GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES


2021-22
ABSTRACT BOOKLET
(Applicable from 01/10/2021)
DETAILS OF COMMITTEE FORMED FOR PREPARATION OF
COMMON SCHEDULE OF RATES FOR 2021-22
(Reference - Government Resolution Marathi No.MIS-2212/(343/12)/MI-2
Mantralaya Mumbai 400032 dated 05/07/2014)

1) C.E.(SP), W.R.D., Pune - President

2) C.E. Kokan Region, W.R.D. Mumbai - Member

3) C.E.(SP), W.R.D., Amaravati - Member

4) C.E. & C.A. (CADA) Aurangabad - Member

5) C.E.(WR), W.R.D., Nagpur - Member

6) C.E. Koyana Project, Pune - Member

7) C.E. Mechanical, W.R.D. Nashik - Member

8) S.E. Thane irrigation circle ,Thane - Member

9) S.E. Kukadi Irrigation Circle, Pune - Member Secretary


DETAILS OF SUBCOMMITTEE FOR PREPARATION OF
COMMON SCHEDULE OF RATES FOR 2021-22
Sr.No. Component of work Members of subcommittee
(1) Additional Lead Charges of all CO-ORDINATOR
Materials Upto 500 Km & Lift C.E., (Civil) Hydro electrical Project And
Charges by Head Load
Quality Control
MEMBERS
1)S.E.Koyana Design Circle, Pune

(2) Excavation & Embankment CO-ORDINATOR


C.E.(SP), WRD, Pune
MEMBERS
1)S.E.Kukadi Irrigation Circle, Pune.
(3) Concrete Work including CO-ORDINATOR
Centering, UCR Masonry, Brick C.E.Kokan Region, WRD, Mumbai
Masonry & R.C.C. Pipes
MEMBERS
1) S.E. Sangli Irrigation Circle, Sangli
2) S.E. South KokanIrrigation Circle, Oras,
Sindhudurga.
(4) Tunnel Works CO-ORDINATOR
C.E.(SP), WRD, Pune
MEMBERS
1)S.E.Osmanabad Irrigation Circle,
Osmanabad.
2)S.E.Kukadi Irrigation Circle, Pune.
(5) Surveying & Investigation CO-ORDINATOR
C.E.(SP), WRD, Amravati
MEMBERS
1) S.E.Kukadi Irrigation Circle, Pune.
2) S.E. Buldhana Project Circle, Buldhana.
(6) Hydrometeorology CO-ORDINATOR
C.E.Planning & Dam Saftey, Nashik,
MEMBERS
1) S.E.DCP and H Circle, Nashik.
(7) Valuation and Rehabilitation Work CO-ORDINATOR
C.E.(SP), WRD, Amaravati.
MEMBERS
1) S.E. A.I.P.C.Amaravati.
(8) Flow Measuring Devices CO-ORDINATOR
C.E.(WR), WRD, Nagpur
Sr.No. Component of work Members of subcommittee
(9) Marking Blue Line & Red Line CO-ORDINATOR
C.E.(WR), WRD, Pune
MEMBERS
1)S.E., Pune Irrigation Circle, Pune.
(10) Land Reclamation Work & Soil CO-ORDINATOR
Survey
C.E. (WR), WRD, Pune.
MEMBERS
1) S.E. & Director, Irrigation Research &
Development, Pune.
(11) Maintenance & Repairs CO-ORDINATOR
C.E. & C.A., CADA, Aurangabad
MEMBERS
1) S.E., Thane Irrigation Circle, Thane.
2) S.E. Kukadi Irrigation Circle, Pune.
(12) Lift and Gravity Drain Pipe CO-ORDINATOR
Distribution Network C.E.(WR), WRD, Pune
C.E.(WR), WRD, Nagpur
MEMBERS
1)S.E.Sangli Irrigation Circle, Sangli.
2)S.E. Koyana Design Circle, Pune
3)S.E. Mechanical Circle, Pune
GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

INDEX

Pages
Sr.
Particulars
No.
From To

1.0 SECTION-1

1.1 General Note 1 7

1.2 Rates of Construction Materials &Labors (Table 1 to


8 13
4)

1.3 Lead Charges Statement for Materials 14 19


SECTION-2
2.0 20 25
Excavation & Embankment - Item No. 1 to 26

SECTION-3
3.0 26 37
Concrete Work including Centering, UCR Masonry,
Brick Masonry & R.C.C. Pipes - Item No. 27 to 72
SECTION-4
4.0 38 41
Tunnel Works - Item No. 73 to 83

SECTION-5
5.0 42 46
Surveying & Investigation - Item No.84 to 100

SECTION-6
6.0 47 48
Hydrometeorology – Item No.101 to 107

SECTION-7
7.0 Valuation of Rehabilitation Works – 49 53
Item No.108 to 138
SECTION-8
8.0 Flow Measuring Devices - Item No.139 to 142 54 56

SECTION-9
9.0 57 58
Marking Blue Line & Red Line-Item No.143 to 149

SECTION-10
10.0 59 60
Land Reclamation Work & Soil Survey -
Item No.150 to 161
SECTION-11
11.0 61 68
Maintenance & Repairs - Item No. 162 to 193

SECTION-12
12.0 Lift and Gravity Pipe Irrigation Network - 69 130
Item No. 194 to 264
GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

SECTION-1

1.1 General Note

1.2 Rates of Construction Materials,


Labour and Machinery use

1.3 Lead charges statement for Materials


महाराष्ट्र शासन, जलसंपदा विभाग

सामाईक दरसूची सन 2021-22


(1.1) सर्वसाधारण टिपणी

सामाईक दरसूची सन 2021-22 ही टदनाांक 01/10/2021 पासून अांमलात येईल. सदर


दरसूची सन 2021-22 मध्ये खालील प्रमुख बाबींचा समार्ेश करण्यात आला आहे .
1) वस्तू व सेवा कर :-
सामाईक दरसूची सन 2021-22मधील सर्व बाांधकाम साटहतयाांचे दर , सर्व यांत्रसामुग्रींचे दर तसेच
सर्व बाबींचे दर हे र्स्तू र् सेर्ाकर टर्रहीत (Without G.S.T.) आहे त.अांदाजपत्रके मांजरू
करणाऱ्या सक्षम अटधकारी याांनी प्रचटलत दराप्रमाणे र्स्तू र् सेर्ाकराच्या दराची
अांदाजपत्रकामध्ये Recapitulation Sheet मध्ये तरतूद करार्ी.
Government of India, Ministry of Finance (Department of Revenue), Notification
No.31/ 2017-Central Tax (Rate), New Delhi, Dt.13th October, 2017 नुसार
सद्य:स्स्ितीत हे दर खालीलप्रमाणे घेण्यात यार्ेत.
1.1 ज्या कामाांमध्ये मातीकाम 75 िक्क्याांपेक्षा जास्त आहे , अशा कामाांसाठी एकूण अांदाजपत्रकीय
ककमतीच्या 5% जी.एस.िी.
1.2 ज्या कामाांमध्ये मातीकाम 75 िक्क्याांपेक्षा कमी आहे , अशा कामाांसाठी एकूण अांदाजपत्रकीय
ककमतीच्या 12% जी.एस.िी.
उपरोक्त नमुद दराांमध्ये भटर्ष्यात बदल झालेस तया दरानुसार अांदाजपत्रक तयार करार्े.
2) स्वामित्व शुल्क:-
र्ाळू, दगड, खडी, तसेच मातीकामाच्या बाबींसाठी लागणारे मुरूम, माती या गौण खटनजाांचे
स्र्ाटमतर् शुल्क या बाबीच्या दरामध्ये तसेच तयाचा र्ापर करून केलेल्या दरपृि:करणात अांतभूवत
नाहीत. महसूल र् र्नटर्भागाच्या र्ेळोर्ेळीच्या अटधसूचनेनस
ु ार गौण खटनजकटरताचे स्र्ाटमतर्
शुल्क अांदाजपत्रकाच्या गोषर्ाऱ्यामध्ये स्र्तांत्रपणे घेण्यात यार्े. मुरुम, खडी, दगड र् र्ाळू या
गौण खटनजाांच्या स्र्ाटमतर् शुल्कार्रील अटधभाराबाबत अांदाजपत्रके तयार करताांना महाराष्र
शासन, उद्योग, उजा र् कामगार मांत्रालय, मुांबई याांचेकडील पटरपत्रक टर्चारात घ्यार्े.
3) नैसर्गिक वाळू (Natural Sand):-
ज्या बाबींच्या दरपृि:करणामध्ये र्ाळूचा अांतभार् आहे अशा सर्व बाबींच्या दरपृि:करणामध्ये
नैसर्गगक र्ाळुचा र्ापर गृहीत धरलेला आहे .नैसगीक र्ाळूचा दर रु.908.90 प्रटत घ.मी (र्ाळूचा
दर: रु.679.30प्रटत.घ.मी.+उतखननाचाखचव :रु.229.60प्रटत घ.मी.)इतका टर्चारात घेतलेला
आहे .अांदाजपत्रक तयार करताना प्रतयक्षात नैसर्गगक र्ाळूसाठी गृहीत धरलेल्या स्रोताच्या
(source ) टठकाणचा मुळ दर {तया टठकाणी टललार् झाले असल्यास टललार्ाचा दर र् तया
टठकाणी टललार् झाले नसल्यास अशा टठकाणच्या र्ाळू साठी टजल्हाटधकारी याांनी

1
महाराष्ट्र शासन, जलसंपदा विभाग

टनस्चचत केलेली हातची टकमत (offset price)}आटण उपरोक्त नमुद केल्याप्रमाणे रु.679.30
प्रटत घमी यामधील फरक टर्चारात घे ण्यात यार्ा .
(उदाहरण :- र्ाळूच्या टललार्ाचा दर रु. 900 प्रटत घमी. र्ाळूच्या दरात अटतटरक्त घ्यार्याची
र्ाढ =900-679.30 =220.70 प्रटतघमी.)
4) कृ मिि वाळू (Artificial / Crushed Sand):-
4.1 ज्या कामाांमध्ये कृ त्रीम र्ाळू र्ापरणे प्रस्ताटर्त आहे , अशा कामाांची अांदाजपत्रके तयार करताना
तयामध्ये कृ त्रीम र्ाळू र्ापरासाठी रु.1615.15 प्रटत घमी असा दर घेण्यात यार्ा.म्हणजेच
दरपृि:करण करताना हा दर (रु.1615.15प्रटतघमी )र् अ क्र ३ मधील नैसर्गगक र्ाळूचा दर
(रु.908.90 प्रटतघमी) यामधील फरक (रु.706.25 प्रटतघमी ) टर्चारात घे णेत यार्ा.
4.2 कृ टत्रम र्ाळूसाठी कच्चा माल म्हणून दगड (Rubble) र्ापरला जात असल्याने दगडाचे र्हन
अांतर हे च र्हन अांतर कृ टत्रम र्ाळूकटरता टर्चारात घ्यार्े.
5)िजुराांच्या सुमवधा :-
शासन टनणवय क्रमाांक.टडएसआर-1090/सीआर-6453/पीएलएन-3, टद.14.07.1993 नुसार
मजुराांच्या सुटर्धाांसाठी दरसूचीतील प्रतयेक बाबीमध्ये 1% तरतूद करण्यात आली आहे .
6)काििार कल्याण उपकर :-
उद्योग र् उजा टर्भागाचे शासन टनणवय क्रमाांक बीसीए-2009/सीआर-108/लेबर 7-अ,
टद.17/06/2010 नुसार कामगार कल्याण उपकरासाठीची १ %ची तरतूद सामाईक दरसूचीतील
बाबीमध्ये दर टनस्चचत करताना टर्चारात घेतलेली नाही. अांदाजपत्रक तयार करताना प्रतयेक
बाबीच्या दरपृि:करणामध्ये कामगार कल्याण उपकराची 1 िक्के इतकी तरतूद करण्यात यार्ी.
7) मविा :-
टर्त्त टर्भागाचा शासन टनणवय क्रमाांक टर्मासां-1008/प्र.क्र.28/98/शा.हमी, टद.19/08/1998
नुसार कामाच्या ककमतीच्या 1% ची टर्मा कटरताची तरतूद सामाईक दरसूचीतील बाबीमध्ये दर
टनस्चचत करताना टर्चारात घेतलेली नाही. अांदाजपत्रक तयार करताना टर्मा कटरताची 1 िक्के
इतकी तरतूद अांदाजपत्रकाच्या गोषर्ाऱ्यात करण्यात यार्ी. कांत्रािदाराने प्रतयक्ष भरल्यानुसार
टर्मा शुल्काची प्रटतपूती १% च्या मयादे त करार्ेत.
8) िजुराांचे दर :- सन 2021-22 या र्षाची सामाईक दरसूची तयार करताांना मजुराांचे दर हे
महाराष्र शासन, जलसांपदा टर्भाग, शासन टनणवय क्र.सांकीणव 2014/(289/14)/लपा-2,
मांत्रालय, मुांबई टद. 22.05.2017 नुसार र् र् कामगार उपायुक्त, कायालयाकडू न प्राप्त पत्र जा.
क्र./काउआ/3695 टदनाांक 25/02/2021 नुसार मजुराांचे दर टनस्चचत करणेत आलेले आहे त.
9) बाांधकाि सामित्याचे दर:-
9.1.लोह: दरसूची तयार करताना M.S./HYSD/TMT स्िीलचे round bar, MS plates,
structural steel इतयादी साठी टद.05/01/2021 रोजीचे जॉइन्ि प्लॅन्ि कटमिीने मुांबई साठी
टनस्चचत केलेले दर (GST टर्रटहत ) टर्चारात घेतलेले आहे त. (उदा. JPC प्रमाणे PIG IRON
चा मुांबईचा दर रु.49570/- , दरसूचीसाठी टर्चारात घेतलेला दर = 49570 / 1.18 =

2
महाराष्ट्र शासन, जलसंपदा विभाग

42008/-). लोहाचे दर हे कामाच्या जर्ळच्या तालुकाम मुख्यालयाच्या टठकाणचे आहे त असे


गृहीत धरून तयानुसार अांदाजपत्रक करताना र्हन अांतर टर्चारात घ्यार्े.अांदाजपत्रक करतेर्ेळी
दरटर्चलेषणासाठी तया तया र्ेळी प्रचटलत असले ले जॉइन्ि प्लाांि कटमिीचे मुांबईसाठीचे दर
आटण दरसूचीत टर्चारात घे तलेले दर यातील फरक टर्चारात घ्यार्ा.
9.2.टसमेंि: दरसूची तयार करताना टसमेंिचा दर (र्स्तू सेर्ाकर टर्रहीत ) हा रु.228/- प्रटत बॅग (50
टकलो) टर्चारात घेतलेला आहे . अांदाजपत्रक करतेर्ेळी दरटर्चलेषणासाठी तया तया र्ेळी प्रादे टशक
सटमतीने टनस्चचत केलेले दर (र्स्तू आटण सेर्ाकर टर्रहीत) आटण दरसूचीतील दर (रु.228/-
प्रटत बॅग) यातील फरक टर्चारात घ्यार्ा. टसमेंिचे दर हे जर्ळच्या तालुका मुख्यालयाच्या
टठकाणचे आहे त असे गृहीत धरून तयानुसार अांदाजपत्रक करताना र्हन अांतर टर्चारात घ्यार्े.
10) यां ि सािुग्रीचे दर: - दरपृि:करण तयार करताना आर्चयक यांत्र सामुग्रीसाठी मुख्य अटभयांता
(याांटत्रकी) जलसांपदा टर्भाग, नाटशक याांचे जा क्र मुअयाां /ताां. 10/सामा.दरसुची21-22 /159/सन
2021 टदनाांक 03/05/2021 यापत्रान्र्ये प्राप्त दर (र्स्तू र् सेर्ाकर टर्रहीत) र्ापरण्यात आले
आहे त.
11) सववसाधारण बाबी:-
11.1 इमारती, पांपगृहाची स्िापतय कामे र् रस्तयाांच्या कामाांसाठी सार्वजटनक बाांधकाम टर्भागाची
अदयायार्त दरसुची र्ापरण्यात यार्ी. तिापी खारभूमी टर्कास कामाांसाठी खारभूमी सांबांधीत
अदयायार्त दरसुची र्ापरण्यात यार्ी.
तिापी कालव्यास छे दणाऱ्या रस्तापुलाच्या कामासाठी जलसांपदा टर्भागाची अदयार्त दरसूची
र्ापरण्यात यार्ी.
11.2 नाल्यार्रील कामाांमध्ये जलटनष्कासन (Dewatering) आर्चयक असल्यास, अशा कामाांसाठी
जलटनष्कासनाकटरता नाला पातळी पयंतच्या कामाच्या एकूण ककमतीच्या 1 िक्का तरतूद
अांदाजपत्रकात ठे र्ण्यात यार्ी. तसेच नदी र्रील कामाांमध्ये जलटनष्कासन (Dewatering)
आर्चयक असल्यास, अशा कामाांसाठी जलटनष्कासना कटरता नदी तळ पातळी पयंतच्या
कामाच्या एकूण ककमतीच्या 3 िक्के तरतूद ठे र्ण्यात यार्ी.
11.3 सामाईक दरसूची 2021-22 मध्ये फक्त खोदकाम आणि भराव (बाब क्रमाांक 1 ते 26) या
घटक बाबी कणरता साणित्यामध्ये 1 km Initial lead गृिीत धरलेले आिे . ज्या बाबी मध्ये
विनावळी साठी णटप्परची आवश्यकता नािी त्या बाबींमधून एक णकमी साठीची विनावळ वजा
करावी.
11.4 जलसांपदा टर्भाग, शासन पत्र क्र.सांकीणव -२०२०/२२०/प्र. क्र.७२/निवसं-२ निि ंक.
२५/११/२०२० व ज .क्र. संकीर्ण -२०१९/प्र. क्र. ०३/२१९/जसं(धोरर्), निि ंक २३/०७/२०२०
अन्वये मंजूर केलेल्य Standard Specifications च संिर्ण िरसूची मधील स्तंर् क्र ३ मध्ये
िर्णनवण्य त आलेल आहे

3
महाराष्ट्र शासन, जलसंपदा विभाग

12) मवमशष्ट क्षे िातील कािाच्या स्वरूपानुसार मवमवध दराांिधील अनुज्ञेय वाढ
12.1 जनजाती क्षेत्रातील तसेच टर्शेष कृ ती कायवक्रम अशा दोन्ही क्षेत्राांतगवत एखादे क्षेत्र समाटर्ष्ि होत
असल्यास तया टठकाणी 10 िक्के इतकी र्ाढ घ्यार्ी.
12.2 गडटचरोली टजल्यातील सर्व तालुक्यातील कामाकटरता 20 िक्के.
12.3 सटरतामापन केंद्राच्या फक्त उभारणीच्या कामाकरीता 30 िक्के.
12.4 योजनेच्या सांपण
ू व क्षेत्राांसाठी र्न्यजीर् प्राणी उपद्रर् असल्यास, ककर्ा सदर योजनेच्या काही
भागातील क्षेत्राांसाठी र्न्यजीर् प्राणी उपद्रर् असल्यास, जशी पटरस्स्िती असेल तया प्रमाणे सदर
योजनेच्या टर्टशष्ठ क्षेत्रासाठी महसुल र् र्न टर्भागाकडू न र्न्यजीर् प्राणी उपद्रर् असल्याचे
सक्षम स्तरार्रील प्रमाणपत्र घेऊन 5 % अटतटरक्त तरतूद अांदाजपत्रकात करण्यात यार्ी.
12.5 डोंगराळ क्षेत्र (टनयोटजत टर्भागाने घोटषत केलेले) अांतगवत एखादे क्षेत्र समाटर्ष्ि होत असल्यास
तयाटठकाणी 10% इतकी र्ाढ घ्यार्ी.
12.6 र्रील अ.क्र. 12.1 ते 12.5यापैकी एकार्ेळी केर्ळ एकच तरतूद (Completed Item साठी)
अनुज्ञेय राहील.
12.7 ज्या प्रकल्पामध्ये कसचन होत आहे अशा प्रकल्पाांच्या कालव्याच्या दुरुस्तीची / पुनस्िापनेची
कामे यांत्रसामुग्री र्ापरुन (कालर्ा बांद कालार्धीत) करताना सामाईक दरसूचीमधील टर्टर्ध
बाबींच्या दरामध्ये अटतटरक्त 10 िक्के र्ाढ टर्चारात घेण्यात यार्ी. सदर र्ाढ कसचन
व्यर्स्िापनाच्या सर्वसाधारण कामासाठी लागू राहणार नाही.
12.8 जलसांपदा टर्भाग शासन पत्र क्र. सांकीणव-२०२०/२२०/प्र.क्र.७२/टनर्सां-२ टदनाांक
२५/११/२०२० र् जा.क्र सांकीणव-२०१९/प्र.क्र.०३/२०१९/जसां(धोरण) टदनाांक
२३/०७/२०२०अन्र्ये मांजरू केलेल्या standard specification चा सांदभव दरसूची मधील स्तांभ
क्र. ३ मध्ये दशवटर्णेत आलेला आहे .
13) Section-2 (खोदकाि व िातीकाि): -
13.1 Section-2 (खोदकाम र् मातीकाम) मधील बाब क्र. 15.16,17 र् 19 बाबत Borrow
area from private land (Contractor’s own material) चे दर पृि:करणाांमध्ये मुरूम/माती
करीत खाजगी जमीन र्ापरासाठी रु.25 लक्ष प्रटत हे क्िर हा दर टर्चारात घेण्यात आला
आहे . तयार्रुन मुरुम/ मातीचा दर रु.46.88 प्रटत घमी आलेला आहे . परां तु, प्रतयक्षात
अांदाजपत्रक तयार करताांना सांबांधीत खाणीच्या जटमनीचा रे डी रे कनरचा दर टर्चारात घ्यार्ा. र्
तया प्रमाणामध्ये मुरुमाची/ मातीची ककमत कमी जास्त करार्ी.
उदािरण (1)
दरपृि:करणात गृहीत धरलेला जटमनीचा दर = रू. 25.00 लक्ष/हे .
जटमनीचा रे डीरे कनरचादर = रू. 30.00 लक्ष/हे .
फरक = रू. 5.00 लक्ष/हे .
मातीकामाच्या दरामधील र्ाढ = 5.00 X 1.8752 =रु.9.376
प्रटतघमी

4
महाराष्ट्र शासन, जलसंपदा विभाग

(म्हणजेच मातीकामाचा दर हा दरपृि:करणापेक्षा रु. 9.376 प्रटतघमी ने जास्त होईल.)

उदािरण(2)
दरपृि:करणात गृहीत धरलेला जटमनीचा दर = रू. 25.00 लक्ष/हे .
जटमनीचा रे डीरे कनरचादर = रू. 20.00 लक्ष/हे .
फरक = रू. (-)5.00लक्ष/हे .
मातीकामाच्या दरामधील घि = (-)5.00 X 1.8752 =रू. (-)9.376
प्रटतघमी
(म्हणजेच मातीकामाचा दर हा दरपृि:करणापेक्षा रु 9.376 प्रटतघमी ने कमी होईल.)
13.2 कालव्यार्रील बाांधकामाांसाठीच्या खोदकामाचे अर्घड स्र्रूप टर्चारात घे ता अशा
खोदकामासाठी या Section मधील खोदकाम याबाबीचे दरामध्ये 50% र्ाढ घेण्यात यार्ी.
14) Section.3 सांधानक कािे :-
14.1 सांधानकाच्याटर्टर्ध बाबींच्यादरपृिकरणामध्ये Concrete with batching plant & Transit
Mixer ची तरतूद गृहीत धरण्यात आलेली आहे . सांधानकाचे पटरणाम आटण कामाचे स्र्रुप
टर्चारात घेता ज्या कामासाठी Batching plant& transit mixer चा र्ापर सांयस्ु क्तक होत नाही
अशा टठकाणी सांधानकाचे काम Mixer ने करणे अपटरहायव असल्यास सांधानकाच्या बाबीचा
मूळ दर 5 िक्क्याने कमी करण्यात यार्ा. तसेच अपर्ादातमक पटरस्स्ितीत Self loading
टमक्सरच्या (eg. AJEX) सहाय्याने सांधानक करणे प्रस्ताटर्त असल्यास तया बाबीचे दर मूळ
दराच्या 2 िक्क्याने कमी करार्ेत.
14.2 जर सांधानकाचे काम 10 मी. पेक्षा जास्त उां चीर्र करार्याचे असेल अिर्ा सांधानकाचे काम
पांपाने अगर िॉर्र क्रेनच्या सहाय्याने करण्याचे टनयोजन असेल तर तयासाठी अटतटरक्त रू.
169.05/घमी एर्ढा दर अांतभूवत करण्यात यार्ा. तसेच सांधानकाच्या दर पृि:करणात 2%
sundries, 1% labour amenities र् 20% (ओव्हरहे ड चाजेस र् ठे केदाराांचा फायदा) याांचा
अांतभार् असल्याने ही तरतूद करताना याबाबी दुबार होणार नाहीत, याची दक्षता घ्यार्ी.
14.3 कामाच्या स्र्रूपानुसार टर्टर्ध बाबींच्या सांधानकासाठी लागणारे सेंिरींग र् शिरींग सांबांटधत
बाबींच्या दरात टर्चारात घेतलेले आहे . तयानुसार कामाचे स्र्रूप टर्चारात घेऊन दरसूचीतील
यिायोग्य दराची टनर्ड करण्यात यार्ी.
14.4 टर्टर्ध बाबीच्या सांधानकाकरीताचे लागणारे दर हे Centering, Shuttering and
Scaffolding सटहत असून हे पटरगटणत करताना तया घिकाची जटमनीपासुनची जास्तीत जास्त
उां ची 10 मी पयंत आहे असे गृहीत धरलेले आहे . ज्या टठकाणी यापेक्षा जास्ती उां चीर्र सांधानक
करने अपेटक्षत आहे , तयाकटरता जादा लागणारे शिकरग टर्चारात घेऊन दर पृि:करणामध्ये
आर्चयक ती जादाची तरतूद (अांदाजपत्रक मांजरू करण्यात समक्ष असणाऱ्या अटधकाऱ्याच्या
मान्यतेने) करण्यात यार्ी.

5
महाराष्ट्र शासन, जलसंपदा विभाग

15) Section 4(Tunnel Work): -


बोगद्यासाठीच्या शाफ्िच्या खोदकामाकटरता आधारकभतीच्या पाया पयंतच्या
खोदकामासाठी section-2 (खोदकाम र् मातीकाम) मधील दर टर्चारात घ्यार्ेत.यानांतरच्या
खोलीमधील शाफ्ि च्या खोदकामासाठी Section-4 मधील दर टर्चारात घ्यार्ेत.
बोगदा कामे:
16) Section-7(िूल्याांकन व पुनववसन) :-
मूल्याांकन र् पुनर्वसनमधील बाबी या बाधीत गार्ठाणातील टर्टर्ध स्िापतय कामाांच्या (उदा .घरे
शाळा ई .)मुल्याांकनासाठी र्ापरण्यात याव्यात.
17) Section-12 (LIS &PDN)
नटलका टर्तरण प्रणालीसाठी अांतभूवत केलेल्या सर्व प्रकारच्या पाईप्सचे पुरर्ठा दर हे पाईपची
ककमत (Ex -Factory),त्रयस्ि अटभकरणामाफवत दजा तपासणी (Third Party Inspection) भराई
(Loading) पाईपची र्ाहतूक करून कायवक्षेत्रार्र पुरर्ठा (Transport),उतरनी (Unloading) र्
साठर्णूक करणे याांसह एकटत्रत असून सदरचे दर हे र्स्तू र् सेर्ाकर टर्रटहत (Without GST)
आहे त.
18) दरसूची भाववाढ मनदे शाांक 2021-22 - “प्रटतर्षी दरसूचीर्र आधाटरत भार्र्ाढ टनदे शाांक”
सोबतच्या पटरटशष्ि -1 मध्ये जोडण्यात आलेले आहे .

6
महाराष्ट्र शासन, जलसंपदा विभाग

पमरमशष्ट 1
कसचन प्रकल्पासाठीचे र्षवटनहाय भार्र्ाढ टनदे शाांक

अ. क्र. र्षव दरसूची भार्र्ाढ शेरा


टनदे शाांक

1 2000 100.00
2 2001 108.51
3 2002 110.77
4 2003 117.51
5 2004 128.07
6 2005 135.03
7 2006 142.37
8 2007 153.37 आधारभूत र्षव
9 2008 167.31 2000
10 2009 168.99
11 2010 186.68
12 2011 202.56
13 2012 219.69
14 2013 233.78
15 2014 243.62
16 2015 243.40
17 2016 247.23
18 2017 240.77
19 2018 258.11 आधारभूत र्षव
20 2019 273.94 2011
21 2020 277.36
22 2021 299.88

7
GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

(1.2) Rates of Construction Materials, Labour and


Machinery use
TABLE "1"
जलसंपदा िवभाग, सामाईक दरसूची सन 2021-22 साठी सािह ांचे ािवत दर

सामाईक दरसूची सन
2021-22 साठी ािवत
अ. . सािह एकक
दर

1 2 3 4
1 Acetylene Cum 387.40
2 Admixture Kg 74.95
3 Air hose hour 8.45
4 Aldrop 30 cm No. 118.75
5 Bamboo 25 mm Rmt. 19.50
6 Binding Wire Kg 64.25
7 Brick No. 6.55
8 Butt Hinges Iron 125 mm No. 35.00
9 Cement (50Kg Bag) Bag 228.00
10 Coal Tar Paint Kg 50.25
11 Copper Plate Kg 567.40
12 Copper water stopper 16 gauge Sqm 9034.25
13 Cotton waste Kg 51.40
Crushed Sand (Excluding Royalty
14 Cum. 1615.15
Charges)
15 Curing Compound Litre 133.35
16 Delay Detonator No. 19.50
17 Diesel Litre 86.56
18 Drill rod Rmt 11905.00
19 Electric Detonator No. 11.70

20 Empty cement Bag No. 11.50

21 Epoxy Paint Litre 228.80


22 Explosive Kelvex-220 Kg 61.35
Fibre fibrillated polypropylene fibres
23 (910 gm/cum of any grade of Kg 275.60
concrete)
24 First Aid Kit No. 278.95
25 Fly Ash Kg 1.05
26 Fuse coil Rmt. 19.50
27 G.I.Pipe 100 mm dia. Rmt. 710.50
28 G.P. Electrodes No. 10.70
29 Gelatin Kg. 143.10
30 Geru Kg. 13.15
31 Goggles No. 161.05
32 Hand Gloves Pair 231.65
33 Handle Iron 125 mm No. 35.00
34 Hook Iron & eye oxi 75 mm No. 17.55
35 Hose pipe oxygen & DA Rmt. 81.80

36 J-Bolt (for soldier fixing) No. 36.00

37 Kerosene Litre 35.60

38 L.H.Electrodes No. 14.60


39 Latches 250 mm No. 44.75
Metal size 40 mm & above
40 Cum. 600.55
(Excluding Royalty charges)
Metal size less than 40 mm
41 Cum. 712.05
(Excluding Royalty charges)
42 Nails 4 cm Kg 67.10

8
सामाईक दरसूची सन
2021-22 साठी ािवत
अ. . सािह एकक
दर

Natural Sand (Excluding Royalty


43 Cum. 679.30
Charges)
44 Neoprene Pad Cu.cm 1.95
45 Non Teak wood Cum. 36732.55
46 Nozzle-3/64 No. 842.85
47 Nut Bolts Kg 63.25

48 Nut Bolts & Washer Kg 98.30

49 Nylon Rope Kg 278.30


50 Oil Paint Litre 228.80
51 Ordinary Detonator No. 6.80
52 Oxygen Cum. 49.20
P.V.C. Water Stopper, 310 mm wide
53 Rmt. 215.35
central bulb type
54 Painting Brush 4" No. 99.25
55 Pickaxe No. 148.90
56 Pin Header of Standard size No. 32.75
57 Plum bob No. 99.25
58 Polyethylene Film 200 Gauge Kg. 237.50
59 Primer Litre 146.30
60 Red Oxide Litre 128.30
61 Rust Cleaner Litre 327.50
62 Safety Helmet No. 248.20
63 Safety Shoes Pair 1433.65
64 Sand blast gun nozzle hour 3.15
Shalitex Super Expansion Pad - 12
65 Sqm 617.10
mm thick
66 Spinning belt Hour 30.90
67 Spirit Level - 150 mm. No. 118.75
68 Steel MT

69 Stone (Excluding Royalty Charges) Cum 377.35


Stone Chips (Excluding Royalty
70 Cum 228.20
Charges)
71 Super Plasticizer Kg 96.95
72 Tower Bolt Iron 200 mm No. 69.05
73 Tower Bolt Iron 250 mm No. 79.85
74 Tripod for chain pully block Day 206.10
75 Turpentine Litre 69.05
76 Water 1000 Litres 37.90
77 Water Proofing Compound Kg 52.90
78 Welding Cable 600 AMP Rmt. 747.50
79 Welding holder hour 8.05
80 White Glass No. 4.85
81 Wire Brush No. 79.85
82 Wire Mesh 50 X 50 - 13 Gauge Sqm 198.60
83 Zink Base Oil Paint Litre 290.80
84 Zink Rich Epoxy Primer Litre 264.65

9
TABLE "2"
जलसंपदा िवभाग, सामाईक दरसूची सन 2021-22 साठी मजुरांचे ािवत दर

सामाईक दरसू ची सन
2021-22 साठी
अ. . मजूर एकक
ािवत दर

1 2 3 4
1 Bar Bender Day 597.00
2 Bhisti Day 597.00
3 CAD Operator / Civil Engg. Assistant Day 751.00
4 Carpenter Day 597.00
5 Civil Engineer Day 1215.00
6 Electrician Day 639.00
7 Fitter Day 597.00
8 Fitter for Shuttering Day 597.00
9 Foreman Day 597.00
10 Gas Cutter Day 597.00
11 Grinder Day 597.00
12 Gauge Inspector Day 597.00
13 Mason Day 597.00
14 Mazdoor (Heavy) Day 597.00
15 Mazdoor (Light) Day 551.00
16 Measurement Clerk Day 597.00
17 Mechanic / Operator Day 597.00
18 Mistri / Mukadam Day 597.00
19 Painter Day 597.00
20 Semiskilled Mazdoor Day 597.00
21 Skilled Mazdoor Day 597.00
22 Surveyor Day 837.00
23 Tile Turner Day 597.00
24 Tracer Day 714.00
25 Unskilled Mazdoor Day 551.00
26 Welder Day 597.00

10
TABLE "3"
"सामाईक दरसू ची सन 2021-22 साठी यं वापर दराचा तपशील
जलसं पदा िवभाग,
सामाईक दरसू ची सन
अ. . यं ाचे नाव एकक 2021-22 साठी ािवत
दर
Total POL
1 2 3 4 5
1 Excavator -0.9 Cum Hour 1767.00 1137.00
2 Compressor 510 CFM Hour 1012.00 812.00
3 Water tanker 10 T Hour 816.00 326.00
4 Breaker & slope compactor Hour
1983.00 1116.00
5 Tipper Hour 1039.00 559.00
6 Diesel pump Hour 272.00 98.00
7 Sismopactor TT 900 Hour 1892.00 877.00
8 JCB JS 3C /Back hoe Hour 1393.00 744.00
9 Generating set41-60 KVA Hour 659.00 559.00
10 Batching plant 25 Cum/Hour Hour 1712.00 ---
11 Concrete mixer 100 ltr capacity Hour 454.00 ---
12 Needle Vibrator Hour 158.00 ---
13 Air compressor 280 CFM Hour 955.00 713.00
14 Jack Hammer Day 40.00 ---
15 Pug machine for cutting Hour 16.00 4.33
16 Bending Machine Day 238.00 97.60
17 Welding Transformer Hour 100.00 98.66
18 Mobile crane 3 T Hour 608.00 312.00
19 Grinding Machine Hour 25.00 ---
20 Sand blasting equipment Hour 119.00 ---
21 Guniting equipment Hour 219.00 ---
22 Spinning Machine Hour 164.00 117.00
23 Dozer 300 hp /Dozer CAT D 8 K Hour 4196.00 2729.00

11
जलसं पदा िवभाग,
सामाईक दरसू ची सन
अ. . यं ाचे नाव एकक 2021-22 साठी ािवत
दर
24 Hydra crane Capacity (Upto 09 T) Hour 608.00 312.00
25 (10 to 15 T Hour 709.00 312.00
29 (16T to 20 T) Hour 1082.00 621.60
30 (11T to 25 T) Hour 1601.00 975.00
31 Tipper mounting Drilling Jumbo Hour 853.00 ---
32 Wheel loader Hour 2074.00 1116.00
33 Scraper Euclid B-FDT model Hour 2924.00 2002.00
34 Passanger wintch Hour 575.00 ---
35 Dozer (Beml BD 80) Hour 3446 1581

12
TABLE "4"
जलसंपदा िवभाग, सामाईक दरसूची सन 2021-22 साठी ीलचे ािवत दर
Rate of Item with GST are as per Joint Plant Committee as on 05/01/2021 vide letter of
JPC dated 05/01/2021

Rate of Item for CSR 2021-22


Sr.No. Item
without GST in (Rs.per Tonne)

1 2 3
1 PIG IRON 42008
2 BILLETS 100 MM 41551
3 BLOOME 150X150 MM 41085
4 PENCIL INGOTS 38500
5 WIRE RODS 6 MM 49068
6 WIRE RODS 8 MM 48246
7 ROUNDS 12 MM 48508
8 ROUNDS 16 MM 48508
9 ROUNDS 25 MM 48508
10 TMT 10 MM 47890
11 TMT 12 MM 47390
12 TMT 25 MM 47407
13 ANGLES 50X50X6 MM 46746
14 ANGLES 75X75X6 MM 46305
15 JOISTS 125X70 MM 47008
16 JOISTS 200X100 MM 46958
17 CHANNELS 75X40 MM 48932
18 CHANNELS 150X75 MM 47763
19 PLATES 6 MM 55907
20 PLATES 10 MM 55466
21 PLATES 12 MM 55034
22 PLATES 25 MM 54161
23 H. R. COILS 2.00 MM 58466
24 H. R. COILS 2.50 MM 57585
25 H. R. COILS 3.15 MM 57585
26 C. R. COILS 0.63 MM 67415
27 C. R. COILS 1.00 MM 66958
28 G. P. SHEETS 0.40 MM 67525
29 G. P. SHEETS 0.63 MM 66169
30 G. C. SHEETS 0. 40 MM 67712
31 G. C. SHEETS 0. 63 MM 66627
32 MELTING SCRAP H M S - I 35653
33 MELTING SCRAP H M S - II 34305
34 SPONGE IRON (COAL BASED) 21941

13
GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

(1.3) LEAD CHARGES STATEMENT


FOR MATERIALS
Lead Charges Statement for 2021-22 (Excluding Loading and Unloading Charges)
Statement I

Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including Trip
(4 Rs (10 % of Truck Charges & Overhead (Rs)
Km/Litre) 86.56/Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)

1 2 3 4 5 6 7 8 9 10 11 12
col 6+col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 86.56 col 6 X 0.10 Rs 2616/day col 9 x 0.20 col 9+col 10 col 11/col 3
7+ col 8
0.50 15.00 48.00 54.00 13.50 1168.56 116.86 2616.00 3901.42 780.28 4681.70 97.54

1.00 16.00 35.56 77.12 19.28 1668.88 166.89 2616.00 4451.77 890.35 5342.12 150.23

1.50 16.50 28.39 91.17 22.79 1972.70 197.27 2616.00 4785.97 957.19 5743.16 202.30

2.00 17.00 23.86 101.44 25.36 2195.16 219.52 2616.00 5030.68 1006.14 6036.82 253.01

2.50 17.25 20.52 108.60 27.15 2350.10 235.01 2616.00 5201.11 1040.22 6241.33 304.16

3.00 17.50 18.06 114.36 28.59 2474.75 247.48 2616.00 5338.23 1067.65 6405.88 354.70

3.50 17.75 16.18 119.26 29.82 2581.22 258.12 2616.00 5455.34 1091.07 6546.41 404.60

4.00 18.00 14.69 123.52 30.88 2672.97 267.30 2616.00 5556.27 1111.25 6667.52 453.88

4.50 18.25 13.49 127.41 31.85 2756.94 275.69 2616.00 5648.63 1129.73 6778.36 502.47

5.00 18.50 12.49 130.90 32.73 2833.11 283.31 2616.00 5732.42 1146.48 6878.90 550.75

5.50 18.50 11.52 132.72 33.18 2872.06 287.21 2616.00 5775.27 1155.05 6930.32 601.59

6.00 18.75 10.81 135.72 33.93 2936.98 293.70 2616.00 5846.68 1169.34 7016.02 649.03

6.50 18.85 10.13 137.69 34.42 2979.40 297.94 2616.00 5893.34 1178.67 7072.01 698.13

7.00 19.00 9.56 139.84 34.96 3026.14 302.61 2616.00 5944.75 1188.95 7133.70 746.20

7.50 19.15 9.06 141.90 35.48 3071.15 307.12 2616.00 5994.27 1198.85 7193.12 793.94

8.00 19.30 8.61 143.76 35.94 3110.97 311.10 2616.00 6038.07 1207.61 7245.68 841.54

8.50 19.45 8.21 145.57 36.39 3149.92 314.99 2616.00 6080.91 1216.18 7297.09 888.81

14
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including Trip
(4 Rs (10 % of Truck Charges & Overhead (Rs)
Km/Litre) 86.56/Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)

1 2 3 4 5 6 7 8 9 10 11 12
col 6+col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 86.56 col 6 X 0.10 Rs 2616/day col 9 x 0.20 col 9+col 10 col 11/col 3
7+ col 8
9.00 19.60 7.86 147.48 36.87 3191.47 319.15 2616.00 6126.62 1225.32 7351.94 935.36

9.50 19.80 7.55 149.45 37.36 3233.88 323.39 2616.00 6173.27 1234.65 7407.92 981.18

10.00 20.00 7.27 151.40 37.85 3276.30 327.63 2616.00 6219.93 1243.99 7463.92 1026.67

11.00 21.00 6.97 159.34 39.84 3448.55 344.86 2616.00 6409.41 1281.88 7691.29 1103.48

12.00 22.00 6.72 167.28 41.82 3619.94 361.99 2616.00 6597.93 1319.59 7917.52 1178.20

13.00 23.00 6.50 175.00 43.75 3787.00 378.70 2616.00 6781.70 1356.34 8138.04 1252.01

14.00 24.00 6.32 182.96 45.74 3959.25 395.93 2616.00 6971.18 1394.24 8365.42 1323.64

15.00 25.00 6.15 190.50 47.63 4122.85 412.29 2616.00 7151.14 1430.23 8581.37 1395.34

20.00 25.00 4.71 194.40 48.60 4206.82 420.68 2616.00 7243.50 1448.70 8692.20 1845.48

25.00 25.00 3.81 196.50 49.13 4252.69 425.27 2616.00 7293.96 1458.79 8752.75 2297.31

30.00 30.00 3.81 234.60 58.65 5076.74 507.67 2616.00 8200.41 1640.08 9840.49 2582.81

35.00 30.00 3.29 236.30 59.08 5113.96 511.40 2616.00 8241.36 1648.27 9889.63 3005.97

40.00 30.00 2.89 237.20 59.30 5133.01 513.30 2616.00 8262.31 1652.46 9914.77 3430.72

45.00 30.00 2.58 238.20 59.55 5154.65 515.47 2616.00 8286.12 1657.22 9943.34 3854.01

50.00 30.00 2.33 239.00 59.75 5171.96 517.20 2616.00 8305.16 1661.03 9966.19 4277.33
60.00 35.00 2.27 278.40 69.60 6024.58 602.46 2616.00 9243.04 1848.61 11091.65 4886.19
70.00 35.00 1.95 279.00 69.75 6037.56 603.76 2616.00 9257.32 1851.46 11108.78 5696.81
80.00 35.00 1.71 279.60 69.90 6050.54 605.05 2616.00 9271.59 1854.32 11125.91 6506.38
90.00 35.00 1.53 281.40 70.35 6089.50 608.95 2616.00 9314.45 1862.89 11177.34 7305.45

