You are on page 1of 5
&& \r+ @ EMINEX KINETIC SDN PILE DRIVING ee BHD RECORD pages a2 Project THE PROPOSED CONSTRUCTION AND COMPLETION INCLUDING OTHER RELATED ANCILLARIES FOR BRIDGE 1 CROSSING SUNGAI LANGAT ON LOT 74469 CONNECTING MAN “JALAN BANTING, MUKIM TANJUNG 12 DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN Date DI [CO[>O2| sreetr I~ Pile no. Platform level 2 as Pie ype size D S Dba ¥ DS Penerato elation Ulin Rig refna, = “Tol ple length installed: \.y4 Veber 4 Hammer type / weight 7 SDaS_ — Neotjoint 2 Hammer drop helght Titi Final st (10 blows) iin Penatraion | No.of | Penetration | Novof | Penetration] No.of | Penetraton | No of (m) Blows (o) Blows ) Blows (m) Blows 0.30 Py 10.20 20.10 Y 30.00 ie oo | 2 1050 moan | 3030 0.90 0.80 20.70 € woe | ( 1.20 11.10 21.00 c< 30.90 ( 1.50 71.40 721.30 i 31.20 (S "120 7170 21.60 31.50 Cf 2a 7200 71.80 ne | Lp 240 42:30 22.20 32.10 & 270 7260 2250 6 32.40 (¢. = ia aad = a0 | | t20 | P| 2310 3500 360 I vaso | 2340 $ 33.30 o 3.90 [ 13.80 YL 23:70 33.60 @ 420 | 14.10 24.00 7 33.90 (2 4.50, T 14.40 & 24,30 + 3420 oe 720 aro | ND | 200 wa | [24 510 1500 _|_ x90 3480 7 30 75.30 wp _| 220 + 35.10 10 570 560 25.50 3540 Q 6.00 5.80 2 25.80 © 36.70 [ 6.30 16.20 ¢ 26.10 (2 6,00 t 60 76.50 c 2640 (eo 36.30 (2 620 7600 |< 2870 7 3660 & 7.20 17.10 v 27.00 Tl 3690 7) 7.50 17.40 730 tz 57.20 £0 = z E ze eS te 8:10 18.00 730 i 20 (0 3.40 "8.50 Fy; 2820 rt 38.10 [0 870 7000 | 4 7280 Zz [ seao 1G fad 8 ae ty an 9.30) 49.20 + 28.10 TY _|_ 3900 lb 9.60 79.50 ¢ 29.40 (Y¢ 39.0 f 2.90 i 19.80 % 23.70 [LY _L_ 2960 ( EMINEX KINETIC SDN BHD Revision: 0 «2 Penetration | No.of | Penetration | No.of Soc —__ (m) Blows (m) Blows, 39.90 (G| #740 vox | (Q | «770 40.50 0. 48.00 40.80 wb 4830 44.10 ic YZ 48.60 maa PC] Lh 2890 41.70 49.20 42.00 49.50 |__| 42.30 49.80 ;__| 7280 30:10 1 | 4290 50.40 oa 43.20 50.70 —_| 43.50 51.00 __| 43.80 51.30 — 44.10 51.60 __| 4440 51.90 | 44.70 52.20 | 45.00 62.50 | 45.30 52.80 45.60 53.10 He | 45.90 53.40 61.20 —— 46.20 53.70 61.50 38.30 46.20 84.00 61.80 9.60 46.50 54:30 62.10 69,90 46.80 34,60 62.40 70.20 47.10 54.90 62.70 70.50 Prepared by Contractor's Representative; ce SN 1 2662 1 Signature 4 5 Name 3) 5 Date 4) 2 E26R Checked by Consultant: Signature Time Start: Name Time Finish Date SIZE: 250 12SP t a DATE: 26/8/2021 SIN: 19563117 ~ ~) sze:25042E “2 DATE: 18/9/2021 sin; 19666972 E) SZE: 250125 by 9 ae) Ss (E DATE: 18/9/2024 ( —_ = b SIN: 19666995 > / - ) SIZE: 250 9E DATE: 31/8/2021 SIN: 19584208 CHECKLIST FOR @ EMINEX KINETIC SDN BHD | NSPECTION SAREE Revision 0 age No: Proiect : Buidge 1 oworet : cu fun [er fee [cove |p eeages, PRY 260 + + 7 lLocation: Cont bou d upped Plo Lang : WaT YE HIP ¥4¢ PleNo: Bg Driven PiieLengh As (we ‘eceptabi r No. Item ee eae Remarks yea, [esne | ee + [neck quatty of pe |a) Honeycomb Ps Visual 5) Ensure no crack ine 2 Visual Ensure the ples are straight ee from fia 1°) distortion and accidental damage ce Die Ensure ples are stackin accordance fo i ?) manufacturer's recommendation a ee 2 check platorm ives before pling 2 survey 3 [check ae point ication uv survey 4. [eneck ple shoe ( aplcabe) 2 Vial [eneckvereaiyofpie by wang spitiovelor | > Visual? lume bobs survey 5 [check wong quaty of pil joint: Ensure the surface to be welded fee fom |?) rust, grease and dit c at |b) Remove weld slags between inter-run passes| ce Visual Welding Joint tobe palnied wih red oxide io) paint before driving continues ard eve 7 [Ensure the piing record sheet is complete Be Visual Prepared by Contractors Representative: Checked by Consutants Representative Name Hered IName mayo _YAZWO Date loate S S4181.164 E 4694481 S I4209,225 E 4708712 I EW S HAZ5 E AMSG S AMNZEIS E 471.651 E 4682872 4240.60: 487.I31 Sovth oe ands BAbge L Os

You might also like