Insurance authorities – To evaluate the state of facility and its risk factor to ar
premium.
Commissioning engineer – uses it to conduct integrity tests of facility and co
facility in logical groupings.
Operational engineer – uses it to “line-up” the facility and operate the facilit
design intent.
Log
Search course documents, questions, and more Expert Help Study Resources Join
in
Usefulness of P & ID
The P&ID is the last stage of process design and serves a
for those responsible for final design and construction.
Instrument engineers
specify, install, and check control systems.
Piping engineers
develop plant layout and elevation drawings.
Project engineers
develop plant and construction schedules.