15
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including Trip
(4 Rs (10 % of Truck Charges & Overhead (Rs)
Km/Litre) 86.56/Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)

1 2 3 4 5 6 7 8 9 10 11 12
col 6+col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 86.56 col 6 X 0.10 Rs 2616/day col 9 x 0.20 col 9+col 10 col 11/col 3
7+ col 8
100.00 35.00 1.38 282.00 70.50 6102.48 610.25 2616.00 9328.73 1865.75 11194.48 8111.94
125.00 40.00 1.26 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 9768.65
150.00 40.00 1.05 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 11722.38
175.00 40.00 0.90 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 13676.11
200.00 40.00 0.79 322.00 80.50 6968.08 696.81 2616.00 10280.89 2056.18 12337.07 15616.54
250.00 40.00 0.63 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 19537.30
300.00 40.00 0.53 324.00 81.00 7011.36 701.14 2616.00 10328.50 2065.70 12394.20 23385.28
350.00 40.00 0.45 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 27352.22
400.00 40.00 0.40 326.00 81.50 7054.64 705.46 2616.00 10376.10 2075.22 12451.32 31128.30
450.00 40.00 0.35 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 35167.14
500.00 40.00 0.32 326.00 81.50 7054.64 705.46 2616.00 10376.10 2075.22 12451.32 38910.38
Note :
1) For calculation of carrying capacity, a tipper of 10 Tonne capacity is considered.
2) For loading and unloading of material on site, 6 minutes of ideal time i.e 0.1 hr is considered for working out No.of Trips.
3)The transportation charges beyond 15 km to 50 km are with 5 km interval, 50 km to 100 km are with 10 km interval ,100 km to 200 km are with 25 km interval and
200 km to 500 km are with 50 km interval.The transportation charges for intermediate Km within the range shall be worked out by lineraly interpolating between rates
of lower and upper values in the range.
4)For calculating additional lead charges , difference of lead charges i.e.(lead charges required -lead charges considered in basic rate analysis ) shall be considered)

16
Lead Charges Statement for 2021-22 (Excluding Loading and Unloading Charges)

Statement II
Cost of
Lead in
Trip Lead Charges in Rs / Unit
Km
( Rs)

As per col Sand , Murum,Earth, Steel


Excavated Rock
L no 12 of Metal Below 40 Metal 40 mm & Concrete Block Cement Water Bricks
Rubble
Statement I mm above Stone Block

Carrying
capacity 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
of Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
0.50 97.54 20.75 16.96 16.26 13.93 9.75 10.84 19.51
1.00 150.23 31.96 26.13 25.04 21.46 15.02 16.69 30.05
1.50 202.30 43.04 35.18 33.72 28.90 20.23 22.48 40.46
2.00 253.01 53.83 44.00 42.17 36.14 25.30 28.11 50.60
2.50 304.16 64.71 52.90 50.69 43.45 30.42 33.80 60.83
3.00 354.70 75.47 61.69 59.12 50.67 35.47 39.41 70.94
3.50 404.60 86.09 70.37 67.43 57.80 40.46 44.96 80.92
4.00 453.88 96.57 78.94 75.65 64.84 45.39 50.43 90.78
4.50 502.47 106.91 87.39 83.75 71.78 50.25 55.83 100.49
5.00 550.75 117.18 95.78 91.79 78.68 55.08 61.19 110.15
5.50 601.59 128.00 104.62 100.27 85.94 60.16 66.84 120.32
6.00 649.03 138.09 112.87 108.17 92.72 64.90 72.11 129.81
6.50 698.13 148.54 121.41 116.36 99.73 69.81 77.57 139.63
7.00 746.20 158.77 129.77 124.37 106.60 74.62 82.91 149.24
7.50 793.94 168.92 138.08 132.32 113.42 79.39 88.22 158.79

17
Cost of
Lead in
Trip Lead Charges in Rs / Unit
Km
( Rs)

As per col Sand , Murum,Earth, Steel


Excavated Rock
L no 12 of Metal Below 40 Metal 40 mm & Concrete Block Cement Water Bricks
Rubble
Statement I mm above Stone Block

Carrying
capacity 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
of Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
8.00 841.54 179.05 146.35 140.26 120.22 84.15 93.50 168.31
8.50 888.81 189.11 154.58 148.14 126.97 88.88 98.76 177.76
9.00 935.36 199.01 162.67 155.89 133.62 93.54 103.93 187.07
9.50 981.18 208.76 170.64 163.53 140.17 98.12 109.02 196.24
10.00 1026.67 218.44 178.55 171.11 146.67 102.67 114.07 205.33
11.00 1103.48 234.78 191.91 183.91 157.64 110.35 122.61 220.70
12.00 1178.20 250.68 204.90 196.37 168.31 117.82 130.91 235.64
13.00 1252.01 266.39 217.74 208.67 178.86 125.20 139.11 250.40
14.00 1323.64 281.63 230.20 220.61 189.09 132.36 147.07 264.73
15.00 1395.34 296.88 242.67 232.56 199.33 139.53 155.04 279.07
20.00 1845.48 392.66 320.95 307.58 263.64 184.55 205.05 369.10
25.00 2297.31 488.79 399.53 382.89 328.19 229.73 255.26 459.46
30.00 2582.81 549.53 449.18 430.47 368.97 258.28 286.98 516.56
35.00 3005.97 639.57 522.78 501.00 429.42 300.60 334.00 601.19
40.00 3430.72 729.94 596.65 571.79 490.10 343.07 381.19 686.14
45.00 3854.01 820.00 670.26 642.34 550.57 385.40 428.22 770.80
50.00 4277.33 910.07 743.88 712.89 611.05 427.73 475.26 855.47
60.00 4886.19 1039.61 849.77 814.37 698.03 488.62 542.91 977.24
70.00 5696.81 1212.09 990.75 949.47 813.83 569.68 632.98 1139.36
80.00 6506.38 1384.34 1131.54 1084.40 929.48 650.64 722.93 1301.28
90.00 7305.45 1554.35 1270.51 1217.58 1043.64 730.55 811.72 1461.09
100.00 8111.94 1725.94 1410.77 1351.99 1158.85 811.19 901.33 1622.39

18
Cost of
Lead in
Trip Lead Charges in Rs / Unit
Km
( Rs)

As per col Sand , Murum,Earth, Steel


Excavated Rock
L no 12 of Metal Below 40 Metal 40 mm & Concrete Block Cement Water Bricks
Rubble
Statement I mm above Stone Block

Carrying
capacity 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
of Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
125.00 9768.65 2078.44 1698.90 1628.11 1395.52 976.87 1085.41 1953.73
150.00 11722.38 2494.12 2038.67 1953.73 1674.63 1172.24 1302.49 2344.48
175.00 13676.11 2909.81 2378.45 2279.35 1953.73 1367.61 1519.57 2735.22
200.00 15616.54 3322.67 2715.92 2602.76 2230.93 1561.65 1735.17 3123.31
250.00 19537.30 4156.87 3397.79 3256.22 2791.04 1953.73 2170.81 3907.46
300.00 23385.28 4975.59 4067.01 3897.55 3340.75 2338.53 2598.36 4677.06
350.00 27352.22 5819.62 4756.91 4558.70 3907.46 2735.22 3039.14 5470.44
400.00 31128.30 6623.04 5413.62 5188.05 4446.90 3112.83 3458.70 6225.66
450.00 35167.14 7482.37 6116.02 5861.19 5023.88 3516.71 3907.46 7033.43
500.00 38910.38 8278.80 6767.02 6485.06 5558.63 3891.04 4323.38 7782.08
Note :
1) For calculation of carrying capacity, a tipper of 10 Tonne capacity is considered.
2) For loading and unloading of material on site, 6 minutes of ideal time i.e 0.1 hr is considered for working out No.of Trips.
3)The transportation charges beyond 15 km to 50 km are with 5 km interval, 50 km to 100 km are with 10 km interval, 100 km to 200 km are with
25 km interval and 200 km to 500 km are with 50 km interval.The transportation charges for intermediate Km within the range shall be worked out
by lineraly interpolating between rates of lower and upper values in the range.
4)For calculating additional lead charges , difference of lead charges i.e.(lead charges required -lead charges considered in basic rate analysis ) shall
be considered)

19
SECTION-2

EXCAVATION AND EMBANKMENT

ITEM NO. 1 TO 26
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-2022
SECTION 2:- EXCAVATION & EMBANKMENT

Rate for 2021-22


Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
1 Item No.1 :-
Excavation in all kinds of soil including boulders up to
0.6 m diameter ( 0.113 cum) for canal, seating of
embankment, filter drains / catch water drains etc., and
placing the excavated stuff neatly in dump area or for
formation of service road / embankment including cost Section Ex. Cum. 92.15 13.22
of all materials, machinery, labour, dressing bed and
sides to required level and profile etc. Complete with
lead up to 1 km and all lifts as directed.

2 Item No.2 :-
Excavation in hard murum including boulders upto 0.6
m diameter ( 0.113 cum) for canal, seating of
embankment, filter drains / catch water drains etc., and
placing the excavated stuff neatly in dump area or for
Section Ex. Cum. 108.55 17.26
formation of service road / embankment including cost
of all materials, machinery, labour, dressing bed and
sides to required level and profile etc., complete with
lead upto 1 km and all lifts as directed.

3 Item No.3 :-
Excavation in soft rock including boulders upto 0.6 m
diameter ( 0.113 cum) for canal, seating of
embankment, filter drain / catch water drains etc., and
placing the excavated soft rock neatly in dump area or
for formation of service road including cost of all Section Ex. Cum. 128.95 23.05
materials, machinery, labour, dressing bed and sides
to required level and profile etc. complete with lead
upto 1 km and all lifts as directed.

4 Item No.4 :-
Excavation in hard rock of all toughness by ordinary
blasting methods including boulders above 0.6 m
dia.(0.113Cum) minimising damage to side slopes of
excavation in water prism area by adopting any one or
combination of line drilling /pre-splitting /smooth Section Ex. Cum. 463.60 84.42
blasting techniques and placing the excavated rock
neatly in approved dump area including cost of all
materials, machinery, labour,levelling bed etc.,
complete with lead upto 1 km and all lifts as directed.

20
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
5 Item No.5 :-
Excavation in hard rock of all toughness by control
blasting methods including boulders above 0.6 m
dia.(0.113Cum)for canals cut-off trench of
embankment filter/catch water drains and other
appurtenent structures including control of vibrations
by use of delay detonators and control of fly rocks by
muffling arrangements and adopting only jack
hammers for drilling holes and minimising damage to Section Ex. Cum. 579.50 105.53
side slopes of canal in water prism area by adopting
any one or combination of line drilling /pre-splitting
/smooth blasting techniques including cost of all
materials,machinery, labour,placing excavated rock
neatly approved dump area as directed etc., complete
with lead upto 1 km and all lifts as directed.

6 Item No.6 :-
Excavation in hard rock of all toughness by breaker
including boulders above 0.6 m dia.(0.113Cum)
minimising damage to side slopes of excavation and As Directed by
placing the excavated rock neatly in approved dump Engineer-In- Cum. 525.30 41.36
area including cost of all materials, machinery, labour, Charge.
levelling bed etc., complete with lead upto 1 km and all
lifts as directed .

7 Item No.7 :-
Watering the embankment in proper layers including Section Em
cost of water, lead of water upto 1 km and all lifts etc. 2.13 Cum. 20.10 ---
complete as directed.
8 Item No.8 :-
Compaction of bankwork with vibratory Compactor
Section Em
to 95 % of Proctor density with a lead upto 1.00 Km. as Cum. 10.10 ---
2.13
directed.

9 Item No.9 :-
Providing cut off trench filling using selected
impervious soil directly available from material of
excavation including cost of all materials,
machinery,labour, all other operations such as
collection of soil, spreading soil in layer of specified
thickness, sorting out, breaking clods, levelling, Section Em Cum. 55.70 2.55
sectioning edges / sides, watering, compacting each
layer to density control of not less than 95 % of Proctor
density using vibratory compactor including cost of
water etc. complete with lead upto1 km for water and
all lifts as directed.

21
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
10 Item No.10 :-
Providing hearting embankment using selected
impervious material available directly from
excavation in layers including cost of all materials,
machinery, labour, all other operations such as
collection of material, spreading soil in layer of
specified thickness, sorting out, breaking clods, Section Em Cum. 55.70 2.55
levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95% of Proctor density using vibratory compactor
including cost of water etc.complete with lead upto1
km for water and all lifts as directed.

11 Item No.11 :-
Providing casing embankment using selected
pervious material available directly from
excavation in layers including cost of all materials,
machinery, labour, all other operations such as
collection of material, spreading material in layer of
specified thickness, sorting out, breaking clods, Section Em Cum. 74.35 3.31
levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc. complete with lead upto1
km for water and all lifts as directed.
12 Item No.12 :-
Providing cut off trench filling using selected
impervious soil from approved borrow areas
(Government acquired land) including cost of all
materials, machinery,labour, all other operations such
as collection of soil, spreading soil in layer of specified
thickness, sorting out, breaking clods, levelling, Section Em Cum. 155.35 2.65
sectioning edges / sides, watering, compacting each
layer to density control of not less than 95 % of Proctor
density using vibratory compactor including cost of
water etc. complete with lead upto1 km for water and
all lifts as directed.

13 Item No.13:-
Providing hearting embankment using selected
impervious soil from approved borrow areas
(Government acquired land) in layers including cost
of all materials, machinery, labour, all other operations
such as collection of soil, spreading soil in layer of
specified thickness, sorting out, breaking clods, Section Em Cum. 138.75 2.52
levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density kusing vibratory
compactor including cost of water etc., complete with
lead upto1 km for wtaer and all lifts as directed.

22
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
14 Item No.14 :-
Providing casing embankment using selected
pervious material from approved borrow areas
(Government acquired land) in layers including cost
of all materials, machinery,labour, all other operations
such as collection of soil, spreading soil in layer of
specified thickness, sorting out, breaking clods, Section Em Cum. 170.45 3.32
levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km and all lifts as directed.

15 Item No.15 :-
Providing cut off trench filling using selected
impervious soil from approved borrow areas
(Private land- contractors own material) including
cost of all materials, machinery,labour, all other
operations such as collection of soil, spreading soil in
layer of specified thickness, sorting out, breaking Section Em Cum. 216.10 3.01
clods, levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc. complete with lead upto1
km for water and all lifts as directed.

16 Item No.16 :-
Providing Hearting embankment using selected
impervious material from approved borrow areas
(Private land- contractor's own material) in layers
including cost of all materials, machinery,labour, all
other operations such as collection of soil, spreading
soil in layer of specified thickness, sorting out, breaking Section Em Cum. 185.65 2.54
clods, levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km for water and all lifts as directed.

17 Item No.17 :-
Providing casing embankment using selected
pervious material from approved borrow areas
(Private land- contractor's own material) in layers
including cost of all materials, machinery, labour, all
other operations such as collection of soil, spreading
soil in layer of specified thickness, sorting out, breaking
Section Em Cum. 217.35 3.30
clods, levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km for water and all lifts as directed.

23
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
18 Item No.18 :-
Providing cohesive non-swelling (CNS) material
lining to canals using selected material from
approved borrow area (Government acquired land)
including cost of all materials, machinery, labour,
spreading soil in layers of thickness not more than 150
mm including providing 20 cm or so (perpendicular to As Directed by
side slope) of extra pride ,removing pride just prior to Engineer-In- Cum. 203.30 34.77
the placement of lining, breaking clods, watering, Charge
compacting to density control of not lessthan 95 % of
Proctor density, dressing to required profile including
cost of water etc. complete with lead upto1 km for
water and all lifts as directed.

19 Item No.19 :-
Providing cohesive non-swelling (CNS) material
lining to canals using selected material from
approved borrow area's (Private land- contractor's
own material) including cost of all materials,
machinery, labour, spreading soil in layers of thickness
not more than 150 mm including providing 20 cm or so As Directed by
(perpendicular to side slope) of extra pride ,removing Engineer-In- Cum. 248.95 34.76
pride just prior to the placement of lining, breaking Charge
clods, watering, compacting to density control of not
lessthan95 % of Proctor density, dressing to required
profile including cost of water etc. complete with lead
upto1 km for water and all lifts as directed .

20 Item No.20A :- Providing and constructing 150 mm


thick unscreened/screened sand layer from
As Directed by
approved source including cost of all materials, labour,
Engineer-In-
machinary etc.complete with lead upto 1 km and all
Charge
lifts as directed .

A)unscreened sand layer Sqm. 187.75 14.46


B)screened sand layer Sqm. 236.90 28.95
20 Item No.20B :- Providing and constructing 150 mm
thick Quarry Spalls of approved trap stone quality of
specified thickness from approved source including As Directed by
cost of all materials, labour, machinary etc.complete Engineer-In- Sqm. 60.80 13.93
with lead upto 1 km and all lifts as directed. Charge

21 Item No.21 :-
Providing and constructing 300 mm thick dry rubble
stone pitching with pin headers at 2 per sqm using
stones and stone chips from approved source As Directed by
including cost of all materials, labour,machinary ,hand Engineer-In- Sqm. 277.25 42.87
packing / wedging stone chips, finishing etc.,complete Charge
with lead upto 1km and all lifts as directed.

24
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
22 Item No.22 :- Providing and constructing 450 mm thick
dry rubble stone pitching with pin headers at 2 per
sqm using stones and stone chips from approved
source including cost of all materials, As Directed by
labour,hand,machinary ,packing / wedging stone chips, Engineer-In- Sqm. 351.50 42.86
finishing etc.complete with lead up to 1 km and all lifts Charge
as directed.

23 Item No.23 :-
Providing and constructing dry rubble rock-toe with
filter below and behind the rock toe using sand
,graded gravel ,quarry spaul ,rubble and stone chips As Directed by
from approved source including cost of all materials, Engineer-In- Cum. 2910.80 244.35
machinery, labour, hand packing rubble and stone Charge
chips, finishing top and sides to required slopes
etc.complete with lead upto 1 km and all lifts as
directed.(Specifications as per "Section 2 ,2.5 ")

24 Item No.24 :-
Providing and constructing longitudinal and cross
graded filter drains using sand and 20 mm down
approved clean, hard, graded aggregates satisfying
specified filter criteria in layers of specified thickness As Directed by
including cost of all materials, machinery, labour, laying Engineer-In- Cum. 1292.05 257.66
to required slopes, compaction etc., complete as per Charge
specifications and approved drawings with lead up to 1
km and all lifts as directed.

25 Item No.25 :-
Providing and constructing 0.50 m thick vertical or
inclined graded filter media consisting of 150 mm
thick sand layers and 200 mm thick 20 mm down
coarse approved clean, hard, graded aggregates
As Directed by
satisfying specified filter criteria in layers of specified
Engineer-In- Cum. 1336.80 257.69
thickness including cost of all materials, machinery,
Charge
labour, laying to required slopes, compaction etc.,
complete as per specifications and approved drawings
with lead up to 1 km and all lifts as directed .

26 Item no 26:-
Dewatering by pumping out water collected with
Diesel or Electrical pumps including cost of all
materials, machinery, labour, providing sump and all
other ancillary operations whenever necessary etc. As Directed by
complete under specific and indispensable Engineer-In- BHP Hr. 12.40 0.78
circumstances with prior approval from competent Charge
authority with authentic evidence of records justifying
dewatering etc. complete as directed .

25
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-22

SECTION 3

CONCRETE WORK INCLUDING


CENTERING, UCR MASONRY, BRICK MASONRY
AND R.C.C. PIPES

ITEM NO. 27 TO 72
CONSUMPTION OF MATERIAL CONSIDERED IN RATE ANALYSIS
Item Item in brief Cement Coarse Fine
No. In bags Aggregate Aggregate
27 CC M-10 (20 MSA) 4.4 0.94 0.47
CC M-10 (40 MSA) 4.4 0.94 0.47
CC M-10 (80 MSA) 4.33 0.94 0.47
28 CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.89 0.45
29 CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.90 0.45
30 CC M-20 (20 MSA) 6.60 0.90 0.45
CC M-20 (40 MSA) 6.08 0.89 0.45
31 CC M-25 (20 MSA) 7.62 0.90 0.45
32 CC M-15 (20 MSA) for Bed lining per Cum 5.64 0.90 0.45
B) for side lining with curing compound 5.64 0.90 0.45
B) for side lining without curing compound 5.64 0.90 0.45
33 CC M-15 (20 MSA) Mechanised lining for bed lining 5.64 0.90 0.45
B) for side lining with curing compound 5.64 0.90 0.45
B) for side lining without curing compound 5.64 0.90 0.45
34 Chip Masonry behind concrete lining 1.25 1.24 0.35
(Rubble)
37 UCR Masonry in CM 1:5 for side lining 2.00 1.24 0.35
(Rubble)
38 Cement Plaster 6 mm thick in CM 1:3 0.057 0.006
39 CC M-10 (20 MSA) 4.40 0.94 0.47
CC M-10 (40 MSA) 4.40 0.94 0.47
CC M-10 (80 MSA) 4.33 0.94 0.47
40 CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.89 0.45
41 CC M-15 (20 MSA) for abutment, pier 5.64 0.90 0.45
CC M-15 (40 MSA) for abutment, pier 5.20 0.89 0.45
CC M-15 (80 MSA) for abutment, pier 4.99 0.90 0.45
42 CC M-20 (20 MSA) for abutment, wing wall, returns, 6.60 0.90 0.45
transition walls, piers, columns, beams & Slabs, road
slab, kerb, super passage/slab culvert, trough resting on
ground, trough for aqueduct, wearing coat & other
concrete
CC M-20 (40 MSA) for abutment, retaining walls, piers 6.08 0.89 0.45
43 CC M-25 (20 MSA) for column, beams and slabs, road 7.62 0.90 0.45
slab, kerb, super passage/slab culvert, trough resting on
ground, trough aqueduct, wearing coat
44 CC M-30 (20 MSA) for trough aqueduct, slab 9.20 0.85 0.425
51,53 UCR Masonry in CM 1:5 for foundation and super 1.71 1.15 0.30
structure (30% mortar) (Rubble)
(35% mortar) 2.00 1.1 0.35
(Rubble)
(45% mortar) 2.57 1.00 0.45
(Rubble)
52 UCR Masonry in CM 1:6 for foundation (30% mortar) 1.43 1.15 0.30
(Rubble)
(35% mortar) 1.67 1.1 0.35
(Rubble)
(45% mortar) 2.14 1.00 0.45
(Rubble)
56 Cement Pointing in CM 1:3 0.0295 0.003
Cement Pointing in CM 1:2 0.0449 0.003
61 B.B. Masonry in CM 1:5 1.77 480 0.31
(Bricks)

26
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 3:- CONCRETE WORK INCLUDING CENTERING, UCR MASONRY,
BRICK MASONRY AND R.C.C. PIPES
Dam and Allied Works
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
Foundation and Bedding
27 Section CC
ITEM NO. 27 : Providing and laying in situ
cement concrete of grade M-10 of trap/ granite /
quartzite / graded metal for foundation and
bedding with Batching Plant and Transit Mixer
including placing, compacting, curing etc.
complete with all lifts as directed.
(A) M-10 (20 MSA) (Cement 4.4 bags/Cum) Cum 3715.55 736.73
(B) M-10 (40 MSA) (Cement 4.4 bags/Cum) Cum 3715.50 736.73
(C) M-10 (80 MSA) (Cement 4.33 bags/Cum) Cum 3650.20 736.73
28 Section CC
Item No. 28 : Providing and laying in situ
cement concrete of grade M-15 of trap / granite
/ gneiss / quartzite / graded metal for foundation
and bedding with Batching Plant and Transit
Mixer including placing, compacting, curing etc.
complete with all lifts as directed.

(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 3991.90 736.73
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 3863.95 736.73
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 3766.45 736.73
Sub and Super Structure
29 Section CC
Item No. 29 : Providing and laying in situ
cement concrete of grade M-15 of trap / granite
/ gneiss / quartzite / graded metal for PCC with or
without surface reinforcement/ RCC concreting
requiring heavy or special type of shuttering for
works of gallery, sluice, spillway crest, spillway
down stream face, energy dissipating structures,
intake structures, training walls, piers, abutments
etc. with Batching Plant and Transit mixer with
centering, centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all
lifts etc. complete as directed.

(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4849.10 1049.17
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4721.20 1049.17
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4628.40 1049.17
30 Section CC
Item No. 30 : Providing and laying in situ
cement concrete of grade M-20 of trap / granite
/ gneiss / quartzite / graded metal for RCC works
of gallery, sluice, spillway crest, spillway down
stream face, energy dissipating structures, intake
structures, training walls, piers, abutments, slab
etc. with Batching Plant and Transit mixer
including centering, shuttering ,scaffolding,
compacting, curing etc. complete with all lifts etc.
complete as directed.

(A) M-20 (20 MSA) (Cement 6.60 bags/Cum) Cum 5108.60 1049.17
(B) M-20 (40 MSA) (Cement 6.08 bags/Cum) Cum 5210.30 1049.17

27
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
31 Section CC
Item No. 31 : Providing and laying in situ
cement concrete of grade M-25 of trap / granite
/ gneiss / quartzite / graded metal for RCC works
of gallery, sluice, spillway crest, spillway down
stream face, energy dissipating structures, intake
structures, training walls, piers, abutments, slab
etc. with Batching Plant and Transit mixer
including centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all
lifts etc. complete as directed.

(A) M-25 (20 MSA) (Cement 7.62 bags/Cum) Cum 5383.80 1049.17
Section B : Canal and Allied Works
32 Section CC
ITEM NO. 32: Providing and laying in situ M-
15 (20 MSA)(28 days cube compressive strength
not less than 15N/sqmm) grade cement concrete
with clean, hard, graded aggregates for canal
lining for side and bed including cost of all
materials, machinery, labour, cleaning with
batching plant and transit mixer placing in
position, finishing with all slope of canal including
centering, scaffolding, formwork, compaction,
curing, by cutting grooves, filling with sealing
compound and providing porous plugs
preparation of sub grade etc. complete with all
lifts etc. complete as directed.

A) For Bed Lining (Cement 5.64 bags/Cum) Cum 4949.80 686.51


B) i) For Side Lining wih curing compound
Cum 5290.95 686.51
(Cement 5.64 bags/Cum)
B) ii) For Side Lining without curing
compound i.e. by curing with water (Cement Cum 5090.50 667.03
5.64 bags/Cum)
33 Section CC &
ITEM NO. 33 : Providing and laying in situ
Section L
mechanised lining in M-15 (20 MSA)(28 days
cube compressive strength not less than
15N/sqmm) grade cement concrete with clean,
hard, graded aggregates for canal side and bed
using vibrating cylindrical type mechanical paver
including cost of all materials, machinery, labour,
cleaning with batching plant and transit mixer
finishing with all slope of canal including
centering, scaffolding, formwork, compaction,
curing, by cutting grooves, filling with sealing
compound and providing porous plugs
preparation of sub grade etc. complete with all
lifts as directed.

A) For Bed Lining (Cement 5.64 bags/Cum) Cum 5042.15 690.32


B) i) For Side Lining wih curing compound
Cum 5383.30 690.32
(Cement 5.64 bags/Cum)
B) ii) For Side Lining without curing
compound i.e. by curing with water (Cement Cum 5182.85 670.84
5.64 bags/Cum)

28
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
34 ITEM NO. 34 : Providing & laying chip As Directed by
masonry back filling behind concrete lining in Engineer-In-
CM 1:8 including striking joints, curing, centering, Charge
Cum 1813.65 468.06
scaffolding etc. complete but excluding pointing
etc. complete as directed (35% mortar) (Cement
1.25 bags/Cum)
35 Item No. 35: Providing, laying, erecting and As Directed by
dismantling M.S. plates form work for side Engineer-In-
lining etc. complete as Directed. (for steeper Charge Sqm 234.05 105.74
slopes only) (to be used with prior approval of
C.E.)
36 As Directed by
ITEM NO. 36 : Providing and laying polythene
Engineer-In-
film of 031 properly manufactured from 100%
Charge
virgin granules confirming to I.S. 2508-1984 with
1.5 to 2.5 m. package in rolls etccomplete as
directed.

A) 200 microns Sqm 54.30 2.66


B) 400 microns Sqm 105.95 2.66
C) 600 microns Sqm 157.60 2.66
37 ITEM NO. 37 : Providing and laying 40 and 45 As Directed by
cm. thick UCR masonry in C.M. 1:5 for side Engineer-In-
lining of the canal including raking joints, Charge
Cum 2614.45 845.98
centering, scaffolding and curing etc. complete
excluding pointing with all lifts as directed (35%
mortar) (Cement 2.00 bags/Cum)
38 ITEM NO. 38 : Providing and laying cement As Directed by
plaster 6 mm thick in C.M. 1:3 single coat Engineer-In-
without neru finish to concrete surface in all Charge
Sqm 114.60 64.18
position including centering, scaffolding, curing
etc. complete as directed. (Cement 0.057
bags/Sqm)

29
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
Section C : Canal Structures
39 ITEM NO. 39 : Providing and laying in situ Section CC
cement concrete of grade M-10 of trap/ granite /
quartzite / graded metal for foundation and
bedding with Batching Plant and Transit Mixer
including placing, centering, shuttering,
compacting, curing, etc. complete with all lifts as
directed.
(A) M-10 (20 MSA) (Cement 4.4 bags/Cum) Cum 4163.45 910.38
(B) M-10 (40 MSA) (Cement 4.4 bags/Cum) Cum 4163.45 910.38
(C) M-10 (80 MSA) (Cement 4.33 bags/Cum) Cum 4098.15 910.38
40 Item No. 40 : Providing and laying in situ Section CC
cement concrete of grade M-15 of trap / granite
/ gneiss / quartzite / graded metal for foundation
and bedding by Batching Plant & Transit Mixer
including centering,shuttering, scaffolding,
placing, compacting, curing etc. complete with all
lifts as directed.
(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4439.80 910.38
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4311.90 910.38
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4214.35 910.38
41 Item No. 41 : Providing and laying in situ Section CC
cement concrete of grade M-15 of trap / granite
/ gneiss / quartzite / graded metal for RCC works
of retaining walls, piers, abutments, etc. with
Batching Plant and Transit mixer including
centering,shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts as
directed.

(A) M-15 (20 MSA) (Cement 5.64 bags/Cum)


i) For Abutment, wing walls, returns,
Cum 5550.05 1316.71
transition walls
ii) For Piers Cum 5680.00 1357.55
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum)
i) For Abutment, wing walls, returns,
Cum 5422.10 1316.71
transition walls
ii) For Piers Cum 5567.70 1373.16
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum)
i) For Abutment, wing walls, returns,
Cum 5329.35 1316.71
transition walls
ii) For Piers Cum 5474.95 1373.16

30
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
42 Item No. 42 : Providing and laying in situ Section CC
cement concrete of grade M-20 of trap / granite
/ gneiss / quartzite / graded metal for RCC works
of RCC works of abutment, wing walls, returns,
transition walls, piers, columns, beams and slabs,
diaphram walls, road slabs trough (Box Culvert)
trough for aqueduct, wearing coat, etc. . with
Batching Plant and Transit mixer including
centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts as
directed.

(A) M-20 (20 MSA) (Cement 6.60 bags/Cum)


i) For Abutment, wing walls, returns,
Cum 5809.55 1316.71
transition walls
ii) Piers Cum 5955.15 1373.16
iii) Columns Cum 7993.15 2163.29
iv) Beams and slabs Cum 8355.85 2119.87
v) Road Slab, kerb, super passage/slab
Cum 8114.45 2037.38
culvert etc.
vi) Trough resting on ground Cum 7403.00 1794.26
vii) Trough for aqueduct Cum 9018.10 2343.04
viii) Wearing Coat and other required concrete Cum 4251.40 736.73

(B) M-20 (40 MSA) (Cement 6.08 bags/Cum)


i) abutment/retaining walls/wing
Cum 5660.00 1316.71
walls/Transition walls
ii) pier Cum 5805.60 1373.16
43 Section CC
Item No. 43 : Providing and laying in situ
cement concrete of grade M-25 of trap / granite
/ gneiss / quartzite / graded metal for RCC works
of columns, beams and slabs, diaphragm walls,
Road slabs trough (Box Culvert) trough for
aqueduct, wearing coat, etc. with Batching Plant
and Transit mixer including centering, shuttering,
scaffolding, placing, compacting, curing etc.
complete with all lifts as directed.

(A) M-25 (20 MSA) (Cement 7.62 bags/Cum)


i) Columns Cum 8268.85 2163.29
ii) Beams and slabs Cum 8631.60 2119.87
iii) Road Slab, kerb, super passage/slab
Cum 8390.15 2037.38
culvert etc.
iv) Trough resting on ground Cum 7678.70 1794.26
v) Trough for aqueduct Cum 9330.35 2358.65
vi) Wearing Coat Cum 4527.10 736.73

31
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
44 Section CC
Item No. 44 : Providing and laying in situ
cement concrete of grade M-30 for trough of
aqueduct etc. of trap / granite / gneiss / quartzite /
graded metal with Batching Plant and Transit
mixer including centering, shuttering, scaffolding
including placing, compacting, curing etc.
complete with all lifts as directed.

(A) M-30 (20 MSA) for trough of aqueduct


Cum 9683.95 2358.65
(Cement 9.20 bags/Cum)
(B) M-30 (20 MSA) for slab (Cement 9.20
Cum 8985.15 2119.87
bags/Cum)
45 ITEM NO. 45 : Providing and laying Section CC
expansion / construction joint with 18 SWG
copper plate and shalitex expansion pad
below and above the copper plate including
sealing the joint with shalitex sealing compound
including 50 x 50 x 5 mm angle frame with
stainless steel bolts etc as directed. (For all slab
thickness)
A) 60 cm wide copper plate Sqm 15193.25 480.50
B) 37.50 cm wide copper plate Sqm 17608.10 768.80
46 ITEM NO. 46 : Providing and laying expansion Section CC
/ construction joint with shalitex super
expansion pad (jute fiber) 12 mm thick
Sqm 1309.40 192.96
including sealing the joint with shalitex sealing
compound etc. complete as directed (For all slab
thickness).
47 Section CC
ITEM NO. 47 : Providing and fixing G.I. sheet 24
gauge and 22.5 cm. wide for the construction
joint in R.C.C. trough wall including cutting 15 Rmt 132.00 35.74
cm. overlap, riveting the joints and fixing in
position etc. complete as directed.
48 Section St
ITEM NO. 48 : Providing and fixing in position
TMT - FE - 500 bar reinforcement of various
diameters for R.C.C. pile caps, footings,
foundations, slabs, beams columns, canopies,
staircase, newels, chajjas, lintels pardis,
MT 69594.25 8571.26
copings, fins, arches etc. as per detailed
designs, drawings and schedules. including
cutting, bending, hooking the bars, binding with
wires or tack welding and supporting as required
complete as directed.

Centering Items
49 Section CC
Item No. 49 : Providing, erecting and laying 3.11 and As
steel shuttering formwork and making surface Directed by
suitable for concreting including dismantling etc. Engineer-In-
complete as directed. Charge

(a) for abutments, piers, wings, returns


Sqm 447.90 173.65
etc.complete
(b) For RCC Solid/Deck slab/Box Cells/ Trough of
Sqm 508.20 173.65
Aqueduct etc.
(c ) For curved surface Sqm 537.50 208.39

32
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
50 Item No. 50 (a) Providing and erecting steel Section CC
props centering up to 3.00 m height including 3.11 and As
Sqm 251.75 108.54
bracing, strengthening and dismantling etc. Directed by
complete as directed. Engineer-In-
(b) Rate for centering for every Additional 1.00 m Charge
Sqm 91.45 54.27
height
U.C.R. Masonry
51 Section M
ITEM NO. 51 : Providing U.C.R. masonry in
C.M. 1:5 in foundation upto 0.5 m above G.L.
with lift upto 1.5 m. including striking joints, curing Cum 2394.35 451.26
etc. complete as directed.
A)Thickness of wall upto 1 m. (30% mortar)
B) Walls of water retaining structures thinner
than 1.0 m. and walls of structures thicker than
Cum 2413.90 358.43
1.0 m. other than dams and water retaining
structures. (35% mortar).
C) For dams and water retaining structures (45%
Cum 2635.95 358.43
mortar) .
52 ITEM NO. 52 : Providing U.C.R. masonry in Section M
C.M. 1:6 in foundation upto plinth with lift upto
1.5 m. including striking joints, curing etc.
complete as directed.
(A) : (30% mortar). Cum 2318.65 451.26
(B) : (35% mortar) Cum 2358.05 391.81
(C) : (45% mortar). Cum 2553.10 391.81
53 Section M
ITEM NO. 53 : Providing U.C.R. masonry in
C.M. 1:5 in superstructure with lift upto 1.5 m.
including striking joints etc. complete as directed

A) Thickness of walls upto 1 m. (30% mortar) Cum 2416.90 473.83


B) Walls of water retaining structures thinner than
1.0 m. and walls of structures thicker than 1.0 m.
Cum 2431.80 376.34
other than dams and water retaining structures.
(35% mortar).
C) For dams and water retaining structures
Cum 2653.85 376.34
(45% mortar) .
54 Section M
ITEM NO. 54 : Providing khandki facing to the
face of masonry with pointing in C.M. 1:2
including finishing to the required shape & slope
with necessary centering, scaffolding, curing etc.
complete as directed. (It is assumed that the
Khandkis are of the size 20cm x 20cm. No mortar
for jointing is taken into account, only face
pointing of joint is considered).

A) with khandki facing on one side Sqm 2486.70 106.86


B) with khandki facing on both side. Sqm 4866.50 106.86
55 ITEM NO. 55 : Providing and laying dry stone Section M
rubble masonry excluding pointing etc. Cum 1168.75 279.96
complete as directed.
56 ITEM NO. 56 : Providing pointing with cement As Directed by
mortar for stone masonry including racking Engineer-In-
joints, centering, scaffolding, curing etc. complete Charge
as directed.
(A) In Cement mortar 1:3 Sqm 50.75 36.54
(B) In Cement Mortar 1:2 Sqm 55.30 36.90

33
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
57 ITEM NO. 57 : Providing and constructing Section M
coarse rubble masonry II sort in C.M. 1:4.5 for
super structure with lift upto 1.5m. including Cum 5317.45 758.94
striking joints, curing etc. complete as directed.
(30% mortar)
58 ITEM NO. 58 : Cutting rectangular grooves of As Directed by
size 10 cm. x 10 cm. in stone masonry Engineer-In-
including clearing pointing etc. to facilitate Charge Rmt 1302.40 1302.40
smooth working of needles etc. complete as
directed.
59 ITEM NO. 59 : Providing and laying rough As Directed by
dressed cut stone coping 23 cm. thick in C.M. Engineer-In-
1:5 excluding cement pointing but including Charge Cum 6349.50 2924.05
watering with lift upto 1.5 m.etc. complete as
directed.
60 Section M
ITEM NO. 60 : Providing coalgrout U.C.R.
masonry in C.M. 1:3 (43% mortar) proper
packing rubble and of the required shape and
quality with the coalgrout at required pressure Cum 3144.35 381.61
with lift upto 1.5 m. including centering,
scaffolding, watering etc. complete as directed.
(Excluding formwork and staging)
BRICK MASONRY

61 ITEM NO. 61 : Providing B.B. masonry with As Directed by


conventional I.S. type bricks for super structure Engineer-In-
including striking joints, watering, centering, Charge Cum 5289.55 540.97
scaffolding with lift upto 1.5 m., including cost of
material etc. complete as Directed.
62 ITEM NO. 62 : Providing B.B. masonry with As Directed by
conventional I.S. type bricks in cement mortar 1:5 Engineer-In-
in super structure upto floor level including mild Charge
steel reinforcement of 2 bars of 6 mm dia. placed
sqm 732.50 74.75
by every 3rd course properly bent, bounded at
ends,centering, scaffolding, watering etc.
complete with all lift. including cost of material
etccomplete as directed.
PIPE LAYING
63 As Directed by
ITEM NO. 63 A: Providing R.C.C. pipe of NP2 Engineer-In-
class conforming to IS 458-2003 of following Charge
diameter including cost of all material and labour
required, inspection charges, transportation to
stores, transit insurance, loading, unloading and
stacking excluding GST levied by GOI and GOM
in all respect etc. complete as directed.

34
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
a) 1200 mm dia Rmt 4080.00
b) 1000 mm dia Rmt 2880.00
c) 900 mm dia Rmt 2448.00
d) 800 mm dia Rmt 2016.00
e) 600 mm dia Rmt 1380.00
f) 450 mm dia Rmt 780.00
As Directed by
ITEM NO. 63 B: Laying and jointing R.C.C.
Engineer-In-
pipe of NP2 class or IRC standard in C.M. 1:2,
Charge
proportion by volume including cost of all
materials (excluding pipes and collars), labour,
aligning pipes, batching and mixing mortar,
packing joints with hemp and mortar, finishing,
curing etc. complete with all lifts as directed.
a) 1200 mm dia Rmt 491.75 313.70
b) 1000 mm dia Rmt 367.25 234.78
c) 900 mm dia Rmt 354.10 234.78
d) 800 mm dia Rmt 340.75 234.78
e) 600 mm dia Rmt 262.55 195.31
f) 450 mm dia Rmt 203.70 155.84
64 ITEM NO. 64 A:Providing R.C.C. pipe of NP3 As Directed by
class conforming to IS 458-2003 of following Engineer-In-
class and diameter including cost of all material Charge
and labour required, inspection charges,
transportation to stores, transit insurance,
loading, unloading and stacking excluding GST
levied by GOI and GOM in all respect etc.
complete as directed.
a) 1200 mm dia Rmt 6540.00
b) 900 mm dia Rmt 4200.00
As Directed by
ITEM NO. 64 B: Laying and jointing R.C.C.
Engineer-In-
pipe of NP3 class or IRC standard in C.M. 1:2,
Charge
proportion by volume including cost of all
materials (excluding pipes and collars), labour,
aligning pipes, batching and mixing mortar,
packing joints with hemp and mortar, finishing,
curing etc. complete with all lifts as directed.
a) 1200 mm dia Rmt 585.85 407.82
b) 900 mm dia Rmt 424.55 305.21
65 As Directed by
ITEM NO. 65 : Laying and jointing R.C.C. pipe Engineer-In-
of P1 class of 900 mm dia or IRC standard in Charge
C.M. 1:2, proportion by volume including cost of
all materials (excluding pipes and collars), labour, Rmt 424.55 305.21
aligning pipes, batching and mixing mortar,
packing joints with hemp and mortar, finishing,
curing etc. complete with all lifts as directed.

66 Item No. 66 : Providing and laying in situ Section CC


cement concrete of grade M-20 of trap / granite
/ gneiss / quartzite / graded metal for Staunch
wall with Batching Plant and Transit Mixer Cum 8890.20 2622.86
including centering, shuttering, scaffolding,
placing, compacting, curing with all lifts etc.
complete as directed.

