe area and nearby sould be made aware ofthis established warning procedure Ath time of eompotnt persons equipped with od flags with vossls should be posted a a possible approaches to the lasting rea to stop trafic and bypasses. G. Firing ing, following safe practices are recommended to avoid any trouble All leticalconnstons shouldbe good & rig by. The blasting machine should bein gon order and of slicent pacity wo re al che levteblstng cps connected in the crcl. K may be tested with a heosta RE BEAT Se Procedure Manual |= A i BURSTENG| Reise | ——w. we Dae | 01020008 Seon No Pane Page No | Page 4 of ¢ «2 Generator type Wasting machine shal bo operated ow times before making the connections o prepare tor he maimuim generation of current. Thistype of blasting ‘machine should be operated ih maximum fore 4, Bete detonators or delay elect detonators of diferent manufactures shoul pot be sen these Bast ‘©. The ssstance of ereuit should be measured with busting galanometer before attempting, ‘ofr Misfire “There is ao absolute safe iethod for banding misfire. Bt msfies canbe prevented 1. By proper use of high-grade blasting supplies Hy testing cach cet caps with blasting galvapometer before fading IM, By testing the complet ict before fing the bls. However ia misfire des eur it shouldbe handled very carefully, only by experienced persons. “The safest way to dspose ofa misfire ist reshot i, ithvow ofrock ean be tolerated. When the ‘roubles caused by ful connections and ifthe leg wires are acesible, test he blasting cap with 1eshe ‘hot ils gai, o the wies ae inaccessible, o i eaps and fuses are being ued ry to sho the hole with flesh primes this Primer inserted and then fe. the glvanometer and try blast the usual manner after giving connections propel sf, the stemming should he removed carefully, new Unused spilled or deteronted explosives should nt be abandoned shouldbe preserved and ioposed only by competent person and experience perean, Wood, pape a ee wea in king ‘explosives shou be burn ony in an isolated outdoors location. Aer the buring has started, no person sal be allower within 100 Feet ofthe pace of burning. BE AMRE]ME| HSE Procedure Manual | se A a isa Dae | Om2001 Sean Na mie Page No | Page of | Object ‘Toft the rapid implementation of lio emergency measires during incident, disaster and prevents minor incidents wth developing into potential major nents. [Matter whether the injy the illness is cause by the work they do. What is portant that they recive immediate atetion and that an ambulance scaled in serious cases, Fits aid at work covers the arangemants employers must make to ensue this happens. It ean save lives and prevent minor injrasHecaag major ones. “The Health and Safety (Fist-Ai) requis employes to provide adequate and appropriate ‘equipment, flies and personel to enable Fist aid to be given to employees they ar injure ‘or become il at work ‘What is adequate and appropriate wil depend onthe circumstances ina patcular workplace. The minimum fis prsnision on any worksites > A suitably stoked i > Anappointed persen to take charge of ist id bon with materials i arrangements, 113s ls important to remember that seen ean happen a any ime, First provision needs to be avilable at al ties poople ae at work A first alder A frst aide is someone wo has undergone an HSE approved taining course in administering Fist i at work and holds current first dat work cetifete. Lists of local ening ‘organizations are available fom the local environmental officer or HSE Oies, The trining should be repeated every thee years to mintun a valid Ceri and kept isl adr upto he First ad box sal be placed under the charge of Safty Oicer or Welle offer on in their absence a qualified First Aer BE ARREAE| Se Procedure Manuat | se | a ~ Revision No_ 0 Ti Wes Pris aaa 7 Ee ages eT ‘Permit to Work: 'A. The permit to work (PFW system wl be fllwed to ensure compliance with the standards 'B. PTW will be used in al common areas, Diflercnt types of work wil nce 4) Height work pent refer MEILISAFETYIF.00/Res.01 1) Eletical work permit refer MEILISAPETY/P-10/Rev.01 ©) Hot work pet eer MEILSAPETY/F-1 Rev 01 <8) Excavation work permit efor MEILISAFETY/F-12/Rev.01 C. The employees