You are on page 1of 1

SLOOF 20/30

TRASRAM
SLOOF 15/20
LANTAI KERAMIK
±0.00 ±0.00
±0.05 SPESI -0.05
±0.15 COR BETON -0.15

±0.30 PASIR URUG -0.30

TANAH URUG

PONDASI BATU KALI


-1.10
±1.10
AANSTAMPING
±1.25 -1.25
±1.30 PASIR URUG -1.30

-1.50
-1.60

TRASRAM -1.80
SLOOF 25/30 0.15 0.20
0.25
LANTAI KERAMIK 0.80 0.35
0.90 0.40
±0.00
-0.05 SPESI 0.80
-0.15 COR BETON 0.90

-0.30 PASIR URUG

DETAIL POTONGAN A-A


SKALA 1: 20

TANAH URUG

-1.10
PONDASI BATU KALI

-1.25 AANSTAMPING
-1.30 PASIR URUG

-1.50
-1.60

PONDASI TELAPAK
-1.80
0.25
0.35
0.40
0.80
0.90

DETAIL POTONGAN B-B


SKALA 1: 20

You might also like