35
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
67 As Directed by
ITEM NO. 67 : Providing and fixing RCC Engineer-In-
Boundary/Guard/Chainage blocks of size 75 x Charge
20 x 20 cm including excavation and fixing in a
No 739.55 158.75
block of 45 x 45 x 45 cm in M-15 Concrete with
oil painting of two coats, lettering etc. complete,
height of stone above GL 40 cm. as directed

68 ITEM NO. 68 :Providing and fixing RCC As Directed by


Km/half km/submergency boundary blocks of Engineer-In-
size 95 x 20 x 20 cm including excavation and Charge
fixing in a block of 45 x 45 x 45 cm in M-15 No 879.65 233.92
Concrete with oil painting of two coats, lettering
etc. complete as directed. (height of stone above
GL 60 cm.)
69 As Directed by
Engineer-In-
ITEM NO. 69 : Providing and fixing canal
Charge
information board of 1.2x0.75 m prepared on
16 gauge M.S. sheet with angle iron frame of
size 35x35x3 mm with cross bracing of size
25x25x3 mm including painting with one coat of
zinc chromate storing primer and two coats each
of green/white back ground and back side grey
store enamelled bonded with red retro reflective
sheet Engineering grade, border/letters/numeral /
arrows coated with non pealable crystal clear
No 5843.35 2138.98
protective transparent coat retaining 100%
reflection including two angle iron post of size
50x50x5 mm of 3.65 m long inflated at bottom
drilled on top and painted in white and black
bonds of 30 cm with four numbers high strength
of G.I. bolts and nuts of size 10 mm dia. and 20
mm long sheet and angle iron post in one piece
without joints including all taxes, conveying, fixing
in ground with cement concrete in M-15 block of
size 60x60x75 cm as directed.

70 ITEM NO. 70 : Providing and laying rubble As Directed by


soling below foundation in layers including Engineer-In-
Charge Cum 1056.90 486.98
filling with rubble chips, murum etc. complete as
directed.
71 As Directed by
ITEM NO. 71 : Back filling up to ground level
Engineer-In-
behind the canal structures etc. complete with
Charge
suitable material of approved quality in layers not Cum 41.30 2.93
exceeding 20 cm without disturbing the structure
etc. complete as directed.

36
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
72 As Directed by
ITEM NO. 72 : Providing and constructing Engineer-In-
contraction joints by fixing 310 mm wide Charge
central bulb type approved quality PVC water
stop in two lines with 8 mm dia. Steel dowel rods
on either side at 1 m interval, forming 125*125
size groove in between 2 water stops for filling
asphalt, fixing 15 mm dia. two legged G.I. pipe Rmt 1952.70 165.82
with U-bend at bottom for circulating steam at
interval and forming 150 mm ida. formed drain
behing water seals including cost of all materials,
machinery, labour, filling asphalt in groove,
circulation of steam at intervals, vulcanizing water
seal joints etc. complete with all lifts as directed.

37
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

SECTION-4

TUNNEL WORKS

ITEM NO. 73 TO 83
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2021-2022
SECTION 4:- TUNNEL WORKS
Rate for 2021-22
(Rate in Rs.)
Sr.No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
73 Item no. 73 - Excavation of tunnel through adit /
itself in all types of rock by drilling and smooth control
perimeter blasting, mucking, disposing muck in muck
yard, lighting, ventilation inside tunnel including
dewatering with initial lead of 1 Km (From average Section T Cum 2192.00 784.43
face to Dump yard including length of Adit) etc.
Complete

74 Item no. 74- Excavation of tunnel through Shaft in


all types of rock by drilling and smooth control
perimeter blasting, mucking, disposing muck in muck
yard, lighting, ventilation inside tunnel including Section T Cum 2655.00 785.73
dewatering with initial lead of 1 Km (From average face
to Dump yard) etc. Complete.

75 Item no. 75- Excavation of Shaft in all types of rock


by drilling and smooth control perimeter blasting,
mucking, disposing muck in muck yard, lighting,
ventilation inside tunnel including dewatering with initial Section T Cum 2485.00 1053.83
lead of 500 m (From top of shaft to Dump yard) etc.
Complete.
76 Item no. 76A - Providing and fixing steel rock bolts of
25 mm diameter and 3.10 m length with resin bond
cement capsule anchorage through adit / itself
including drilling holes, inserting grout capsule, driving
bolt, fixing 10 mm thick plate and nuts and tightening Section RB,
No. 2784.00 239.80
the same by torque wrench after hardening of cement Section T
grout, cost of all materials, machinery, labour,
ventilation, lighting, drainage and other ancillary
operations etc complete with all lifts.

76 Item no. 76B - Providing and fixing steel rock bolts of


25 mm diameter and 3.10 m length with resin bond
cement capsule anchorage through shaft including
drilling holes, inserting grout capsule, driving bolt, fixing
10 mm thick plate and nuts and tightening the same by
torque wrench after hardening of cement grout, cost of Section RB,
No. 3004.00 239.80
all materials, machinery, labour, ventilation, lighting, Section T
drainage and other ancillary operations etc complete
with all lifts.

77 Item no. 77A - Providing and fixing anchor bar of 25


mm diameter 3.375 m length with resin bond cement
capsule anchorage through adit / itself including
drilling holes, inserting grout capsule, driving anchor,
As Directed by
cost of all materials, machinery, labour, ventilation,
lighting, drainage and other ancillary operations etc Engineer-In- No. 2532.00 204.04
complete with all lifts as Directed . Charge

38
Rate for 2021-22
(Rate in Rs.)
Sr.No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
77 Item no. 77B - Providing and fixing anchor bar of 25
mm diameter 3.375 m length with resin bond cement
capsule anchorage through shaft including drilling
holes, inserting grout capsule, driving anchor, cost of As Directed by
all materials, machinery, labour, ventilation, lighting, Engineer-In- No. 2576.00 204.04
drainage and other ancillary operations etc complete Charge
with all lifts as Directed .

78 Item no. 78A - Providing and fixing anchor bar of 32


mm diameter 4.32 m length with resin bond cement
capsule anchorage through adit/ itself including
drilling holes, inserting grout capsule, driving anchor,
As Directed by
cost of all materials, machinery, labour, ventilation,
lighting, drainage and other ancillary operations etc Engineer-In- No. 3260.00 204.04
complete withall lifts as Directed . Charge

78 Item no. 78B - Providing and fixing anchor bar of 32


mm diameter 4.32 m length with resin bond cement
capsule anchorage through shaft including drilling
holes, inserting grout capsule, driving anchor, cost of
As Directed by
all materials, machinery, labour, ventilation, lighting,
drainage and other ancillary operations etc complete Engineer-In- No. 3304.00 204.04
with all lifts as Directed. Charge

79 Item no. 79A - Providing, fabricating and fixing in


position permanent structural steel supports
through adit / itself as per details including cost of all
materials, machinery, labour, cutting, bending, welding, Section T MT 101209.00 ---
grinding, lighting, ventilation, drainage and all other
ancillary operations etc complete with all lifts.

79 Item no. 79B - Providing, fabricating and fixing in


position permanent structural steel supports
through shaft as per details including cost of all
materials, machinery, labour, cutting, bending, welding, Section T MT 103665.00 ---
grinding, lighting, ventilation, drainage and all other
ancillary operations etc complete with all lifts.

80 Item no. 80A- Providing, fabricating and placing in


position reinforcement steel for tunnel RCC works
through adit / itself including cleaning, straightening,
cutting, bending, hooking, lapping, welding joints Section T,
wherever required tying with binding wire including cost MT 76424.00 ---
SectionST
of all materials, machinery, labour, lighting, ventilation,
drainage etc. complete with all lifts.

39
Rate for 2021-22
(Rate in Rs.)
Sr.No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
80 Item no. 80B- Providing, fabricating and placing in
position reinforcement steel for tunnel RCC works
through shaft including cleaning, straightening,
cutting, bending, hooking, lapping, welding joints Section T,
wherever required tying with binding wire including cost MT 79816.00 ---
SectionST
of all materials, machinery, labour, lighting, ventilation,
drainage etc. complete with all lifts.

81 Item no. 81 A - Providing and applying wet shotcrete


(M-25 : 10MSA) 50 mm thick in two layers through
adit / itself of tunnel including admixtures, neccessary
machinery , labours ,scaffolding, lighting, drainage, Section T,
sqm 471.24 29.26
ventilation with providingand all other ancillary SectionSC
operations etc., complete with all lifts.

81 Item no. 81 B - Providing and applying wet shotcrete


(M-25 10MSA) 50 mm thick in two layers through
shaft of tunnel including admixtures, neccessary
machinery , labours ,scaffolding, lighting, drainage, Section T,
ventilation with providingand all other ancillary sqm 725.75 29.26
SectionSC
operations etc., complete with all lifts.

82 Item no.82A Providing and laying insitu vibrated M20


grade cement concrete using 20 mm clean, hard,
graded aggregates for side and arch lining of tunnel
through adit / itself including cost of all materials,
machinery, labour, formwork, batching, mixing, Section T,
conveying upto placing point in agitator car, placing in Section CC, Cum 7975.00 1418.62
position, laying, vibrating, finishing, curing, ventilation, Section L
lighting, draining and all other ancillary operations etc.,
complete with all lifts for Tunnel.

82 Item no.82B- Providing and laying insitu vibrated M20


grade cement concrete using 20 mm clean, hard,
graded aggregates for side and arch lining of tunnel
through shaft including cost of all materials,
machinery, labour, formwork, batching, mixing, Section T,
conveying upto placing point in agitator car, placing in Section CC, Cum 8184.75 1418.62
position, laying, vibrating, finishing, curing, ventilation, Section L
lighting, draining and all other ancillary operations etc.,
complete with all lifts for Tunnel.

83 Item no. 83A- Providing and laying insitu vibrated M-20


grade cement concrete using 20 mm clean, hard,
graded aggregates for Invert (Kerb and bed) lining
of tunnel through adit / itself including cost of all
materials, machinery, labours, formwork, batching, Section T,
mixing, conveying upto placing point in agitator car, Section CC, Cum 5663.00 623.18
placing in position, laying, vibrating, finishing, curing, Section L
ventilation, lighting, draining and all other ancillary
operations etc., complete with all lifts for Tunnel

40
Rate for 2021-22
(Rate in Rs.)
Sr.No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
83 Item no. 83B Providing and laying insitu vibrated M-20
grade cement concrete using 20 mm clean, hard,
graded aggregates for Invert (Kerb and bed) lining
of tunnel through shaft including cost of all materials,
machinery, labours, formwork, batching, mixing, Section T,
conveying upto placing point in agitator car, placing in Section CC, Cum 5795.55 623.18
position, laying, vibrating, finishing, curing, ventilation, Section L
lighting, draining and all other ancillary operations etc.,
complete with all lifts for Tunnel.

41
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

SECTION-5

SURVEYING AND INVESTIGATION

ITEM NO. 84 TO 100


GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 5 :- SURVEYING AND INVESTIGATION
Rate for 2021-22
( Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
84 Item No. 84 : As Directed by
Double levelling using Auto level to connect Engineer-In-
Geodetic Trignometrical survey, bench mark and Charge
establishing permanent bench mark at Dam site at Km. 1014.25 953.25
place along the canal alignment, submergence and in
command area etc. complete, as directed.
(Excluding cost of B.M. structure)
85 Item No. 85 : As Directed by
Block contour survey of 10m x 10m grid (Not less Engineer-In-
than 121 raw data points distributed uniformly Charge
over a Hector) for irrigation projects using digital
state of art Total Station / DGPS, including transfer
of entire data to computer system in different
georeferential layer / themes using features of
standard plotting Softwares compatible with canal
irrigation system design Software packages including
contour plotting at specified interval and scale. The
test print of the drawing shall be approved by
Engineer-in-charge and the same shall be delivered
in a CD format as well as hard copy in six numbers
including one print on tracing paper, as directed.

(A) Total Station Ha. 751.55 575.07

(B) DGPS Ha. 266.10 136.33

86 Item No. 86 : As Directed by


Block contour survey of 15 m x 15 m grid (Not Engineer-In-
less than 64 raw data points distributed uniformly Charge
over a Hector) for irrigation projects using digital
state of art Total Station / DGPS, including transfer
of entire data to computer system in different
georeferential layer / themes using features of
standard plotting Softwares compatible with canal
irrigation system design Software packages including
contour plotting at specified interval and scale.The
test print of the drawing shall be approved by
Engineer-in-charge and the same shall be delivered
in a CD format as well as hard copy in six numbers
including one print on tracing paper,as directed.

(A) Total Station Ha. 505.90 387.10


(B) DGPS Ha. 179.15 91.80

42
Rate for 2021-22
( Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
87 Item No. 87 : As Directed by
Block contour survey of 20m x 20m grid (Not less Engineer-In-
than 36 raw data points distributed uniformly over Charge
a Hector) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
design Software packages including contour plotting
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge and
the same shall be delivered in a CD format as well as
hard copy in six numbers including one print on
tracing paper,as directed.

(A) Total Station Ha. 379.50 290.35

(B) DGPS Ha. 134.35 68.85


88 Item No. 88 : As Directed by
Block contour survey of 30m x 30m grid (Not less Engineer-In-
than 25 raw data points distributed uniformly over Charge
a Hactor) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
design Software packages including contour plotting
at specified interval and scale.The test print of the
drawing shall be approved by Engineer-in-charge and
the same shall be delivered in a CD format as well as
hard copy in six numbers including one print on
tracing paper, as directed.

(A) Total Station Ha. 260.40 199.25

(B) DGPS Ha. 92.20 47.25


89 Item No.89 : As Directed by
Block contour survey of 60m x 30m grid (Not less Engineer-In-
than 15 raw data points distributed uniformly over a Charge
Hector) for irrigation projects using digital state of art
Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
design Software packages including contour plotting
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge and
the same shall be delivered in a CD format as well as
hard copy in six numbers including one print on
tracing paper,as directed.

(A) Total Station Ha. 133.95 102.50


(B) DGPS Ha. 47.40 24.30

43
Rate for 2021-22
( Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
90 Item No. 90 : As Directed by
Block contour survey of 150m x 30m grid (Not less Engineer-In-
than 5 raw data points distributed uniformly over a Charge
Hector) for irrigation projects using digital state of art
Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
design Software packages including contour plotting
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge and
the same shall be delivered in a CD format as well as
hard copy in six numbers including one print on
tracing paper,as directed.

(A) Total Station Ha. 59.55 45.55


(B) DGPS Ha. 21.05 10.80
91 Item No. 91 : As Directed by
Carrying out line survey with digital state of art Engineer-In-
Total Station for fixing FRL / HFL including C/s Charge
survey with levels at 20m interval/ survey for 'L'
section of alternative Dam site OR 'L' section of river
1Km u/s OR 1Km D/s of alternative Dam site etc
complete including station, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting Soft
Km. 744.10 569.40
wares compatible with canal irrigation system design
Soft wares packages including contour plotting at
specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge and
the same shall be delivered in a CD format as well as
hard copy in six numbers including one print on
tracing paper as directed.

92 Item No. 92 : As Directed by


Survey for main canal, branches, distributaries Engineer-In-
with digital state of art Total Station on falling Charge
contour including investigation of alternative line,
taking falling contour fixing canal line, taking 'L'
section and cross section on final line and
distributaries survey including transfer of entire data
to computer system in different georeferential layer/
themes using features of standard plotting Softwares
Km. 892.90 683.30
compatible with canal irrigation system design
Softwares packages including contour plotting at
specified interval and scale. Absolutely linear survey
for all types of canals (Length of survey for L-section
and cross sections to be measured separately for
payment) etc complete,as directed. (Excluding fixing
apex / chainage stones)

44
Rate for 2021-22
( Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
93 Item No. 93 : As Directed by
Preparation of detailed construction plan for pipe Engineer-In-
distribution network system including necessary Charge
command survey, linear survey for pipe laying, chak
planning, designing of pipe network, and preparation
of estimates,as directed.

Ha.
A) Total Station 1029.65 588.74
CCA
Ha.
B) DGPS 544.20 150.00
CCA
94 Item No. 94 : As Directed by
Providing permanent bench mark dressed stone Engineer-In-
of basalt, granite or gniess of size 30cm X 30cm X Charge
45cm at least 15Cm below the ground and
embedding it to a depth of 30cm in grade M-15 insitu
concrete of size 90cm X 90cm X 60cm deep over 1M No. 5157.80 434.84
deep foundation concrete of grade M-10 including
excavation, concrete, providing and fixing dressed
stone and backfilling the pit up to ground level with
sand etc. complete,with all lifts as directed.

95 Item No. 95 : As Directed by


Fixing precast RCC alignment blocks (Pillar) on Engineer-In-
alternative dam site finally approved of size 900 x Charge
175 x 100 mm at 90 M interval including fixing in 517.95 43.71
No.
1:3:6 (600 x 450 x 450mm) cement concrete,
excavation, backfilling and coloring etc.with all lifts as
directed.

96 Item No. 96 : As Directed by


Supplying labour for Double levelling to connect Engineer-In-
Geodetic Trignometrical Survey Bench Mark and Charge
establishing the Permanent Bench Mark at Dam site
at place along the canal alignment submergence and Km. 1113.10 1113.10
in command area etc.as directed.(Excluding cost of
P.B.M. structure)

97 Item No.97 : As Directed by


Taking trial bore for detailed investigation with NX Engineer-In-
diamond drill double tube in all sorts of strata like Charge
soft murum, hard murum and boulders including all
materials such as casing pipes, accessories, grease,
steel boolsam and other such materials and or as
required including conveying such materials and
machinery to site of works, preserving the loose
samples in glass/plastic jar and core samples serially
numbered at site of work and conveying the same to
the head quarter of concerned office and submission
of detailed bore log sheet etc complete,as directed.
(Excluding Core Box)

(A) Over Burdon (soil of all sorts, soft,murum,hard


Rmt. 2069.00 409.00
murum, boulders and soft rock)

(B) Hard Rock Rmt. 3864.00 476.00

45
Rate for 2021-22
( Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
98 Item No.98: As Directed by
Providing core box of M.S.of size 1.25m x 0.35m x Engineer-In-
0.15m for preserving core sample with all fixtures and Charge
fastening handles including locking arrangement etc. No. 3864.95 0.00
complete,as directed.

99 Item No.99 : As Directed by


Carrying out water intake test / permeability test Engineer-In-
at any stage or depth by filling the bore hole with Charge
water or air at specific pressure of specified limit as Test 718.95 375.08
and where ,as directed.

100 Item No. 100 : As Directed by


Excavation for taking trial pits on final alignment Engineer-In-
of dam and canal at specified interval and in Nalla- Charge
bed of size 2.00 x 2.00 x 2.50mtr. in length, breadth
Cum. 135.75 19.96
and depth respectively or Various sizes including
backfilling trial pits etc. complete,with all lifts as
Directed

46
NMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

SECTION-6

HYDROMETEROLOGY

ITEM NO. 101 TO 107


GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 6 :- HYDROMETEOROLOGY
Rate for 2021-22
Sr. (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed
Labour
Item
1 2 3 4 5 6
101 Item No.101 : Standard Rain Gauge Station
(Measurement Clerk)
Providing person to take measurement at every morning As Directed by
8:30 am to SRG station, taking the entry in the register. Engineer-In- Per Month 1582.80 1582.80
Sending the reading daily to Sub-Dn by SMS & monthly Charge
progress (reading) to Sub-Dn, including taking care of
instruments established on the station. As Directed.

102 Item No. 102 : Autographic Rain Gauge


(Measurement Clerk)
Providing person to take measurement at every morning
8:30 am of autographic rain gauge station including As Directed by
changing graph at 8:30 am, taking reading in the register, Engineer-In- Per Month 3391.70 3391.70
also sending reading to Sub-Dn by SMS & monthly Charge
progress (reading) sending to Sub-Dn, with taking care of
instruments established on the station. As Directed.

103 Item No. 103 : Full climatic station


[Measurement Clerk]
Providing person to take reading from the below
mentioned scientific instruments established in the F.C.S
Station including taking reading in the register as per
prescribed Proforma given by the Sub-Dn, also sending As Directed by
to concern Sub-Division in the precribed Proforma time to Engineer-In- Per Month 21707.00 21707.00
time. As Directed. Charge
Scientific instruments
1) ARG, 2) SRG, 3) Pan Evaporimeter, 4) Pan Water
Temperature, 5) Thermometer [Dry, Wet, Minimum,
Maximum], 6) Thermo hygrograph, 7) Anemometer, 8)
Wind Vane, 9) Sunshine Recorder.
104 Item No. 104 : Gauge Discharge (Gauge Inspector)
Providing Gauge Inspector to take hourly gauge
measurements in the river in rainy & other season taking As Directed by
all reading in the register & sending to concern Sub- Engineer-In- Per Month 22358.20 22358.20
Division as per instruction in the precribed proforma Charge
including accidental insurance. As Directed.
105 Item No. 105: Gauge Discharge ( Measurement
Clerk)
Providing measurement Clerk to take measurement by
winch & Cradle with current meter or by float method
from required compartment in the flood season, taking
As Directed by
measurements as per instruction given by concern
Engineer-In- Per Month 22358.20 22358.20
Engineer, taking Water levels in four times daily,
Charge
changing paper of AWLR and Calculating Velocity as per
given area. Taking all readings in the register, sending to
Concern Sub-Division as per instructions in the
prescribed proforma, including accidiental insurance. As
Directed.

47
Rate for 2021-22
Sr. (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed
Labour
Item
1 2 3 4 5 6
106 Item No. 106 : Gauge Discharge (Boat Driver)
Providing boat driver ( He must be good swimmer) to
drive the boat for taking measurements at G.D. Stations
near compartment in the Steady position. After taking the As Directed by
measurement bringing back the boat & concern persons Engineer-In- Per Month 22358.20 22358.20
in the boat safely, Installing the boat in out of danger Charge
area etc. complete, including accidiental insurance. As
Directed.

107 Item No. 107 : Gauge Discharge (Boat Chowkidar)


Providing Boat Chowkidar ( He must be good swimmer)
to take care & Security of boat. When the Water Level of As Directed by
river increase or decrease, he must tighten the boat at Engineer-In- Per Month 20635.40 20635.40
safe place & taking care of boat in the night. including Charge
accidiental insurance. As Directed.

48
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22


SECTION-7
VALUATION OF REHABILITATION WORKS

ITEM NO. 108 TO 138


GOVERNMENT OF MAHARASHTRA
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 07:-VALUATION OF REHABILITATION WORKS
Rate for 2021-22 (Rate in
Rs.)
Sr.
Item Specifications Unit
No
Completed Item Labour

1 2 3 4 5 6
108 Item No.108 :

Providing and constructing stone masonry in As Directed by


mud mortar in foundation and plinth including Engineer-In-
scaffolding, finishing etc. complete. As directed. Charge.

(A) Up to Plinth Cum. 1324.05 525.05

(B) Super structure Cum. 1492.10 693.10


109 Item No.109 :

Providing and constructing U.C.R.masonry in As Directed by Cum. 2290.50 525.10


lime 1:6 mortar in foundation and plinth including Engineer-In-
scaffolding, finishing etc.complete.As directed. Charge

110 Item No.110:

Providing second class B.B.masonry with


conventional/ I.S. type bricks in mud mortar in As Directed by
super structures, including racking out joints, Engineer-In-
when plastering is to be done including scaffolding Charge
and watering etc. complete.As directed.

(A) For Super structure Cum. 5438.60 1043.10


(B) For foundation and Plinth Cum. 5229.95 834.45
111 Item No.111 :

Providing and constructing arch like B.B.Masonry


slab roofing in lime mortor including 'I' Section As Directed by Sq.m 2568.25 1043.10
as (150 x 100 mm @ 0.90 mt.C/C) as a bottom Engineer-In-
support and tie rods with shuttering and Charge
scaffolding etc.complete.As directed.

112 Item No.112:

Providing 50 mm. thick mud plaster including As Directed by


Sq.m 182.25 131.95
racking out joints, scaffolding all finishing Engineer-In-
etc.complete.As directed. Charge

113 Item No.113 :

Providing & Constructing Kud Walls with vertical


As Directed by Sq.m 306.10 114.40
posts (100 mm Dia), bamboos (25 mm Dia.) and
Engineer-In-
tur/cotton/Paddy bushes Excluding mud plaster
Charge
etc. complete.As directed.

49
Rate for 2021-22 (Rate in
Rs.)
Sr.
Item Specifications Unit
No
Completed Item Labour

1 2 3 4 5 6
114 Item No.114 :
Providing 25 mm thick mud plaster to kud walls As Directed by
Sq.m 142.95 117.75
including cow dung wash etc.complete.As Engineer-In-
directed. Charge
115 Item No.115 :
Providing & Constructing Kud Walls with
clothing of grass/other vegetation with vertical As Directed by Sq.m 143.40 23.20
(100 mm Dia) posts and bamboos (25 mm Dia At Engineer-In-
450 mm c/c) excluding mud plaster Charge
etc.complete.As directed.
116 Item No.116 :

Providing & constructing Kud walls including As Directed by


Sq.m 586.40 349.90
mud plaster 25 mm thick on both sides with cow Engineer-In-
dung wash etc. complete.As directed. Charge

117 Item No.117 :


Providing & constructing Kud walls, split
As Directed by Sq.m 446.25 234.15
Bamboo knitted together and covered with 12 mm.
Engineer-In-
thick mud plaster on both sides etc. complete. As
Charge
directed.
118 Item No.118 :
Providing & constructing Kud roofing with
As Directed by Sq.m 563.40 235.30
bamboos and balli rafter alongwith tur/cotton
Engineer-In-
bushes excluding mud plater etc.complete. As
Charge
directed.
119 Item No.119 :

Providing & Fixing non teak wood Dhaba


including mud flooring and mud plaster on non As Directed by
Sq.m 5167.20 185.50
teak planks, rested on non teak rafter at 1.5 x 2.5 Engineer-In-
m. intervals, including mud flooring over the planks Charge
etc.complete (Jungle wood Dhaba) As directed.

120 Item No.120 :

Providing & Fixing teak wood Dhaba including


mud flooring and mud plaster on non teak
As Directed by Sq.m 11565.70 185.50
planks, rested on non teak wood rafter 1.5 x 2.5
Engineer-In-
m. intervals, including mud flooring over the planks
Charge
etc.complete (Vertical posts and beams are
considered in Teak wood) As directed.

121 Item No.121 :

Providing & constructing split bamboo mesh As Directed by


Sq.m 347.15 57.85
knitted together including all labour material Engineer-In-
leads and lift etc.complete. As directed. Charge

50
Rate for 2021-22 (Rate in
Rs.)
Sr.
Item Specifications Unit
No
Completed Item Labour

1 2 3 4 5 6
122 Item No.122 :

Providing & constructing mud boulder otta As Directed by


No 1145.45 400.35
(1mx1mx1m) with earthen Ranjan etc.complete. Engineer-In-
As directed. Charge
123 Item No.123 :

Providing & constructing mud Wall including As Directed by


Cum 1952.60 1241.80
preparation of mud mortar including placing Engineer-In-
scaffolding, finishing etc.complete.As directed. Charge

124 Item No.124 :

Providing & fixing non teak doors/windows 40


mm. Thick ledged with 25 mm. Thick plain planked
shutters without ventilators/fan light/iron bars As Directed by Sq.m 5045.55 1665.15
including the frames of the sizes as per standard Engineer-In-
specification, iron fixtures and fastenings and Charge
finishing the wood work with oiling etc.complete.As
directed.

125 Item No.125 :

Providing and fixing non teak doors/window II


class fully pannelled without ventilators/fan
As Directed by Sq.m 7705.80 3788.10
light/iron bars including the frames of the sizes as
Engineer-In-
per standard specification, Iron fixtures and
Charge
fastenings and finishing the wood work with oil
painting etc.complete.As directed.

126 Item No.126 :

Providing & fixing non teak doors ledged and


As Directed by Sq.m 7511.20 3792.00
braced with 20 mm thick, planked shutters
Engineer-In-
including the frame without sill with all fixture and
Charge
fastenings oil painting etc. complete.As directed.

127 Item No.127 :

Providing & fixing Jungle wood door of frame


60 mm x 100 mm for second class door's and
As Directed by Sq.m 3074.25 376.55
window with/without ventilators fan light and clear
Engineer-In-
storey windows including chamfering/ rounding
Charge
rebating and hold fast finishing with one coat of
primer etc. complete.As directed.

51
Rate for 2021-22 (Rate in
Rs.)
Sr.
Item Specifications Unit
No
Completed Item Labour

1 2 3 4 5 6
128 Item No.128 :

Providing and fixing Country Teak wood frame As Directed by


Sq.m 2888.35 818.25
of size 60 mm x 100 mm with G.I. Sheet Shutter Engineer-In-
etc.complete.As directed. Charge
129 Item No.129:

Providing & fixing Country Teak Wood plank


ceiling 12 mm. Thick with planked on
As Directed by Sq.m 2182.10 489.10
underside, longuled and grooved including
Engineer-In-
scaffolding, fixtures with oiling and two coats of
Charge
varnishing etc. complete. (excluding battens and
joists) As directed.

130 Item No.130:


Providing & fixing non teak wood plank ceiling
12 mm. Thick with planked on underside,
As Directed by Sq.m 1225.55 508.25
longuled and grooved including scaffolding,
Engineer-In-
fixtures with oiling and two coats of varnishing etc.
Charge
complete (Excluding battens and joists) As
directed.
131 Item No.131 :

Providing & fixing wooden shelf of country


teak wood plank 30 cm wide and 20 mm thick As Directed by Sq.m 994.45 192.95
with wooden brackets of 50 mm x 50 mm without Engineer-In-
fillets including all fixtures with oil painting etc. Charge
complete. As directed.
132 Item No.132 :

Providing and fixing eaves board (Projection)


As Directed by Sq.m 533.60 36.70
of country teak wood plank 20 cm, x 20 mm.
Engineer-In-
thick plan decorative type including scaffolding &
Charge
painting with 2 coats, etc.complete.As directed.

133 Item No.133 :

Providing & fixing T.W.frame and shutter to


wall cupboard made of 25 mm. thick particle
As Directed by Sq.m 3513.55 1243.85
board one face with approved colour laminated
Engineer-In-
face borided with phenol formal desynthetic
Charge
lipping, beading oxidised iron fixtures & oil primer
coat etc. complete. As directed.

52
Rate for 2021-22 (Rate in
Rs.)
Sr.
Item Specifications Unit
No
Completed Item Labour

1 2 3 4 5 6
134 Item No.134 :

Providing & fixing xpm Jalli with teak wood/ non As Directed by
teak wood frame including fixing painting etc. Engineer-In-
complete.As directed. Charge

i) Non teak wooden frame into wooden bar Jalli.


Sq.m 1967.35 698.65

ii) N.T.Wooden frame & M.S.Bar Sq.m 1190.50 401.90


iii) Country teak wooden frame with M.S.bar
Sq.m 1856.70 388.70
iv) xpm. Jalli with T.W. wooden frame (18 gauge)
Sq.m 1756.15 390.65

v) Providing and fixing xpm jalli (18 gauge) with


non teak wood frame including fixing oiling Sq.m 1089.95 403.95
etc.complete.

135 Item No.135 :

Providing & fixing half round single country As Directed by


Sq.m 799.60 369.80
tiled roofing over bamboo battens including nails, Engineer-In-
battens etc. complete. As directed. Charge

136 Item No.136 :

Providing and fixing medium grade G.I. pipe ( As Directed by


Rmt. 534.60 48.60
50 mm. dia.) below C.G.I sheet roofing Engineer-In-
etc.complete.As directed. Charge

137 Item No.137 :

As Directed by Rmt. 312.05 51.95


Providing & fixing M.S.angle of size 50 x 50 x 6
Engineer-In-
mm.etc complete.As directed.
Charge
138 Item No.138 :

Providing & fixing half round single country


As Directed by Sqm 903.90 345.10
tiled roofing over bamboo mats laid on half split
Engineer-In-
bamboo battens including all fastenings
Charge
etc.complete.As directed.

53
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

SECTION-8

FLOW MEASURING DEVICES

ITEM NO. 139 TO 142


GOVERNMENT OF MAHARASHTRA, WATER RESOUCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 8:- FLOW MEASURING DEVICES
Rates for 2021-22
(Rates in Rs.)
Sr. No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
139 Item No 139 Providing and fixing gauge plate As Directed by
of FRP sheet very sturdy bothsides ,gelcoat Engineer-In-
finish composite material,sandwich with M S Charge
strip by contact moulding process, engraved
moulded bandwidth and figures with
computerised gauge marking with reflective
Sq m 25720 2086
radium pasting, spary lamination with
polyurethane chemical for surface protection
including material reqd for fixing, nut bolts,
washers, Nylon rope, hanger,drilling machine
etc. complete as directed.

140 Item No 140 As Directed by


Providing ,installing & erecting in correct line Engineer-In-
and level, fiber glass reinforced plastics(FRP) " Charge
V notch" of following sizes and discharge
capacities, for accurate measurement of water
flowing through open channel with
prefabricated fiber glass lining moulded
engraved gauge marking ( in lit/sec and in cms)
including discharge table, capacity marking, flow
direction,sand treatment on the back side of " V"
notch,testing, etc. complete as directed.
(Excluding base preparation ie CBL,canal
section and other concrete etc.)

FRP V notch having discharge capacity 15 lit/


a sec of section 20 x 40 cms with upstream and No 13227 695
downstream channel
FRP V notch having discharge capacity 30 lit/
b sec of section 25 x 50 cms with upstream and No 20388 869
downstream channel
FRP V notch having discharge capacity 45 lit/
c sec of section 28 x 56 cms with upstream and No 22956 1043
downstream channel
FRP V notch having discharge capacity 60 lit/
d sec of section 30 x 60 cms with upstream and No 27620 1217
downstream channel
FRP V notch having discharge capacity 90 lit/
e sec of section 35 x 70 cms with upstream and No 34842 1391
downstream channel
FRP V notch having discharge capacity 120 lit/
f sec of section 42 x 84 cms with upstream and No 43870 1565
downstream channel

54
Rates for 2021-22
(Rates in Rs.)
Sr. No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
141 Item No 141 Providing , installing & erecting in As Directed by
correct line and level, fiber glass reinforced Engineer-In-
plastics(FRP) cut throat flume ( CTF ) Charge
measuring devices on calculated hump level
for accurate measurement of water flowing
through open channel , with prefabricated fiber
glass lining moulded engraved gauge marking
( in lit/sec and in cms.) including discharge
table, capacity marking, flow direction,sand
treatment on the back side of flume,testing, etc.
complete as directed.
(Excluding CBL and hump preparation,
canal section and other concrete required
for hump ,U/S and D/S slopes of hump etc.)

a Cut throat flume 10 x 90 cms -0.33 cusecs No 4994 1043


b Cut throat flume 10 x 90 cms 0.50 cusecs No 5588 1043
c Cut throat flume 20 x 90 cms -1.0 cusecs No 10845 1391
d Cut throat flume 20 x 90 cms -2.0 cusecs No 11693 1391
e Cut throat flume 20 x 90 cms -3.0 cusecs No 13069 1391
f Cut throat flume 20 x 90 cms -4.0 cusecs No 13487 1391
g Cut throat flume 40 x 180 cms -5.0 cusecs No 32392 2086
h Cut throat flume 40 x 180 cms -6.0 cusecs No 34175 2086
i Cut throat flume 40 x 180 cms 8.0 cusecs No 36343 2086
j Cut throat flume 40 x 180 cms -10.0 cusecs No 38446 2086
k Cut throat flume 40 x 180 cms 12.0 cusecs No 39664 2086
l Cut throat flume 40 x 180 cms 15.0 cusecs No 43718 2086
m Cut throat flume 40 x 180 cms -18.0 cusecs No 45476 2086
n Cut throat flume 40 x 180 cms 20.0. cusecs No 47294 2086
o Cut throat flume 100 x 270 cms -25 cusecs No 76653 2782
p Cut throat flume 100 x 270 cms -30 cusecs No 80174 2782
q Cut throat flume 100 x 270 cms -35 cusecs No 85137 2782
r Cut throat flume 100 x 270 cms 40 cusecs No 90770 2782
s Cut throat flume 100 x 270 cms -50 cusecs No 96051 2782
t Cut throat flume 100 x 270 cms 60 cusecs No 104596 2782
u Cut throat flume 100 x 270 cms -70 cusecs No 109315 2782
v Cut throat flume 100 x 270 cms 80 cusecs No 117922 2782

55
Rates for 2021-22
(Rates in Rs.)
Sr. No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
142 Item No 142 As Directed by
Providing , installing & erecting in correct line Engineer-In-
and level, fiber glass reinforced plastics(FRP) Charge
parshall flume on calculated hump level of
following sizes and discharge capacities, for
accurate measurement of water flowing through
open channel with prefabricated fiber glass
lining moulded engraved gauge marking ( in
lit/sec and in cms) including discharge table,
capacity marking, flow direction,sand treatment
on the back side of flume, testing, etc.
complete as directed.
( Excluding CBL and hump preparation ,
canal section and other concrete required
for hump ,U/sand D/S slopes of hump etc.)

a Parshall flume -243.80 x 437 cms -100 cusecs No 279791 2782

b Parshall flume -243.80 x 437 cms -150 cusecs No 297843 2782

c Parshall flume -304.80 x 701 cms -200 cusecs No 532181 4173

d Parshall flume -304.80 x 701 cms -250 cusecs No 542151 4173

e Parshall flume -365.80 x 823 cms -300 cusecs No 555451 4173

f Parshall flume -365.80 x 823 cms -400 cusecs No 590575 4173

g Parshall flume -365.80 x 823 cms -500 cusecs No 974924 4173

h Parshall flume -452.70 x 1189 cms -750 cusecs No 1039524 4173


Parshall flume -610.00 x 1311 cms -1000
i No 1384758 5563
cusecs
Parshall flume -610.00 x 1311 cms -1250
j No 1472083 5563
cusecs

k Parshall flume 762.00 x 1341 cms -1500 cusecs No 1521175 5563

56
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

SECTION-9

MARKING BLUE LINE AND RED LINE

ITEM NO. 143 TO 149


GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 9:- MARKING BLUE LINE AND RED LINE
Rate for 2021-22
(Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completed Labour
Item
1 2 3 4 5 6
143 Item No 143:
Fixing control points by Differential Global Position
System (DGPS) instrument at every One Km. along the both As Directed by
side of river including collection of necessary flood data etc. Engineer-In- Km. 1498.20 437.68
complete including labour welfare cess, service tax, labour Charge
insurance and all applicable taxes etc. complete as directed.

144 Item No 144:


Traverse Survey along river with cross section at 100 m .c/c
along river .The levels on cross section shall be at every 30
m c/c beyond past locally observed flood line, using
Differential Global Position System (DGPS) instrument
including labour, transportation, using sounding by boat in As Directed by
river water in wet condition and transfer of entire data to Engineer-In-
computer system in different geo referential layers/ themes Charge
using features of standard plotting software computable with
design software package including contour plotting at
required interval and at a scale and following deliverables
etc. all complete as directed.

A)For Rivers/Nalas in Dry condition Ha. 601.50 225.80


B)For River and Nalas with deep water and flowing condition
Ha. 673.85 298.15
145 Item 145:
Delivering Contour map of 0.50 m. contour interval by
using standard software & superimposing it on village map As Directed by
with scale1:5000 showing Prohibited line( Blue line) & Engineer-In- Ha. 54.90 47.66
Restricted line (Red line) along with mapping of structures & Charge
other details etc all complete as directed .

146 Item 146:


Providing computerised detailed cross section drawings
in two copies at 100 m interval with actual profile of river
(levels at every 30m. distance along cross section) on A-3
size paper with scale 1cm = 15m or 1cm = 30m which is
suitable as per site condition showing 25 year return flood
As Directed by
line (Blue line) and 100 years return flood line (Red line) Cross-
Engineer-In- 388.75 --
computed by software analysis and submission in the form of section
Charge
soft and hard copy as directed by Engineer in charge. So as
to use the data of above Item No.143 to 145 by HEC-RAS
Software. including submission of check print and getting
approval of Engineer in charge etc all complete as directed.

147 Item 147:


Computation of Blue line ( 25 Year return flood line ) and
red line ( 100 year return flood line ) by using HEC-RAS
software including estimation of flood getting approval of
competent authority for the same giving all the precise As Directed by
necessary input details into the software, viz. cross sectional Engineer-In- Km. 2914.40 --
and longitudinal features of the stream, flow obstructions etc. Charge
including site validation & recalculation to the satisfaction of
Engineer In charge etc all complete as directed.

57
Rate for 2021-22
(Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completed Labour
Item
1 2 3 4 5 6
148 Item 148:
Providing computerised detailed river alignment with
contours on A-1 size paper with scale 1 cm equal to 15 m or
30m whichever is suitable as per site condition. (one sheet
for one Km. length of river) with contour at 0.50 m. interval
including marking 25 years return flood level (Blue line) & As Directed by
100 years return flood level (Red line) line & showing Engineer-In- Sheet 1174.05 --
locations of bridges, KT Weirs & other permanent structures Charge
on each drawing along and across the river as directed by
Engineer in Charge, including providing one color check print
& six hard copies(color print) with one soft copy etc. all
complete as directed.

149 Item 149:


Marking of 25 year's flood levels (Blue line) & 100 year's
flood levels (Red line) at interval not less than 100m & not
more than 500m on permanent structures like Bridges, As Directed by
Temples & other permanent structures along & across the Engineer-In- No. 592.80 97.26
river, including permanent coloured painting, lettering on Charge
both the banks of river, after the final approval of flood levels,
etc. all complete as directed by engineer in charge.

58
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

SECTION-10

LAND RECLAIMATION WORK AND SOIL SURVEY

ITEM NO. 150 TO 161


GOVERNMENT OF MAHARASHTRA, WATER RESOUCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 10:- LAND RECLAMATION & SOIL SURVEY WORK
Rate for 2021-22
(Rate in Rs.)
Sr. No. Discription of Item Specifications Unit
Completd rate Labour
1 2 3 4 5 6
150 Item No. :-150
Collecting and filling soil samples in plastic bag
of size (15X23cm) 200 gauge and cloth bag of As Directed by Per
size (18X25 cm) with inside flap of 4 X 5 cm for Engineer-In- auger 93.60 65.80
address tag and packing properly including cost of Charge. hole
bags etc. complete as Directed.

151 Item No.:-151


Taking well observations in the command area
including collecting data of well water level, taking
photos of wells for GPS Based Monitoring, with
Software developing, Maintenance of Web & As Directed by
Producing reports,Syncronisation of reloads through Engineer-In- No. 95.95 95.95
Internet. & Cloud storage ,Water samples, visual Charge.
observation of crops and preparing data base
recording in well observation book collecting water
samples.etc complete.as directed.

152 Item No. :-152


Taking auger bores of 10 cm.dia.with auger for
classifying strata including putting the excavated As Directed by
stuff in cyclic order, dewatering for recuperating Engineer-In- Rmt 575.10 575.10
results etc. complete as Directed.( Auger karkoon Charge.
not engaged departmentally )
153 Item No.:-153
Taking auger bores of 10 cm.dia.with auger for
classifying strata including putting the excavated As Directed by
stuff in cyclic order, dewatering for recuperating Engineer-In- Rmt 454.50 454.50
results etc. complete as Directed. ( Auger karkoon Charge.
engaged departmentally )
154 Item No.:-154
Measuring drain discharge in every season
including transporting and installing temporarily the As Directed by
measuring device such as “V “notch on site with all Engineer-In- No. 361.80 361.80
Labour & material recording in well observation Charge.
book etc Complete as Directed.

155 Item No. :-155


Collecting & filling water samples in plastic As Directed by
bottles including cost of plastic bottles etc. complete Engineer-In- No 3.90 0
as Directed. Charge.

156 Item No.:-156


Testing of soil sample obtained from auger as
per depth, doing weight of 100gm of soil sample
As Directed by
mix with distilled water in 1:2 proportion using 20
Engineer-In- No. 39.90 36.20
lit.for 100 samples, Testing Ec &pH of each sample
Charge.
filling result in prescribe forms cleaning of
equipments,measuring cylinder etc. complete as
Directed.

59
Rate for 2021-22
(Rate in Rs.)
Sr. No. Discription of Item Specifications Unit
Completd rate Labour
1 2 3 4 5 6
157 Item No.:-157
Labour charges for removing grass, thorny
shurbs, Jungli shurb, Kubabul and alike grass As Directed by
along and in the drain/canal making the ground Engineer-In- Sqm 14.45 14.45
clean by showel and phavaras etc. complete as Charge.
Directed.