will mini high standard of hygiene at work, 1D. The ination dite of permit, estimated stat and ration of pert wi be specified. The permit valty for maximum duration of 8 hous will be specified , The brief Job description ofthe work andl equipment wil be provided an ik assessment wil bbe done to determine the contin of work and plant conditions. PPE will be provided F. The request for pemitta work will be detailed with names of sponsible person, G. The Safety Officer wil review PTW penit request for worksite safety and its contents and selevant attachments end provide endorsement, Contact mbers nd specs instruction will be provided by Activin In charge HH. Inspection of work cation, reviewing of condition stipulated in permit and attached documents wil be cared out in scordace with Health and Safety Regulation, 1. Safety Oior will give permision to proceed after reviewing the permit and relevant documents stached, 4. The appropriate column inthe attachment wil be signed off once the work is completed in secondanc with the permit requirements The work inspestion,seeptance and reinstatement ofthe completed work in accordance permit requirements wl be dane by activity in charge 1. Gas test authorization i require, wll be conducted and endorsed on site by Safety Oct. ‘The work will he stoned when ever an unsafe acts or conditions are encountered, The work ‘ill commence only ater these unsafe acts oe conitions have been restored and endorsed M “The salty requirement for all classes work will be mandatory and applicable class of work ‘will be reviowed and completed in conjunction with hot eatery N, Permitto-Wovk-Systen willbe adoped in ll estioted & unrestricted aes, (0.0ne copy of work permit will o posted a site during the PWT s being carted at work site BE AME|E| Hse Procedure Manuat | 1 A Revision Wo | O Tie Stores Safety seis Seaton PMT age No | Page 28 of > The materials are stacked with passage to reach thom. The ase is marked, Materials should ot protnae beyond the marked area posing Wiping hazard Name bods shall be displayed to mention the place for every em “Theracks installed must be supported well 10 prevent fom falling "To each the rack to person should not ei on the rack shelf, ler should be vse Vertical stocking of materiale should not exceed the pesribed norms psing fling hazard because of imbalance Adequate ihting is rovided > Flammable materials lke Dissolved acetylene, pains ete ae stored under well-ventilated shed. Electrical conestion in these locations shoul be proper and maintained well uch that they do cause sor ire. Smoking carving matchbox or anyother fr eausing materials prohibited in these eas 1 Sufficient fire extinguishers are Kept at conspicuous places and the path to reach them shall ot he blacked antine > Toxic materials are labeled and Kop at sectased place where only authorize persons shal handle, The MSDS ef the chemizals > Nail pullers shal be used whenever possible to remove mais flom boxes and erates, Metal strapping shold be eu with proper safety to > Barels and drums stall preferably be place on end. If placed on thei side, these shal be provided wit ack or blocked so these cannot ol > Gils, greases and paints shall wot Be openly sre at ny ime > The srap pile and junk materi sl be pe as onderly as conditions will permit. Extreme cae shal be used in andling serap material to prevent persona ny BE WME MT ASE Procedure Manual | xe A Reisen Ne | Tie Stores Safety Das OnoeROTS Sesion No ma FageNo | Page? of Storage of Cylinders: 1. Oxygen and acetylene cylinders should he stored separately since any mistre of go leakage ‘ould be highly explesive. Storage should be preferably be on hard standing in the open sir under a shel, but interior storages nocessary, rooms mist be well ventilated 2. Housekeeping should be mainained ‘The aea inside and around the shed! should be clear from liters 3. Acetylene and oxygen ae citer kept minimum a distance of 10feet away’ 8 partition is ced berwcen them, 4. Acetylene & Oxygen cylinders, whether fllor empty, should ways be kept upright 5. Full eylindes should be kept separate from empties. Name boards are displayed t identify the liners ©. Cylinders shoul! be shelled from