0% found this document useful (0 votes)
62 views1 page

Msc-Qhsef-02 Corrective Action Form

A corrective action report was issued regarding a nonconformity where the supplier evaluation for Amiantit Qatar Pipes was not available. The root cause was determined to be a lack of monitoring by the purchase team. The corrective action taken was to conduct evaluations of suppliers. An attached report on Amiantit Qatar Pipes was included.

Uploaded by

Adil Abdulkhader
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views1 page

Msc-Qhsef-02 Corrective Action Form

A corrective action report was issued regarding a nonconformity where the supplier evaluation for Amiantit Qatar Pipes was not available. The root cause was determined to be a lack of monitoring by the purchase team. The corrective action taken was to conduct evaluations of suppliers. An attached report on Amiantit Qatar Pipes was included.

Uploaded by

Adil Abdulkhader
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MSC-QHSEF-02

D:01-11-2022
CORRECTIVE ACTION REPORT R:00

CAR Ref No: MSC-CAR-QHSE-03 Date: 16 Dec 2022

Department:

Non Conformity

Supplier Evaluation for Amiantit Qatar Pipes not available.

Originator: Adil Abdulkhader

Signature & Date: 16 Dec 2022

Root causes of Investigation

Lack of monitoing by purchase team

Investigated By:Adil
Abdulkhader

Signature & Date:

Corrective Action

Evaluations will be conducted.

Done By: Sarwar Khan - QHSE Rep

Signature & Date:

Effectiveness

Attached Amiantit Qatar Pipes report

Originator Acceptance Verified By:

Yes / No Yes / No

Signature & Date: 20 12 2022 Signature & Date: 20 12 2022