158 Item No.:-158


Taking open pits, one open pit per sq.km.,
including refilling of open pit after taking down As Directed by
all necessary morphological observation. Size of pit - Engineer-In- No 836.00 836.00
Length 2.5 m. x Width 1.20 m and Depth of open pit Charge.
up to 2.50 m. or up to hard strata if met
first.etc.complete as Directed.

159 Item No.:-159


Carrying out infiltration tests at the location of As Directed by
open pits in the command area etc.complete as Engineer-In- No. 362.00 362.00
Directed. Charge.

160 Item No.:-160


Carrying out phase level mapping for
confirmation of morphological properties of soil As Directed by
and their interconnection in field for various phases Engineer-In- sq.km. 904.45 904.45
such as texture, erosion, slope, salinity, rockiness, Charge.
stoniness etc.complete as Directed.

161 Item No.:-161


Carrying out drying, pounding, sieving of soil
samples in laboratory including washing the sets As Directed by
No. 16.70 16.70
of soil samples after every test and discarding of Engineer-In-
tested soil samples at laboratory etc.complete as Charge.
Directed.

60
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

SECTION-11

MAINTANANCE & REPAIRS

ITEM NO. 162 TO 193


GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 11:- MAINTENANCE AND REPAIRS

Rates for 2021-2022


Item. ( Rate in Rs.)
Description of item Specification Unit
No. Completed
Labour
Rate
1 2 4 5 6
162 Item No.162:- Dismantling the Stone As Directed by
Masonry in cement mortar including Engineer-In-
Cum 221.70 221.70
stacking the material with all lifts etc.complete charge
as directed.
163 Item No.163:- Dismantling the old lime As Directed by
concrete or cement concrete including Engineer-In-
Cum 267.10 267.10
stacking the material with all lifts etc.complete charge
as directed.
164 Item No.164:- Dismantling R.C.C. works As Directed by
and removing the stuff to a distance of 15 m Engineer-In-
charge Cum 400.70 400.70
and all lifts including stacking etc. complete as
directed.
165 Item No.165:- Cleaning grass and removal As Directed by
of rubbish up to a distance of 50 meters Engineer-In-
Sqm 4.00 4.00
outside the periphery of the area as directed. charge

166 Item No.166:- Cutting down trees including As Directed by


cutting trunks & branches and stacking the Engineer-In-
material with all lift including uprooting and charge
refilling the pit with material etc. complete as
directed. (excluding extra material required for
refilling)
a above 30 cm to 60 cm girth No 253.50 205.95
b above 60 cm to 90 cm girth No 315.25 267.70
c above 90 cm to 1.5 m. girth No 562.35 514.80
d above 1.5 m. to 3.0 m. girth No 830.05 782.50
e above 3.0 m. to 4.5 m. girth No 1344.85 1297.30
167 Item No.167 :- Numbering road and canal As Directed by
sites trees including painting etc. Complete Engineer-In- No 14.80 7.00
as directed. charge
168 Item No.168 :- Removing dry silt from the As Directed by
canal bed and stacking as directed with 15 Engineer-In-
Cum 60.10 60.10
mtr. Lead and all lift etc. Complete as directed. charge

169 Item No.169:- Removing wet silt from canal As Directed by


bed with 15 mtr. Lead and all lift including Engineer-In-
Cum 88.80 88.80
depositing the excavated stuff etc. Complete charge
as directed.
170 Item No.170:- Removing old paint from steel As Directed by
and other surface with flame, cleaning and Engineer-In-
making the surface even including scaffolding charge Sqm 44.50 40.10
etc. Complete as directed.

171 Item No.171:- Providing and applying As Directed by


Primer Red Oxide Paint in two coats Engineer-In-
including surface preparation, chipping the charge Sqm 257.50 135.66
welding, cleaning spatters, dust etc. Complete
as directed.

61
Rates for 2021-2022
Item. ( Rate in Rs.)
Description of item Specification Unit
No. Completed
Labour
Rate
1 2 4 5 6
172 Item No.172:- Providing and applying As Directed by
anticorrosive coal tar black paint IS 290- Engineer-In-
1961 in two coats including surface charge Sqm 317.60 258.82
preparation, chipping the welding, cleaning
spatters, dust etc. Complete as directed.
173 Item No.173:- Providing and applying As Directed by
anticorrosive Coal Tar Epoxy paint for Engineer-In-
upstream side in two coats including surface charge
Sqm 319.60 178.17
preparation, chipping the welding, cleaning
spatters, dust etc. Complete as directed.

174 Item No.174:- Providing and applying two As Directed by


coats of flat oil paint of approved colour and Engineer-In-
shade to internal / external plastered surfaces charge
including scaffolding if necessary clearing and Sqm 87.10 43.14
preparing surfaces excluding primer paint etc.
Complete as directed.

175 Item No.175:- Providing and applying two As Directed by


coats of flat oil paint of approved colour to Engineer-In-
the old structural steel work and iron work charge
previously painted including scaffolding if Sqm 83.90 43.17
necessary clearing & preparing surface
excluding primer coat etc. Complete as
directed.
176 Item No.176:- Providing and applying two As Directed by
coats of lead / zinc base oil paint / Engineer-In-
bituminous paint of approved colour and charge
shade to wood work/fiber boards previously Sqm 111.30 55.61
painted including scaffolding if necessary,
preparing surface excluding primary coat etc.
complete as directed.
177 Item No.177:- Providing and applying coal As Directed by
tar in one coat on previously painted wood Engineer-In-
charge Sqm 23.70 14.46
work including preparing the surface
scaffolding etc. Complete as directed.
178 Item No.178:- Applying geru wash and As Directed by
white wash to canal road side Km Engineer-In-
stones/Boundary stones / Ch. stones / bottom charge No 63.10 51.51
of trees, etc. Complete as directed.
179 Item No.179:- Removing M.S. needles from As Directed by
the K.T. Weir opening before on set of the Engineer-In-
monsoon for Passing the flood water through charge
the K.T. Weir openings including conveying No 163.00 155.10
the same up to the river banks, stacking the
same as directed with all leads and lifts etc.
complete as directed.

62
Rates for 2021-2022
Item. ( Rate in Rs.)
Description of item Specification Unit
No. Completed
Labour
Rate
1 2 4 5 6
180 Item No.180:- Transportation of As Directed by
M.S.Needles from the river bank to the Engineer-In-
store shed / safe place or from store charge
shed/safe place to river bank by Bullock cart No 47.50 47.50
including loading unloading and stacking with
lifts etc. complete as directed. (lead half Km)

181 Item No.181:- Providing supplying and As Directed by


applying 1 coat of red oxide to the steel Engineer-In-
structure as a primary coat including cleaning, charge
Sqm 179.20 113.60
scrubbing for preparing the surface to apply
paint with all lift etc complete as directed.

182 Item No.182:-Fixing of M.S. Needles in weir As Directed by


openings after offset of the monsoon for Engineer-In-
storage of Water from post monsoon river charge
flow and making it water tight by using
Needle 570.90 151.05
wooden pegs, Dungry cloth & empty cement
bags etc. with all lifts and including all material
and labour etc. complete as directed. (For 07
Nos)
183 Item No.183:- Cleaning by redrilling the As Directed by
vertical porous drain pipe including Engineer-In-
removing of leaching material, grout material if charge
any inside of the V.P.D. etc complete with lifts
etc. as directed. (Vertical upward drilling)

a From 0 to 5 m. meter 6711.80 1377.44


b From 5 to 10 m. meter 7383.00 1515.18
c From 10 to 15 m. meter 8054.15 1652.93
d From 15 to 20 m. meter 8389.75 1721.80
184 Item No.184:- Providing and applying As Directed by
single coat of epoxy primer (4.42 sq m per Engineer-In-
kg) (resin : hardener, 2:1) on old UCR / charge Sqm 526.90 104.33
concrete surface etc. Complete as directed.

185 Item No.185:- Providing & applying of As Directed by


Epoxy Mortar layers to Monolith joint of Engineer-In-
Masonry Dam with all lift etc. complete as charge kg 212.00 67.84
directed.
186 Item No. 186 :- Providing and Fixing and As Directed by
errecting, welding 8 mm MS bar @200 mm Engineer-In-
c/c both ways for ferrocement walling with charge
Sqm 1244.75 108.54
welded mesh of size 100x100x2.30 mm
and chiken mesh 3 layers as directed.

187 Item No.187 :- Providing and casting As Directed by


Ferrocement wall in CM 1:3 including Engineer-In-
curing etc complete as directed. charge
A) For 30 mm thick wall Sqm 720.80 563.58
B) 40 mm thick 951.75 750.68
C) 50 mm thick 1183.10 940.06

63
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
188 Providing,erecting,testing and As Directed by
commissioning of a Casagrande type Engineer-In-
Piezometer in a 100 mm dia.cased drilled charge
hole with all its required accessories as
follows as per IS -7356 part-I at the dam
site

A) Drilling perfectly vertical cased bore hole


of 100 mm diameter for casagrande
piezometer inclusive of charges of
transporting ,lowering and fixing of 50 mm
diameter M.S./G.I./P.V.C.casing pipe inside
the cased bore hole including all works
pertaining to drilling such as transportation, RMT 1617.00 1617.00
Installation and removal of drilling machine
etc. complete in all type of collapsible strata
consisting of soft soil, clays,murum,gravel as
per direction of Engineer- in-charge upto 100
mtr depth below ground.

B) UPVC,(Schedule 40) pipe of 50 mm


diameter for casing of bore hole, ISI mark
with required length and all required material RMT 1165.00 267.00
complete.
C) 100 mm dia and 1.80 m deep well graded
sand filter( 2.36 to 4.75 mm screened )
Cum 3690.00 845.00
around the casagrande piezometer.

D) Rigid UPVC (Schedule 40) riser pipe of 20


mm inner dia. ,(min wall thickness 2.87 mm )
with required length and all its required RMT 377.00 86.00
accessories.

E) 37 mm dia,6 mm wall thickness and 60


cm long porous tube piezometer with stopper
and top adapter made up of carborundum
No. 16309.00 4151.00
with porous tube fillter of grain size 60
micron as specified in IS 7356 part-I.

F) 25 mm brass hexagonal pipe top cap. No. 73.00 19.00


G) Providing 100 mm dia and 0.60 m deep
bentonite clay plug above sand filter. No 754.00 200.00

64
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
H) 50 mm dia and 1.25 m long G.I
pipe,Heavy , (Schedule C) type for casing No. 815.00 187.00
protective cover
I) Construction of cement concrete
platform/block/muffing of size
700x700x700mm around the piezometer
pipe below ground with cavity around the
pipe of 300x300x300 mm in cement concrete
in M15 including excavation ,cantering ,
shutting arrangement of RCC cover ( frame Each 2866.00 661.00
300x300mm with lifting arrangement
including laying of angle iron frame of angle
size as 50x50x6 mm to be fixed /embedded
on the top of chamber complete.) cost of all
materials and labour and curing etc.complete.

189 Providing electronic water level indicator As Directed by


for taking water level reading in Engineer-In-
casagrande piezometer with stainless charge
steel probe connected with indelibly
graduated electric measurement cable
No 32566.00 0.00
having graduation at 0.5 m interval & 200
m length (100 m on spool with the device
and 100 m as spare ) as per IS 7356 (Part
I) 2002

190 Providing,erecting,testing and As Directed by


commissioning of Twin Tube Piezometer Engineer-In-
with all its required accessories as per IS charge
7356 part -II with all material ,labour and
transportation at the sites etc complete.

A) Foundation or embankment type twin tube


piezometer tip assembly of 50 mm dia and
32 mm height with all its accessories like No. 3641.00 927.00
metallic end plate ring ,ceramic filter and
screws etc complete.
B) Polypropylene tubing 8 mm O.D. 1.6 mm
wall thickness which can be fitted to the twin
tube piezometer tip assembly with all Meter 124.00 32.00
relevant accessories like elbow, nuts etc
complete.

65
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
C) Identification tag with nylon thread. Set 109.00 28.00
D) Brass compression connector between
twin tube tip assembly and tubing. No. 364.00 93.00

E) Brass End Plug No. 291.00 74.00


F) Twin tube piezometer manifold system in
the Terminal Well like main Pressure gauge,
Valves, Pressure Pump Set etc.with all the No. 436853.00 111191.00
required accessories as per IS 7356 Part II.

G) Panel board with individual pressure


gauges for six tips. Set 473257.00 120457.00

191 Providing accessories required for As Directed by


Repairs to manifold system of twin tube Engineer-In-
piezometer as below charge
A) Compression type T
No 219.00 56.00
B) Straight union for joint No 146.00 37.00

C) Elbow brass fitting No. 182.00 46.00

D) Ferrule and nut No 36.00 9.00


E) Compression type Brass coupling for
No 364.00 93.00
jointing tubes End Plug
F) End Plug No 291.00 74.00
G) Gauge Plug No 7281.00 1853.00
H) Hand shut up valve No 1820.00 463.00
I) Pressure Pump No. 109213.00 27798.00
J) Identification Tag Set 109.00 28.00
192 Manufacturing, Supplying and Erection of As Directed by
sub assemblies of conventional plumb Engineer-In-
bob as per IS 13073 (part I) : 2002 charge

A) Manufacturing and supplying of table


stand of size 600 x 700 mm & 1200 mm
height.as per specifications given & drawing Job 39731.00 0.00
provided.
B) Manufacturing and supplying of Weight
gatta. as per specifications given & drawing Job 34629.00 0.00
provided.

66
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
C) Manufacturing and supplying of fixing
point anchoring arrangement. as per Job 36366.00 0.00
specifications given & drawing provided.
D) Manufacturing & supplying oil tank &
stand for tank as per specifications given & Job 29635.00 0.00
drawing provided.
E) Supply of S.S. wire ø 1.6 x 100 mtr long.
Complete job . Job 8359.00 0.00

F) Manufacturing of Box Cover of size 400 x


400 x 250 for Microscopes 2 Nos. as per Job 8467.00 0.00
specifications given & drawing provided.
G) Supply of Vernier microscope - 2 Nos as
per specifications given which is having 18
cm scale in size, Horizontal scale Least
count of 0.01 mm Vertical scale Least count
Job 25619.00 0.00
of 0.01 mm.Microscope shall be of 20 -21
power and focusing through 37 mm having
cross hair in the eye piece.

H) Erection and commissioning charges at


site. Complete job including material Job 74128.00 74128.00
handling, labour charges
Total Rates for Manufacturing, Supplying and
Erection of sub assemblies of conventional Set 256933.0 74128.00
plumb bob.
193 Manufacturing, Supplying sub As Directed by
assemblies of Inverted plumb bob as per Engineer-In-
IS 13073 (part I) : 2002 charge

A)Stand for oil tank of plumb bob as per


Job 59705.00 0.00
specifications given & drawing provided.
B) Oil tank with cover as per specifications
given & drawing provided. Job 35171.00 0.00

C) Copper/ SS float in oil tank Job 18020.00 0.00


D) Spider attachment as per specifications
given & drawing provided. Job 2063.00 0.00

E) Anchor rod as per specifications given &


drawing provided. Job 3474.00 0.00

F) Supply of S.S. wire ø 1.6 x 100 mtr long.


Complete job . Job 8359.00 0.00

G) Manufacturing of Box Cover of size 400 x


400 x 250 for Microscopes 2 Nos. as per
Job 8467.00 0.00
specifications given & drawing provided.

67
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
H) Supply of Vernier microscope - 2 Nos as
per specifications given which is having 18
cm scale in size, Horizontal scale Least
count of 0.01 mm Vertical scale Least count
of 0.01 mm. Microscope shall be of 20 -21 Job 25619.00 0.00
power and focusing through 37 mm having
cross hair in the eye piece.

I) Erection and commissioning charges at


site. Complete job including material Job 74128.00 74128.00
handling, labour charges
Total Rates for Manufacturing, Supplying and
Erection of sub assemblies of conventional Set 235005.00 74128.00
plumb bob.

68
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2021-22

SECTION-12

LIFT AND GRAVITY PIPE DISTRIBUTION NETWORK

ITEM NO. 194 TO 264


GOVERNMENT OF MAHARASHTRA,WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION-12 :- LIFT AND GRAVITY PIPE DISTRIBUTION NETWORK
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
194 Item.No. 194:- Excavation for deep trenches for laying
rising main in Earth Soil of all types, sand, gravel and
soft murum including trimming to correct line, level and
to specified widths including removing the excavated
material and stacking or spreading the same upto a
distance of 1 km and all lifts as directed, preparing the As Directed by
bed for foundation and necessary safety precautions , Engineer-In- cum 138.25 19.86
keep the trench undisturbed till pipe laying & fixing Charge.
necessary specials etc complete as per detailed
specifications As Directed.
(Payable measurements with vertical excavation)

195 Item No.195:- Excavation for deep trenches for laying


rising main in Hard murum, soft bhisa, Hard man and
boulder including trimming to correct line and level and
to specified width, including removing the excavated
material and stacking or spreading the same upto a
distance of 1km and all lifts as directed, preparing the As Directed by
bed for foundation and necessary safety precautions , Engineer-In- cum 162.85 25.92
keep the trench undisturbed till pipe laying & fixing Charge.
necessary specials etc complete as per detailed
specifications
(Payable measurements with vertical excavation).

196 Item No. 196 :- Excavation for deep trenches for laying
rising main in Soft Rock by crow bar and shavel
including trimming to correct line and level and to
specified width including trimming and levelling the bed
removing the excavated material and stacking the same
As Directed by
upto a distance of 1 km and all lifts as directed and
Engineer-In- cum 167.65 29.98
safety precautions to keep the trench undisturbed till
Charge.
pipe laying & fixing necessary specials etc complete as
per detailed specifications.
(Payable measurements with vertical excavation).

197 Item No.197 :- Excavation for deep trenches for laying


rising main in Hard Rock of any toughness by breaker
to correct line and level and to specified width including
trimming and levelling the bed as directed, removing the
excavated material and sorting, stacking the same upto
a distance of 1 km and all lifts as directed, preparing the As Directed by
bed for foundation and keep the trench undisturbed till Engineer-In- cum 525.30 41.36
pipe laying & fixing necessary specials etc complete as Charge.
per detailed specifications. As Directed.
(Payable measurements with vertical excavation).

69
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
198 Item No. 198 :-Providing and laying Murum bedding
using available material from excavation in trenches
with murum of approved quality in layers not exceeding
150 mm to 200 mm, each layer shall be compacted by Section LIS cum 215.00 143.61
watering and ramming etc complete as directed.

199 Item No. 199:- Providing and laying Murum bedding


using material from borrow area (Private land/
Contractors own material) in trenches with murum of
approved quality in layers not exceeding 150 mm to 200 Section LIS cum 302.60 143.61
mm, each layer shall be Compacted by watering and
ramming etc complete with lead upto 1 km and all lifts
as directed.
200 Item No. 200 :- Providing and laying sand bedding in As Directed by
trenches with sand of approved quality including Engineer-In- cum 1267.25 143.63
watering and compaction etc complete as directed. Charge.
201 Item No.201 :- Backfilling the trenches using
available material from excavation in layers not
exceeding 300 mm, each layer shall be compacted by
watering and ramming without disturbing the pipe line As Directed by
with excavated stuff , including breaking of clods of soil Engineer-In- cum 44.45 2.44
etc complete as directed. (The backfilling on the two Charge.
sides of the pipeline should be carried out
simultaneously)
202 Item No.202 :-Providing & Erecting M.S. pipes
made out of MS plate conforming to IS 2062:1992
including procurement of plates, gas cutting to required
size, rolling, tack welding, assembling in suitable
lengths to form pipes on automatic welding machine
and transportation upto 500 m.The welding Shall be
ERW/SAW using electrodes having weldmark E7018
(Low Hydrogen electrodes) and forming 'V' edge on
both ends of pipes, Including third party inspection
charges, lowering and laying to correct position on
prepared bedding or on pedastals or chairs, field
hydraulic testing at specified test pressure as per IS Section LIS Kg 99.00 9.89
5822: 1994 sec 11, field welding to join pipes after
laying, Radiographic (5%) and ultrasonic (10%)
testing of welds including all equipments submitting
report, expert personnel required for testing,
interpreting and submitting report along with developed
film where applicable all incidental charges etc
complete as per IS - 3589:2001 and as per
specifications (No negative tolerance in thickness is
permissible).

70
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
203 Item No 203:- Lowering, laying in position to correct
line & level including M.S. pipes with / without any
outcoating on prepared bedding or on pedaetals or
chairs or upon prepared formation including loading,
unloading, hoisting, marginal cutting wherever required,
assembling , and transportation upto 500 m etc.
completed as specified with all leads & lifts etc.
complete including tack welding, field hydraulic Section LIS kg 8.20 3.70
testing at specified pressure and as per procedure
mentioned in section 11 of IS 5822: 1994. (item to be
used only in situations where pipes are already
procured ) For total quantity 7.5 rmt & 900 mm Dia. 6
mm thick).As Directed.

204 Item No 204 :- Providing and Erecting tapers made


out of MS plate conforming to IS 2062:1992 including
procurement of plates, gas cutting to required size and
shape, rolling, tack welding, full welding on either
automatic welding machine or manually and forming 'V'
edge on both ends for welding it to pipe, including
fabrication & full welding of stiffeners as per design
requirements, third party inspection charges, lowering
& laying to correct position etc, complete as per IS -
3589 and IS - 5504 as applicable and as per detailed Section LIS kg 103.35 20.01
specifications. Cost of longitudinal welding and " V "
edging required for circumferencial welding required to
connect MS special to Rising main /delivery pipes is
inclusive in the rate however circumferencial welding
for connecting the M.S. special to Rising main shall be
paid seperately on running meter basis. (No negative
Tolerance in thickness is permissible).

205 Item No 205 :- Providing and Erecting "Y"


connection with Crotch plate made out of MS plate
conforming to IS 2062:1992 including procurement of
plates, gas cutting to required size and shape, rolling,
tack welding, full welding on either automatic welding
machine or manually and forming 'V' edge on all the
three ends for welding it to pipe, including fabrication
and full welding of crotch plate and stiffeners as per
design requirements,third party inspection charges
,lowering & laying to correct position etc, complete as
per IS - 3589 and IS - 5504 as applicable as per
Section LIS Kg 119.55 22.97
detailed specifications. Cost of welding of crotch plate
is included in the rate. Cost of longitudanal welding and
" V " edging required for circumferencial welding
required to connect MS special to Rising main /delivery
pipe is inclusive in the rate however circumferencial
welding required for connecting Y-piece to Rising main
/ manifold pipe shall be paid seperately on running
meter basis.As directed. (No negative Tolerance in
thickness is permissible).

71
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
206 Item No 206 :- Providing and Erecting "Y" and "T"
branches with coller plate made out of MS plate
conforming to IS 2062:1992 including procurement of
plates, gas cutting to required size and shape, rolling,
tack welding, full welding on either automatic welding
machine or manually and forming 'V' edge on both ends
for welding it to pipe, including fabrication & full welding
of coller plate and stiffeners as per design
requirements, third party inspection charges ,lowering
& laying to correct position etc, complete as per IS -
3589 and IS - 5504 as applicable as per detailed
specifications. Cost of "V" edging, machining and Section LIS Kg 105.25 21.00
welding of collar plate in "Y" and "T" connection is
included in the rate. Cost of longitudinal welding and
"V" edging required for circumferencial welding
required to connect MS special to Rising main / delivery
pipes is inclusive in the rate however circumferencial
welding required to connect Y/T to Rising main or
manifold shall be paid separately on running meter
basis.As Directed. (No negative Tolerance in
thickness is permissible).

207 Item No 207 :- Providing and Erecting manhole


covers made out of MS plate conforming to IS
2062:1992 including procurement of plates, gas cutting
to required size and shape, rolling, tack welding and full
welding on either automatic welding machine or
manually and forming 'V' edge on both ends, including
fabrication and full welding of stiffeners as per design
requirements, lowering & laying to correct position etc,
third party inspection charges complete as per IS -
3589 and IS - 5504 as applicable and as per detailed
specifications. Cost of longitudinal welding and 'V'
Section LIS kg 105.25 21.00
edging required for circumferencial welding required to
connect MS special to Rising main /delivery pipes is
inclusive in the rate however circumferencial welding
required for connecting man hole to Rising main shall
be paid separately on running meter basis. Cost of
washers , nuts, bolts, etc. required for fixing manhole
cover is included in the rate.As directed. (No negative
Tolerance in thickness is permissible).

72
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
208 Item No 208 :- Providing and Erecting M S bends
made out of MS plate conforming to IS 2062:1992
including procurement of plates, gas cutting to required
size and shape, rolling, tack welding, full welding on
either automatic welding machine or manually and
forming 'V' edge on both ends for welding it to pipe,
including fabrication & full welding of stiffeners as per
design requirements, lowering & laying to correct
position, third party inspection charges etc,
complete as per IS - 3589 and IS - 5504 as
applicable as per detailed specifications. Cost of Section LIS kg 105.25 21.00
longitudinal welding and " V " edging required for
circumferencial welding required to connect MS special
to Rising main /delivery pipes is inclusive in the rate
however circumferencial welding required for
connecting M.S. special to Rising Main shall be paid
separately on running meter basis.
(No negative Tolerance in thickness is permissible).

209 Item No 209 :- Providing and Erecting short pipes,


cants made out of MS plate conforming to IS
2062:1992 including procurement of plates, gas cutting
to required size and shape, rolling, tack welding, full
welding on either automatic welding machine or
manually and forming 'V' edge on both ends for welding
it to pipe, including fabrication and full welding of
stiffeners as per design requirements, lowering & laying
to correct position third party inspection charges etc,
complete as per IS - 3589 and IS - 5504 as applicable Section LIS kg 98.85 19.03
as per detailed specifications. Cost of longitudinal
welding and " V " edging required for circumferencial
welding required to connect MS special to Rising main
/delivery pipes is inclusive in the rate however
circumferencial welding required for connecting M.S.
special to Rising Main shall be paid separately on
running meter basisAs Directed..
(No negative Tolerance in thickness is permissible).

210 Item No.210 :- Radiographic testing of welded butt


joints in Rising main as per Procedure given in IS
4853:1982 including cost of all materials, equipments &
expert personnel required for testing, developing,
interpreting and submitting report along with developed Section LIS Rmt 1733.10 1053.00
films, including all incidental charges, transportation to
site and local transportation on site etc. complete.As
Directed.

73
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
211 Item No. 211 :- Ultrasonic testing of field welded
joints as per Procedure laid down in IS 4260:1986
including actual testing, interpreting and submitting test
report in detail including cost of all materials,
equipments & expert personnel required for testing, Section LIS Rmt 407.10 243.03
developing, interpreting and submitting report, including
all incidental charges, transportation to site and local
transportation on site etc. complete.As directed.

212 Item No 212 :- Cleaning the surface of M.S. pipe by


Sand Blasting to expose fresh metal surface ready for
painting including removal of all rust, oil, grease, etc.
as per specification including all material, labour and Section LIS Sq. m. 88.05 13.35
equipments etc complete.As Directed.

213 Item No. 213 :- Providing & applying Liquid epoxy


coating system to the external surface of Rising
Main Pipes as per Annex-B of IS 3589:2001, with
one coat of Zinc rich epoxy primer (90 % zink (DFT
40 micron , coverage 9 Sqm / lit) and two coats of coal
tar epoxy paint (DFT 120 X 2 micron coverage 5 Sqm
Section LIS Sq. m. 640.45 395.14
/ Lit / coat) including cleaning the surface to the
satisfaction of Engineer in charge by sand blasting /
scraping removing oil, grease, other foreign materials
including all necessary material , labour with all lifts
etc. complete.As directed.

214 Item No. 214 :- Providing & applying Liquid epoxy


coating system to the interior surface of Rising Main
Pipes as per Annex - B of IS 3589:2001,with one
coat of Zinc rich epoxy primer (90% zink ,DFT 40
micron , coverage 9 Sqm / lit) and three coats of coal
tar epoxy paint (DFT 120 X 3 micron coverage 5
Sqm/Lit/coat) including cleaning the surface to the Section LIS Sq. m. 816.70 514.80
satisfaction of Engineer in charge by sand blasting
/chemical cleaning / scraping removing oil, grease,
other foreign materials including all necessary material,
labour with all leads and lifts etc. complete.As directed.

215 Item No.215 :- Providing and guniting in CM 1 : 3


(cement consumption 15.94 kg/sqm) pnumatically
under pressure of 2.1 to 2.8 kg /Sq cm, with weld mesh
50 x 50 x 2.54 mm (13 gauge), after duly cleaning the
surface by wire brushing, degreasing etc., including
Section LIS Sq. m. 539.60 42.16
necessary admixtures (200 ml / bag of cement), curing,
rehandling the pipe from fabrication shop to guniting
place and from guniting place to laying location etc.
complete with all lifts As Directed.

74
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
216 Item No.216 :- Providing cement mortar lining of
specified thickness to inner surface of pipe in
proportion 1:1.5 using mechanical spinning machine, As Directed by
including all necessary labour, material, plants and Engineer-In-
equipments, local handling etc. complete as per Charge.
procedure laid down in IS 3589:2001.As Directed.

1) For 9 mm thick mortar lining Sq.m. 312.45 80.60


2) For 12 mm thick mortar lining Sq.m. 389.70 80.60
217 Item No. 217 : Providing 'X' Ray Quality M.S. Welding
in all positions with required number of runs, for M.S.
pipes internally and / or externally including gauging
wherever necessary, fixing appurtenances and other
accessories in connection with pipe laying work as per
specification, using electrodes having weldmark E7018 Section LIS
(Low hydrogen electrodes), including Surface
preparation, (i.e. Removal of scale, cleaning, etc.)
including all materials, labour, equipments, etc.
complete.As Directed.
A : Single 'V' Butt Joint
Butt Joint : Plate thickness
6 mm Rmt 342
8 mm Rmt 485
10 mm Rmt 677
12 mm Rmt 810
14 mm Rmt 1017
16 mm Rmt 1227
18 mm Rmt 1471
20 mm Rmt 1731
22 mm Rmt 1957
25 mm Rmt 2239
B : Fillet Type Joint
Fillet Weld Size
4 mm Rmt 140
5 mm Rmt 210
6 mm Rmt 286
8 mm Rmt 399
10 mm Rmt 608
12 mm Rmt 861
14 mm Rmt 1158
16 mm Rmt 1616

75
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-2022
1 2 3 4 5
I. DUCTILE IRON (D.I.) PIPES (K-7)
218 Item No 218 : Providing and supplying D.I. pipes (push on Section - PDN
joints pressure pipes of D. I. of following class and diameters D.I.Pipe
confirming to the I.S. specification inclusive cost of jointing (P.N. 1 to 30)
materials (Rubber gasket of EPDM Quality) excluding GST levied
by GOI & GOM in all respect including Third party inspection
charges of TPI Agency approved by WRD including Transit
insurance, Railway Freight, Unloading from railway wagon,
Loading into Truck, Transportation to departmental store,
unloading, stacking etc. completed as directed by Engineer-in-
charge (IS 1536/2001 for pipes and IS 158/1969 and IS
12820/1989 or latest edition/revision with amendments for Rubber
Gaskets. (IS:8329-2000 Latest Version) D.I. K-7

(IS:8329-2000 latest version)


1 100 mm Rmt 1024.00
2 150 mm Rmt 1446.00
3 200 mm Rmt 1783.00
4 250 mm Rmt 2345.00
5 300 mm Rmt 3012.00
6 350 mm Rmt 3704.00
7 400 mm Rmt 4512.00
8 450 mm Rmt 5322.00
9 500 mm Rmt 6349.00
10 600 mm Rmt 8309.00
11 700 mm Rmt 11168.00
12 750 mm Rmt 12670.00
13 800 mm Rmt 14251.00
14 900 mm Rmt 17531.00
15 1000 mm Rmt 20954.00
16 1100 mm Rmt 29994.00
17 1200 mm Rmt 34732.00
219 Item No 219 : Lowering, laying and jointing in proper grade Section - PDN
and alignment D.I. pipes with cost of all jointing materials D.I.Pipe (P.N.
(rubber packing, nut bolts, etc.) including cost of conveyance from 1 to 30)
stores to site of works, all labours involved, etc. complete. Only
SBR rubber Gasket to be used as per IS 5382 and IS 12820 (for
all class of pipes)
1 100 mm Rmt 51.00
2 150 mm Rmt 68.00
3 200 mm Rmt 78.00
4 250 mm Rmt 93.00
5 300 mm Rmt 178.00
6 350 mm Rmt 214.00
7 400 mm Rmt 374.00
8 450 mm Rmt 407.00
9 500 mm Rmt 428.00
10 600 mm Rmt 671.00
11 700 mm Rmt 811.00
12 750 mm Rmt 911.00
13 800 mm Rmt 1060.00
14 900 mm Rmt 1233.00
15 1000 mm Rmt 1477.00
16 1100 mm Rmt 1835.00
17 1200 mm Rmt 2529.00

76
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-2022
1 2 3 4 5
220 Item No 220 : Providing and supplying ISI standard D. I. Section - PDN
specials & fitting with sealing rubber gasket of S.B.R, complete D.I.Pipe (P.N.
with cast iron follower gland and M. S. nut bolts coated or 1 to 30)
otherwise protected from rusting and suitable for D.I. pipes
including cost of labour, materials, and transportation to stores /
site, loading and unloading excluding GST levied by GOI & GOM
in all respect, as per IS-9523. For all types of specials, bends,
tees etc. complete
1 a) up to 300 mm dia. Kg 132.00
2 b) 350 mm & above dia. Kg 132.00
221 Item No 221 : Hydraulic testing of D.I. pipe line to specified Section - PDN
pressure including cost of all materials and labour and water for D.I.Pipe (P.N.
testing for specified length including cutting, placing end cap 1 to 30)
making arrangement for filling safe water using reciprocating type
pumps which should be able to provide specified test pressure
gauges and other necessary equipments, labour, operation
charges, etc. required for testing. The rate under this item shall
also include cost of retesting, if necessary and reinstating to
original position using water supplied by the contractor.

1 80 mm Km 6860.00
2 100 mm Km 7069.80
3 125 mm Km 7385.05
4 150 mm Km 8121.00
5 200 mm Km 9046.15
6 250 mm Km 10206.95
7 300 mm Km 12323.40
8 350 mm Km 15291.20
9 400 mm Km 18782.00
10 450 mm Km 22489.05
11 500 mm Km 26431.80
12 600 mm Km 31433.00
13 700 mm Km 37611.05
14 750 mm Km 41053.60
15 800 mm Km 44731.85
16 900 mm Km 52770.00
17 1000 mm Km 61802.00
18 1100 mm Km 71751.00
19 1200 mm Km 82643.00

77
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
II. POLYVINYL CHLORIDE (P.V.C.) PIPES
222 Item No 222: Providing and supplying in standard Section - PDN
lengths ISI mark rigid unplasticised PVC pipes suitable P.V.C. Pipe
for potable water with solvent cement joints including cost of (P.N. 1 to 23)
couplers, as per IS specification no. 4985 / 1988 excluding
GST levied by GOI and GOM in all respect, including
transportation, freight charges, inspection charges, loading,
unloading, conveyance to the departmental stores and
stacking the same in closed shed duly protected from sun
rays and rains including cost of jointing material i.e. solvent
cement, etc. complete (selffit type to be jointed with cement
solvent).
a) Working Pressure 4 Kg./Sq.cm
1 63 mm Rmt 76.00
2 75mm Rmt 106.00
3 90mm Rmt 148.00
4 110 mm Rmt 214.00
5 125 mm Rmt 285.00
6 140 mm Rmt 351.00
7 160 mm Rmt 460.00
8 180 mm Rmt 570.00
9 200 mm Rmt 732.00
10 225 mm Rmt 908.00
11 250 mm Rmt 1139.00
12 280 mm Rmt 1478.00
13 315 mm Rmt 1694.00
14 400 mm Rmt 4355.00
b) Working Pressure 6 Kg./Sq.cm
1 63 mm Rmt 103.00
2 75mm Rmt 146.00
3 90mm Rmt 214.00
4 110 mm Rmt 295.00
5 125 mm Rmt 416.00
6 140 mm Rmt 514.00
7 160 mm Rmt 664.00
8 180 mm Rmt 814.00
9 200 mm Rmt 1030.00
10 225 mm Rmt 1359.00
11 250 mm Rmt 1697.00
12 280 mm Rmt 2134.00
13 315 mm Rmt 2670.00
14 400 mm Rmt 6392.00
c) Working Pressure 8 Kg./Sq.cm
1 63 mm Rmt 138.00
2 75mm Rmt 197.00
3 90mm Rmt 277.00
4 110 mm Rmt 408.00
5 125 mm Rmt 537.00
6 140 mm Rmt 672.00
7 160 mm Rmt 888.00
8 180 mm Rmt 1067.00
9 200 mm Rmt 1355.00
10 225 mm Rmt 1762.00
11 250 mm Rmt 2202.00
12 280 mm Rmt 2766.00
13 315 mm Rmt 3467.00
14 400 mm Rmt 9010.00
d) Working Pressure 10 Kg./Sq.cm
1 63 mm Rmt 163.00

78
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
2 75mm Rmt 228.00
3 90mm Rmt 330.00
4 110 mm Rmt 501.00
5 125 mm Rmt 645.00
6 140 mm Rmt 805.00
7 160 mm Rmt 1066.00
8 180 mm Rmt 1269.00
9 200 mm Rmt 1656.00
10 225 mm Rmt 2096.00
11 250 mm Rmt 2628.00
12 280 mm Rmt 3262.00
13 315 mm Rmt 4144.00
14 400 mm Rmt 10494.00
e) Working Pressure 12.5 Kg./Sq.cm
1 110 mm Rmt 873.00
2 125 mm Rmt 1143.00
3 140 mm Rmt 1410.00
4 160 mm Rmt 1850.00
5 200 mm Rmt 2955.00
6 250 mm Rmt 4727.00
7 315 mm Rmt 7529.00
8 400 mm Rmt 13538.00
223 Item No 223 : Lowering, laying and jointing with P.V.C. Section - PDN
pipes and specials of following class and diameter including P.V.C. Pipe
cost of conveyance from stores to site of works including cost (P.N. 1 to 23)
of all labour, material, except cement solvent, rubber ring, as
per IS code, etc. complete (with cement solvent joint / ring fit
joint). (for all class of pipes)

1 63 mm Rmt 16.00
2 75mm Rmt 20.00
3 90mm Rmt 24.00
4 110 mm Rmt 29.00
5 125 mm Rmt 32.00
6 140 mm Rmt 34.00
7 160 mm Rmt 36.00
8 180 mm Rmt 49.00
9 200 mm Rmt 49.00
10 225 mm Rmt 57.00
11 250 mm Rmt 64.00
12 280 mm Rmt 71.00
13 315 mm Rmt 80.00
14 400 mm Rmt 100.00
224 Item No 224 : Providing and supplying ISI mark P.V.C. pipes Section - PDN
fitting/specials including loading , unloading , P.V.C. Pipe
trasnporatation upto departmental store, stacking excluding (P.N. 1 to 23)
GST levied by GOI & GOM in all respect.etc.complete.

i) up to 300 mm dia. Rmt 2 % of per


mtr. rate of
pipe
ii) above 300 mm dia. Rmt 5 % of per
mtr. rate of
pipe

79
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
225 Item No 225 : Hydraulic testing of PVC pipe line to Section - PDN
specified pressure including cost of all materials and labour P.V.C. Pipe
and water for testing for specified length including cutting, (P.N. 1 to 23)
placing end cap making arrangement for filling safe water
using reciprocating type pumps which should be able to
provide specified test pressure gauges and other necessary
equipments, labour, operation charges, etc. required for
testing. The rate under this item shall also include cost of
retesting, if necessary and reinstating to original position.

a) Working Pressure 4 Kg./Sq.cm


1 63 mm Km 6043.55
2 75mm Km 6813.45
3 90mm Km 6960.20
4 110 mm Km 7188.80
5 125 mm Km 7385.05
6 140 mm Km 7964.25
7 160 mm Km 8287.20
8 180 mm Km 8647.80
9 200 mm Km 9046.15
10 225 mm Km 9597.10
11 250 mm Km 10206.95
12 280 mm Km 11016.60
13 315 mm Km 12788.30
14 400 mm Km 18782.00

80
Rate
Sr. Specification
Description Unit (in Rs.) 2021-
No. Ref. No.
22
1 2 3 4 5
III. P.V.C.-O PIPES
226 Item No 226 : Providing and supplying in ISI mark rigid PVC- Section - PDN
O class-500 s/s pipes (push on joints) pressure pipes P.V.C-O Pipe
confirming to IS specifications no 16647- 2017 inclusive cost of (P.N. 1 to 25)
EPDM gasket seals on joints including all statutory duties
excluding GST levied by Government of India and Government
of Maharashtra in all respect including third party inspection
charges of agency approved by WRD, transit insurance loading,
unloading charges conveyance to the departmental store / site
and stacking the same in closed shade duly protected from
sunrays etc complete.