direct sunlight or other heat to avoid the build up of ‘excess interal presi, which might lead to gs leakage or eventual bursting ofthe einer alls. Some protection should be provided ine and snow conditions to avoid x redution in pressure, which would lead to diffiuliss in operation, 7. Storage compounds shouldbe sted well away from risk areas and all oxygen cylinders specially should be Lept off ol and grease since these will ignite violently in an oxygen 8. -"NOSMOKING? signs are displayed Diesel /Peteol storage area: ‘+ Approved quantity of ist! petrol stored Diesel drums are stored on hard surface proferably ona conte lor. The lor sloped towards 3 comer whee a simp is mae fr eulleto the piled + They re kept undera shed. ‘+ Adequate numbers of eam type extinguishers are installed + Housstexping should be maintained ‘The ara inside and around the shed should be clear from ‘+ Caution Boards on fie hazards ike, “NO SMOKING" shall be displayed. + Others ammable materials should wot tock with he desel (LPG Gases) BM meElh) se Procedure Manat | sw a Reise | | Tie Bar Bening / Cuting Activity ison | ay Seaion No PME Page No | Page FoF > Instllation of bar eed oper ating power cable in use, double each provided > Power cable shouldbe rote through overhead ‘Wile Shifting ofreiefrcemen tel workmen tsined for safe handling of rebar 1g MICS connection tapped through EL.CB, proper joint, Authorized operators inservice Trained workmen sifclnt work place aslable Sorap disposal yard ewmarked daily coleton of bar cut pices observed ‘Trained operator, suifcient machines avilable Proper eye protections ae in use Safe Material handling tectnigue in application Proper lighting should be provided ding night ine Propor access salle fo shift the reinforcement tel > suitable PPE (hand gloves, gouges) should be wed TE mel) vse rrocedure Manat |e A Raizea Ne |W. Tite ___Norkat height Se eT | Sean Ne ar age No | Page| of 2 “Thee is no minimus height cequirement for work t height It includes all work ativites where ‘here i need to contol ask of falling distance abl to cause persona injury. Tiss tegardless ofthe work st right involve or the height at whic the work is peeformed Ht includes acces to and egress from place of work and therefore includes: > Working ona scflld or om a mobil elevated wrk patorm (MEWP) 3 Stecting lor’ o¥ dipping a road tanker, > Climbing permanex structure, sich a2 yanty, water tnk o eletical ple or elephone pole & es > Working neer am exavation ares or cllar opening iT person could fallin oi and he injured > Work arid out tie painting and decorator at height Precautionary measures: > When work is carried ou at eight, the employer shal tke suitable & sufficient measures tw prevent, 50 fara is reasonably practicable, any person fling a distance liable to cause injury (eg the use of guard rails. "The employer sal take suitable and suicint measures to minimize the distance an consequences of fil cllestve measures, for example salty nets, must be tke precedence over inividual measies fr example, safety Harnesses) Prove the adtionaltrinings those ae working at height Arrange the required love of supervision Use of guard rls toe-boards, working platforms and means of secess and eres. Provision of foot ad hand hols Arrange requied FPES such as safety elms ad armesses "he presence of fall arest systems, Sth as meting oF SoM Tanang sytem ‘Check the health sus ofthe workers Working condition & weather condition Arrange adequate fares and edge preston Eliminate or avoid working a height > Work fro the exising sate workplace provides, BD BAMEAE| HSE Procedure Manual | t= rn eins | an a pea sLeeee ae OTRO | Sesion No mn rages | POF ‘Worknen wearing hamesses attached toa work positioning Fie which i ited tothe staging “The most common types of il arrest equipment a safety hamess, safety nets Safety Harness: Should only be wed alone when conventional protection, using gard rl, iso longer practicable, Sich sonditons accu when itis posible ofall 2 or moe om the ‘open edge. “The flowing pins se considered when safety harnesses ae use 1. ‘The fngth of ill only i reduced by safety harness, The worker could sil be ijured Never dip hot electro holder in water for