You are on page 1of 3
TABLE OF CONTENTS LIST OF ABBREVIATIONS LIST OF FIGURES LIST OF TABLES: CHAPTER T Introduction 10 TT Project Details 0 12 Location of Project 1 1.3 About Project Ta Necessity of Project CHAPTER 2 About the Company 14 3.1 Company Profile 4 2.2 History 15 2.3 Current Projects 16 2.4 Recent Developments. WG 25 AwardAchievements iF CHAPTER 3 Training Acti 19 3.1 Site work 1S 3.1.1 Survey 1S 2 Earthwork 3.1.3 Construction of pavement a CHAPTERS Structural Work 38 41 Construction of Major Bridge € TI.I Theory of Bridge 3835 4.1.2 Rafi Foundation ry 42 Construction of Drainage E E21 Side Ditch E NETAJI SUBHAS INSTITUTE OF TECHNOLOGY , PATNA. 422 Culverts Fi CHAPTER 5 Theory About Mechanical Process 56 31 Excavation And Backiiling 5657 CHAPTER 6 Tab Work (Quality Assurance & Quality 0 control Department 6.1 Quality Implementation at Site « 62 Project Quality Plan o 3 Tests 61 3.1 Soil Tests al 63.2 Asphalt Tests 77 6.3.3 Concrete Tests 8) 6.34 Field Tests CHAPTERT Batching Plant eo 7.1 Cement ci ot 7.3 Admixers ol 7.4 Report of Mix Design 9: CHAPTER 8 Safety 98 B11 Safety Appliances os PRD Benefit of Training 101 ‘Conclusion 108 CHAPTER 10, References 109 AJL SUBHAS INSTITU’ E OF TECHNOLOG' PATNA Table No, Table Name H mbankment material specification 2 kipecification oF sub base course material 28 3 krrading specification of sub base material 28 4 kpecification of base course material 30 3 ksrading specification of base course material ar 6 kpecification of asphalt a 3 7 ize and amount of aggregate sample prepared for LAL 72 est 8 fesult of bitumen penetration test 8 9 lerade specification of extraction test 80 0 [Percentage Strength at T and 3 days Mt 1 [Percentage Strength at 7. 14 and 28 days Bt 12 Compressive Strength of different grades of concrete at 7) 84 ind 28days NE’ AJISUBHAS INSTIT CHNOLOGY , PATNA

You might also like