Note :-
Diameter wise overlapping lengths are respectively, 110mm
2.92%, 160mm- 3.33%, 200mm 3.75%, 250mm 4.5%, 315mm
5.42%, 400mm 6.25%
a) Class - 500 PN - 12.5
i) 110 mm Rmt 687.00
ii) 160 mm Rmt 1132.00
iii) 200 mm Rmt 1483.00
iv) 250 mm Rmt 2050.00
v) 315 mm Rmt 2760.00
vi) 400 mm Rmt 4162.00
b) Class - 500 PN - 16
i) 110 mm Rmt 760.00
ii) 160 mm Rmt 1273.00
iii) 200 mm Rmt 1689.00
iv) 250 mm Rmt 2203.00
v) 315 mm Rmt 2999.00
vi) 400 mm Rmt 4529.00
c) Class - 500 PN - 25
i) 110 mm Rmt 918.00
ii) 160 mm Rmt 1335.00
iii) 200 mm Rmt 1818.00
iv) 250 mm Rmt 2512.00
v) 315 mm Rmt 4093.00
vi) 400 mm Rmt 6059.00
227 Item No 227 : Lowering, laying and jointing with P.V.C.-O Section - PDN
pipes and specials of following class and diameter including cost P.V.C-O Pipe
of conveyance from stores to site of works including cost of all (P.N. 1 to 25)
labour, material, except cement solvent, rubber ring, as per IS
code, for all class of pipe, etc. complete (with cement solvent
joint / ring fit joint).

i) 110 mm Rmt 53.00


ii) 160 mm Rmt 66.00
iii) 200 mm Rmt 82.00
iv) 250 mm Rmt 97.00
v) 315 mm Rmt 120.00
vi) 400 mm Rmt 131.00

81
Rate
Sr. Specification
Description Unit (in Rs.) 2021-
No. Ref. No.
22
1 2 3 4 5
228 Item No 228 : Providing and supplying ISI mark P.V.C.-O Section - PDN
pipes fitting / specials including loading, unloading, P.V.C-O Pipe
trasnporatation upto departmental store, stacking excluding GST (P.N. 1 to 25)
levied by GOI & GOM in all respect.etc.complete.

i) up to 300 mm dia. Rmt 2 % of per mtr.


rate of pipe

ii) above 300 mm dia. Rmt 5 % of per mtr.


rate of pipe

229 Item No 229 : Hydraulic testing of PVC-O pipe line to Section - PDN
specified pressure including cost of all materials and labour and P.V.C-O Pipe
water for testing for specified length including cutting, placing (P.N. 1 to 25)
end cap making arrangement for filling safe water using
reciprocating type pumps which should be able to provide
specified test pressure gauges and other necessary equipments,
labour, operation charges, etc. required for testing. The rate
under this item shall also include cost of retesting, if necessary
and reinstating to original position.(for all class of pipe)

i) 110 mm Km 7188.80
ii) 160 mm Km 8287.20
iii) 200 mm Km 9046.15
iv) 250 mm Km 10206.95
v) 315 mm Km 12788.30
vi) 400 mm Km 18782.00

82
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
IV. PRE-STRESSED CEMENT CONCRETE PIPES (PSC)
230 Item No 230: Providing and supplying ISI standard Pre-stressed Section - PDN
Cement concrete pipes of following class and diameter including P.S.C. Pipe
cost of all meterial and labour required, cost, inspection charges, (P.N. 1 to 22)
transportaion to stores, unloading and stacking excluding GST levied
by GI & GOM in all respect etc. complete as per IS-784-2001.

i) Factory test pressure


2 2
a) Site test pressure + 01N/mm , For working pressure upto 1 N/mm
b) Site test pressure + 02N/mm , For working pressure upto 1 N/mm2
2

ii) Site test pressure - 1.5 times working pressure pertaining to the
section or 1.1 times static pressure, whichever is more (such pressure
is to be control within 25% of pumphead incase of pumping main)

iii) Working pressure - The maximum sustained internal pressure


excluding surge to which each portion of pipeline may be subjected
when installed.
Note : One rubber ring should be supplied with each pipe, cost
included in rates below.
b) Factory Test Pressure 4 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3574.00
3 450 mm Rmt 3749.00
4 500 mm Rmt 3956.00
5 600 mm Rmt 4922.00
6 700 mm Rmt 5656.00
7 800 mm Rmt 6767.00
8 900 mm Rmt 8414.00
9 1000 mm Rmt 9811.00
10 1100 mm Rmt 11203.00
11 1200 mm Rmt 12944.00
12 1300 mm Rmt 15384.00
13 1400 mm Rmt 16506.00
14 1500 mm Rmt 18852.00
15 1600 mm Rmt 20908.00
16 1700 mm Rmt 22966.00
17 1800 mm Rmt 25022.00
18 1900 mm Rmt 30852.00
19 2000 mm Rmt 33346.00
c) Factory Test Pressure 6 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3574.00
3 450 mm Rmt 3755.00
4 500 mm Rmt 3997.00
5 600 mm Rmt 4980.00
6 700 mm Rmt 5671.00
7 800 mm Rmt 7015.00
8 900 mm Rmt 8748.00
9 1000 mm Rmt 10202.00
10 1100 mm Rmt 11616.00
11 1200 mm Rmt 13454.00
12 1300 mm Rmt 15725.00
13 1400 mm Rmt 17104.00
14 1500 mm Rmt 19591.00
15 1600 mm Rmt 21758.00

83
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
16 1700 mm Rmt 23926.00
17 1800 mm Rmt 26092.00
18 1900 mm Rmt 31643.00
19 2000 mm Rmt 34223.00
d) Factory Test Pressure 8 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3574.00
3 450 mm Rmt 3755.00
4 500 mm Rmt 3997.00
5 600 mm Rmt 4980.00
6 700 mm Rmt 5957.00
7 800 mm Rmt 7115.00
8 900 mm Rmt 8809.00
9 1000 mm Rmt 10226.00
10 1100 mm Rmt 11818.00
11 1200 mm Rmt 14024.00
12 1300 mm Rmt 16338.00
13 1400 mm Rmt 18058.00
14 1500 mm Rmt 20479.00
15 1600 mm Rmt 22511.00
16 1700 mm Rmt 24994.00
17 1800 mm Rmt 28276.00
18 1900 mm Rmt 32810.00
19 2000 mm Rmt 35525.00
e) Factory Test Pressure 10 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3574.00
3 450 mm Rmt 3773.00
4 500 mm Rmt 3997.00
5 600 mm Rmt 4980.00
6 700 mm Rmt 6079.00
7 800 mm Rmt 7115.00
8 900 mm Rmt 8809.00
9 1000 mm Rmt 10226.00
10 1100 mm Rmt 11818.00
11 1200 mm Rmt 14024.00
12 1300 mm Rmt 17268.00
13 1400 mm Rmt 18857.00
14 1500 mm Rmt 20479.00
15 1600 mm Rmt 22511.00
16 1700 mm Rmt 24994.00
17 1800 mm Rmt 28276.00
18 1900 mm Rmt 34032.00
19 2000 mm Rmt 36883.00
f) Factory Test Pressure 12 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3574.00
3 450 mm Rmt 3773.00
4 500 mm Rmt 3997.00
5 600 mm Rmt 4980.00
6 700 mm Rmt 6079.00
7 800 mm Rmt 7115.00
8 900 mm Rmt 8809.00
9 1000 mm Rmt 10226.00
10 1100 mm Rmt 11818.00
11 1200 mm Rmt 14024.00
12 1300 mm Rmt 17316.00
13 1400 mm Rmt 18857.00
14 1500 mm Rmt 20479.00
15 1600 mm Rmt 22511.00

84
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
16 1700 mm Rmt 24994.00
17 1800 mm Rmt 28276.00
18 1900 mm Rmt 36348.00
19 2000 mm Rmt 39420.00
g) Factory Test Pressure 14 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3638.00
3 450 mm Rmt 3858.00
4 500 mm Rmt 4087.00
5 600 mm Rmt 5186.00
6 700 mm Rmt 6306.00
7 800 mm Rmt 7361.00
8 900 mm Rmt 9118.00
9 1000 mm Rmt 10600.00
10 1100 mm Rmt 12265.00
11 1200 mm Rmt 14521.00
12 1300 mm Rmt 17876.00
13 1400 mm Rmt 22382.00
14 1500 mm Rmt 22382.00
15 1600 mm Rmt 24656.00
16 1700 mm Rmt 27575.00
17 1800 mm Rmt 30196.00
18 1900 mm Rmt 37314.00
19 2000 mm Rmt 40663.00
h) Factory Test Pressure 16 kg/Sqcm
1 350 mm Rmt 3397.00
2 400 mm Rmt 3847.00
3 450 mm Rmt 4158.00
4 500 mm Rmt 4686.00
5 600 mm Rmt 5879.00
6 700 mm Rmt 6877.00
7 800 mm Rmt 8578.00
8 900 mm Rmt 11384.00
9 1000 mm Rmt 12812.00
10 1100 mm Rmt 15377.00
11 1200 mm Rmt 17749.00
12 1300 mm Rmt 20430.00
13 1400 mm Rmt 22550.00
14 1500 mm Rmt 26784.00
15 1600 mm Rmt 30043.00
16 1700 mm Rmt 33300.00
17 1800 mm Rmt 36556.00
18 1900 mm Rmt 39952.00
19 2000 mm Rmt 44424.00
i) Factory Test Pressure 18 kg/Sqcm
1 350 mm Rmt 3559.00
2 400 mm Rmt 3953.00
3 450 mm Rmt 4277.00
4 500 mm Rmt 4831.00
5 600 mm Rmt 6089.00
6 700 mm Rmt 7520.00
7 800 mm Rmt 9385.00
8 900 mm Rmt 11869.00
9 1000 mm Rmt 13948.00
10 1100 mm Rmt 16096.00
11 1200 mm Rmt 18604.00
12 1300 mm Rmt 21427.00
13 1400 mm Rmt 28277.00
14 1500 mm Rmt 31883.00
15 1600 mm Rmt 35938.00

85
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
16 1700 mm Rmt 39988.00
17 1800 mm Rmt 44040.00
j) Factory Test Pressure 20 kg/Sqcm
1 350 mm Rmt 3642.00
2 400 mm Rmt 4048.00
3 450 mm Rmt 4400.00
4 500 mm Rmt 4981.00
5 600 mm Rmt 6305.00
6 700 mm Rmt 8330.00
7 800 mm Rmt 11084.00
8 900 mm Rmt 13102.00
9 1000 mm Rmt 15761.00
10 1100 mm Rmt 18736.00
11 1200 mm Rmt 23562.00
12 1300 mm Rmt 25925.00
13 1400 mm Rmt 30287.00
14 1500 mm Rmt 34334.00
15 1600 mm Rmt 38400.00
16 1700 mm Rmt 42463.00
17 1800 mm Rmt 46529.00
231 Item No 231: Lowering, laying and jointing in proper grade and Section - PDN
alignment Pre-Stressed Cement Concrete Pipes with rubber ring P.S.C. Pipe
joints including cost of conveyance from stores to site of works, all (P.N. 1 to 22)
labour involved, etc. complete but excluding cost of rubber rings (for
all class of pipes)

1 350 mm Rmt 82.00


2 400 mm Rmt 123.00
3 450 mm Rmt 141.00
4 500 mm Rmt 168.00
5 600 mm Rmt 227.00
6 700 mm Rmt 255.00
7 800 mm Rmt 274.00
8 900 mm Rmt 299.00
9 1000 mm Rmt 393.00
10 1100 mm Rmt 562.00
11 1200 mm Rmt 575.00
12 1300 mm Rmt 674.00
13 1400 mm Rmt 674.00
14 1500 mm Rmt 786.00
15 1600 mm Rmt 854.00
16 1700 mm Rmt 891.00
17 1800 mm Rmt 1126.00
18 1900 mm Rmt 1155.00
19 2000 mm Rmt 1244.00
232 Item No 232: Providing and supplying ISI standard specials & Section - PDN
fitting suitable for P. S. C. pipes including cost of labour, materials, P.S.C. Pipe
and transportation to stores / site, loading and unloading excluding (P.N. 1 to 22)
GST levied by GOI & GOM in all respect, complete.

350 mm & above dia. Kg 132.00

86
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
233 Item No 233: Hydraulic testing of Pre-Stressed Cement Concrete Section - PDN
Pipes with rubber ring joints to specified pressure including cost of all P.S.C. Pipe
materials and labour and water for testing for the length upto 1 km., (P.N. 1 to 22)
using reciprocating type pumps which should be able to provide
specified test pressure guages and other necessary equipments,
labour, operation charges, etc. required for testing. The rate under this
item shall also include cost of retesting, if necessary.

i) 350 mm Km 15291.20
ii) 400 mm Km 18782.00
iii) 450 mm Km 22489.05
iv) 500 mm Km 26431.80
v) 600 mm Km 31433.00
vi) 700 mm Km 37611.05
vii) 800 mm Km 44731.85
viii) 900 mm Km 52770.00
ix) 1000 mm Km 61802.00
x) 1100 mm Km 71751.00
xi) 1200 mm Km 82643.00
xii) 1300 mm Km 94477.00
xiii) 1400 mm Km 107255.00
xiv) 1500 mm Km 124638.00
xv) 1600 mm Km 140636.00
xvi) 1700 mm Km 156242.00
xvii) 1800 mm Km 172790.00
xviii) 1900 mm Km 190281.00
xix) 2000mm Km 208715.00

87
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
V. BAR WRAPPED STEEL CYLINDER PIPES (BWSC)
234 Item No 234: Providing and supplying Bar Wrapped steel Section - PDN
cylinder pipes, conforming to IS-15155-2002 (suitable for B.W.S.C. Pipe
overlaping steel welded joint or butt welded steel joints) of (P.N. 1 to 20)
following class and diameter including cost of all material and
labour required, inspection charges, transportation to stores,
transit insurance, loading, unloding and stacking excluding GST
levied by GOI & GOM in all respect, etc. complete.

i) Factory test pressure


2
a) Site test pressure + 01N/mm , For working pressure upto 1
2
N/mm
2
b) Site test pressure + 02N/mm , For working pressure upto 1
2
N/mm

ii) Site test pressure - 1.5 times working pressure pertaining to


the section or 1.1 times static pressure, which ever is more (such
pressure is to be control within 25% of pumphead incase of
pumping main)
iii) Working pressure - The maximum sustained internal
pressure excluding surge to which each portion of pipeline may
be subjected when installed.
Note : 1) Class mentioned below represents the working
pressure of pipe. 2) For external coating at site to the joints,
necessary polythene wrap ping for pouring cement slurry
shall also be given free with each pipe.

a) Factory Test Pressure 4 kg/Sqcm


i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3653.00
iii) 350 mm Rmt 4110.00
iv) 400 mm Rmt 4508.00
v) 450 mm Rmt 4987.00
vi) 500 mm Rmt 5594.00
vii) 600 mm Rmt 7252.00
viii) 700 mm Rmt 8370.00
ix) 800 mm Rmt 9199.00
x) 900 mm Rmt 12650.00
xi) 1000 mm Rmt 14813.00
xii) 1100 mm Rmt 20952.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27267.00
xv) 1400 mm Rmt 29244.00
xvi) 1500 mm Rmt 31538.00
xvii) 1600 mm Rmt 34191.00
xviii) 1700 mm Rmt 36274.00
xix) 1800 mm Rmt 38730.00
a) Factory Test Pressure 6 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3653.00
iii) 350 mm Rmt 4110.00
iv) 400 mm Rmt 4508.00
v) 450 mm Rmt 4987.00
vi) 500 mm Rmt 5594.00
vii) 600 mm Rmt 7252.00
viii) 700 mm Rmt 8370.00
ix) 800 mm Rmt 9206.00
x) 900 mm Rmt 12650.00

88
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xi) 1000 mm Rmt 14820.00
xii) 1100 mm Rmt 20952.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27267.00
xv) 1400 mm Rmt 29244.00
xvi) 1500 mm Rmt 31538.00
xvii) 1600 mm Rmt 34202.00
xviii) 1700 mm Rmt 36281.00
xix) 1800 mm Rmt 38736.00
a) Factory Test Pressure 8 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3653.00
iii) 350 mm Rmt 4110.00
iv) 400 mm Rmt 4508.00
v) 450 mm Rmt 4987.00
vi) 500 mm Rmt 5594.00
vii) 600 mm Rmt 7252.00
viii) 700 mm Rmt 8370.00
ix) 800 mm Rmt 9217.00
x) 900 mm Rmt 12650.00
xi) 1000 mm Rmt 14833.00
xii) 1100 mm Rmt 20952.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27267.00
xv) 1400 mm Rmt 29244.00
xvi) 1500 mm Rmt 31538.00
xvii) 1600 mm Rmt 34213.00
xviii) 1700 mm Rmt 36293.00
xix) 1800 mm Rmt 38750.00
a) Factory Test Pressure 10 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3653.00
iii) 350 mm Rmt 4110.00
iv) 400 mm Rmt 4508.00
v) 450 mm Rmt 4987.00
vi) 500 mm Rmt 5594.00
vii) 600 mm Rmt 7252.00
viii) 700 mm Rmt 8370.00
ix) 800 mm Rmt 9236.00
x) 900 mm Rmt 12650.00
xi) 1000 mm Rmt 14849.00
xii) 1100 mm Rmt 20952.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27267.00
xv) 1400 mm Rmt 29244.00
xvi) 1500 mm Rmt 31538.00
xvii) 1600 mm Rmt 34229.00
xviii) 1700 mm Rmt 36311.00
xix) 1800 mm Rmt 38768.00
a) Factory Test Pressure 12 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3653.00
iii) 350 mm Rmt 4110.00
iv) 400 mm Rmt 4508.00
v) 450 mm Rmt 4987.00
vi) 500 mm Rmt 5594.00
vii) 600 mm Rmt 7252.00
viii) 700 mm Rmt 8370.00
ix) 800 mm Rmt 10350.00
x) 900 mm Rmt 12650.00

89
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xi) 1000 mm Rmt 15727.00
xii) 1100 mm Rmt 20952.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27267.00
xv) 1400 mm Rmt 29244.00
xvi) 1500 mm Rmt 31538.00
xvii) 1600 mm Rmt 34887.00
xviii) 1700 mm Rmt 37760.00
xix) 1800 mm Rmt 41994.00
b) Factory Test Pressure 14 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3659.00
iii) 350 mm Rmt 4117.00
iv) 400 mm Rmt 4511.00
v) 450 mm Rmt 5002.00
vi) 500 mm Rmt 5693.00
vii) 600 mm Rmt 7384.00
viii) 700 mm Rmt 9609.00
ix) 800 mm Rmt 11265.00
x) 900 mm Rmt 13896.00
xi) 1000 mm Rmt 16730.00
xii) 1100 mm Rmt 21039.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27983.00
xv) 1400 mm Rmt 31574.00
xvi) 1500 mm Rmt 35131.00
xvii) 1600 mm Rmt 39174.00
xviii) 1700 mm Rmt 43012.00
xix) 1800 mm Rmt 47056.00
c) Factory Test Pressure 16 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3661.00
iii) 350 mm Rmt 4121.00
iv) 400 mm Rmt 4517.00
v) 450 mm Rmt 5178.00
vi) 500 mm Rmt 6106.00
vii) 600 mm Rmt 7926.00
viii) 700 mm Rmt 10228.00
ix) 800 mm Rmt 12256.00
x) 900 mm Rmt 15157.00
xi) 1000 mm Rmt 18423.00
xii) 1100 mm Rmt 22191.00
xiii) 1200 mm Rmt 25877.00
xiv) 1300 mm Rmt 30826.00
xv) 1400 mm Rmt 34798.00
xvi) 1500 mm Rmt 38807.00
xvii) 1600 mm Rmt 43157.00
xviii) 1700 mm Rmt 47902.00
xix) 1800 mm Rmt 53450.00
d) Factory Test Pressure 18 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3842.00
iii) 350 mm Rmt 4307.00
iv) 400 mm Rmt 4802.00
v) 450 mm Rmt 5595.00
vi) 500 mm Rmt 6587.00
vii) 600 mm Rmt 8619.00
viii) 700 mm Rmt 11331.00
ix) 800 mm Rmt 13372.00
x) 900 mm Rmt 16528.00

90
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xi) 1000 mm Rmt 20163.00
xii) 1100 mm Rmt 24260.00
xiii) 1200 mm Rmt 28268.00
xiv) 1300 mm Rmt 33565.00
xv) 1400 mm Rmt 38356.00
xvi) 1500 mm Rmt 42364.00
xvii) 1600 mm Rmt 48057.00
xviii) 1700 mm Rmt 53299.00
xix) 1800 mm Rmt 58992.00
e) Factory Test Pressure 20 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3920.00
iii) 350 mm Rmt 4307.00
iv) 400 mm Rmt 5071.00
v) 450 mm Rmt 5792.00
vi) 500 mm Rmt 7023.00
vii) 600 mm Rmt 9187.00
viii) 700 mm Rmt 11945.00
ix) 800 mm Rmt 14580.00
x) 900 mm Rmt 18005.00
xi) 1000 mm Rmt 22028.00
xii) 1100 mm Rmt 26438.00
xiii) 1200 mm Rmt 30736.00
xiv) 1300 mm Rmt 36510.00
xv) 1400 mm Rmt 42077.00
xvi) 1500 mm Rmt 47388.00
xvii) 1600 mm Rmt 52929.00
xviii) 1700 mm Rmt 59129.00
xix) 1800 mm Rmt 65454.00
235 Item No 235: Lowering, laying and jointing in proper grade Section - PDN
and alignment Bar wrapped steel cylinder pipes with B.W.S.C. Pipe
couplings & gasket including cost of conveyance from stores to (P.N. 1 to 20)
site of works, all labour involved, etc. complete (for all class of
pipes)
i) 250 mm Rmt 316.00
ii) 300 mm Rmt 328.00
iii) 350 mm Rmt 338.00
iv) 400 mm Rmt 384.00
v) 450 mm Rmt 395.00
vi) 500 mm Rmt 470.00
vii) 600 mm Rmt 520.00
viii) 700 mm Rmt 622.00
ix) 800 mm Rmt 719.00
x) 900 mm Rmt 789.00
xi) 1000 mm Rmt 890.00
xii) 1100 mm Rmt 977.00
xiii) 1200 mm Rmt 1077.00
xiv) 1300 mm Rmt 1195.00
xv) 1400 mm Rmt 1271.00
xvi) 1500 mm Rmt 1417.00
xvii) 1600 mm Rmt 1450.00
xviii) 1700 mm Rmt 1634.00
xix) 1800 mm Rmt 1667.00
xx) 1900 mm Rmt 1700.00
xxi) 2000 mm Rmt 1947.00
xxii) 2100 mm Rmt 1979.00
xxiii) 2200 mm Rmt 2011.00

91
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
236 Item No 236: Providing and supplying ISI mark Bar wrapped Section - PDN
steel cylinder pipes fitting/specials including loading, B.W.S.C. Pipe
unloading, trasnporatation upto departmental store, stacking (P.N. 1 to 20)
excluding GST levied by GOI & GOM in all respect.etc.complete.

i) 250 mm dia. To 1800mm kg 107.00

237 Item No 237: Hydraulic testing of Bar wrapped steel cylinder Section - PDN
pipes to specified pressure including cost of all materials and B.W.S.C. Pipe
labour and water for testing for the length upto 1 km., using (P.N. 1 to 20)
reciprocating type pumps which should be able to provide
specified test pressure guages and other necessary equipments,
labour, operation charges, etc. required for testing. The rate
under this item shall also include cost of retesting, if necessary.

i) 250 mm Km 10206.95
ii) 300 mm Km 12323.40
iii) 350 mm Km 15291.20
iv) 400 mm Km 18782.00
v) 450 mm Km 22489.05
vi) 500 mm Km 26431.80
vii) 600 mm Km 31433.00
viii) 700 mm Km 37611.05
ix) 800 mm Km 44731.85
x) 900 mm Km 52770.00
xi) 1000 mm Km 61802.00
xii) 1100 mm Km 71751.00
xiii) 1200 mm Km 82643.00
xiv) 1300 mm Km 94477.00
xv) 1400 mm Km 107255.00
xvi) 1500 mm Km 124638.00
xvii) 1600 mm Km 140636.00
xviii) 1700 mm Km 156242.00
xix) 1800 mm Km 172790.00
xx) 1900 mm Km 190281.00
xxi) 2000 mm Km 208715.00
xxii) 2100 mm Km 228092.00
xxiii) 2200 mm Km 249079.00

92
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
VI. GLASS FIBRE REINFORCED PLASTIC PIPES (GRP)
238 Item No 238: Providing and supplying Glass fibre Section - PDN
reinforced plastic (GRP) pipes confirming to IS 14402 with G.R.P. Pipe
double bell REKA GRP coupling EPDM rubber gaskets for (P.N. 1 to 26)
sealing of following pressure diameter and stiffness class
including cost of all material and labour required, insurance,
transportation to store, unloading and stacking excluding GST
levied by GOI & GOM in all respect etc. complete.
A. Class (SN) 2500 (124 kpa)
a) 3 Kg/Sq.cm :
i) 300 mm Rmt 2728.00
ii) 350 mm Rmt 3154.00
iii) 400 mm Rmt 3473.00
iv) 450 mm Rmt 3906.00
v) 500 mm Rmt 4420.00
vi) 600 mm Rmt 5610.00
vii) 700 mm Rmt 6960.00
viii) 800 mm Rmt 8610.00
ix) 900 mm Rmt 10512.00
x) 1000 mm Rmt 12468.00
xi) 1100 mm Rmt 15180.00
xii) 1200 mm Rmt 17700.00
xiii) 1300 mm Rmt 20028.00
xiv) 1400 mm Rmt 23160.00
xv) 1500 mm Rmt 26316.00
xvi) 1600 mm Rmt 30660.00
xvii) 1700 mm Rmt 36696.00
xviii) 1800 mm Rmt 40040.00
xix) 1900 mm Rmt 44760.00
xx) 2000 mm Rmt 48384.00
xxi) 2100 mm Rmt 54103.00
xxii) 2200 mm Rmt 58080.00
xxiii) 2300 mm Rmt 62760.00
xiv) 2400 mm Rmt 67080.00
xxv) 2500 mm Rmt 73002.00
xxvi) 2600 mm Rmt 79152.00
xxvii) 2700 mm Rmt 84480.00
xxviii) 2800 mm Rmt 90660.00
xxix) 2900 mm Rmt 97050.00
xxx) 3000 mm Rmt 103428.00
b) 6 Kg/Sq.cm :
i) 300 mm Rmt 2832.00
ii) 350 mm Rmt 3235.00
iii) 400 mm Rmt 3636.00
iv) 450 mm Rmt 4036.00
v) 500 mm Rmt 4502.00
vi) 600 mm Rmt 5843.00
vii) 700 mm Rmt 7303.00
viii) 800 mm Rmt 8959.00
ix) 900 mm Rmt 10932.00
x) 1000 mm Rmt 13014.00
xi) 1100 mm Rmt 15780.00
xii) 1200 mm Rmt 18302.00
xiii) 1300 mm Rmt 20934.00
xiv) 1400 mm Rmt 23974.00
xv) 1500 mm Rmt 27360.00
xvi) 1600 mm Rmt 31944.00
xvii) 1700 mm Rmt 38185.00
xviii) 1800 mm Rmt 41586.00

93
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xix) 1900 mm Rmt 46560.00
xx) 2000 mm Rmt 50384.00
xxi) 2100 mm Rmt 56220.00
xxii) 2200 mm Rmt 60612.00
xxiii) 2300 mm Rmt 65304.00
xiv) 2400 mm Rmt 69742.00
xxv) 2500 mm Rmt 77298.00
xxvi) 2600 mm Rmt 83100.00
xxvii) 2700 mm Rmt 89022.00
xxviii) 2800 mm Rmt 95280.00
xxix) 2900 mm Rmt 102264.00
xxx) 3000 mm Rmt 109260.00
c) 9 Kg/Sq.cm :
i) 300 mm Rmt 2922.00
ii) 350 mm Rmt 3394.00
iii) 400 mm Rmt 3784.00
iv) 450 mm Rmt 4290.00
v) 500 mm Rmt 4502.00
vi) 600 mm Rmt 6194.00
vii) 700 mm Rmt 7752.00
viii) 800 mm Rmt 9703.00
ix) 900 mm Rmt 11826.00
x) 1000 mm Rmt 14040.00
xi) 1100 mm Rmt 16978.00
xii) 1200 mm Rmt 19744.00
xiii) 1300 mm Rmt 22800.00
xiv) 1400 mm Rmt 26225.00
xv) 1500 mm Rmt 29778.00
xvi) 1600 mm Rmt 34788.00
xvii) 1700 mm Rmt 41736.00
xviii) 1800 mm Rmt 45624.00
xix) 1900 mm Rmt 50734.00
xx) 2000 mm Rmt 55020.00
xxi) 2100 mm Rmt 61272.00
xxii) 2200 mm Rmt 65904.00
xxiii) 2300 mm Rmt 71144.00
xiv) 2400 mm Rmt 76738.00
xxv) 2500 mm Rmt 87755.00
xxvi) 2600 mm Rmt 95170.00
xxvii) 2700 mm Rmt 101940.00
xxviii) 2800 mm Rmt 109440.00
xxix) 2900 mm Rmt 117132.00
xxx) 3000 mm Rmt 124800.00

94
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
d) 12 Kg/Sq.cm :
i) 300 mm Rmt 3095.00
ii) 350 mm Rmt 3571.00
iii) 400 mm Rmt 3978.00
iv) 450 mm Rmt 4770.00
v) 500 mm Rmt 4502.00
vi) 600 mm Rmt 6666.00
vii) 700 mm Rmt 8280.00
viii) 800 mm Rmt 10296.00
ix) 900 mm Rmt 12634.00
x) 1000 mm Rmt 15076.00
xi) 1100 mm Rmt 18516.00
xii) 1200 mm Rmt 21600.00
xiii) 1300 mm Rmt 24468.00
xiv) 1400 mm Rmt 28195.00
xv) 1500 mm Rmt 32238.00
xvi) 1600 mm Rmt 37438.00
xvii) 1700 mm Rmt 44951.00
xviii) 1800 mm Rmt 49320.00
xix) 1900 mm Rmt 54598.00
xx) 2000 mm Rmt 59388.00
xxi) 2100 mm Rmt 66204.00
xxii) 2200 mm Rmt 71422.00
xxiii) 2300 mm Rmt 79452.00
xiv) 2400 mm Rmt 86154.00
xxv) 2500 mm Rmt 116467.00
xxvi) 2600 mm Rmt 125350.00
xxvii) 2700 mm Rmt 134244.00
xxviii) 2800 mm Rmt 144174.00
xxix) 2900 mm Rmt 158202.00
xxx) 3000 mm Rmt 163136.00
e) 15 Kg/Sq.cm :
i) 300 mm Rmt 3222.00
ii) 350 mm Rmt 3721.00
iii) 400 mm Rmt 4140.00
iv) 450 mm Rmt 4770.00
v) 500 mm Rmt 5483.00
vi) 600 mm Rmt 7164.00
vii) 700 mm Rmt 8916.00
viii) 800 mm Rmt 11160.00
ix) 900 mm Rmt 13795.00
x) 1000 mm Rmt 16380.00
xi) 1100 mm Rmt 20122.00
xii) 1200 mm Rmt 23359.00
xiii) 1300 mm Rmt 26950.00
xiv) 1400 mm Rmt 30864.00
xv) 1500 mm Rmt 35052.00
xvi) 1600 mm Rmt 40680.00
xvii) 1700 mm Rmt 49584.00
xviii) 1800 mm Rmt 54154.00
xix) 1900 mm Rmt 60492.00
xx) 2000 mm Rmt 65874.00
xxi) 2100 mm Rmt 75588.00

95
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xxii) 2200 mm Rmt 81779.00
xxiii) 2300 mm Rmt 88236.00
xiv) 2400 mm Rmt 94212.00
xxv) 2500 mm Rmt 128114.00
xxvi) 2600 mm Rmt 137885.00
xxvii) 2700 mm Rmt 147668.00
xxviii) 2800 mm Rmt 158592.00
xxix) 2900 mm Rmt 174022.00
xxx) 3000 mm Rmt 179450.00
B. Class (SN) 5000 (248 kpa)
a) 3 Kg/Sq.cm :
i) 300 mm Rmt 2923.20
ii) 350 mm Rmt 3429.60
iii) 400 mm Rmt 3854.40
iv) 450 mm Rmt 4394.40
v) 500 mm Rmt 4917.60
vi) 600 mm Rmt 6328.80
vii) 700 mm Rmt 7904.40
viii) 800 mm Rmt 9828.00
ix) 900 mm Rmt 12140.40
x) 1000 mm Rmt 14446.80
xi) 1100 mm Rmt 17539.20
xii) 1200 mm Rmt 20569.20
xiii) 1300 mm Rmt 23558.40
xiv) 1400 mm Rmt 26918.40
xv) 1500 mm Rmt 30760.80
xvi) 1600 mm Rmt 35766.00
xvii) 1700 mm Rmt 42922.80
xviii) 1800 mm Rmt 47042.40
xix) 1900 mm Rmt 52381.20
xx) 2000 mm Rmt 57010.80
xxi) 2100 mm Rmt 63454.80
xxii) 2200 mm Rmt 68498.40
xxiii) 2300 mm Rmt 75998.40
xiv) 2400 mm Rmt 82118.40
xxv) 2500 mm Rmt 88476.00
xxvi) 2600 mm Rmt 95037.60
xxvii) 2700 mm Rmt 102194.40
xxviii) 2800 mm Rmt 109234.80
xxix) 2900 mm Rmt 117213.60
xxx) 3000 mm Rmt 125232.00
b) 6 Kg/Sq.cm :
i) 300 mm Rmt 2968.80
ii) 350 mm Rmt 3488.40
iii) 400 mm Rmt 3854.40
iv) 450 mm Rmt 4394.40
v) 500 mm Rmt 5061.60
vi) 600 mm Rmt 6466.80
vii) 700 mm Rmt 8109.60
viii) 800 mm Rmt 10066.80
ix) 900 mm Rmt 12438.00
x) 1000 mm Rmt 14774.40
xi) 1100 mm Rmt 18097.20
xii) 1200 mm Rmt 21046.80
xiii) 1300 mm Rmt 24188.40
xiv) 1400 mm Rmt 27598.80
xv) 1500 mm Rmt 31480.80
xvi) 1600 mm Rmt 36651.60
xvii) 1700 mm Rmt 43974.00
xviii) 1800 mm Rmt 48181.20

96
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xix) 1900 mm Rmt 53692.80
xx) 2000 mm Rmt 58538.40
xxi) 2100 mm Rmt 65100.00
xxii) 2200 mm Rmt 70384.80
xxiii) 2300 mm Rmt 78056.40
xiv) 2400 mm Rmt 84027.60
xxv) 2500 mm Rmt 90754.80
xxvi) 2600 mm Rmt 98106.00
xxvii) 2700 mm Rmt 105141.60
xxviii) 2800 mm Rmt 112579.20
xxix) 2900 mm Rmt 120685.20
xxx) 3000 mm Rmt 128832.00
c) 9 Kg/Sq.cm :
i) 300 mm Rmt 3076.80
ii) 350 mm Rmt 3606.00
iii) 400 mm Rmt 4057.20
iv) 450 mm Rmt 4618.80
v) 500 mm Rmt 5284.80
vi) 600 mm Rmt 7179.60
vii) 700 mm Rmt 8505.60
viii) 800 mm Rmt 10992.00
ix) 900 mm Rmt 13006.80
x) 1000 mm Rmt 15526.80
xi) 1100 mm Rmt 20346.00
xii) 1200 mm Rmt 23643.60
xiii) 1300 mm Rmt 26520.00
xiv) 1400 mm Rmt 29760.00
xv) 1500 mm Rmt 34200.00
xvi) 1600 mm Rmt 38520.00
xvii) 1700 mm Rmt 46440.00
xviii) 1800 mm Rmt 50548.80
xix) 1900 mm Rmt 55104.00
xx) 2000 mm Rmt 66120.00
xxi) 2100 mm Rmt 69900.00
xxii) 2200 mm Rmt 75588.00
xxiii) 2300 mm Rmt 85320.00
xiv) 2400 mm Rmt 91812.00
xxv) 2500 mm Rmt 96148.80
xxvi) 2600 mm Rmt 103813.20
xxvii) 2700 mm Rmt 111145.20
xxviii) 2800 mm Rmt 117000.00
xxix) 2900 mm Rmt 126000.00
xxx) 3000 mm Rmt 133800.00
d) 12 Kg/Sq.cm :
i) 300 mm Rmt 3164.40
ii) 350 mm Rmt 3753.60
iii) 400 mm Rmt 4149.60
iv) 450 mm Rmt 4804.80
v) 500 mm Rmt 5486.40
vi) 600 mm Rmt 7245.60
vii) 700 mm Rmt 9024.00
viii) 800 mm Rmt 11114.40
ix) 900 mm Rmt 13936.80
x) 1000 mm Rmt 16401.60
xi) 1100 mm Rmt 20346.00
xii) 1200 mm Rmt 23643.60
xiii) 1300 mm Rmt 27097.20
xiv) 1400 mm Rmt 31090.80
xv) 1500 mm Rmt 35298.00
xvi) 1600 mm Rmt 39616.80

97
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xvii) 1700 mm Rmt 49148.40
xviii) 1800 mm Rmt 52868.40
xix) 1900 mm Rmt 58753.20
xx) 2000 mm Rmt 71310.00
xxi) 2100 mm Rmt 76423.20
xxii) 2200 mm Rmt 82159.20
xxiii) 2300 mm Rmt 93903.60
xiv) 2400 mm Rmt 99160.80
xxiii) 2500 mm Rmt 149779.20
xiv) 2600 mm Rmt 160312.80
xxiii) 2700 mm Rmt 172256.40
xiv) 2800 mm Rmt 183914.40
xxiii) 2900 mm Rmt 197270.40
xiv) 3000 mm Rmt 209792.40
e) 15 Kg/Sq.cm :
i) 300 mm Rmt 3278.40
ii) 350 mm Rmt 3901.20
iii) 400 mm Rmt 4362.00
iv) 450 mm Rmt 5036.40
v) 500 mm Rmt 5748.00
vi) 600 mm Rmt 7508.40
vii) 700 mm Rmt 9495.60
viii) 800 mm Rmt 11859.60
ix) 900 mm Rmt 14679.60
x) 1000 mm Rmt 17514.00
xi) 1100 mm Rmt 21487.20
xii) 1200 mm Rmt 25177.20
xiii) 1300 mm Rmt 28610.40
xiv) 1400 mm Rmt 33061.20
xv) 1500 mm Rmt 37587.60
xvi) 1600 mm Rmt 42338.40
xvii) 1700 mm Rmt 51094.80
xviii) 1800 mm Rmt 55234.80
xix) 1900 mm Rmt 64256.40
xx) 2000 mm Rmt 74568.00
xxi) 2100 mm Rmt 81646.80
xxii) 2200 mm Rmt 85537.20
xxiii) 2300 mm Rmt 97746.00
xiv) 2400 mm Rmt 106800.00

98
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xxiii) 2500 mm Rmt 164756.40
xiv) 2600 mm Rmt 176344.80
xxiii) 2700 mm Rmt 189482.40
xiv) 2800 mm Rmt 202305.60
xxiii) 2900 mm Rmt 216997.20
xiv) 3000 mm Rmt 230772.00
239 Item No 239: Lowering, laying and jointing in proper grade Section - PDN
and alignment Glass fibre reinforced plastic (GRP) pipes G.R.P. Pipe
with couplings & gasket including cost of conveyance from (P.N. 1 to 26)
stores to site of works, all labour involved, etc. complete (for all
class of pipes)
i) 300 mm Rmt 216.00
ii) 350 mm Rmt 216.00
iii) 400 mm Rmt 216.00
iv) 450 mm Rmt 216.00
v) 500 mm Rmt 216.00
vi) 600 mm Rmt 231.00
vii) 700 mm Rmt 231.00
viii) 800 mm Rmt 269.00
ix) 900 mm Rmt 336.00
x) 1000 mm Rmt 336.00
xi) 1100 mm Rmt 363.00
xii) 1200 mm Rmt 365.00
xiii) 1300 mm Rmt 402.00
xiv) 1400 mm Rmt 426.00
xv) 1500 mm Rmt 523.00
xvi) 1600 mm Rmt 526.00
xvii) 1700 mm Rmt 578.00
xviii) 1800 mm Rmt 617.00
xix) 1900 mm Rmt 615.00
xx) 2000 mm Rmt 631.00
xxi) 2100 mm Rmt 712.00
xxii) 2200 mm Rmt 768.00
xxiii) 2300 mm Rmt 929.00
xiv) 2400 mm Rmt 943.00
xxv) 2500 mm Rmt 1064.00
xxvi) 2600 mm Rmt 1064.00
xxvii) 2700 mm Rmt 1064.00
xxviii) 2800 mm Rmt 1064.00
xxix) 2900 mm Rmt 1064.00
xxx) 3000 mm Rmt 1064.00
240 Item No 240: Providing and supplying ISI mark Glass fibre Section - PDN
reinforced plastic pipes (GRP) fitting/specials including G.R.P. Pipe
loading, unloading, transportation upto departmental store, (P.N. 1 to 26)
stacking excluding GST levied by GOI & GOM in all
respect.etc.complete.
i) 90 DRG Bend with one coupling One 7 times x Pipe
Bend Per Mtr Price
ii) 60 DRG Bend with one coupling One 5 times x Pipe
Bend Per Mtr Price

99
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
iii) 45 DRG Bend with one coupling One 4 times x Pipe
Bend Per Mtr Price
iv) 30 DRG Bend with one coupling One 3 times x Pipe
Bend Per Mtr Price
v) 22.5 DRG Bend with one coupling One 2.5 times x
Bend Pipe Per Mtr
Price
vi) 11.25 DRG Bend with one coupling One 2 times x Pipe
Bend Per Mtr Price
vii) GRP Equal Tee One Tee 5 times x Pipe
Per Mtr Price
viii) Flange Tail Piece (Length 0.65 m) One 4 times x Pipe
Flange Per Mtr Price
ix) Lamination joint (Butt strap joint) One 1.5 times x
joint Pipe Per Mtr
Price
x) GRP Double bell coupling One 1.5 times x
coupling Pipe Per Mtr
Price
241 Item No 241: Hydraulic testing of Glass fibre reinforced Section - PDN
plastic (GRP) pipes to specified pressure including cost of all G.R.P. Pipe
materials and labour and water for testing for the length upto 1 (P.N. 1 to 26)
km., using reciprocating type pumps which should be able to
provide specified test pressure guages and other necessary
equipments, labour, operation charges, etc. required for testing.
The rate under this item shall also include cost of retesting, if
necessary.

i) 300 mm Km 12323.40
ii) 350 mm Km 15291.20
iii) 400 mm Km 18782.00
iv) 450 mm Km 22489.05
v) 500 mm Km 26431.80
vi) 600 mm Km 31433.00
vii) 700 mm Km 37611.05
viii) 800 mm Km 44731.85
ix) 900 mm Km 52770.00
x) 1000 mm Km 61802.00
xi) 1100 mm Km 71751.00
xii) 1200 mm Km 82643.00
xiii) 1300 mm Km 94477.00
xiv) 1400 mm Km 107255.00
xv) 1500 mm Km 124638.00
xvi) 1600 mm Km 140636.00
xvii) 1700 mm Km 156242.00
xviii) 1800 mm Km 172790.00
xix) 1900 mm Km 190281.00
xx) 2000 mm Km 208715.00
xxi) 2100 mm Km 228092.00
xxii) 2200 mm Km 249079.00
xxiii) 2300 mm Km 270342.00
xiv) 2400 mm Km 292547.00
xxv) 2500 mm Km 315695.00
xxvi) 2600 mm Km 339785.00
xxvii) 2700 mm Km 364818.00
xxviii) 2800 mm Km 390794.00
xxix) 2900 mm Km 417713.00
xxx) 3000 mm Km 445575.00

100
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
VII. H.D.P.E. PIPES
242 Item No 242: Providing and supplying in standard lengths Section - PDN
Polyethelene Pipes, confirming to IS 4984 /14151 / 12786 / H.D.P.E. Pipe
13488 with nesessary jointing material like mechanical connector (P.N. 1 to 28)
i.e. thread / insert joint / quick release coupler joint / compression
fitting joint or flanged joint excluding coupler/specials, including
transportation and freight charges, inspection charges, loading /
unloading charges, conveyance to the departmental stores &
stacking the same in closed shade duly protecting from sunrays &
rains, excluding GST levied by GI & GOM in all respect etc.
complete.