cling as it may expose the welder to letic shock. > Welder must wear ruber elves inside the lethor gloves, where there is probability of exposing the welding electode with water (like ain, seawater et) Conductors should never be left exposed All he welding crmestions should be done with proper sie of ls Inspect insulation on electrode holders, cables accessories, epulay and replace ll worn ‘out and darnages cables immediatly. > Welder should switch off the curent tthe electrode holder and remove the electrode whenever not in we, > Polarity ofthe clesrode should never be change hold be covered pew aida showing et hy the metalic objects > ‘The welding machine should be property earthed > Donat weap welding cable around your boy. HSE Procedure Manual | sv A “Te Fabrication works Reion Ne | a (Welding & Gas Cating) Due] OvO2013 Sean PML Page No | Page 2 of 5 “To prevent burn injury - Rk contol measures— > Only Standard mate holders shold be used ‘Suitable etal bins shall be provided fee spent electrodes stubs, as they ate sully ot ‘when discarded and ean cause severe hur nur: > Suike the ae oly onthe objects 1 be welded > Incorder to prevent severe leg bur injury, welders should wear Safety Shoes, Leg Guads or Leaings > In order to prevent hand bur injury du t welding spatters wea ether gloves. Gloves, shouldbe long eno,gh io protest wrist an ores, > A shield canbe fited beeen the elecvode holder andthe handle to prevent tive elements rom being touches "To prevent the explosion of emp drum vessels [isk Conteol Measures ~ ‘Welders have been knows to use apparently empty drums to support temporary bench for ‘welding operations, These drums may contain dangerous elements and they can explode de £9 heat or spark o aecidental contac of electrode Do not use paint drum fr siting while caring out welding, ‘Wile carrying out any hot work for closed vessels arrange 1o open all the manholes, purges, "To prevent the miscellaneous injury ~ isk control measures — Red Hye: - Welder’s helper is required to pte from the ultraviolet radiation emited in the ‘welding. One most commen injury occured is ed eye. Special types of goggles are availabe to prevent welder’ elper rom the red eye ‘Hand Burn Tojury:- Ae welding the surface bocomes ho, if anybody touches i, severe burn Injury can occured. BE MEAT! Se Procedure Manual | ts a | Te Fabra Reise | vet Dae [OTRAS Sea Page 80 | Page 3 jn welding is injury due to welding electrode, Welder ater completion of his jb aises the eletode. IF welde's helper is siting nearby, severe eye injury can occur de to eet racking his yes ‘ther common accident is fl of hot used eleetode onthe person working nearby. Welder when ‘lease wed hot electrodes, i can fal on the person working below and fe or barn injury can result “Miscellancous Gas Cutting Safety Measures: Risk Control Measures — > Wear personal pote equipment. Wear welding gloves, helmet, feather shoes, Weld gles, and ther personal proetive equipment to help prevent weld burs and injury Fasten cylinders seurely: Do not handle eyindrs roughly. Chain cylinders in an upright postion to 8 wal or cart. When repulators are not on eines, Keep Safty caps in place {Caps will prevent damage to liner valves > Never we oon velding equipment Oil and grease may ignite spontaneously, when in contact with oxygen, ‘Open cylinder valves correctly. Open the valve on the aceilene cylinder no more than thrce-fourhs of tum 30 i san be closed quskly in ease of emergency. Open the valve on the oxygen tank fly Wiile welding or euting, eave the valve wrench in position Keep the tip pointed away’ from your body. Do ot saturate your clothing with oxygen oe acerytene Bofoce and while lighting the lame, keep the tp pointed away fom your boy > Light the lame with an approved lighter Using matches to ight the torch ings fingers too lose tothe tp Set the operating posse carefully. Never use acetylene at presture over IS psi Follow the manufsctorer's commendation forthe correct operating pressures for the metal being ‘welded and for the tp sie bing used Bo aot sake of ali anyone else to smoke nea the ox-fuel gas welder, I fel gas were 1 lea fom the unit smoking coud povide ignition and cause a ire or an