Note:- H.D.P.E. Pipes shall be as per latest IS Specifications.

a) PE-100 : 4 Kg/Sq.cm
1 75 mm Rmt 91.00
2 90 mm Rmt 133.00
3 110 mm Rmt 195.00
4 125 mm Rmt 248.00
5 140 mm Rmt 313.00
6 160 mm Rmt 408.00
7 180 mm Rmt 514.00
8 200 mm Rmt 616.00
9 225 mm Rmt 801.00
10 250 mm Rmt 982.00
11 280 mm Rmt 1232.00
12 315 mm Rmt 1562.00
13 355 mm Rmt 1978.00
14 400 mm Rmt 2510.00
15 450 mm Rmt 3381.00
16 500 mm Rmt 4161.00
17 560 mm Rmt 5214.00
18 630 mm Rmt 6586.00
19 710 mm Rmt 8400.00
20 800 mm Rmt 10631.00
21 900 mm Rmt 13435.00
22 1000 mm Rmt 16567.00
23 1200 mm Rmt 23875.00
b) PE-100 : 6 Kg/Sq.cm
1 75 mm Rmt 139.00
2 90 mm Rmt 196.00
3 110 mm Rmt 302.00
4 125 mm Rmt 381.00
5 140 mm Rmt 478.00
6 160 mm Rmt 626.00
7 180 mm Rmt 787.00
8 200 mm Rmt 975.00
9 225 mm Rmt 1230.00
10 250 mm Rmt 1517.00
11 280 mm Rmt 1893.00
12 315 mm Rmt 2388.00
13 355 mm Rmt 3030.00
14 400 mm Rmt 3856.00

101
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
15 450 mm Rmt 4501.00
16 500 mm Rmt 6416.00
17 560 mm Rmt 8030.00
18 630 mm Rmt 10144.00
19 710 mm Rmt 12917.00
20 800 mm Rmt 16353.00
21 900 mm Rmt 20715.00
22 1000 mm Rmt 25593.00
23 1200 mm Rmt 36808.00
c) PE-100 : 8 Kg/Sq.cm
1 75 mm Rmt 171.00
2 90 mm Rmt 240.00
3 110 mm Rmt 361.00
4 125 mm Rmt 463.00
5 140 mm Rmt 581.00
6 160 mm Rmt 762.00
7 180 mm Rmt 961.00
8 200 mm Rmt 1181.00
9 225 mm Rmt 1492.00
10 250 mm Rmt 1836.00
11 280 mm Rmt 2307.00
12 315 mm Rmt 2923.00
13 355 mm Rmt 3700.00
14 400 mm Rmt 4708.00
15 450 mm Rmt 6368.00
16 500 mm Rmt 7873.00
17 560 mm Rmt 9857.00
18 630 mm Rmt 12463.00
19 710 mm Rmt 15879.00
20 800 mm Rmt 20151.00
21 900 mm Rmt 25509.00
22 1000 mm Rmt 31498.00
23 1200 mm Rmt 45312.00
d) PE-100 : 10 Kg/Sq.cm
1 75 mm Rmt 208.00
2 90 mm Rmt 299.00
3 110 mm Rmt 440.00
4 125 mm Rmt 565.00
5 140 mm Rmt 710.00
6 160 mm Rmt 930.00
7 180 mm Rmt 1176.00
8 200 mm Rmt 1446.00
9 225 mm Rmt 1834.00
10 250 mm Rmt 2252.00
11 280 mm Rmt 2831.00
12 315 mm Rmt 3581.00
13 355 mm Rmt 4569.00
14 400 mm Rmt 5786.00
15 450 mm Rmt 7763.00
16 500 mm Rmt 9592.00
17 560 mm Rmt 12021.00
18 630 mm Rmt 15224.00
19 710 mm Rmt 19307.00
20 800 mm Rmt 24548.00
21 900 mm Rmt 31032.00
22 1000 mm Rmt 38344.00
23 1200 mm Rmt 55178.00

102
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
e) PE-100 : 12.5 Kg/Sq.cm
1 75 mm Rmt 250.00
2 90 mm Rmt 356.00
3 110 mm Rmt 530.00
4 125 mm Rmt 688.00
5 140 mm Rmt 864.00
6 160 mm Rmt 1138.00
7 180 mm Rmt 1421.00
8 200 mm Rmt 1752.00
9 225 mm Rmt 2217.00
10 250 mm Rmt 2738.00
11 280 mm Rmt 3430.00
12 315 mm Rmt 4363.00
13 355 mm Rmt 5504.00
14 400 mm Rmt 6986.00
15 450 mm Rmt 9583.00
16 500 mm Rmt 11624.00
17 560 mm Rmt 14559.00
18 630 mm Rmt 18430.00
19 710 mm Rmt 23425.00
20 800 mm Rmt 29737.00
21 900 mm Rmt 37632.00
22 1000 mm Rmt 46410.00
23 1200 mm Rmt 66831.00
f) PE-100 : 16 Kg/Sq.cm
1 75 mm Rmt 316.00
2 90 mm Rmt 425.00
3 110 mm Rmt 636.00
4 125 mm Rmt 817.00
5 140 mm Rmt 1029.00
6 160 mm Rmt 1341.00
7 180 mm Rmt 1693.00
8 200 mm Rmt 2108.00
9 225 mm Rmt 2638.00
10 250 mm Rmt 3260.00
11 280 mm Rmt 4094.00
12 315 mm Rmt 5168.00
13 355 mm Rmt 6576.00
14 400 mm Rmt 8346.00
15 450 mm Rmt 11222.00
16 500 mm Rmt 13866.00
17 560 mm Rmt 17391.00
18 630 mm Rmt 21989.00
19 710 mm Rmt 27932.00
20 800 mm Rmt 35459.00
21 900 mm Rmt 44868.00
22 1000 mm Rmt 55425.00

243 Item No 243: Lowering, Laying and Jointing H. D. P. E pipes Section - PDN
in proper position including all specials by compression H.D.P.E. Pipe
fitting/electrofusion and butt fusion jointing procedure as per (P.N. 1 to 28)
relevent IS Code complete with all materials for jointing procedure
like Electrofusion machine, Electric heater/butt fusion welding
machine with hydraulic jack, top loading clamp etc. and all labours
as directed by engineer in charge as per IS-7634 Part II For all
classes.

1 75 mm Rmt 57.00
2 90 mm Rmt 65.00
3 110 mm Rmt 70.00

103
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
4 125 mm Rmt 83.00
5 140 mm Rmt 95.00
6 160 mm Rmt 106.00
7 180 mm Rmt 112.00
8 200 mm Rmt 131.00
9 225 mm Rmt 164.00
10 250 mm Rmt 179.00
11 280 mm Rmt 218.00
12 315 mm Rmt 259.00
13 355 mm Rmt 301.00
14 400 mm Rmt 316.00
15 450 mm Rmt 332.00
16 500 mm Rmt 388.00
17 560 mm Rmt 406.00
18 630 mm Rmt 538.00
19 710 mm Rmt 561.00
20 800 mm Rmt 701.00
21 900 mm Rmt 934.00
22 1000 mm Rmt 971.00
23 1200 mm Rmt 1038.00
244 Item No 244: Providing and supplying ISI mark H. D. P. E Section - PDN
pipes fitting/specials including loading , unloading , H.D.P.E. Pipe
trasnporatation upto departmental store, stacking excluding GST (P.N. 1 to 28)
levied by GOI & GOM in all respect.etc.complete.
75 mm & above dia. Rmt 2 % of per
mtr. rate of
pipe
245 Item No 245: Hydraulic testing of H. D. P. E. pipe line to Section - PDN
specified pressure including cost of all materials and labour and H.D.P.E. Pipe
water for testing for specified length including cutting, placing end (P.N. 1 to 28)
cap making arrangement for filling safe water using reciprocating
type pumps which should be able to provide specified test
pressure gauges and other necessary equipments, labour,
operation charges, etc. required for testing. The rate under this
item shall also include cost of retesting, if necessary and
reinstating to original position.

1 75 mm Km 6813.45
2 90 mm Km 6960.20
3 110 mm Km 7188.80
4 125 mm Km 7385.05
5 140 mm Km 7964.25
6 160 mm Km 8287.20
7 180 mm Km 8647.80
8 200 mm Km 9046.15
9 225 mm Km 9597.10
10 250 mm Km 10206.95
11 280 mm Km 11016.60
12 315 mm Km 12788.30
13 355 mm Km 15467.40
14 400 mm Km 18782.00
15 450 mm Km 22489.05
16 500 mm Km 26431.80
17 560 mm Km 29550.00
18 630 mm Km 33187.40
19 710 mm Km 38280.70
20 800 mm Km 44731.85
21 900 mm Km 52770.00
22 1000 mm Km 61802.00
23 1200 mm Km 82643.00

104
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
VIII. PRE-STRESSED CONCRETE CYLINDER PIPES (PCC)

246 Item No 246: Providing and supplying Prestressed Concrete Section - PDN
Cylinder Pipes suitable for sliding ovrelap weld joint or confined P.C.C. Pipe
rubber ring joint with necessary rubber ring of following class (P.N. 1 to 20)
and diameter including cost of transportation, inspection charges
to store, transit insurance, unloading and stacking excluding GST
levied by GOI & GOM in all respect etc. complete.

i) Factory test pressure


2
a) Site test pressure + 01N/mm , For working pressure upto 1
2
N/mm
b) Site test pressure + 02N/mm2, For working pressure upto 1
N/mm2

ii) Site test pressure - 1.5 times working pressure pertaining to


the section or 1.1 times static pressure, which ever is more (such
pressure is to be control within 25% of pumphead incase of
pumping main)
iii) Working pressure - The maximum sustained internal
pressure excluding surge to which each portion of pipeline may
be subjected when installed. As per IS 784:2001

a) Factory Test Pressure 4 kg/Sqcm


i) 350 mm Rmt 5174.00
ii) 400 mm Rmt 5687.00
iii) 450 mm Rmt 6248.00
iv) 500 mm Rmt 6887.00
v) 600 mm Rmt 7950.00
vi) 700 mm Rmt 9653.00
vii) 800 mm Rmt 10878.00
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 15235.00
x) 1100 mm Rmt 16822.00
xi) 1200 mm Rmt 18754.00
xii) 1300 mm Rmt 21443.00
xiii) 1400 mm Rmt 23285.00
xiv) 1500 mm Rmt 26052.00
xv) 1600 mm Rmt 27808.00
xvi) 1700 mm Rmt 29566.00
xvii) 1800 mm Rmt 31319.00
xviii) 1900 mm Rmt 57094.00
xix) 2000 mm Rmt 61638.00
xx) 2100 mm Rmt 64045.00
xxi) 2200 mm Rmt 67590.00
b) Factory Test Pressure 5.5 kg/Sqcm
i) 350 mm Rmt 5174.00
ii) 400 mm Rmt 5714.00
iii) 450 mm Rmt 6282.00
iv) 500 mm Rmt 6887.00
v) 600 mm Rmt 7972.00
vi) 700 mm Rmt 9736.00
vii) 800 mm Rmt 11003.00
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 15385.00
x) 1100 mm Rmt 17093.00
xi) 1200 mm Rmt 19298.00
xii) 1300 mm Rmt 21758.00
xiii) 1400 mm Rmt 23688.00

105
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xiv) 1500 mm Rmt 26474.00
xv) 1600 mm Rmt 28231.00
xvi) 1700 mm Rmt 29987.00
xvii) 1800 mm Rmt 31744.00
xviii) 1900 mm Rmt 57876.00
xix) 2000 mm Rmt 62539.00
xx) 2100 mm Rmt 65333.00
xxi) 2200 mm Rmt 69011.00
c) Factory Test Pressure 7 kg/Sqcm
i) 350 mm Rmt 5186.00
ii) 400 mm Rmt 5737.00
iii) 450 mm Rmt 6310.00
iv) 500 mm Rmt 6887.00
v) 600 mm Rmt 8026.00
vi) 700 mm Rmt 9828.00
vii) 800 mm Rmt 11160.00
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 15619.00
x) 1100 mm Rmt 17316.00
xi) 1200 mm Rmt 19592.00
xii) 1300 mm Rmt 22158.00
xiii) 1400 mm Rmt 24352.00
xiv) 1500 mm Rmt 26513.00
xv) 1600 mm Rmt 28270.00
xvi) 1700 mm Rmt 30029.00
xvii) 1800 mm Rmt 31783.00
xviii) 1900 mm Rmt 58652.00
xix) 2000 mm Rmt 63440.00
xx) 2100 mm Rmt 66024.00
xxi) 2200 mm Rmt 70531.20
d) Factory Test Pressure 8.5 kg/Sqcm
i) 350 mm Rmt 5207.00
ii) 400 mm Rmt 5770.00
iii) 450 mm Rmt 6343.00
iv) 500 mm Rmt 6887.00
v) 600 mm Rmt 8098.00
vi) 700 mm Rmt 9943.00
vii) 800 mm Rmt 11319.00
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 15853.00
x) 1100 mm Rmt 17582.00
xi) 1200 mm Rmt 19933.00
xii) 1300 mm Rmt 22742.00
xiii) 1400 mm Rmt 24816.00
xiv) 1500 mm Rmt 26996.00
xv) 1600 mm Rmt 28752.00
xvi) 1700 mm Rmt 30509.00
xvii) 1800 mm Rmt 32264.00
xviii) 1900 mm Rmt 59435.00
xix) 2000 mm Rmt 65126.00
xx) 2100 mm Rmt 67765.00
xxi) 2200 mm Rmt 71642.00
e) Factory Test Pressure 10 kg/Sqcm
i) 350 mm Rmt 5225.00
ii) 400 mm Rmt 5792.00
iii) 450 mm Rmt 6383.00
iv) 500 mm Rmt 6904.00
v) 600 mm Rmt 8174.00
vi) 700 mm Rmt 10055.00
vii) 800 mm Rmt 11489.00

106
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 16085.00
x) 1100 mm Rmt 17850.00
xi) 1200 mm Rmt 20224.00
xii) 1300 mm Rmt 23148.00
xiii) 1400 mm Rmt 25290.00
xiv) 1500 mm Rmt 27491.00
xv) 1600 mm Rmt 29251.00
xvi) 1700 mm Rmt 31007.00
xvii) 1800 mm Rmt 32762.00
xviii) 1900 mm Rmt 61014.00
xix) 2000 mm Rmt 66028.00
xx) 2100 mm Rmt 68977.00
xxi) 2200 mm Rmt 72887.00
f) Factory Test Pressure 11.5 kg/Sqcm
i) 350 mm Rmt 5246.00
ii) 400 mm Rmt 5828.00
iii) 450 mm Rmt 6400.00
iv) 500 mm Rmt 6965.00
v) 600 mm Rmt 8256.00
vi) 700 mm Rmt 10169.00
vii) 800 mm Rmt 11762.00
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 16321.00
x) 1100 mm Rmt 18120.00
xi) 1200 mm Rmt 20564.00
xii) 1300 mm Rmt 23558.00
xiii) 1400 mm Rmt 25770.00
xiv) 1500 mm Rmt 27991.00
xv) 1600 mm Rmt 29747.00
xvi) 1700 mm Rmt 31504.00
xvii) 1800 mm Rmt 33260.00
xviii) 1900 mm Rmt 61990.00
xix) 2000 mm Rmt 67052.00
xx) 2100 mm Rmt 71346.00
g) Factory Test Pressure 13 kg/Sqcm
i) 350 mm Rmt 5287.00
ii) 400 mm Rmt 5876.00
iii) 450 mm Rmt 6457.00
iv) 500 mm Rmt 7004.00
v) 600 mm Rmt 8335.00
vi) 700 mm Rmt 10284.00
vii) 800 mm Rmt 11910.00
viii) 900 mm Rmt 13872.00
ix) 1000 mm Rmt 16663.00
x) 1100 mm Rmt 18432.00
xi) 1200 mm Rmt 20904.00
xii) 1300 mm Rmt 23974.00
xiii) 1400 mm Rmt 26243.00
xiv) 1500 mm Rmt 28487.00
xv) 1600 mm Rmt 30244.00
xvi) 1700 mm Rmt 31999.00
xvii) 1800 mm Rmt 33742.00
xviii) 1900 mm Rmt 62846.00
xix) 2000 mm Rmt 68078.00
xx) 2100 mm Rmt 72662.00
h) Factory Test Pressure 14.5 kg/Sqcm
i) 350 mm Rmt 5333.00
ii) 400 mm Rmt 5929.00
iii) 450 mm Rmt 6496.00

107
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
iv) 500 mm Rmt 7064.00
v) 600 mm Rmt 8420.00
vi) 700 mm Rmt 10478.00
vii) 800 mm Rmt 12073.00
viii) 900 mm Rmt 14018.00
ix) 1000 mm Rmt 16895.00
x) 1100 mm Rmt 18700.00
xi) 1200 mm Rmt 21245.00
xii) 1300 mm Rmt 24382.00
xiii) 1400 mm Rmt 27427.00
xiv) 1500 mm Rmt 29722.00
xv) 1600 mm Rmt 31480.00
xvi) 1700 mm Rmt 33235.00
xvii) 1800 mm Rmt 34991.00
xviii) 1900 mm Rmt 64741.00
xix) 2000 mm Rmt 70685.00
xx) 2100 mm Rmt 73985.00
i) Factory Test Pressure 17 kg/Sqcm
i) 350 mm Rmt 5375.00
ii) 400 mm Rmt 5984.00
iii) 450 mm Rmt 6572.00
iv) 500 mm Rmt 7145.00
v) 600 mm Rmt 8530.00
vi) 700 mm Rmt 10520.00
vii) 800 mm Rmt 12302.00
viii) 900 mm Rmt 14423.00
ix) 1000 mm Rmt 17154.00
x) 1100 mm Rmt 19147.00
xi) 1200 mm Rmt 21779.00
xii) 1300 mm Rmt 24798.00
xiii) 1400 mm Rmt 27955.00
xiv) 1500 mm Rmt 30276.00
xv) 1600 mm Rmt 32032.00
xvi) 1700 mm Rmt 33790.00
xvii) 1800 mm Rmt 35545.00
xviii) 1900 mm Rmt 66893.00
xix) 2000 mm Rmt 72698.00
xx) 2100 mm Rmt 77002.00

108
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
j) Factory Test Pressure 18.5 kg/Sqcm
i) 350 mm Rmt 5416.00
ii) 400 mm Rmt 6025.00
iii) 450 mm Rmt 6629.00
iv) 500 mm Rmt 7204.00
v) 600 mm Rmt 8638.00
vi) 700 mm Rmt 10652.00
vii) 800 mm Rmt 12466.00
viii) 900 mm Rmt 14605.00
ix) 1000 mm Rmt 17448.00
x) 1100 mm Rmt 19459.00
xi) 1200 mm Rmt 22646.00
xii) 1300 mm Rmt 25990.00
xiii) 1400 mm Rmt 28681.00
xiv) 1500 mm Rmt 30407.00
xv) 1600 mm Rmt 32165.00
xvi) 1700 mm Rmt 33922.00
xvii) 1800 mm Rmt 35677.00
xviii) 1900 mm Rmt 68916.00
xix) 2000 mm Rmt 74569.00
xx) 2100 mm Rmt 79225.00
k) Factory Test Pressure 20 kg/Sqcm
i) 350 mm Rmt 5459.00
ii) 400 mm Rmt 6060.00
iii) 450 mm Rmt 6666.00
iv) 500 mm Rmt 7264.00
v) 600 mm Rmt 8744.00
vi) 700 mm Rmt 10782.00
vii) 800 mm Rmt 12629.00
viii) 900 mm Rmt 14786.00
ix) 1000 mm Rmt 17750.00
x) 1100 mm Rmt 20161.00
xi) 1200 mm Rmt 23395.00
xii) 1300 mm Rmt 26549.00
xiii) 1400 mm Rmt 29315.00
xiv) 1500 mm Rmt 31068.00
xv) 1600 mm Rmt 32825.00
xvi) 1700 mm Rmt 34582.00
xvii) 1800 mm Rmt 36337.00
xviii) 1900 mm Rmt 69874.00
xix) 2000 mm Rmt 76697.00
xx) 2100 mm Rmt 81354.00
l) Factory Test Pressure 21.5 kg/Sqcm
i) 350 mm Rmt 5508.00
ii) 400 mm Rmt 6112.00
iii) 450 mm Rmt 6724.00
iv) 500 mm Rmt 7322.00
v) 600 mm Rmt 8873.00
vi) 700 mm Rmt 11000.00
vii) 800 mm Rmt 12758.00
viii) 900 mm Rmt 15049.00
ix) 1000 mm Rmt 18260.00
x) 1100 mm Rmt 20509.00
xi) 1200 mm Rmt 23774.00
xii) 1300 mm Rmt 27166.00
xiii) 1400 mm Rmt 30924.00
xiv) 1500 mm Rmt 32747.00
xv) 1600 mm Rmt 34507.00
xvi) 1700 mm Rmt 36263.00
xvii) 1800 mm Rmt 38380.00

109
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xviii) 1900 mm Rmt 72342.00
xix) 2000 mm Rmt 79040.00
m) Factory Test Pressure 23 kg/Sqcm
i) 350 mm Rmt 5549.00
ii) 400 mm Rmt 6146.00
iii) 450 mm Rmt 6762.00
iv) 500 mm Rmt 7384.00
v) 600 mm Rmt 9059.00
vi) 700 mm Rmt 11185.00
vii) 800 mm Rmt 13040.00
viii) 900 mm Rmt 15374.00
ix) 1000 mm Rmt 18666.00
x) 1100 mm Rmt 20873.00
xi) 1200 mm Rmt 24421.00
xii) 1300 mm Rmt 27936.00
xiii) 1400 mm Rmt 31776.00
xiv) 1500 mm Rmt 33344.00
xv) 1600 mm Rmt 35102.00
xvi) 1700 mm Rmt 36859.00
xvii) 1800 mm Rmt 38612.00
xviii) 1900 mm Rmt 74602.00
xix) 2000 mm Rmt 79298.00
n) Factory Test Pressure 24.5 kg/Sqcm
i) 350 mm Rmt 5592.00
ii) 400 mm Rmt 6181.00
iii) 450 mm Rmt 6820.00
iv) 500 mm Rmt 7423.00
v) 600 mm Rmt 9422.00
vi) 700 mm Rmt 11339.00
vii) 800 mm Rmt 13086.00
viii) 900 mm Rmt 15764.00
ix) 1000 mm Rmt 18956.00
x) 1100 mm Rmt 21413.00
xi) 1200 mm Rmt 25646.00
xii) 1300 mm Rmt 30151.00
xiii) 1400 mm Rmt 32099.00
xiv) 1500 mm Rmt 33970.00
xv) 1600 mm Rmt 35726.00
xvi) 1700 mm Rmt 37481.00
xvii) 1800 mm Rmt 39239.00
247 Item No 247: Lowering, Laying and Jointing in proper grade Section - PDN
and alignment Prestressed Concrete Cylinder Pipes (PCCP) P.C.C. Pipe
with welding & mortor coating joints including cost of conveyance (P.N. 1 to 20)
from stores to site of works, loading, unloading, hoisting, all
labour involved,etc.complete but excluding cost of rubber rings
(For all class of pipes)

i) 350 mm Rmt 338.00


ii) 400 mm Rmt 384.00

110
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
iii) 450 mm Rmt 395.00
iv) 500 mm Rmt 470.00
v) 600 mm Rmt 520.00
vi) 700 mm Rmt 622.00
vii) 800 mm Rmt 719.00
viii) 900 mm Rmt 789.00
ix) 1000 mm Rmt 890.00
x) 1100 mm Rmt 977.00
xi) 1200 mm Rmt 1077.00
xii) 1300 mm Rmt 1195.00
xiii) 1400 mm Rmt 1271.00
xiv) 1500 mm Rmt 1417.00
xv) 1600 mm Rmt 1450.00
xvi) 1700 mm Rmt 1634.00
xvii) 1800 mm Rmt 1667.00
xviii) 1900 mm Rmt 1700.00
xix) 2000 mm Rmt 1947.00
xx) 2100 mm Rmt 1979.00
xxi) 2200 mm Rmt 2011.00
248 Item No 248: Providing and supplying ISI standard specials Section - PDN
& fitting suitable for P. C. C. pipes including cost of labour P.C.C. Pipe
,materials, and transportation to stores / site, loading and (P.N. 1 to 20)
unloading excluding GST levied by GOI & GOM in all respect,
complete.
i) above 300 mm dia. kg 107.00

249 Item No 249: Hydraulic testing of Prestressed Concrete Section - PDN


Cylinder Pipes with rubber ring joints to specified pressure P.C.C. Pipe
including cost of all materials and labour and water for testing for (P.N. 1 to 20)
the length upto 1 km., using reciprocating type pumps which
should be able to provide specified test pressure guages and
other necessary equipments, labour, operation charges, etc.
required for testing. The rate under this item shall also include
cost of retesting, if necessary.
i) 350 mm Km 15291.20
ii) 400 mm Km 18782.00
iii) 450 mm Km 22489.05
iv) 500 mm Km 26431.80
v) 600 mm Km 31433.00
vi) 700 mm Km 37611.05
vii) 800 mm Km 44731.85
viii) 900 mm Km 52770.00
ix) 1000 mm Km 61802.00
x) 1100 mm Km 71751.00
xi) 1200 mm Km 82643.00
xii) 1300 mm Km 94477.00
xiii) 1400 mm Km 107255.00
xiv) 1500 mm Km 124638.00
xv) 1600 mm Km 140636.00
xvi) 1700 mm Km 156242.00
xvii) 1800 mm Km 172790.00
xviii) 1900 mm Km 190281.00
xix) 2000 mm Km 208715.00
xx) 2100 mm Km 228092.00
xxi) 2200 mm Km 249079.00

111
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
250 Item No 250: Providing, supplying & erecting of As Directed
approved make CI D/F reflux valves (non-return valves by Engineer-
) of following dia with technical specifications as below In-Charge
i. Design, manfacturing & testing standard IS 5312 Part
1 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.Reflux valves as per I.S.5312 Part
I (1984)

a) Without by pass arrangement -PN -1


1 100 mm 7050 1366 8416
2 150 mm 13979 1366 15345
3 200 mm 20057 1366 21423
4 250 mm 26135 5577 31712
5 300 mm 42546 5577 48123
6 350 mm 63211 5577 68788
7 400 mm 82661 5577 88238
8 450 mm 109404 10594 119998
9 500 mm 133716 10594 144310
10 600 mm 194496 10594 205090
b) With by pass arrangement - PN-1
1 100 mm 7474 1366 8840
2 150 mm 14818 1366 16184
3 200 mm 21261 1366 22627
4 250 mm 27704 5577 33281
5 300 mm 45099 5577 50676
6 350 mm 67004 5577 72581
7 400 mm 87620 5577 93197
8 450 mm 115968 10594 126562
9 500 mm 141739 10594 152333
10 600 mm 206166 10594 216760
c) Without by pass arrangement - PN -1.6
1 100 mm 7897 1366 9263
2 150 mm 15657 1366 17023
3 200 mm 22464 1366 23830
4 250 mm 29272 5577 34849
5 300 mm 47652 5577 53229
6 350 mm 70797 5577 76374
7 400 mm 92580 5577 98157
8 450 mm 122532 10594 133126
9 500 mm 149762 10594 160356
10 600 mm 217836 10594 228430

112
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
d) With by pass arrangement - PN-1.6
1 100 mm 8370 1366 9736
2 150 mm 16596 1366 17962
3 200 mm 23812 1366 25178
4 250 mm 31028 5577 36605
5 300 mm 50511 5577 56088
6 350 mm 75044 5577 80621
7 400 mm 98135 5577 103712
8 450 mm 129884 10594 140478
9 500 mm 158748 10594 169342
10 600 mm 230906 10594 241500
251 Item No 251: Providing, supplying & erecting of As Directed
approved make multi door CI D/F reflux valves (non- by Engineer-
return valves ) of following dia with technical In-Charge
specifications as below
i. Design, manfacturing & testing standard IS 5312 Part
2 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete. Reflux valves as per I.S.5312 Part
II (1984)
a) Without by pass arrangement -PN -1
1 700 mm 320513 19365 339878
2 750 mm 354550 19365 373915
3 800 mm 368732 19365 388097
4 900 mm 496370 19365 515735
5 1000 mm 581462 22083 603545
6 1100 mm 737464 22083 759547
7 1200 mm 907648 22083 929731
b) With by pass arrangement -PN -1
1 700 mm 339744 19365 359109
2 750 mm 375823 19365 395188
3 800 mm 390856 19365 410221
4 900 mm 526152 19365 545517
5 1000 mm 616350 22083 638433
6 1100 mm 781712 22083 803795
7 1200 mm 962107 22083 984190
c) Without by pass arrangement -PN -1.6
1 700 mm 358975 19365 378340
2 750 mm 397096 19365 416461
3 800 mm 412980 19365 432345
4 900 mm 555934 19365 575299
5 1000 mm 651237 22083 673320
6 1100 mm 825960 22083 848043
7 1200 mm 1016566 22083 1038649

113
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
d) With by pass arrangement -PN -1.6
1 700 mm 380513 19365 399878
2 750 mm 420922 19365 440287
3 800 mm 437759 19365 457124
4 900 mm 589290 19365 608655
5 1000 mm 690312 22083 712395
6 1100 mm 875517 22083 897600
7 1200 mm 1077560 22083 1099643
252 Item No 252: Providing, supplying & erecting of As Directed
approved make DI or SGI D/F reflux valves (non- by Engineer-
return valves ) of following dia with technical In-Charge
specifications as below
i. Design, manfacturing & testing standard IS 5312 Part
1 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete. Reflux valves as per I.S.5312 Part
I (1984)
a) Without by pass arrangement -PN -1
1 100 mm 8531 1366 9897
2 150 mm 16915 1366 18281
3 200 mm 24269 1366 25635
4 250 mm 31624 5577 37201
5 300 mm 51481 5577 57058
6 350 mm 76486 5577 82063
7 400 mm 100020 5577 105597
8 450 mm 132379 10594 142973
9 500 mm 161796 10594 172390
10 600 mm 235340 10594 245934
b) With by pass arrangement - PN-1
1 100 mm 9043 1366 10409
2 150 mm 17930 1366 19296
3 200 mm 25726 1366 27092
4 250 mm 33521 5577 39098
5 300 mm 54569 5577 60146
6 350 mm 81075 5577 86652
7 400 mm 106021 5577 111598
8 450 mm 140322 10594 150916
9 500 mm 171504 10594 182098
10 600 mm 249461 10594 260055

114
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
c) Without by pass arrangement - PN -1.6
1 100 mm 9555 1366 10921
2 150 mm 18945 1366 20311
3 200 mm 27182 1366 28548
4 250 mm 35419 5577 40996
5 300 mm 57658 5577 63235
6 350 mm 85664 5577 91241
7 400 mm 112022 5577 117599
8 450 mm 148264 10594 158858
9 500 mm 181212 10594 191806
10 600 mm 263581 10594 274175
d) With by pass arrangement - PN-1.6
1 100 mm 10128 1366 11494
2 150 mm 20082 1366 21448
3 200 mm 28813 1366 30179
4 250 mm 37544 5577 43121
5 300 mm 61118 5577 66695
6 350 mm 90804 5577 96381
7 400 mm 118743 5577 124320
8 450 mm 157160 10594 167754
9 500 mm 192085 10594 202679
10 600 mm 279396 10594 289990
253 Item No 253: Providing, supplying & erecting of As Directed
approved make multi door DI D/F reflux valves (non- by Engineer-
return valves ) of following dia with technical In-Charge
specifications as below
i. Design, manfacturing & testing standard IS 5312 Part
2 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.Reflux valves as per I.S.5312 Part
II (1984)
a) Without by pass arrangement -PN -1
1 700 mm 387821 19365 407186
2 750 mm 429006 19365 448371
3 800 mm 446166 19365 465531
4 900 mm 600608 19365 619973
5 1000 mm 703569 22083 725652
6 1100 mm 892331 22083 914414
7 1200 mm 1098254 22083 1120337
b) With by pass arrangement -PN -1
1 700 mm 411090 19365 430455
2 750 mm 454746 19365 474111
3 800 mm 472936 19365 492301
4 900 mm 636644 19365 656009
5 1000 mm 745783 22083 767866
6 1100 mm 945871 22083 967954
7 1200 mm 1164149 22083 1186232

115
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
c) Without by pass arrangement -PN -1.6
1 700 mm 434359 19365 453724
2 750 mm 480486 19365 499851
3 800 mm 499706 19365 519071
4 900 mm 672681 19365 692046
5 1000 mm 787997 22083 810080
6 1100 mm 999411 22083 1021494
7 1200 mm 1230045 22083 1252128
d) With by pass arrangement -PN -1.6
1 700 mm 460421 19365 479786
2 750 mm 509315 19365 528680
3 800 mm 529688 19365 549053
4 900 mm 713041 19365 732406
5 1000 mm 835277 22083 857360
6 1100 mm 1059376 22083 1081459
7 1200 mm 1303847 22083 1325930
254 Item No 254: Providing, supplying & erecting of As Directed
approved make CS D/F reflux valves (non-return by Engineer-
valves ) of following dia with technical specifications as In-Charge
below
i. Design, manfacturing & testing standard IS 5312 Part
1 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete. Reflux valves as per I.S.5312 Part
I (1984)
a) Without by pass arrangement -PN -1
1 100 mm 9518 1366 10884
2 150 mm 18872 1366 20238
3 200 mm 27077 1366 28443
4 250 mm 35283 5577 40860
5 300 mm 57437 5577 63014
6 350 mm 85335 5577 90912
7 400 mm 111592 5577 117169
8 450 mm 147695 10594 158289
9 500 mm 180517 10594 191111
10 600 mm 262570 10594 273164
b) With by pass arrangement - PN-1
1 100 mm 10089 1366 11455
2 150 mm 20005 1366 21371
3 200 mm 28702 1366 30068
4 250 mm 37400 5577 42977
5 300 mm 60883 5577 66460
6 350 mm 90455 5577 96032
7 400 mm 118288 5577 123865
8 450 mm 156557 10594 167151
9 500 mm 191348 10594 201942
10 600 mm 278324 10594 288918

116
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
c) Without by pass arrangement - PN -1.6
1 100 mm 10660 1366 12026
2 150 mm 21137 1366 22503
3 200 mm 30327 1366 31693
4 250 mm 39517 5577 45094
5 300 mm 64330 5577 69907
6 350 mm 95575 5577 101152
7 400 mm 124983 5577 130560
8 450 mm 165419 10594 176013
9 500 mm 202179 10594 212773
10 600 mm 294078 10594 304672
d) With by pass arrangement - PN-1.6
1 100 mm 11300 1366 12666
2 150 mm 22405 1366 23771
3 200 mm 32146 1366 33512
4 250 mm 41888 5577 47465
5 300 mm 68189 5577 73766
6 350 mm 101310 5577 106887
7 400 mm 132482 5577 138059
8 450 mm 175344 10594 185938
9 500 mm 214309 10594 224903
10 600 mm 311723 10594 322317
255 Item No 255: Providing, supplying & erecting of As Directed
approved make multi door CS D/F reflux valves (non- by Engineer-
return valves ) of following dia with technical In-Charge
specifications as below
i. Design, manfacturing & testing standard IS 5312 Part
2 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.Reflux valves as per I.S.5312 Part
II (1984)
a) Without by pass arrangement -PN -1
1 700 mm 432693 19365 452058
2 750 mm 478643 19365 498008
3 800 mm 497788 19365 517153
4 900 mm 670100 19365 689465
5 1000 mm 784974 22083 807057
6 1100 mm 995576 22083 1017659
7 1200 mm 1225325 22083 1247408
b) With by pass arrangement -PN -1
1 700 mm 458654 19365 478019
2 750 mm 507361 19365 526726
3 800 mm 527655 19365 547020
4 900 mm 710305 19365 729670
5 1000 mm 832072 22083 854155
6 1100 mm 1055311 22083 1077394
7 1200 mm 1298844 22083 1320927

117
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
c) Without by pass arrangement -PN -1.6
1 700 mm 484616 19365 503981
2 750 mm 536080 19365 555445
3 800 mm 557523 19365 576888
4 900 mm 750511 19365 769876
5 1000 mm 879171 22083 901254
6 1100 mm 1115046 22083 1137129
7 1200 mm 1372364 22083 1394447
d) With by pass arrangement -PN -1.6
1 700 mm 513693 19365 533058
2 750 mm 568244 19365 587609
3 800 mm 590974 19365 610339
4 900 mm 795542 19365 814907
5 1000 mm 931921 22083 954004
6 1100 mm 1181948 22083 1204031
7 1200 mm 1454706 22083 1476789
256 Item No 256: Providing, supplying & erecting of CI As Directed
double flange sluice valve confirming for IS-14846 by Engineer-
including worm gear arrangements as per test pressure In-Charge
stainless steel spindle, caps Including transportation,
inspection, unloding, loading, stacking excluding GST
levied by GOI & GOM in all respect etc. complete.

a) Sluice valves - PN -1 without by pass arrangement

1 100 mm 8226 1366 9592


2 150 mm 12055 1366 13421
3 200 mm 19571 1366 20937
4 250 mm 31200 5577 36777
5 300 mm 42546 5577 48123
6 350 mm 55310 5577 60887
7 400 mm 72895 5577 78472
8 450 mm 91616 10594 102210
9 500 mm 106365 10594 116959
10 600 mm 185784 10594 196378
11 700 mm 293567 19365 312932
12 750 mm 343204 19365 362569
13 800 mm 423333 19365 442698
14 900 mm 558771 19365 578136
15 1000 mm 631099 22083 653182
16 1100 mm 744555 22083 766638
17 1200 mm 914739 22083 936822

118
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
b) Sluice valve - PN - 1.6
without by pass arrangement
1 100 mm 8637 1366 10003
2 150 mm 12657 1366 14023
3 200 mm 20550 1366 21916
4 250 mm 32760 5577 38337
5 300 mm 44673 5577 50250
6 350 mm 58075 5577 63652
7 400 mm 76540 5577 82117
8 450 mm 96197 10594 106791
9 500 mm 111683 10594 122277
10 600 mm 195073 10594 205667
11 700 mm 308246 19365 327611
12 750 mm 360365 19365 379730
13 800 mm 444499 19365 463864
14 900 mm 586709 19365 606074
15 1000 mm 662654 22083 684737
16 1100 mm 781783 22083 803866
17 1200 mm 960476 22083 982559
257 Item No 257: Providing, supplying & erecting of As Directed
double flange Ductile Iron non-rising spindle soft by Engineer-
seated Resilient seated sluice Valves in accordance In-Charge
with BS 5163/ EN 1074-1&2 of PN-10 / 16 rated, with
Body and bonnet of Ductile Iron confirming to EN1563/
GGG40 Wedge fully encapsulated high quality WRAS or
DVGW approved EPDM rubber (approved for drinking
water), Replaceble Wedge nut of Brass, Shaft of
Stainless Steel EN1.4105, Stem seals min. 4 nos. of
NBR, Internal fasteners of Stainless Steel A2. Body &
Bonnet coated inside & outside with electrostatically
applied epoxy powder coated blue colour RAL 5017
(suitable for drinking water) to DIN 30677-2 & GSK
guidelines with a coating thickness of min. 250 microns.
Valves should be full bore & 100% tight shut-off. Flange
drilling as per IS 1538 raised face. Gate valve shall be
compatible for buried applications without valve chamber.
Manual operation by Handwheel. Operating torque shall
be less than that mentioned in EN 1171. Testing shall be
as per BS 5163 / EN 12266-1&2 / IS 14846.

a) Sluice valves - PN -1 without by pass arrangement

1 100 mm 9953 1366 11319


2 150 mm 14586 1366 15952
3 200 mm 23681 1366 25047
4 250 mm 37752 5577 43329
5 300 mm 51481 5577 57058
6 350 mm 66925 5577 72502
7 400 mm 88204 5577 93781
8 450 mm 110855 10594 121449
9 500 mm 128702 10594 139296

119
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
10 600 mm 224799 10594 235393
11 700 mm 355217 19365 374582
12 750 mm 415277 19365 434642
13 800 mm 512233 19365 531598
14 900 mm 676113 19365 695478
15 1000 mm 763630 22083 785713
16 1100 mm 900912 22083 922995
17 1200 mm 1106834 22083 1128917
b) Sluice valve - PN - 1.6
without by pass arrangement
1 100 mm 10451 1366 11817
2 150 mm 15315 1366 16681
3 200 mm 24865 1366 26231
4 250 mm 39640 5577 45217
5 300 mm 54055 5577 59632
6 350 mm 70271 5577 75848
7 400 mm 92614 5577 98191
8 450 mm 116398 10594 126992
9 500 mm 135137 10594 145731
10 600 mm 236039 10594 246633
11 700 mm 372977 19365 392342
12 750 mm 436041 19365 455406
13 800 mm 537844 19365 557209
14 900 mm 709918 19365 729283
15 1000 mm 801811 22083 823894
16 1100 mm 945957 22083 968040
17 1200 mm 1162176 22083 1184259
258 Item No 258:Providing, supplying & erecting of As Directed
double flanged short body pattern type manually by Engineer-
operated C.I. Butterfly Valve confirming in to IS-13095- In-Charge
1991, Synthetic rubber faced ring secured on disc by
retaining ring with stainless steel screw stub shaft of
stainless steel riding in teflon bearing including
transportation, inspection, unloding, loading, stacking
excluding GST levied by GOI & GOM in all respect etc.
complete.
a) Butterfly valves - PN -1
1 100 mm 6807 1366 8173
2 150 mm 9360 1366 10726
3 200 mm 12480 1366 13846
4 250 mm 17018 5577 22595
5 300 mm 26946 5577 32523
6 350 mm 34179 5577 39756
7 400 mm 40561 5577 46138
8 450 mm 45099 10594 55693
9 500 mm 59990 10594 70584
10 600 mm 98849 10594 109443
11 700 mm 140118 19365 159483
12 750 mm 144656 19365 164021
13 800 mm 168908 19365 188273

120
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
14 900 mm 192875 19365 212240
15 1000 mm 284065 22083 306148
16 1100 mm 323350 22083 345433
17 1200 mm 414398 22083 436481
b) Butterfly valves - PN -1.6
1 100 mm 7148 1366 8514
2 150 mm 9828 1366 11194
3 200 mm 13104 1366 14470
4 250 mm 17869 5577 23446
5 300 mm 28293 5577 33870
6 350 mm 35888 5577 41465
7 400 mm 42589 5577 48166
8 450 mm 47354 10594 57948
9 500 mm 62989 10594 73583
10 600 mm 103791 10594 114385
11 700 mm 147124 19365 166489
12 750 mm 151889 19365 171254
13 800 mm 177353 19365 196718
14 900 mm 202519 19365 221884
15 1000 mm 298269 22083 320352
16 1100 mm 339517 22083 361600
17 1200 mm 435118 22083 457201
259 Item No 259: Providing, supplying & erecting of Ductile As Directed
Iron Double Flanged Double Eccentric Butterfly by Engineer-
Valves.in accordance with EN 593 /BS 5155 /IS 13095 In-Charge
/API 609 with Body & disc of Ductile Iron confirming to
EN1563/ GGG40 / IS 1865 Gr. 400/12, Body seat of
PTFE seated with Stainless Steel backed , disk seat of
S.S. AISI 304/316 , Shaft of S.S. AISI 420(Dry Shaft
Design , (to ensure 100% drop tight shut off as per EN
Std suitable for drinking water application), Internal
fasteners of Stainless Steel . Body & disc coated inside &
outside with electrostatically applied epoxy powder
coated blue colour (suitable for drinking water) to DIN
30677-2 & GSK guidelines with a coating thickness of
min. 250 microns. Valves should be 100% tight shut-off.
Leakages not allowed. Flange drilling as per IS 1538/ IS
9523/ ASME B 16.5 / EN1092-2 raised face. Testing as
per EN 12266-1&2. Features required for Butterfly valves
will be suitable to water work application for continuous
operation up to 70 degree Celsius as per above general
specification or otherwise the standard BS 5155/ EN593

121
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
a) Butterfly valves - PN -1
1 100 mm 8237 1366 9603
2 150 mm 11326 1366 12692
3 200 mm 15101 1366 16467
4 250 mm 20592 5577 26169
5 300 mm 32604 5577 38181
6 350 mm 41356 5577 46933
7 400 mm 49078 5577 54655
8 450 mm 54569 10594 65163
9 500 mm 72588 10594 83182
10 600 mm 119607 10594 130201
11 700 mm 169543 19365 188908
12 750 mm 175034 19365 194399
13 800 mm 204378 19365 223743
14 900 mm 233379 19365 252744
15 1000 mm 343719 22083 365802
16 1100 mm 391253 22083 413336
17 1200 mm 501422 22083 523505
b) Butterfly valves - PN -1.6
1 100 mm 8649 1366 10015
2 150 mm 11892 1366 13258
3 200 mm 15856 1366 17222
4 250 mm 21622 5577 27199
5 300 mm 34235 5577 39812
6 350 mm 43424 5577 49001
7 400 mm 51532 5577 57109
8 450 mm 57298 10594 67892
9 500 mm 76217 10594 86811
10 600 mm 125587 10594 136181
11 700 mm 178020 19365 197385
12 750 mm 183786 19365 203151
13 800 mm 214597 19365 233962
14 900 mm 245048 19365 264413
15 1000 mm 360905 22083 382988
16 1100 mm 410816 22083 432899
17 1200 mm 526493 22083 548576

122
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
260 Item No 260: Providing, supplying & erecting of Air As Directed
Valves confirming IS-14845-2000 and standard by Engineer-
specifications double orifice type combined with isolating In-Charge
sluice valve, mounted in horzontal position and operated
by wheel gearing, small orifice elastic ball resting on a
gun metal orifice nipple, large orifice vulcanite ball
seating on moulded seat ring, inlet face and drilled,
including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.

a) Double Ball Flanged


Type - PN -1.0
1 100 mm 8485 288 8773
2 150 mm 15463 387 15850
3 200 mm 26006 425 26431
b) Double Ball Flanged
Type - PN -1.6
1 100 mm 12972 288 13260
2 150 mm 18276 387 18663
3 200 mm 30735 425 31160
261 Item No 261: Providing, supplying & erecting of As Directed
Kinetic Double Orifice type Air Valves confirming to IS by Engineer-
14845 & as per standard specifications combined with In-Charge
screw down isolating valve, small orifice elastic ball
resting on a gun metal orifice nipple, large orifice
vulcanite ball seating on moulded seat ring, inlet face and
drilled, including transportation, inspection, unloding,
loading, stacking excluding GST levied by GOI & GOM in
all respect etc. complete.

a) Kinetic Air Valve Flanged


Type P-1
2 50 mm 8818 234 9052
3 80 mm 10345 257 10602
4 100 mm 11277 288 11565
5 150 mm 15771 387 16158
6 200 mm 24589 425 25014
b) Kinetic Air Valve Flanged
Type P-1.6
2 50 mm 11022 234 11256
3 80 mm 12930 257 13187
4 100 mm 14097 288 14385
5 150 mm 19713 387 20100
6 200 mm 30735 425 31160

123
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
262 Item No 262: Electric Valve Actuator for non rising
spindle type
sluice valve, PN 1 & PN 1.6 rating
Providing, erecting electric Valve actuators totally As Directed
enclosed, weather-proof and dust proof construction with by Engineer-
IP-67, protection class suitable for installation in any In-Charge
position without lubrication, leakage or other operational
difficulty with special grease filled gear box and hand
wheel for emergency manual operation which will
automatically disengage on restoration of power to motor
and with 10 watt single phase space heater and
continuous local mechanical position indicator and
individually replaceable counter gear assembly and with
two torque and four limit switches with S.S. flap and
operated with gear driven cams and of rating 250 Volt, 5
Amp, AC/DC, torque switch dial and with TEFC squirrel
cage induction motor working on 440 Volts +/- 10%, 3
phase, 50 Hz AC of intermittent duty rating S-2, insulation
class "F" and temp rise restricted to class "B" with IP - 67
protection class suitable for DOL starting and with three
thermostat and 30% over load margin. The torque rating
of reduction gear box shall be at least 1.5 times max.
torque required for opening and closing of valve with
integral starter controls having four limit switches 1 for
OPEN, 1 for CLOSE & 2 Nos. for intermediate positions
for interlocking etc complete.

1 150 mm 65732
2 200 mm 68306
3 250 mm 72596
4 300 mm 77395
5 350 mm 79421
6 400 mm 81447
7 450 mm 84857
8 500 mm 92304
9 600 mm 103474
10 700 mm 107675
11 750 mm 109701
12 800 mm 112474
13 900 mm 121959
14 1000 mm 128887

124
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
263 Item No 263: Dismantling Joints
Providing, erecting and commissioning M.S. Dismantling As Directed
joint as per requirement and Department's approved by Engineer-
drawing and specifications, including machining and In-Charge
rubber rings and suitable for working pressure with
required flanges of suitable size with nut bolts etc
complete. The joint should have through long bolts so
that during normal working pressure there should be no
sliding movement of sliding flanges. L.O.F. ( length over
flange ) should not be less than 75% of dia.

PN 1.0
1 100 mm 3936 79 4015
2 150 mm 6559 131 6690
3 200 mm 8246 165 8411
4 250 mm 11619 232 11851
5 300 mm 14055 281 14336
6 350 mm 19678 394 20072
7 400 mm 26237 525 26762
8 450 mm 31484 630 32114
9 500 mm 37481 750 38231
10 600 mm 46102 922 47024
11 700 mm 58845 1177 60022
12 750 mm 72338 1447 73785
13 800 mm 79647 1593 81240
14 900 mm 86956 1739 88695
15 1000 mm 113755 2275 116030
16 1100 mm 147300 2946 150246
17 1200 mm 180658 3613 184271
PN 1.6
1 100 mm 4172 83 4255
2 150 mm 6953 139 7092
3 200 mm 8741 175 8916
4 250 mm 12316 246 12562
5 300 mm 14899 298 15197
6 350 mm 20858 417 21275
7 400 mm 27811 556 28367
8 450 mm 33373 667 34040
9 500 mm 39730 795 40525
10 600 mm 48868 977 49845
11 700 mm 62376 1248 63624
12 750 mm 76679 1534 78213
13 800 mm 84426 1689 86115
14 900 mm 92173 1843 94016
15 1000 mm 120580 2412 122992
16 1100 mm 156138 3123 159261
17 1200 mm 191498 3830 195328

125
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
264 Item No 264: Metallic Expansion Joints
Providing, erecting and commissioning M.S. fabricated As Directed
Metallic Expansionjoint as per requirement and by Engineer-
Department's approved drawing and specifications, In-Charge
including machining and rubber rings and suitable for
working pressure with required flanges of suitable size
with nut bolts etc complete. The joint should have
through long bolts so that during normal working
pressure there should be no sliding movement of sliding
flanges. L.O.F. ( length over flange ) should not be less
than 75% of dia.

PN 1.0
1 100 mm 6372 127 6499
2 150 mm 10307 206 10513
3 200 mm 13868 277 14145
4 250 mm 17991 360 18351
5 300 mm 22114 442 22556
6 350 mm 30172 603 30775
7 400 mm 37481 750 38231
8 450 mm 40854 817 41671
9 500 mm 46851 937 47788
10 600 mm 80959 1619 82578
11 700 mm 94827 1897 96724
12 800 mm 107196 2144 109340
13 900 mm 117878 2358 120236
14 1000 mm 180658 3613 184271
15 1100 mm 187405 3748 191153
16 1200 mm 214204 4284 218488
PN 1.6
1 100 mm 6754 135 6889
2 150 mm 10926 219 11145
3 200 mm 14700 294 14994
4 250 mm 19070 381 19451
5 300 mm 23441 469 23910
6 350 mm 31983 640 32623
7 400 mm 39730 795 40525
8 450 mm 43306 866 44172
9 500 mm 49662 993 50655
10 600 mm 85816 1716 87532
11 700 mm 100517 2010 102527
12 800 mm 113627 2273 115900
13 900 mm 124950 2499 127449
14 1000 mm 191498 3830 195328
15 1100 mm 198649 3973 202622
16 1200 mm 227056 4541 231597

126
PDN CSR 2021-22 PIPE FITTINGS/SPECIALS ABSTRACT

S.N. Classification/ diameter Ductile Polyvinyl Oriented Polyvinyl Pre-Stressed Bar Warapped Glass Reinforced High Density Pre-Stressed
Iron (D.I.) Chloride Chloride (P.V.C - O) Cement Steel Cylinder Plastic (G.R.P) Polyethylene Concrete
Pipes (P.V.C) Pipes Pipes Concrete (B.W.S.C) Pipes (H.D.P.E) Cylinder
(P.S.C) Pipes Pipes (P.C.C)
Pipes Pipes

1 2 3 4 5 6 7 8 9 10
1 75mm & above dia 2 % of per mtr.
rate of pipe

2 up to 300 mm dia. 132 /kg 2 % of per mtr. 2 % of per mtr. rate


rate of pipe of pipe

3 above 300 mm dia. 132/ kg 5 % of per mtr. 5 % of per mtr. rate 107/ kg
rate of pipe of pipe

4 350mm & above dia 132 /kg


5 250mm dia to 1800 mm dia 107/kg

6 90 DRG Bend One 7 times x Pipe


with one coupling Bend Per Mtr Price

7 60 DRG Bend One 5 times x Pipe


with one coupling Bend Per Mtr Price

8 45 DRG Bend One 4 times x Pipe


with one coupling Bend Per Mtr Price

9 30 DRG Bend One 3 times x Pipe


with one coupling Bend Per Mtr Price

10 22.5 DRG Bend One 2.5 times x Pipe


with one coupling Bend Per Mtr Price

11 11.25 DRG Bend One 2 times x Pipe


with one coupling Bend Per Mtr Price

127
S.N. Classification/ diameter Ductile Polyvinyl Oriented Polyvinyl Pre-Stressed Bar Warapped Glass Reinforced High Density Pre-Stressed
Iron (D.I.) Chloride Chloride (P.V.C - O) Cement Steel Cylinder Plastic (G.R.P) Polyethylene Concrete
Pipes (P.V.C) Pipes Pipes Concrete (B.W.S.C) Pipes (H.D.P.E) Cylinder
(P.S.C) Pipes Pipes (P.C.C)
Pipes Pipes

12 GRP Equal Tee One Tee 5 times x Pipe


Per Mtr Price
13 Flange Tail Piece One 4 times x Pipe
(Length 0.65 m) Flange Per Mtr Price

14 Lamination joint One joint 1.5 times x Pipe


(Butt strap joint) Per Mtr Price

15 GRP Double bell One 1.5 times x Pipe


coupling coupling Per Mtr Price

128
PDN CSR 2021-22 HYDRAULIC TESTING ABSTRACT

Hydraulic testing of All types of pipe line to specified pressure including cost of all
materials and labour and water for testing for specified length including cutting,
placing end cap making arrangement for filling safe water using reciprocating type
pumps which should be able to provide specified test pressure gauges and other
necessary equipments, labour, operation charges, etc. required for testing. The rate
under this item shall also include cost of retesting, if necessary and reinstating to
original position.

Sr No. Dia of pipe Unit Rate for 2021-22 (Rate in Rs.)

1 2 3 4
1 63 mm km 6043.55
2 75 mm km 6813.45
3 80 mm km 6860.00
4 90 mm km 6960.20
5 100 mm km 7069.80
6 110 mm km 7188.80
7 125 mm km 7385.05
8 140 mm km 7964.25
9 150 mm km 8121.00
10 160 mm km 8287.20
11 180 mm km 8647.80
12 200 mm km 9046.15
13 225 mm km 9597.10
14 250 mm km 10206.95
15 280 mm km 11016.60
16 300 mm km 12323.40
17 315 mm km 12788.30
18 350 mm km 15291.20
19 355 mm km 15467.40
20 400 mm km 18782.00
21 450 mm km 22489.05
22 500 mm km 26431.80
23 560 mm km 29550.00
24 600 mm km 31433.00
25 630 mm km 33187.40
26 700 mm km 37611.05
27 710 mm km 38280.70
28 750 mm km 41053.60
29 800 mm km 44731.85
30 900 mm km 52770.00
31 1000 mm km 61802.00
32 1100 mm km 71751.00
33 1200 mm km 82643.00
34 1300 mm km 94477.00
35 1400 mm km 107255.00
36 1500 mm km 124638.00

129
Sr No. Dia of pipe Unit Rate for 2021-22 (Rate in Rs.)

37 1600 mm km 140636.00
38 1700 mm km 156242.00
39 1800 mm km 172790.00
40 1900 mm km 190281.00
41 2000 mm km 208715.00
42 2100 mm km 228092.00
43 2200 mm km 249079.00
44 2300 mm km 270342.00
45 2400 mm km 292547.00
46 2500 mm km 315695.00
47 2600 mm km 339785.00
48 2700 mm km 364818.00
49 2800 mm km 390794.00
50 2900 mm km 417713.00
51 3000 mm km 445575.00

130
ANNUXURE- 2
GOVERNMENT RESOLUTION FOR REFERANCE
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×−ÖµÖ´Ö−Ö
¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ) †×¬Ö×−ÖµÖ´Ö 1996 ŸÖÃÖê“Ö ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü
×−ÖµÖ´Ö 1998 †ÓŸÖÖÔŸÖ ˆ¯Öú¸ü ¾ÖÃÖæ»Ö
ú¸üÖ¾ÖµÖÖ“Öß úÖµÖÔ¯Ö¬¤üŸÖß ×−ÖÛ¿“ÖŸÖ ú¸üÖê²ÖÖ²ÖŸÖ

´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−Ö
ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö,
¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ Îú´ÖÖӍú : ²ÖßÃÖß‹ 2009/¯ÖÏ.Îú. 108/úִ֐ÖÖ¸ü 7-†
´ÖÓ¡ÖÖ»ÖµÖ, ´ÖÓã²Ö‡Ô- 32.
פü−ÖÖӍú 17 •Öã−Ö 2010

¾ÖÖ“ÖÖ - †) ×−ÖµÖ´Ö ¾Ö †×¬Ö×−ÖµÖ´Ö


1) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996
2) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996
3) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998
4) ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) ×−ÖµÖ´Ö 2007
פü.5.2.2007
²Ö) ¿ÖÖÃÖ−Ö×−֝ÖÔµÖ ¾Ö ¯Ö׸ü¯Ö¡Öúê
1) ¿ÖÖÃÖ−Ö †×¬ÖÃÖæ“Ö−ÖÖ, Îú´ÖÖӍú ‹´Ö‹ÃÖÃÖß 1097/ÃÖ߆ָü 775/úִ֐ÖÖ¸ü-2,
פü−ÖÖӍú 26 •Öæ−Ö,1997
2) ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ Îú. ‹´Ö‹ÃÖÃÖß 1097/ÃÖ߆ָü 442/úִ֐ÖÖ¸ü 10, פü. 21 ´Öê,1999
3) ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ, ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö, Îú. ²ÖßÃÖß‹ 12007/¯ÖÏ.Îú.775/
úִ֐ÖÖ¸ü-7, פü−ÖÖӍú 4 †ÖòÖÙü, 2007
4) ¿ÖÖÃÖ−Ö †×¬ÖÃÖæ“Ö−ÖÖ, ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö, Îú. ²ÖßÃÖß‹ 12007/ ¯ÖÏ.Îú.-
778/ úִ֐ÖÖ¸ü-7, פü−ÖÖӍú 4 †ÖòÖÙü, 2007 ¾Ö ¿Ö㬤ü߯֡֍ú5 †ÖòÖÙ, 2008ü
5) ¿ÖÖÃÖ−Ö †×¬ÖÃÖæ“Ö−ÖÖ, ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö, Îú. ²ÖßÃÖß‹ 2008/ ¯ÖÏ.Îú.-
907/úִ֐ÖÖ¸ü-7, פü−ÖÖӍú 16 ‹×¯ÖÏ»Ö, 2008 .
6) ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Öú Îú´ÖÖӍú : ²ÖßÃÖß‹ 2007/¯ÖÏ.Îú. 788/úִ֐ÖÖ¸ü 7-†,
פü−ÖÖӍú 26 †ÖòŒ™üÖê²Ö¸ü, 2009
7) ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Öú Îú´ÖÖӍú : ‡´ÖÖ¸üŸÖ 2009/¯ÖÏ.Îú. 119/úִ֐ÖÖ¸ü 7-†, פü−ÖÖӍú 1 ×›üÃÖë²Ö¸ü, 2009
8) ÃÖ×“Ö¾Ö (úִ֐ÖÖ¸ü)µÖÖÓ−Öß −ÖÖê¤ÓüÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓÃÖ×»Ö×Æü»Öê»Öê †.¿ÖÖ.¯Ö¡Ö ÎÓú. †ÃÖӍúÖ 2009 ¯ÖÏ.ÎÓú.62
úÖ´Ö 7 † פü. 14 •Öã−Ö 2010

¯ÖÏßÖÖ¾Ö−ÖÖ :-
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996 ¾Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü
²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ †×¬Ö×−ÖµÖ´Ö 1996 Æêü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö Öê¡ÖÖŸÖ úÖµÖÔ¸üŸÖ
†ÃÖ»Ö껵ÖÖ ²ÖÖӬ֍úÖ´Ö ´Ö•Öæ¸üÖÓ−ÖÖ, •Öê ¸üÖ•µÖ ¿ÖÖÃÖ−ÖÖ−Öê ÖךüûŸÖ êú»Ö껵ÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö ú»µÖÖÖ ´ÖÓ›üôûÖŸÖ
»ÖÖ³ÖÖ£Öá ´ÆüÖæ−Ö −ÖÖëפüŸÖ —ÖÖ»Öê»Öê ׍Óú¾ÖÖ •µÖÖ úִ֐ÖÖ¸üÖÓ“Öß »ÖÖ£ÖÖ£Öá ´ÆüÖã−Ö −ÖÖë¤üÖß ú¸üµÖÖŸÖ µÖêÖÖ¸ü †ÖÆêü †¿ÖÖ
úִ֐ÖÖ¸üÖÓ“Öê ú»µÖÖÖ ú¸üµÖÖ“µÖÖ ˆ§êü¿ÖÖ−Öê ¯ÖÖ¸üßŸÖ êú»Öê»Öê †ÖÆêüŸÖ. ÃÖ¤ü¸ü úÖµÖªÖ“Öß ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖÖŸÖ
†Ó´Ö»Ö²Ö•Ö־֝Öß ú¸üµÖÖ“µÖÖ ¥üÛ™üü−Öê ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 2007
ŸÖµÖÖ¸ü ú¸üµÖÖŸÖ †Ö»Öê †ÖÆêüŸÖ. †×¬Ö×−ÖµÖ´ÖÖŸÖᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü פü.26.6.1997 “µÖÖ †×¬ÖÃÖã“Ö−Öê−ÖãÃÖÖ¸ü ¯ÖÖÓ“Ö
¿ÖÖÃ֍úßµÖ ÃÖ¤üõÖÖÓ“Öê ´ÖÓ›üôû ãÖÖ¯Ö−Ö ú¸üµÖÖŸÖ †Ö»Öê»Öê †ÖÆêü. µÖÖ †×¬Ö×−ÖµÖ´ÖÖӟ֐ÖÔŸÖ ˆ¯Öú¸ü ÖÖêôûÖ ú¸üµÖÖ²ÖÖ²ÖŸÖ“Öß
ŸÖÃÖê“Ö ²ÖÖӬ֍úÖ´ÖÖ“Öê ´Ö㻵ÖÖÓӍú−Ö ú¸üµÖÖ“Öß ŸÖ¯Ö¿Ö߻־ÖÖ¸ü úÖµÖÔ¯Ö¬¤üŸÖß ŸÖµÖÖ¸ü ú¸üµÖÖÃÖÖšüß ´ÖÓÓסִÖÓÓ›üôûÖ−Öê פü−ÖÖӍú
12/05/2010 ¸üÖê•Öß ŸÖŸ¾ÖŸÖ: ´ÖÖ−µÖŸÖÖ ‘ÖꝵÖÖŸÖ †Ö»Öß, ŸµÖÖ −ÖãÃÖÖ¸ ´ÖÖ. ´Ö㏵ÖÃÖד־ÖÖÓ“µÖÖ †¬µÖÖŸÖêÖÖ»Öᯙ ÃÖ×´ÖŸÖß−Öê
×−ÖÛ¿“ÖŸÖ êú»Öê»Öß úÖµÖÔ¯Ö¬¤üŸÖß ¯Öãלü»Ö¯ÖÏ´Ö֝Öê †ÖÆêü.

¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ:-

‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá) †×¬Ö×−ÖµÖ´Ö 1996 (ëúצüµÖ †×¬Ö×−ÖµÖ´Ö
27/1996) †Ö×Ö ŸµÖÖ †ÓŸÖÖÔŸÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996 (ëúצüµÖ
†×¬Ö×−ÖµÖ´Ö 28/1996) (ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö ) Æêü úÖµÖ¤êü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö Öê¡ÖÖŸÖ úÖµÖÔ¸üŸÖ
†ÃÖ»Ö껵ÖÖ ²ÖÖӬ֍úÖ´Ö ´Ö•Öæ¸üÖÓ“µÖÖ ú»µÖ֝֍úÖ¸üß ˆ«êü¿µÖÖ−Öê •ÖÃÖê úß,†Ö¸üÖꐵÖ, ÃÖã¸üÖÖ †Ö×Ö ú»µÖÖÖ ‡ŸµÖÖ¤üß µÖÖê•Ö−ÖÖ
²ÖÖӬ֍úÖ´Ö Öê¡ÖÖŸÖ úÖ´Ö ú¸üÖÖ·µÖÖ úִ֐ÖÖ¸üÖ−Ó ÖÖ ¯Öã¸ü׾֝µÖÖ²ÖÖ²ÖŸÖ“µÖÖ ŸÖ¸üŸÖã¤üß ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ †ÖÆêüŸÖ. êÓ¦ü
¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998 †Ó´Ö»ÖÖŸÖ †ÖÖ»Öê»Öê †ÖÆêüŸÖ. ´Ö㏵Ö
†×¬Ö×−ÖµÖ´ÖÖŸÖᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü ´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−ÖÖ−Öê ²ÖßÃÖß‹ 32003/ÃÖ߆ָü 146/ úִ֐ÖÖ¸ü 7 פü.5.2.2007
†−¾ÖµÖê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá) ×−ÖµÖ´Ö 2007 ŸÖµÖÖ¸ü êú»Öê»Öê
†ÖÆêüŸÖ. ŸÖÃÖê“Ö ×¤ü.18.9.2007 “µÖÖ šü¸üÖ¾ÖÖ−ÖãÃÖÖ¸ü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö •Ö´ÖÖ ú¸üµÖÖÃÖÖšüß ÖÖŸÖê Îú´ÖÖӍú
004220110000153 ²Öэú †Öò±ú ‡Ó×›üµÖÖ µÖê£Öê ˆ‘Ö›üµÖÖŸÖ †Ö»ÖÖ †ÖÆêü.

2. ´ÖãµÖ †×¬Ö×−ÖµÖ´Ö ¾Ö ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ´ÖÆüŸ¾ÖÖ“µÖÖ ŸÖ¸üŸÖã¤üß ¯Ö׸üÛ¿Ö™ü 1 ´Ö¬µÖê −Ö´Öã¤ü êú»Ö껵ÖÖ †ÖÆêüŸÖ.

3. Ö֕֐Öß Øú¾ÖÖ ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´ÖÖ“µÖÖ ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ ÃÖÓ¤ü³ÖÖÔŸÖ •Öê ×¾Ö³ÖÖÖ ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ †Ö¸ü֏֛ü¶ÖÃÖ
´ÖÖ−µÖŸÖÖ ¤êüµÖÖÃÖ ÃÖÖ´Ö †ÖÆêüŸÖ, •ÖÃÖê úß (1) ´ÖÆüÖ−֐ָü ¯ÖÖ׻֍úÖ,−֐ָü¯ÖÖ׻֍úÖ ¯ÖÏ¿ÖÖÃÖ−Ö †Ö×Ö −֐ָü ׾֍úÖÃÖ ×¾Ö³Ö֐Ö
(ÃÖ¾ÖÔ ¿ÖÆü¸üß Ã£ÖÖ×−֍ú ÃÖÓãÖÖÓ“µÖÖ ²ÖÖ²ÖŸÖߟÖ). (2) וֻÆüÖ¯Ö׸üÂÖ¤ü, ÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ †Ö×Ö ÖÏÖ´Ö ×¾ÖúÖÃÖ ×¾Ö³ÖÖÖ (ÃÖ¾ÖÔ ÖÏÖ´Ö
¯ÖÓ“ÖÖµÖŸÖß). (3) ˆªÖêÖ ×¾Ö³ÖÖÖ (‹´Ö.†ÖµÖ.›üß.ÃÖß. †Ö×Ö ×¾ÖúÖÃÖ †ÖµÖ㌟Ö, ‹ÃÖ‡Ô—Öê›ü) †Ö×Ö ÃÖ¾ÖÔ ¸üÖ•µÖ /ëú¦ü
¿ÖÖÃÖ−ÖÖ“Öê ×¾Ö³ÖÖÖ •µÖÖ´Ö¬µÖê ²ÖÖӬ֍úÖ´Ö “ÖÖ»Öæ †ÖÆêü ¾Ö ŸµÖÖŸÖ úִ֐ÖÖ¸ü ×−ÖµÖãŒŸÖ êú»Öê †ÖÆêüŸÖ, ŸµÖÖÓ−ÖÖ ŸµÖÖÓ“µÖÖ ×¾Ö³Ö֐ÖßµÖ
¯ÖÏ´ÖãÖÖÓ−Öß ŸÖÖŸÖ›üß−Öê ÃÖæ“Ö−ÖÖ ªÖ¾µÖÖ.

(1). ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ¾ÖÃÖæ»Ö ú¸üŸÖÖ−ÖÖ, ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ ‹æÖ
´Ö㻵ÖÖ−ÖãÃÖÖ¸ü(•Ö´Öß−Öß“Öß Øú´ÖŸÖ ¾ÖÖôæû−Ö )ŸÖÃÖê“Ö ÃÖÓ²ÖÓ×¬ÖŸÖ †ÖãÖÖ¯Ö−Öê−Öê úִ֐ÖÖ¸üÖÓ−ÖÖ Øú¾ÖÖ ŸµÖÖÓ“µÖÖ −Öֻ֟֐ÖÖÓ−ÖÖ
úִ֐ÖÖ¸üÖÓÃÖÖšüß −ÖãúÃÖÖ−Ö ³Ö¸ü¯ÖÖ‡Ô †×¬Ö×−ÖµÖ´Ö 1923 ´Ö¬Öᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü úÖêÖŸµÖÖÆüß ¯ÖύúÖ¸ü“Öß ³Ö¸ü¯ÖÖ‡Ô ×¤ü»Öê»Öß
†ÃÖê»Ö ŸÖß ¸üŒú´Ö ¾ÖÖôæû−Ö ˆ¾ÖÔ¸üßŸÖ ²ÖÖӬ֍úÖ´Ö ´Ö㻵ÖÖ¾Ö¸ü 1 % ˆ¯Öú¸ ¾ÖÃÖã»Ö ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ÆüÖ ˆ¯Öú¸ü Ö֕֐Öß
ŸÖÃÖê“Ö ¿ÖÖÃ֍úßµÖ ²ÖÖӬ֍úÖ´ÖÖ¾Ö¸ü ¤êü×Ö»Ö ¾ÖÃÖæ»Ö ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü.

(2). ²ÖÖӬ֍úÖ´ÖÖ“Öß †Ó¤üÖ×•ÖŸÖ ´Öã»µÖ šü¸ü׾֝µÖÖ²ÖÖ²ÖŸÖ −ÖÖë¤üÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓ−ÖÖ ´Ö֐ÖÔ¤ü¿Öԍú ŸÖŸ¾Öê ×−֐ÖÔ×´ÖŸÖ
ú¸üµÖÖÃÖÖšüß ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ †Ö»Öê †ÖÆêüŸÖ. ¾Ö −ÖÖë¤üÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓ−Öß µÖÖ²ÖÖ²ÖŸÖßŸÖ Ã¾ÖŸÖÓ¡Ö†Ö¤êü¿Ö ×−֐ÖÔ×´ÖŸÖ ú¸üÖ¾ÖêŸÖ.
†¿ÖÖ ¯ÖύúÖ¸êü ×−ÖÛ¿“ÖŸÖ êú»Ö껵ÖÖ ´Ö֐ÖÔ¤ü¿Öԍú ŸÖŸ¾ÖÖÓ“ÖÖ †Ö×Ö ŸµÖÖ ´Ö¬µÖê ¾ÖêôûÖê¾Öêôßü êú»Ö껵ÖÖ ÃÖã¬ÖÖ¸üÖÖÓ“ÖÖ †Ö¬ÖÖ¸ü
²ÖÖӬ֍úÖ´ÖÖ“Öê †Ó¤üÖ×•ÖŸÖ ´Öã»µÖ šü¸ü×¾ÖŸÖÖ−ÖÖ ‘µÖÖ¾ÖÖ.

(3) −ÖÖë¤ü¾ÖÆüß šêü¾ÖÖê ¾Ö ´ÖÖ×Ã֍ú ×¾Ö¾Ö¸üÖ ¯Öãœüᯙ ´Ö×Æü−µÖÖ“µÖÖ 10 ŸÖÖ¸üÖê¯Öã¾Öá †¬µÖÖ, ´ÖÆüÖ¸üÖÂ™Ò ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü
²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ ú»µÖÖÖ ´ÖÓ›üô, ´ÖãÓ²Ö‡Ô (¯Ö׸ü׿Ö™ü 2 ¯ÖÏ´Ö֝Öê)µÖÖÓ“µÖÖ ú›êü ¯ÖÖšü¾ÖÖ¾Öê. •ÖêÖêú¹ý−Ö µÖÖÓ−ÖÖ •Ö´ÖÖ
êú»Ö껵ÖÖ ˆ¯Öú¸üÖ“µÖÖ ¸üŒú´Öê“ÖÖ ŸÖÃÖê“Ö ²ÖэúêŸÖ/úÖêÂÖ֐ÖÖ¸üÖŸÖ •Ö´ÖÖ —ÖÖ»Ö껵ÖÖ ¸üŒú´Öê“ÖÖ (¯Ö׸ü׿Ö™ü 3 ¯ÖÏ´Ö֝Öê)
ŸÖÖôû´Öêôû ‘ÖêÖê ¿ÖŒµÖ ÆüÖê‡Ô»Ö. ŸÖÃÖê“Ö ˆ¯Öú¸ü¾ÖÃÖã»Öß“µÖÖ −ÖÖë¤üß šêü¾ÖµÖÖÃÖÖšüß −ÖÖê¤ü¾ÖÊÖ ¾Ö ´ÖÖ×Ã֍ú ×¾Ö¾Ö¸üÖ¯Ö¡Ö
šêü¾ÖµÖÖ²ÖÖ²ÖŸÖ ×¤ü.1.12.2009 ¯Ö׸ü¯Ö¡ÖúÖ´Ö‘µÖê −Ö´Öæ¤ü êú»Ö껵ÖÖ ÃÖã“Ö−ÖÖÓ“ÖêÆüß ¯ÖÖ»Ö−Ö ú¸üÖ¾Öêü.

(4) ‡´ÖÖ¸üŸÖ ¾Ö ‡üŸÖ¸ü ²ÖÖӬ֍úÖ´ÖÖÃÖ ´ÖÓ•Öæ¸üß ¤êüÖÖ¸êü ¾Ö ŸµÖÖÃÖÓ¤ü³ÖÖÔŸÖᯙ ˆ¯Öú¸ü •Ö´ÖÖ ú¸üÖÖ·µÖÖ ×¾Ö³Ö֐Ö/ãÖÖ×−֍ú
þָüÖ•µÖ ÃÖÓãÖÖ/¯ÖÏÖ׬֍ú¸üÖ µÖÖÓ−Öß ŸµÖÖÓ“Öê µÖÖÃÖÓ¤ü³ÖÖÔŸÖß»Ö ×¾Ö¾Ö¸üÖ¯Ö¡Öê ¾Ö ¾ÖÖÙÂ֍ú †Æü¾ÖÖ»Ö ¯Ö׸ü׿Öšü 4 ¯ÖÏ´Ö֝Öê ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖÃÖ ¯ÖÏŸµÖêú ¯Öãלü»Ö†Ö٣֍ú ¾ÖÂÖÖÔ“µÖÖ 15 ´Öê ¯Öæ¾Öá ÃÖÖ¤ü¸ü ú¸üÖ¾ÖêŸÖ. Æêü
¾ÖÖÙÂ֍ú ×¾Ö¾Ö¸üÖ¯Ö¡Ö ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ¯ÖÖÃÖæ−Ö 30 פü¾ÖÃÖÖÓ“µÖÖ †ÖŸÖ ´ÖÓ›üôû ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ †Ö¸ü֏֛üµÖÖÃÖ ´ÖÓ•Öæ¸üß ¤êüÖÖ·µÖÖ ¾Ö
ˆ¯Öú¸ü ÖÖêôûÖ ú¸üÖÖ·µÖÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖÏÖ׬֍ú¸üÖÖÃÖ ÃÖ¤ü¸ü ˆ¯Öú¸ü ÖÖêôûÖ ú¸üµÖÖÃÖÖšüß —ÖÖ»Ö껵ÖÖ Ö“ÖÖÔ“ÖÖ ( •Ö´ÖÖ -
— ÖÖ»Öê»ÖÖ ˆ¯ÖúÖ¸üÖ“µÖÖ 1 ™üŒúÖ¯ÖêÖÖü †×¬Öú −ÖÖÆüß) ¯Ö¸üŸÖÖ¾ÖÖ ú¸üß»Ö.

4. ÃÖÖ¾ÖÔ•Ö×−֍ú ²ÖÖӬ֍úÖ´Ö, •Ö»ÖÃÖÓ¯Ö¤üÖ ¾Ö ¾Ö−Ö ×¾Ö³ÖÖÖ ŸÖÃÖê“Ö ×•Ö»ÆüÖ ¯Ö׸üÂÖ¤ü µÖÖÓ“µÖÖ«üÖ¸êü êú»Öß •Ö֝ÖÖ¸üß •Öß úÖ´Öê
"‡´ÖÖ¸üŸÖ ¾Ö ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ ¯Ö׸ü³ÖÖÂÖêŸÖ µÖêŸÖÖŸÖ †¿ÖÖ úÖ´ÖÖÓÃÖÖšüß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´ÖÖ“Öê Óú¡ÖÖ™ü ‘ÖêÖÖ·µÖÖ
ÓúÓ¡ÖÖ™ü¤üÖ¸ü/†×³Öú¸üÖ µÖÖÓ“µÖÖ ¤êüµÖúÖŸÖæ−Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×¾Ö×ÆüŸÖ ¤ü¸üÖ−Öê ¾ÖÃÖæ»Ö
ú¸üµÖÖŸÖ µÖÖ¾ÖÖ." ÃÖ¤ü¸ü •Ö²ÖÖ²Ö¤üÖ¸üß ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³Ö֐ÖÖ“Öß †ÃÖê»Ö ŸÖÃÖê“Ö •Öß ¤êüµÖêú úÖêÂÖ֐ÖÖ¸üÖŸÖ ÃÖÖ¤ü¸ü ÆüÖêŸÖᯙ †¿ÖÖ
¤êüµÖúÖŸÖ ÃÖÓ²ÖÓ×¬ÖŸÖ †ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ·µÖÖ−Öê "‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü" µÖÖ“Öß
¾ÖÃÖæ»Öß ¤ü¿ÖÔ¾ÖÖ¾Öß ¾Ö ŸµÖÖ−ÖãÃÖÖ¸ü úÖêÂÖ֐ÖÖ¸üÖ−Öê ÃÖ¤ü¸ü ¾ÖÃÖæ»Öß ú¸üÖ¾Öß.

5. ÃÖ¾ÖÔ †ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ-µÖÖÓ−ÖÖ ¾Ö ÃÖ¾ÖÔ ¿ÖÖÃ֍úßµÖ †×³ÖúŸµÖÖÕ−ÖÖ ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ µÖÖ¾ÖêŸÖ úß, µÖÖ
ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 3 †Ö×Ö ëú¦ü¿ÖÖÃÖ−ÖÖ“µÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö
1998 “µÖÖ ×−ÖµÖ´Ö 3 −ÖãÃÖÖ¸ü ×−֐ÖÔ×´ÖŸÖ êú»Ö껵ÖÖ ×¤ü.26.9.1996 “µÖÖ †×¬ÖÃÖã“Ö−Öê−ÖãÃÖÖ¸üü 1 ™üŒúÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö
ŸµÖÖÓ−Öß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖŸÖ ¾Ö¸üᯙ ¯Ö¬¤üŸÖß−Öê פü.1.7.2010 ¯ÖÖÃÖæ−Ö −Ö “ÖãúŸÖÖ •Ö´ÖÖ
ú¸üÖ¾Öß.

6. •Öß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Öê ‘‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá)
†×¬Ö×−ÖµÖ´Ö, 1996’ “µÖÖ ú»Ö´Ö 2 (1) (›üß) †−ÖãÂÖӐÖÖ−Öê ¯Ö׸ü³ÖÖÂÖêŸÖ µÖêŸÖÖŸÖ ¾Ö •µÖÖ“Öê úÖ´Ö ‘ÖꝵÖÖÃÖÖšüß“ÖÖ ú¸üÖ¸ü
פü−ÖÖӍú 01 •Öã»Öê 2010 ¾ÖÖ ŸÖ¤Ëü−ÖÓŸÖ¸ü ú¸üµÖÖŸÖ µÖê‡Ô»Ö †¿ÖÖ ÃÖ¾ÖÔ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´ÖÖÓ−ÖÖ ¾Ö¸üᯙ ¯Ö¬¤üŸÖ »Ö֐Öæ
¸üÖÆüß»Ö.

7. ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³Ö֐ÖÖÓ¿Öß ×¾Ö“ÖÖ¸ü×¾Ö×−Ö´ÖµÖ ú¹ý−Ö ˆ¯Öú¸ü ¾ÖÃÖæ»Öß´Ö¬µÖê ÃÖãÃÖæ¡ÖŸÖÖ µÖꝵÖÖÃÖÖšüß ¯ÖÏŸµÖêú
¯Öύú¸üÖÖÃÖ µÖã×−֍ Îú´ÖÖӍú ¤êüµÖÖ²ÖÖ²ÖŸÖ ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Ö פü.26.10.2009 †−¾ÖµÖê ÃÖ×¾Ößָü ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ
†Ö»Öê»Öê †ÖÆêüŸÖ. ŸµÖÖ−ÖãÃÖÖ¸ü ÃÖ¤ü¸ü µÖã×−֍ú Îú´ÖÖӍúÖ“Öß ¯Ö¬¤üŸÖ ™ü¯µÖÖ™ü¯µÖÖ−Öê ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³Ö֐Ö֍ú›æü−Ö ¸üÖ²Ö׾֝µÖÖŸÖ µÖÖ¾Öß
¾Ö ¯ÖÏ£Ö´Ö ™ü¯¯µÖÖŸÖ −֐ָü ׾֍úÖÃÖ ×¾Ö³ÖÖÖ ¾Ö ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ ´ÖÆüÖ−֐ָü¯ÖÖ׻֍úÖ, −֐ָü¯ÖÖ׻֍úÖ, ÃÖ¾ÖÔ ¿ÖÆü¸üß Ã£ÖÖ×−֍ú
ÃÖÓãÖÖ ¾Ö ¯ÖÏÖ׬֍ú¸üÖê ‡ŸµÖÖ¤üß ŸÖÃÖê“Ö ÖéÆü×−Ö´ÖÖÔÖ ×¾Ö³ÖÖÖ ¾Ö ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ ÃÖ¾ÖÔ ÃÖÓãÖÖ/¯ÖÏÖ׬֍ú¸üÖ µÖÖÓ−ÖÖ ¯ÖÏ£Ö´Ö
™ü¯¯µÖÖŸÖ »Ö֐Öæ ¸üÖÆüß»Ö, ŸÖÃÖê“Ö ¯Öãœüᯙ ™ü¯¯µÖÖÓÃÖÖšüß úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö֍ú›æü−Ö Ã¾ÖŸÖӡ֯֝Öê ÃÖæ“Ö−ÖÖ ¤êüµÖÖŸÖ µÖêŸÖß»Ö.
8. ÃÖ¤ü¸ü ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ ÆüÖ ´Ö㏵ÖÃÖד־ÖÖÓ“µÖÖ †¬µÖÖŸÖêÖÖ»Öᯙ ÃÖ×´ÖŸÖß“µÖÖ ²ÖîšüúßŸÖ —ÖÖ»Ö껵ÖÖ “Ö“Ö쓵ÖÖ
†−ÖãÂÖӐÖÖ−Öê ¾Ö ÃÖ¤ü¸ü ²ÖîšüúßÃÖ ˆ¯ÖÛÃ£ÖŸÖ †ÃÖ»Ö껵ÖÖ ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³Ö֐ÖÖÓ“µÖÖ ¯ÖϬÖÖ−Ö ÃÖד־Ö/ÃÖד־ÖÖÓ“µÖÖ ÃÖÆü´ÖŸÖß−Öê
×−֐ÖÔ×´ÖŸÖ ú¸üµÖÖŸÖ µÖêŸÖ †ÖÆêü.

´ÖÆüÖ¸üÖ™ÒüÖ“Öê ¸üÖ•µÖ¯ÖÖ»Ö µÖÖÓ“µÖÖ †Ö¤êü¿ÖÖ−ÖãÃÖÖ¸ü ¾Ö −ÖÖÓ¾ÖÖ−Öê,

(ú×¾ÖŸÖÖ Ö㯟ÖÖ )
ÃÖד־Ö,úִ֐ÖÖ¸ü

¯ÖÏŸÖ-
´ÖÖ.¸üÖ•µÖ¯ÖÖ»Ö µÖÖÓ“Öê ÃÖד־Ö,
´ÖÖ.´Ö㏵ִÖÓ¡Öß µÖÖÓ“Öê ¯ÖϬÖÖ−Ö ÃÖד־Ö,
´ÖÖ.ˆ¯Ö´Ö㏵ִÖÓ¡Öß µÖÖÓ“Öê ÃÖד־Ö,
´ÖÖ.´ÖÓ¡Öß (úִ֐ÖÖ¸ü) µÖÖÓ“Öê Ö֕֐Öß ÃÖד־Ö,
´ÖÖ.¸üÖ•µÖ´ÖÓ¡Öß (úִ֐ÖÖ¸ü) µÖÖÓ“Öê Ö֕֐Öß ÃÖד־Ö,
´ÖãµÖ ÃÖד־Ö, ´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−Ö,
†¯Ö¸ü ´ÖãµÖ ÃÖ×“Ö¾Ö / ¯ÖϬÖÖ−Ö ÃÖ×“Ö¾Ö / ÃÖ×“Ö¾Ö ÃÖ¾ÖÔ ´ÖÓ¡ÖÖ»ÖµÖß−Ö ×¾Ö³Ö֐Ö, ´ÖÓ¡ÖÖ»ÖµÖ,´ÖãÓ²Ö‡Ô.
(´ÖÓ¡ÖÖ»ÖµÖß−Ö ÃÖ¾ÖÔ ×¾Ö³Ö֐ÖÖӍú›æü−Ö ÆüÖ ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ †ÃÖ»Ö껵ÖÖ ÃÖ¾ÖÔ ÃÖÖ¾ÖÔ•Ö×−֍ú
ˆ¯ÖÎú´ÖÖÓ“µÖÖ ×−Ö¤ü¿ÖÔ−ÖÖÃÖ †ÖÖµÖÖŸÖ µÖÖ¾ÖÖ.)
´ÖãµÖ †×³ÖµÖÓŸÖÖ, ÃÖÖ¾ÖÔ•Ö×−֍ú ²ÖÖӬ֍úÖ´Ö ×¾Ö³Ö֐Ö,
´ÖãµÖ †×³ÖµÖÓŸÖÖ, •Ö»ÖÃÖÓ¯Ö¤üÖ ×¾Ö³Ö֐Ö,
ÃÖ¾ÖÔ ×¾Ö³Ö֐ÖßµÖ †ÖµÖ㌟Ö,
úִ֐ÖÖ¸ü †ÖµÖ㌟Ö, ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖ, ´ÖãÓ²Ö‡Ô.
ÃÖ¾ÖÔ ×•Ö»ÆüÖ׬֍úÖ¸üß,
ÃÖ¾ÖÔ ´ÖãµÖ úÖµÖԍúÖ¸üß †×¬ÖúÖ¸üß, וֻÆüÖ ¯Ö׸üÂÖ¤üÖ,
ÃÖ¾ÖÔ ´ÖÆüÖ−֐ָü¯ÖÖ׻֍úÖ †ÖµÖ㌟Ö,
ÃÖ¾ÖÔ Ö™ü׾֍úÖÃÖ †×¬ÖúÖ¸üß, ¯ÖÓ“ÖÖµÖŸÖ ÃÖ×´ÖŸÖß,
ÃÖ¾ÖÔ ´Ö㏵ÖÖ׬֍úÖ¸üß, −֐ָü ¯Ö׸üÂÖ¤üÖ,
ÃÖ¾ÖÔ −ÖÖë¤üÖß †×¬ÖúÖ¸üß,
úÖ †×¬ÖúÖ¸üß (¯ÖÏ¿ÖÖÃÖ−Ö-2) ˆªÖêÖ,‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³ÖÖÖ µÖÖÓ−ÖÖ ÃÖ¤ü¸ü ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ ¾Öê²ÖÃÖÖ‡Ô™ü¾Ö¸ü
™ü֍úµÖÖ“µÖÖ ×¾Ö−ÖÓŸÖßÃÖÆü †ÖÏê×ÂÖŸÖ./×−Ö¾Ö›ü−ÖßÖß.
¯Ö׸ü׿Ö™ü -1
´Ö֐ÖÔ¤ü¿Öԍú ŸÖŸ¾Öê.
×−ÖµÖ´Ö ¾Ö †×¬Ö×−ÖµÖ´Ö
1) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996
2) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996
3) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998
4) ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) ×−ÖµÖ´Ö 2007
פü.5.2.2007
´ÖÆüŸ¾ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß ¾Ö ŸµÖÖ“µÖÖ †Ó´Ö»Ö²Ö•Ö־֝Öß²ÖÖ²ÖŸÖ ´Ö֐ÖÔ¤ü¿Öԍú ŸÖŸ¾Öê.