explosion. [ED WWREAE| HSE Procedure Manual [ise A ay Fabrication works Revision Wo | 00 (Welding & Gas Cetting) Due | 017020013 Seon PMs Page No__[- Page 4 of Treat the Name with rospect. Keep the flame an heat away fom the cylinder, hoses, and oople, Never lay down a lighted torch, Be sire the flame is ou Before laying down the tore, Never walk sr with ight torch > Control Mashbacks and backfies. Make corn that reverse flow-check valves and Mash restr reinstall on the oxygen and acetylene ies Do not leave the work cea uni the einer valves are closed, Be sure the ener valves are closed and prese i elived frm the hoses before yw leave the work ae, [Never snd in fon ofa epuator while you are opening a tank valve ‘Do not weld or cut on containers that have held lune materials ‘Remove regulators nd replace protective caps belore transporting cylinders Store oxygen cylinders away fom acetylene cylinders. A non-combustible wal at lest $ Foot high shouldbe usd o separate liners. Handle hot metal with plies or tongs. Do not lave hot metal on the welding table beeause ‘unsuspecting persons may touch itand be bumed. > Check connections for leaking gases. To prevent fires or explosions, we soapy water to check connections fr leaks, eam be gretly ininized ‘Saap out cam occur daring the use Both the regulators incorrect pressure, > Torch nazte obsritd > Nozze held too closet the work Corrective Action: ~ ‘Completely shut both torch valves (Cheek the regulator setting (Check the eplinde's pressure ‘Check the nozzles Retight [2 WREME, HE Procedure Manuar | we | oat Fabrication works Reisen |W. (Welling & Gas Cutng) Dae | o4/o22073 Sea PML Page No | Page Sof 5 ‘Backfirecan oscur on fighting up when: = > Regulator not sto coneet pressure > Light applied before the Now ofthe gas mixture properly established > Close bath the torch valves Cheek the eylnder pressure Check the adjust equator sting > Cool the torch andchesk the nozzle rife for obstustion relight lashhask: - Preventive Actions Use FlashBack Arestor Ensure all eonnoctons ae tight nse the eyindes valves re open and torch valves are closed Set regulators tothe requied pressure Purge each hose ssparatey and consecutively by opening the torch valves and allowing the gusto flow forthe sulisint time to ensure tat te only pare gas will remain inthe hoses Close te valve foreach gas Corrective Action > Close beth torch valve > Eatingush hose ifalight ‘Close beth the etinder's valves FMEA Se Procedure Manual | soe a Revise No | oo Tie Scaffolding, Dae amas Ssson No Paes age No | Page 1 of 2 ‘Seaffolds or work patos shall not be altered once they ae erected and propesy aged. All scaffolding shall be inspected and approved by the concemed department / HSE department ‘and by competent person, > Guard ni rails shall be installed on all open sides of scaffolds, Gund, mid ‘ails and toe boards should be constucted fam components fumisbed by the smanulactuer. Where this i not possible, sound 2 x 4 inch lumber for (or the ‘eivlent) gardai and midis ant 4 inch amber for te boards > Scaffold planks mst be a least 2x 10 ich fl thickness amber seaTld grade, othe equivalent. > Scaffold planks shall he cleaned or secured and must be extond over the end supponts by af est six inches bat not more than 12 inches > All saffolds shoul he fly plankod and constructed with a safety factor. > All scald members shall be visually inspected before ea use. Damaged scaffold ‘members must be rmoved fom serie, > Access ladders shll be provided for each scaffold. Climbing the end frames is prohibited unless tse design incorporates an approved lar. > Approved mud sil or eter rigid footing, capable of supporting the maximum intended oad, shall be proved > Scaffold shall be eure to the building or structure a interals not to exceed 30 fet horizontally and 26 fee venically. > Scaffold shall not be overloaded. Materials should be brought up a8 neoded, Access ‘materials and sera shall be removed from the scaToldimmeiately on completion of > Bares, boxes, kegs and similar unstable objects shal othe used as work platforms oF 10 support seatolds > Where persons ae required to work under a scaffold a srcen of 18 gms, inch wire mesh o equivalent protections reuired betwoon the toebourd andthe guar > Overhead protection is required iF employees working on scalTols are exposed to ‘overhead hazards HSE Procedure Manual | tse A [Revision No | 0 Dae | UMHS Tale Scaffolding Seaton Ne PETS | Page No | Page 2 of 2 General Res for ase of Scaffolding Scaffold should not eet near a excavation are and vse versa Engng experience personnel ony while working on sefTd Prope sopervsions ensured during worktime Scaffold tg syste shouldbe implement for uss, Lateral supports atevery 6 meters intervals with permanent taste ‘Vericaliy of seafld is ensured tothe norm of tolerance Inn por meter While erecting the saffold stay away ftom the erection area to safe guard from fll of materials Working Platform nade with 600 mm with toe guand & Secured both sides with handrails & Use of Ful boy Harness with Double lanyard is ensred For avoid of pessoal fling, 9. No loose materials allowed to keep atop ofthe seafal, 10 Hand too shall be secured so hat it will ot even missed 1. Workers abit 10 work at heights physically examined and authorized to work at eight. Wor Immediate ae an 13, Adequate illumination of 150 ux ensured st workplace. 12 No work on saffol is allowed to cary out during 1H, No materials are town fam height, educate the workers in sae material handling ‘operation 15. Competent supervision shall be improved. 16. Using the pulley al materials while lower. TD pape) se Procedure Manual | os A 5 5; Revi Ne| 10 ite Confined Space a ‘Seaioa No | PREIS Page No |_Page 1 of CONFINED spaces > Confined or enclose spaces occur on most projects. Confined or enclosed spaces are defined as any space having © limited mem of access or that is subst 0 the ‘sccumltion of toi or Nlammmable contaminants or thal may hive an oxygen deficient imosphere. Confined or enclose spaces ince, but reno ited to, cisons, storage fanks, process ves, bins boilers, ventilation’ exhaust dicts, sewers, underground ity vaults, tunnels pipeines, and open tp spaces more than four fee in depth, suchas Pits, abs, vessel, vats, and smps. > Prior to entering» coined space, the fllowving rections mast be taken Employees must never entra confined space without approval oftheir supervisor and / ‘or the Safety & Health Services department and until the atmosphere has been tested by designated person aud determined tobe safe. Confined space pernits or tags must be posted prior to en, > Confined space werk operations len require additional safety precautions, The precaution wil be exslined by your supervisor pir to the sat oF work @ FME|F| se Procedure Manual | ue A Raia Re | —o0 oS nae Dae | o1a7073 Seon —— | PTT age No_ | Page ro LADDERS: > All adders sal be of prope lng nd of gd condition, > Alladr shall een at kas on mate abo th eve the sees. > Broken o damaged unscented lnker shal at be wed Do nt splice together short ladders to make a longer ladder, All staight and extension ladders shall be equipped with safety fet ot be secured a the bation Vertical ladder shall not exced 60 meter All straight ldsers shall be secured atthe tpt prevent movement. Ladders must not be placed aginst movable objets. ‘The base of straight or extension ladders shall be set back a sf distance from the ‘este (approx. one fourth ofthe working length ofthe addr, Ladders sed for acess oa Moor o platform shall extend east 36 inches above sch oor platform, “The areas around the top and base of lads must be fie of tripping hazards suchas loose material, wat, cords, hoses and leds Ladders thet projet into passageways or doorways where they could be struck by personnel, moving equipment, or materials being handed, must be protected by bariades or guards Employees shall us the ladder when ascending or descending. Be sie that your shoes are free of mus, grease, or other substances that could cause a slip ofall Do mot cary materials ip or down a ladder, You must use Hoth hans when going wp oe down a nde: [Always move the Inder to avoid overeaching. ‘Stepiaers sal be fly opened to peemi the spreader o lock, Employees must aver stand on wtp two steps ofa stepladder ‘Metal ladders shall no be used for eletial work on ress whee they could contact energized lines.

You might also like