1. ‘‘‡´ÖÖ¸üŸÖ ؍ú¾ÖÖ ‡ŸÖ¸ü ²Ö֬֍úÖ´Ö ü úÖ´Ö’’ “Öß ¾µÖ֏µÖÖ (ú»Ö´Ö 2 (d) ) ´Ö¬µÖê פü»Öê»Öß †ÖÆêü.
²ÖÖӬ֍úÖ´Ö, ±êú¸ü±úÖ¸ü, ¤ãü¹ýßÖß,¤êüÖ³ÖÖ»Ö, ؍ú¾ÖÖ ¯ÖÖ›æü−Ö ™ü֍úÖê ‡ŸµÖÖ¤üß ‡´ÖÖ¸üŸÖ, ¸üßÖê,´Ö֐ÖÔ, ¸êü»¾Öê,
™ÒüÖ´Ö¾Öê•Ö,‹†¸ü ×±ú»›üÃÖË, ¯ÖÖšü²ÖÓ¬ÖÖ¸êü, •Ö»Ö×−ÖÃÃÖÖ¸üÖ,²ÖÓ¬ÖÖ¸üÖ ¾Ö −Öê¾ÆüߐÖê¿Ö−Ö úÖ´Ö, ¯Öã¸ü ×−ÖµÖӡ֝ÖÖ“Öê
úÖ´Ö (¾ÖÖ¤üôûÖ´Öãôêû •Ö»Ö×−ÖÃÃÖÖ¸üÖÖ“µÖÖ úÖ´ÖÖÃÖÆüߟÖ), ŸÖê»Ö ¾Ö ¾ÖÖµÖã“Öß •ÖÖê›üÖß ™ü֍úÖê, ×¾ÖªãŸÖ
»ÖÖ‡Ô−ÃÖ, ¾ÖÖµÖ¸ü»ÖêÃÖ, ¸êü›ü߆Öê, ™êü×»Ö¾Æüß•Ö−Ö, ™êü×»Ö±úÖê−Ö, ™êü׻֐ÖÏÖ±ú, †Ö×Ö ÃÖ´Öã¦üÖ¯ÖÖ¸ü ¤üôûÖ¾ÖôûÖ,
¬Ö¸üÖê, úÖ»Ö¾Öê,•Ö»ÖÖ¿ÖµÖê,•Ö»Ö¯ÖϾÖÖÆü, ²ÖÖêÖ¤êü, ¯Öã»Ö, ÃÖêŸÖã, ÃÖêŸÖã¯ÖϝÖÖ»Ö, ¯ÖÖ‡Ô¯Ö»ÖÖ‡Ô−Ö, ™üÖò¾ÖÃÖÔ, ãú»ÖߐÖ
™üÖò¾Ö¸üÃÖÔ, ¯ÖÖ¸êüÂÖÖ ™üÖò¾ÖÃÖÔ †Ö×Ö µÖÖ ¯ÖύúÖ¸ü“Öê ‡ŸÖ¸ü úÖ´Öê ÃÖ´Öã×“ÖŸÖ ¿ÖÖÃÖ−Ö †×¬ÖÃÖã“Ö−Öê«üÖ¸êü »Ö֐Ö㠍ú¹ý
¿ÖúŸÖê ¯Ö¸ÓüŸÖæ úÖ¸üÖÖ−Öê †×¬Ö×−ÖµÖ´Ö, 1948 ؍ú¾ÖÖ ÖÖÖ †×¬Ö×−ÖµÖ´Ö, 1952 “µÖÖ ŸÖ¸üŸÖæ¤üß •µÖÖ
†ÖãÖÖ¯Ö−ÖêÃÖ »Ö֐Öã ÆüÖêŸÖÖŸÖ ŸµÖÖÓ−ÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß »Ö֐Öã
ÆüÖêÖÖ¸ü −ÖÖÆüߟÖ.
2. úÖêÖŸµÖÖÆüß ×¤ü¾Ö¿Öß 10 ؍ú¾ÖÖ ŸµÖÖ¯ÖêÖÖ •ÖÖÃŸÖ úִ֐ÖÖ¸ü úÖ´ÖÖ¾Ö¸ü šêü¾Ö»Öê †¿ÖÖ ÃÖ¾ÖÔ †ÖãÖÖ¯Ö−ÖÖ−ÖÖ
ÆüÖ úÖµÖ¤üÖ »Ö֐Öã ÆüÖêŸÖÖê. ‘‘†ÖãÖÖ¯Ö−ÖÖ’’ ´ÆüÖ•Öê ú»Ö´Ö 2 (•Öê) úÖêÖŸÖßÆüß †ÖãÖÖ¯Ö−ÖÖ •Öß
¿ÖÖÃÖ−ÖÖ“µÖÖ ×−ÖµÖӡ֝ÖÖŸÖ †ÖÆêü. úÖêÖŸµÖÖÆüß ×−֐ִ֓µÖÖ ×−ÖµÖӡ֝Ö֏ÖÖ»Öß †ÖÆêü ؍ú¾ÖÖ ¾µÖ¾ÖÃÖÖµÖ
ÃÖÓãÖꓵÖÖ ×−ֵ֡֝Ö֏ÖÖ»Öß †ÖÆêü †Ö×Ö ¾ÖîµÖŒŸÖߍú ؍ú¾ÖÖ †ÃÖÖêÃÖß‹¿Ö−Ö Øú¾ÖÖ ‡ŸÖ¸ü ¾ÖîµÖŒŸÖߍú
ÃÖÓãÖÖÓ“µÖÖ †ÓŸÖÖÔŸÖ •Öê ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ×−ÖµÖãŒŸÖ ú¸üŸÖÖŸÖ †Ö×Ö •µÖÖŸÖ Óú¡ÖÖ™ü¤üÖ¸üÖÓ“ÖÖ ÃÖ´ÖÖ¾Öê¿Ö
ÆüÖêŸÖÖê ¯Ö¸ÓüŸÖæ ¾µÖŒŸÖߐ֟Ö׸üŸµÖÖ •Öê †ÃÖê úִ֐ÖÖ¸ü ŸµÖÖÓ“Öê þ֟Ö:“Öê ‘Ö¸ü ²ÖÖӬ֝µÖ֍ú¸üߟÖÖ ¹ý¯ÖµÖê 10 »Ö֏Ö
¯ÖµÖÔŸÖ ¯ÖêÖÖ •ÖÖßÖ
−ÖÃÖê»Ö ŸÖê ŸµÖÖÓ−ÖÖ †ÖãÖÖ¯Ö−Öê“Öß ¾µÖ֏µÖÖ »Ö֐Öã ÆüÖêÖÖ¸ü −ÖÖÆüß.

3. ‘‘ ´Öֻ֍ú ’’ “Öß ¾µÖ֏µÖÖ ú»Ö´Ö 2 (i) ´Ö¬µÖê ‡Ã™üÖ²»Öß¿Ö´Öë™ü ÃÖÓ²ÖÓ¬ÖÖŸÖ −Ö´Öã¤ü êú»Öê»Öß †ÖÆêü.
ŸµÖÖŸÖ ÖÖ»Öᯙ ¯ÖÏ´Ö֝Öê †ÓŸÖ³ÖÖÔ¾Ö ÆüÖêŸÖÖê :-
i) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úÖ´Ö Ã£ÖÖ×−֍ú ÃÖÓãÖÖÓŸÖ±ìú ؍ú¾ÖÖ ‡ŸÖ¸ü †ÖãÖÖ¯Ö−Öê´ÖÖ±ÔúŸÖ ú¸üµÖÖŸÖ
µÖêŸÖ †ÃÖ»µÖÖÃÖ ¾Ö •µÖÖŸÖ ¯ÖÏÖ׬֍úÖ¸üß −Öê´Öã−Ö ×¤ü»Öê»ÖÖ −ÖÃÖ»µÖÖÃÖ †¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ ×¾Ö³Ö֐ÖÖ“ÖÖ
¯ÖÏ´ÖãÖ.
ii) •Öê£Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´ÖÖ“Öê úÖ´Ö Ã£ÖÖ×−֍ú ¯ÖÏÖ׬֍ú¸üÖÖ´ÖÖ±ÔúŸÖ ü ؍ú¾ÖÖ ‡ŸÖ¸ü
†ÖãÖÖ¯Ö−ÖÖ´ÖÖ±ÔúŸÖ, £Öê™ü Óú¡ÖÖ™ü¤üÖ¸üÖ ×¿Ö¾ÖÖµÖ ú¸üµÖÖŸÖ µÖêŸÖê †¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ ŸµÖÖ ¯ÖÏÖ׬֍úÖ¸üÖÖ“ÖÖ
؍ú¾ÖÖ †ÖãÖÖ¯Ö−Öê“ÖÖ ´ÖãµÖ úÖµÖԍúÖ¸üß †×¬ÖúÖ¸üß,
iii) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü Óú¡ÖÖ™ü¤üÖ¸üÖ´ÖÖ±ÔúŸÖ ؍ú¾ÖÖ ´Öֻ֍úÖ´ÖÖ±ÔúŸÖ ú¸üµÖÖŸÖ µÖêŸÖê
†¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ Óú¡ÖÖ™ü¤üÖ¸ü
4. ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 3 ¾Ö ×−ÖµÖ´Ö 4 (3) −ÖãÃÖÖ¸ü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‹ÃÖ†Öê −ÖÓ.2899,
פü−ÖÖӍú 26.3.1996 †−¾ÖµÖê ײֻÖÖŸÖæ−Ö 1 % ˆ¯Öú¸ü ú¯ÖÖŸÖ ú¸üµÖÖ²ÖÖ²ÖŸÖ ×−֐ÖÔ×´ÖŸÖ êú»Ö껵ÖÖ
†×¬ÖÃÖã“Ö−ÖꓵÖÖ †−ÖãÂÖӐÖÖ−Öê ú¯ÖÖŸÖ êú»Ö껵ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Öê“ÖÖ ¬Ö−Ö֍úÂÖÔ ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖ ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖ֝֍úÖ¸üß ´ÖÓ›üôû, ´ÖãÓ²Ö‡Ô µÖÖÓ“ÖÖ ÖÖŸÖê Îú´ÖÖӍú
004220110000153 ²Öэú †Öò±ú ‡Ó×›üµÖÖ ´ÖãÓ²Ö‡Ô µÖÖ ²Öэêú“µÖÖ ´ÖÆüÖ¸üÖ™ÒüÖŸÖᯙ úÖêÖŸµÖÖÆüß ¿Ö֏ÖêŸÖ
ÃÖÖê²ÖŸÖ •ÖÖê›üµÖÖŸÖ †Ö»Ö껵ÖÖ ×¾Ö×ÆüŸÖ “Ö»Ö−ÖÖ«üÖ¸êü •Ö´ÖÖ ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü.
5. ˆ¯Öú¸ü ×−ÖµÖ´ÖÖ“µÖÖ ×−ÖµÖ´Ö, 4 (4) †−ÖãÃÖÖ¸ü •Öê£Öê ²ÖÖӬ֍úÖ´Ö֍ú¸üߟÖÖ Ã£ÖÖ×−֍ú ÃÖÓãÖê“Öß ´ÖÓ•Öæ¸üß
†Ö¾Ö¿µÖú †ÖÆêü. ŸÖê£Öê †¿ÖÖ ´ÖÓ•Öæ¸üߍú¸üߟÖÖ ¯ÖÏÖ¯ŸÖ —ÖÖ»Ö껵ÖÖ ¯ÖÏŸµÖêú †•ÖÖÔ ÃÖÖê²ÖŸÖ ´ÖÓ›üôûÖ“µÖÖ −ÖÖÓ¾Öê
ˆ¯Öú¸üÖÃÖÓ²ÖÓ¬Öß“ÖÖ ¸êüÖÖÓ׍úŸÖ ¬Ö−Ö֍úÂÖÔ (‹úÖ ¾ÖÂÖÖÔ“µÖÖ ²ÖÓ֬֍úÖ´ÖÖ“µÖÖ †Ó¤üÖ•ÖßŸÖ Ö“ÖÖÔ“µÖÖ 1 %
¸üŒú´Öê ‹¾ÖœüÖ)ÃÖ¤ü¸ü ãÖÖ×−֍ú ÃÖÓãÖêÃÖ ÃÖÖ¤ü¸ü ú¸üÖê †Ö¾Ö¿µÖú †ÖÆêü.
6. ¯Öãœêü ×−ÖµÖ´Ö 5 −ÖãÃÖÖ¸ü ¿ÖÖÃÖ׍úµÖ úÖµÖÖÔ»ÖµÖ/ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´Ö/ãÖÖ×−֍ú ÃÖÓãÖÖ“µÖÖ ²ÖÖ²ÖŸÖߟÖ
¾ÖÃÖæ»Öß †×¬ÖúÖ-µÖÖÓ−Öê ×−ÖµÖ´Ö 4 †ÓŸÖÖÔŸÖ •Ö´ÖÖ êú»Öê»ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö “Ö»Ö−ÖÖ«üÖ¸êü ¯ÖÏŸµÖÖ Ö“ÖÔ
—ÖÖ»Öê»Öß ¸üŒú´Ö •Öß 1 % ¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃ֝ÖÖ¸ü ŸÖê¾Öœüß ú´Öß ú¹ý−Ö ˆ¾ÖÔ¸üßŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö
•Ö´ÖÖ ú¸êü»Ö.
7. ×−ÖµÖ´Ö 5 (3) −ÖãÃÖÖ¸ü •Ö´ÖÖ êú»Öê»Öß ¸üŒú´Ö ´ÖÓ›üôû֍ú›êü 30 פü¾ÖÃÖÖÓŸÖ •Ö´ÖÖ ú¸üÖê †Ö¾Ö¿µÖú †ÖÆêü.

8. úÖêÖŸµÖÖÆüß ²ÖÖӬ֍úÖ´Ö †ÖãÖÖ¯Ö−Öê−Öê ؍ú¾ÖÖ ²ÖÖӬ֍úÖ´Ö ´Öֻ֍úÖ−Öê ؍ú¾ÖÖ ˆ¯Öú¸ü ¾ÖÃÖã»Öß †×¬ÖúÖ-µÖÖ−Öê
؍ú¾ÖÖ Ã£ÖÖ×−֍ú ÃÖÓãÖê−Öê ؍ú¾ÖÖ ¿ÖÖÃ֍úßµÖ úÖµÖÖÔ»ÖµÖÖ−Öê ؍ú¾ÖÖ ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´ÖÖ−Öê ؍ú¾ÖÖ »ÖÖ³ÖÖ£Öá
úִ֐ÖÖ¸üÖ−Öê ´ÆüÖ•Öê“Ö •Öê úÖêÖß ú»µÖÖÖ ´ÖÓ›üôû ×−Ö¬Öß´Ö¬µÖê ˆ¯Öú¸ü †£Ö¾ÖÖ »ÖÖ³ÖÖ£Öá −ÖÖë¤üÖß ¿Ö㻍ú
µÖÖ“ÖÖ ³Ö¸üÖÖ ú¸üÖÖ¸ü †ÃÖŸÖᯙ ŸÖê ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖ“µÖÖ ²Öэú †Öò±ú ‡Ó×›üµÖÖ
´Ö¬Öᯙ ´ÖÆüÖ¸üÖ™ÒüÖŸÖᯙ úÖêÖŸµÖÖÆüß ¿Ö֏ÖêŸÖ ú¸üµÖ֍ú׸üŸÖÖ ÃÖÖê²ÖŸÖ •ÖÖê›üµÖÖŸÖ †Ö»Ö껵ÖÖ ×¾Ö×ÆüŸÖ
“Ö»Ö−ÖÖ«üÖ¸êü ÃÖ¤ü¸ü ³Ö¸üÖÖ ú¸üŸÖß»Ö. µÖÖ “Ö»Ö−ÖÖ“Öß 4 ¯ÖÏŸÖßŸÖ ×¾Ö³Ö֐֝Öß †ÃÖæ−Ö 2 ¯ÖÏŸÖß ²Öэú
þ֟Ö:ú›êü šê¾Öæ−Ö ˆ¾ÖÔ׸üŸÖ 2 ¯ÖÏŸÖß ³Ö¸üÖÖ ú¸üÖÖ-µÖÖ ¾µÖŒŸÖßÃÖ (¸êü×´Ö™ü¸üú›êü) ¤êüµÖÖŸÖ µÖê‡Ô»Ö. ÃÖ¤ü¸ü
³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê 1 ¯ÖÏŸÖ ÃÖ×“Ö¾Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôû µÖÖÓ−ÖÖ
¯ÖÖšü¾ÖÖ¾ÖµÖÖ“Öß †ÖÆêü. ¤ü¸ü ´Ö×Æü−µÖÖ“µÖÖ 10 ŸÖÖ¸üÖê¯Öæ¾Öá ˆ¯Öú¸üÖ¯ÖÖê™üß •Ö´ÖÖ ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ
¸üú´Öê“ÖÖ ŸÖ¯Ö×¿Ö»Ö ¤ü¿ÖÔ×¾Ö»Ö껵ÖÖ ´ÖÖ×Ã֍ú ŸÖŒŸµÖÖŸÖ •ÖÖê›ü¯Ö¡Ö-3 ´Ö¬µÖê ˆ¯Öú¸ü ³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê
ú»µÖÖÖ ´ÖÓ›üôû֍ú›êü ´ÖÖ×ÆüŸÖß ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öß †ÖÆêü. ŸÖÃÖê“Ö •ÖÖê›ü¯Ö¡Ö-4 ´Ö¬µÖê −Ö´Öæ¤ü êú»Ö껵ÖÖ
ŸÖŒŸµÖÖŸÖ ¿ÖÖÃ֍úßµÖ ×¾Ö³Ö֐Ö, ãÖÖ×−֍ú ÃÖÓãÖÖ ¾Ö ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´Ö µÖÖÓ−Öß ¾ÖÖÙÂ֍ú ×¾Ö¾Ö¸üÖ¯Ö¡Ö
ú»µÖÖÖ ´ÖÓ›üôû֍ú›êü ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öê †ÖÆêü. †Ö¸ü֏֛üÖ ´ÖÓ•Öæ¸ü ú¸üÖÖ-µÖÖ ¯ÖÏÖ׬֍úÖ-µÖÖ−Öê ¤êüÖß»Ö
ˆ¯Ö¸üÖêŒŸÖ ¯ÖÏ´Ö֝Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ−ÖÓŸÖ¸ü ú»µÖÖÖ ´ÖÓ›üôû֍ú›êü “Ö»Ö−ÖÖ«üÖ¸êü ³Ö¸üÖÖ
ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ŸÖÃÖê“Ö ŸµÖÖ²ÖÖ²ÖŸÖ“ÖÖ ´ÖÖ×Ã֍ú †Æü¾ÖÖ»Ö •ÖÖê›ü¯Ö¡Ö-3 ´Ö¬µÖê ¾Ö ¾ÖÖÙÂ֍ú
×¾Ö¾Ö¸üÖÖ¯ÖÖê™üß •ÖÖê›ü¯Ö¡Ö-5 ´Ö¬µÖê ú»µÖÖÖ ´ÖÓ›üôûÖÃÖ ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. “Ö»Ö−ÖÖ“Öß ˆ¾ÖÔ׸üŸÖ ¯ÖÏŸÖ
³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê þ֟Ö:ú›êü šêü¾Öæ−Ö ¸üú´ÖꓵÖÖ ‡ŸÖ¸ü ŸÖ¯Ö׿ֻÖÖÃÖÆü ´ÖÓ›üôûÖ−Öê ŸÖ¯ÖÖÃ֝Öߍú׸üŸÖÖ
´ÖÖאֻ֟µÖÖÃÖ ÃÖÖ¤ü¸ü ú¸üÖê †Ö¾Ö¿µÖú †ÃÖê»Ö.
9. ˆ¯Öú¸ü ŸÖÃÖê“Ö »ÖÖ³ÖÖ£Öá −ÖÖê¤ÓüÖß ¿Ö㻍ú ²Öэêú“µÖÖ •µÖÖ ¿Ö֏Öê´Ö¬µÖê •Ö´ÖÖ ÆüÖêŸÖ †ÃÖê»Ö ŸÖß ¿Ö֏ÖÖ ¤ü¸ü´ÖÆüÖ
²Öэú †Öò±ú ‡Ó×›üµÖÖ µÖÖÓ“µÖÖ ´ÖãÓ²Ö‡Ô µÖê£Öᯙ ŸÖÖ›ü¤êü¾Ö ¿Ö֏ÖêŸÖ “Ö»Ö−ÖÖ“µÖÖ ˆ¾ÖÔ¸üßŸÖ ¯ÖÏŸÖß ‹úס֟֯֝Öê ÃÖÖ¤ü¸ü
ú¸êü»Ö. •ÖêÖêú¹ý−Ö ²Öэú †Öò±ú ‡Ó×›üµÖÖ, ú»µÖÖÖ ´ÖÓ›üôû µÖÖÓ−ÖÖ †Ö¯ÖÖ¯ÖÃÖÖŸÖ •Ö´ÖÖ ˆ¯Öú¸ü ¾Ö »ÖÖ³ÖÖ£Öá
−ÖÖë¤üÖß ¿Ö㻍úÖ“ÖÖ ŸÖÖôû´Öêôû ‘Öֻ֝Öê ¿ÖŒµÖ ÆüÖê‡Ô»Ö.
10.ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 6 (1) −ÖãÃÖÖ¸ü ¯ÖÏŸµÖêú ´Öֻ֍ú ²ÖÖӬ֍úÖ´ÖÖ“Öê úÖ´Ö ÃÖã¹ý
—ÖÖ»µÖÖ¯ÖÖÃÖæ−Ö 30 פü¾ÖÃÖÖŸÖ Øú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸ü»µÖÖ −ÖÓŸÖ¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-
µÖÖÃÖ ¯ÖÏ¯Ö¡Ö 1 ´Ö¬µÖê ´ÖÖ×ÆüŸÖß ÃÖÖ¤ü¸ü ú¸êü»Ö (¯ÖÏŸÖ •ÖÖê›ü»Öß †ÖÆêü.)
11.×−ÖµÖ´Ö 7 −ÖãÃÖÖ¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ŸµÖÖÓ−ÖÖ ±úÖò´ÖÔ 1 ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ−ÖÓŸÖ¸ü 6
´Ö×Æü−µÖÖ¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖ»Ö껵ÖÖ úÖ»ÖÖ¾Ö¬ÖßŸÖ ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ²ÖÖ²ÖŸÖ“Öê †Ö¤êü¿Ö ¯ÖÖ¸üߟÖ
ú¸êü»Ö.•Ö¸ü ŸÖÖê ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ“µÖÖ ²ÖÖ²ÖŸÖßŸÖ ÃÖ´ÖÖ¬ÖÖ−Öß †ÃÖê»Ö ŸÖ¸ü

12. µÖã×−֍ú úÖê›ü −ÖÓ. :- i) ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖ ¿ÖÖÃ֍úßµÖ/×−Ö´Ö ¿ÖÖÃ֍úßµÖ ˆ¯ÖÎú´Ö µÖÖÓ−Öß
²ÖÖӬ֍úÖ´ÖÖÃÖ ¯Ö¸ü¾ÖÖ−֐Öß ¤êüµÖÖ“µÖÖ ¯ÖÏŸµÖêú ¯Öύú¸üÖÖÃÖ ÆüÖ µÖã×−֍ú Îú´ÖÖӍú ªÖ¾ÖÖ. †ÖםÖ
ÆüÖ Îú´ÖÖӍú ²ÖÖӬ֍úÖ´Ö ÃÖã¹ý ú¸üµÖÖ“µÖÖ ¯ÖÏ´Ö֝֯֡ÖÖ´Ö¬µÖê −Ö´Öæ¤ü ú¸üÖ¾ÖÖ. ´ÖÆüÖ¸üÖ™Òü ¾Ö ‡ŸÖ¸ü
²ÖÖӬ֍úÖ´Ö ˆ¯Öú¸üÖ ÃÖÓ²ÖÓ¬Öß“ÖÖ ÆüÖ µÖã×−֍ú úÖê›ü −ÖÃÖê»Ö ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö ÃÖã¹ý ú¸üµÖÖ“Öê ¯ÖÏ´Ö֝֯֡Ö
†¯ÖæÖÔ †ÃÖ»µÖÖ“Öê ´ÖÖ−֝µÖÖŸÖ µÖÖ¾Öê. ÆüÖ µÖã×−֍ú úÖê›ü Îú´ÖÖӍú ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖ−Öê ªÖ¾ÖµÖÖ“µÖÖ
µÖã×−֍ú úÖê›ü“µÖÖ ¬ÖŸÖá¾Ö¸ü †ÃÖê»Ö.

ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖ−Öê ªÖ¾ÖµÖÖ“ÖÖ µÖã×−֍ú úÖê›ü −ÖÓÓ. ÆüÖ ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Öú
פü.26.10.2009 †−¾ÖµÖê ×−Ö¬ÖÖÔ׸üŸÖ êú»µÖÖ−ÖãÃÖÖ¸ü †ÃÖê»Ö.

13. ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö, ¾Ö ŸµÖÖ †ÓŸÖÖÔŸÖ ×−ÖµÖ´ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß−ÖãÃÖÖ¸ü •Ö¸ü ¯ÖãŸÖÔŸÖÖ êú»Öß −ÖÖÆüß ŸÖ¸ü
ÖÖ»Öᯙ ¯ÖÏ´Ö֝Öê úÖ¸ü¾ÖÖ‡Ô“Öß ŸÖ¸üŸÖæ¤ü ú¸üµÖÖŸÖ †Ö»Öê»Öß †ÖÆêü :-

ˆ¯Öú¸ü ˆ×¿Ö¸üÖ ³Ö¸ü»µÖÖÃÖ ú»Ö´Ö 8 −ÖãÃÖÖ¸ü ¾µÖÖ•Ö


úÖêÖŸÖÖÆüß ´Öֻ֍ú ú»Ö´Ö 3 −ÖãÃÖÖ¸ü ×¾ÖÆüßŸÖ êú»Ö껵ÖÖ ¾ÖêôêûŸÖ ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ“µÖÖ †Ö¤êü¿ÖÖ−ÖãÃÖÖ¸ü
ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ †ÃÖê ´Öֻ֍ú ˆ¯Öú¸üÖ“µÖÖ ¸üŒú´Öê¾Ö¸ü ¯ÖÏןִÖÆüÖ Øú¾ÖÖ •µÖÖ ŸÖÖ¸üÖê¯ÖÖÃÖæ−Ö
ˆ¯Öú¸ü ³Ö¸üµÖÖÃÖ ¯ÖÖ¡Ö †ÖÆêüŸÖ †¿ÖÖ ŸÖÖ¸üÖê¯ÖÖÃÖæ−Ö 2 % ¾µÖÖ•Ö ³Ö¸üÖ¾Öê »Ö֐Öê»Ö.
×¾ÖÆüßŸÖ ¾ÖêôêûŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ú»Ö´Ö 9 ¯ÖÏ´Ö֝Öê ¤Óü›ü :- ú»Ö´Ö 3 −ÖãÃÖÖ¸ü
×¾ÖÆüßŸÖ ¾ÖêôêûŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ú»Ö´Ö 5 −ÖãÃÖÖ¸ü ×−Ö¬ÖÖÔ¸üÖ êú»µÖÖ¯ÖÏ´Ö֝Öê −Ö ³Ö¸ü»µÖÖÃÖ ÃÖÓ²ÖÓ׬֟Ö
†×¬ÖúÖ¸üß µÖÖêµÖ ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ´Öֻ֍úÖ×¾Ö¹ý¬¤Ëü ¤Óü›üÖ“Öß ¸üŒú´Ö •Öß ˆ¯Öú¸üÖ“µÖÖ ¸üŒú´Öê¯ÖêÖÖ •ÖÖßÖ
¸üÆü֝ÖÖ¸ü −ÖÖÆüß ‹¾Öœüß ³Ö¸üµÖÖ“Öß ×¿ÖÖÖ ´Öֻ֍úÖÃÖ ¤êüŸÖÖ µÖê‡Ô»Ö.
ŸÖ£ÖÖׯÖ, †¿Öß ×¿ÖÖÖ ¤êüµÖÖ¯Öã¾Öá †¿ÖÖ ´Öֻ֍úÖÓ−ÖÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ´ÖÖÓ›üµÖÖ“Öß µÖÖêµÖ ŸÖß
ÃÖÓ¬Öß ¤êüÖê †Ö¾Ö¿µÖú †ÖÆêü. •Ö¸ü ´Öֻ֍úÖ−Öê µÖÖêµÖ ¾Ö ¯Öã¸êü¿ÖÖ úÖ¸üÖÖ´Öãôêû ¤Óü›üÖ“Öß ¸üŒú´Ö ³Ö¸ü»Öß −ÖÖÆüß.
†ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖÏÖ׬֍úÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ´Öֻ֍úÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü †ÖúÖ¸ü»ÖÖ •Ö֝ÖÖ¸ü −ÖÖÆüß.
†×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 10 −ÖãÃÖÖ¸ü ¸üŒú´Öê“Öß ¾ÖÃÖæ»Öß ú¸üµÖÖ²ÖÖ²ÖŸÖ:- ÆüµÖÖ úÖµÖªÖ
†ÓŸÖÖÔŸÖ ¾µÖÖ•Ö Øú¾ÖÖ ¤Óü›üÖ“Öß úÖêÖŸÖßÆüß ¸üŒú´Ö ¾ÖÃÖæ»Ö ú¸üµÖÖ²ÖÖ²ÖŸÖ £Öú²Ö֍úß“Öß ¸üŒú´Ö »Öò›ü
¸êü¾Æüß−µÖ㓵ÖÖ ¯Ö¬¤ËüŸÖß−ÖãÃÖÖ¸ü ¾ÖÃÖæ»Ö ú¸üŸÖÖ µÖê‡Ô»Ö.

¤Óü›ü:- 1) ú»Ö´Ö 12 −ÖãÃÖÖ¸ü •ÖÖê úÖêÖß úÖµÖªÖ“µÖÖ ŸÖ¸üŸÖæ¤üß−ÖãÃÖÖ¸ü •Ö֝Öã−Ö²Öã•Öæ−Ö ×¾Ö¾Ö¸üÖ¯Ö¡Ö


ÃÖÖ¤ü¸ü ú¸üÖÖ¸ü −ÖÖÆüß Øú¾ÖÖ ÖÖê™êü ×¾Ö¾Ö¸üÖ¯Ö¡Ö ÃÖÖ¤ü¸ü êú»µÖÖÃÖ †¿ÖÖÓ−ÖÖ 6 ´Ö×Æü−µÖÖ¯ÖµÖÔŸÖ“Öß ×¿ÖÖÖ Øú¾ÖÖ
¤Óü›ü •ÖÖê 1000 ¹ý¯ÖµÖÖ¯ÖµÖÔŸÖ †ÃÖê»Ö ؍ú¾ÖÖ ¤üÖê−Æüß“Öß ŸÖ¸üŸÖæ¤ü ú¸üµÖÖŸÖ †Ö»Öê»Öß †ÖÆêü.
1) •ÖÖê úÖêÖß ÆêüŸÖã¯Öã¸üïָü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸üµÖÖÃÖ ™üÖôûÖ™üÖôû ú¸üŸÖÖê †¿ÖÖÓ−ÖÖ 6
´Ö×Æü−µÖÖ¯ÖµÖÔŸÖ“Öß îú¤ü †£Ö¾ÖÖ ¤Óü›ü †£Ö¾ÖÖ ¤üÖê−Æüß ÆüÖê‰ú ¿ÖúŸÖê.
2) úÖêÖŸÖêÆüß −µÖÖµÖÖ»ÖµÖ †¿ÖÖ Öã−ÆüµÖÖÓ“Öê ¤üÖ»Ö ‘ÖêÖÖ¸ü −ÖÖÆüß •ÖÖê ¯ÖµÖÔŸÖ êú¦ü ¿ÖÖÃÖ−ÖÖ“µÖÖ ¯ÖÏÖ׬֍úÖ-
µÖÖÓ−Öê ŸÖÎúÖ¸ü êú»Öê»Öß −ÖÃÖê»Ö.

¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 12 −ÖãÃÖÖ¸ü ¤Óü›ü :- (1) ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓÃÖ †ÃÖê •Ö¸ü †ÃÖê
†Öœüôæ−Ö †Ö»Öê úß, ´Öֻ֍úÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ×−Ö¬ÖÖÔ¸üÖ †Ö¤êü¿ÖÖŸÖ −Ö´Öã¤ü êú»µÖÖ−ÖãÃÖÖ¸ü ³Ö¸ü»Öß
−ÖÃÖê»Ö ؍ú¾ÖÖ ú´Öß ³Ö¸ü»Öß †ÃÖê»Ö ؍ú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ‹ãúÖ ¸üŒú´Öê¾Ö¸ü ú´Öß úÖ¯Ö»Öß
†ÃÖê»Ö ŸÖ¸ü ´Öֻ֍úÖÃÖ ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß −ÖÖê™üßÃÖ £Öú²Ö֍úß †ÃÖ»µÖÖ“Öê úôû×¾Ö»Ö †Ö×Ö µÖÖꐵÖ
ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ´Öֻ֍úÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Öê»Ö.•ÖÖê ˆ¯Öú¸üÖ“µÖÖ
¸üŒú´Öê¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖê»Ö.
¯Ö¸ÓüŸÖæ †ÃÖÖ ¤Óü›ü »Ö־֝µÖÖ¯Öã¾Öá ´Öֻ֍úÖÃÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ‹îãú−Ö ‘ÖꝵÖ֍ú¸üߟÖÖ ÃÖÓ¬Öß ¤êüµÖÖŸÖ µÖê‡Ô»Ö ¾Ö
´Öֻ֍úÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸üµÖÖ ´Ö֐֝Öß úÖ¸üÖê µÖÖêµÖ ¾Ö ¯Öã¸êü¿Öß †ÖÆêüŸÖ †ÃÖê ×−Ö¬ÖÖÔ¸üÖ
†×¬ÖúÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ŸµÖÖÓ“µÖÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Ö»ÖÖ •Ö֝ÖÖ¸ü −ÖÖÆüß.
3) •ÖÖê úÖêÖß ÆêüŸÖã¯Öã¸üïָü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸üµÖÖÃÖ ™üÖôûÖ™üÖôû ú¸üŸÖÖê †¿ÖÖÓ−ÖÖ 6
´Ö×Æü−µÖÖ¯ÖµÖÔŸÖ“Öß îú¤ü †£Ö¾ÖÖ ¤Óü›ü †£Ö¾ÖÖ ¤üÖê−Æüß ÆüÖê‰ú ¿ÖúŸÖê.
4) úÖêÖŸÖêÆüß −µÖÖµÖÖ»ÖµÖ †¿ÖÖ Öã−ÆüµÖÖÓ“Öê ¤üÖ»Ö ‘ÖêÖÖ¸ü −ÖÖÆüß •ÖÖê ¯ÖµÖÔŸÖ êú¦ü ¿ÖÖÃÖ−ÖÖ“µÖÖ ¯ÖÏÖ׬֍úÖ-
µÖÖÓ−Öê ŸÖÎúÖ¸ü êú»Öê»Öß −ÖÃÖê»Ö.

¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 12 −ÖãÃÖÖ¸ü ¤Óü›ü :- (1) ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓÃÖ †ÃÖê •Ö¸ü †ÃÖê
†Öœüôæ−Ö †Ö»Öê úß, ´Öֻ֍úÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ×−Ö¬ÖÖÔ¸üÖ †Ö¤êü¿ÖÖŸÖ −Ö´Öã¤ü êú»µÖÖ−ÖãÃÖÖ¸ü ³Ö¸ü»Öß
−ÖÃÖê»Ö ؍ú¾ÖÖ ú´Öß ³Ö¸ü»Öß †ÃÖê»Ö ؍ú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ‹ãúÖ ¸üŒú´Öê¾Ö¸ü ú´Öß úÖ¯Ö»Öß
†ÃÖê»Ö ŸÖ¸ü ´Öֻ֍úÖÃÖ ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß −ÖÖê™üßÃÖ £Öú²Ö֍úß †ÃÖ»µÖÖ“Öê úôû×¾Ö»Ö †Ö×Ö µÖÖꐵÖ
ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ´Öֻ֍úÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Öê»Ö.•ÖÖê ˆ¯Öú¸üÖ“µÖÖ
¸üŒú´Öê¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖê»Ö.
¯Ö¸ÓüŸÖæ †ÃÖÖ ¤Óü›ü »Ö־֝µÖÖ¯Öã¾Öá ´Öֻ֍úÖÃÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ‹îãú−Ö ‘ÖꝵÖ֍ú¸üߟÖÖ ÃÖÓ¬Öß ¤êüµÖÖŸÖ µÖê‡Ô»Ö ¾Ö
´Öֻ֍úÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸üµÖÖ ´Ö֐֝Öß úÖ¸üÖê µÖÖêµÖ ¾Ö ¯Öã¸êü¿Öß †ÖÆêüŸÖ †ÃÖê ×−Ö¬ÖÖÔ¸üÖ
†×¬ÖúÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ŸµÖÖÓ“µÖÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Ö»ÖÖ •Ö֝ÖÖ¸ü −ÖÖÆüß.
•ÖÖê›ü¯Ö¡Ö - 1 “Öê ¯Ö׸ü׿Ö™ü
¯ÖÏ¯Ö¡Ö 1 (×−ÖµÖ´Ö 7)
−ÖÖë¤üÖß Îú.
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü
(¸üÖê•ÖÖÖ¸ü ×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá)
†×¬Ö×−ÖµÖ´Ö, 1996 †ÓŸÖÖÔŸÖ
−ÖÖë¤üÖß ¯ÖÏÖ׬֍úÖ¸üß
1) †ÖãÖÖ¯Ö−Öê“Öê −ÖÖÓ¾Ö :-
2) ¯Ö¢ÖÖ
3) úÖ´ÖÖ“Öê −ÖÖÓ¾Ö/þֹý¯Ö
4) ×−ÖµÖãŒŸÖ êú»Öê»Öê úִ֐ÖÖ¸ü ÃÖӏµÖÖ
5) úÖ´Ö ÃÖã¹ý¾ÖÖŸÖ —ÖÖ»µÖÖ“Öß úÖ´ÖÖ“Öê †Ó¤üÖ•Öê úÖ»ÖÖ¾Ö¬Öß
ŸÖÖ¸üߏÖ/´Ö×Æü−ÖÖ/¾ÖÂÖÔ ´Ö×Æü−Öê / ¾ÖÂÖÔ
6) ²ÖÖӬ֍úÖ´ÖÖ“Öê ˆ¯Öú¸ü
†Ó¤üÖ•ÖßŸÖ ´Öã»µÖ ³Ö¸üµÖÖ²ÖÖ²ÖŸÖ“ÖÖ
ŸÖ¯Ö׿ֻÖ.
™ü¯¯Öê ´Öã»µÖ ¸üŒú´Ö, “Ö»Ö−Ö Îú.¾Ö †ÖÏß´Ö - ‹
פü−ÖÖӍú ¾Ö•ÖÖ¾Ö™ü - †
†ÓŸÖß´Ö - ‹±ú
¯ÖÆüß»Öê ¾ÖÂÖÔ
¤ãüÃÖ¸êü ¾ÖÂÖÔ
ןÖÃÖ¸êü ¾ÖÂÖÔ
“ÖÖî£Öê ¾ÖÂÖÔ
‹ãúÖ
---------------------------------------------------------------------------------------------------
´Öֻ֍úÖ“Öß Ã¾Öցָüß
´Öֻ֍úÖ“Öê −ÖÖÓ¾Ö
פü−ÖÖӍú
×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓ−Öê ³Ö¸üÖ¾ÖµÖÖ“Öê
7.¯ÖãÖÔŸ¾ÖÖ“Öß ŸÖÖ¸üßÖ 8. †Ó×ŸÖ´Ö ´Ö㻵Ö
9) ×−Ö¬ÖÖÔ¸üÖÖ“Öß ŸÖÖ¸üßÖ 10) ×−Ö¬ÖÖÔ¸üßŸÖ ¸üŒú´Ö
11) †×¯Ö»ÖÖ“Öß ŸÖÖ¸üßÖ †ÃÖ»µÖÖÃÖ 12) †×¯Ö»ÖÖÃÖÓ²ÖÓ¬Öß“µÖÖ †Ö¤êü¿ÖÖ“Öß ŸÖÖ¸üߏÖ
13) †×¯Ö»ÖÖ“µÖÖ †Ö¤êü¿ÖÖ−ÖãÃÖÖ¸ü 14) ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ´ÖÓ›üôûÖŸÖ •Ö´ÖÖ êú»µÖÖ“Öß
¸üŒú´Ö ŸÖÖ¸üߏÖ
15) ÆüßÖÖÓŸÖ¸üßŸÖ ¸üŒú´Ö - “Ö»Ö−Ö Îú. ¾Ö פü−ÖÖӍú
þÖցָüß
Ææü¤ü¤ËüÖ
¯Ö׸ü׿Ö™ü- 2
ˆ¯Öú¸üÖ¯ÖÖê™üß •Ö´ÖÖ ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ ¸üŒú´Öê“ÖÖ ŸÖ¯Ö×¿Ö»Ö ¤ü¿ÖÔ׾֝ÖÖ¸üÖ ´ÖÖ×Ã֍ú ŸÖŒŸÖÖ

†.Îú. Óú¡ÖÖ™ü¤üÖ¸üÖ“Öê ÃÖã¯Öã¤Ôü ײֻÖÖ¯ÖÖê™üß ×²Ö»Öê ú¯ÖÖŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ´ÖÓ›üôûÖŸÖ


−ÖÖ¾Ö ¾Ö ¯Ö¢ÖÖ ú¸üµÖÖŸÖ ¤êüµÖÖŸÖ ¤êüµÖÖŸÖ ú¸üµÖÖŸÖ •Ö´ÖÖ êú»µÖÖ²ÖÖ²ÖŸÖ“ÖÖ ŸÖ¯Ö׿ֻÖ
†Ö»Ö껵ÖÖ †Ö»Öê»Öß †Ö»Ö껵ÖÖ †Ö»Ö껵ÖÖ
úÖ´ÖÖ“ÖÖ ‹ãúÖ ŸÖÖ¸üÖÖ ˆ¯Öú¸üÖ“Öß
ŸÖ¯Ö×¿Ö»Ö ¸üŒú´Ö ¸üŒú´Ö
ŸÖÖ¸üßÖ “Ö»Ö−Ö ¸üŒú´Ö
Îú´ÖÖӍú
1. 2. 3. 4. 5. 6. 7. 8. 9.
¯Ö׸ü׿Ö™ü-ü 3
¿ÖÖÃÖ׍úµÖ ×¾Ö³Ö֐Ö/ãÖÖ×−֍ú ÃÖÓãÖÖ/ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´ÖÖŸÖ±ìú ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öê ¾ÖÖÙÂ֍ú ×¾Ö¾Ö¸üÖ
ÃÖ−Ö 200 ú¸üߟÖÖ
×¾Ö³Ö֐ÖÖ“Öê −ÖÖÓ¾Ö :-
†ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ-µÖÖÓ“Öê −ÖÖÓ¾Ö ¾Ö Ææü¤ü¤ËüÖ :-
−ÖÖë¤üÖß Îú´ÖÖӍú :-
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü †×¬Ö×−ÖµÖ´Ö †ÓŸÖÖÔŸÖ
†ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ-µÖÖÓ“ÖÖ ÃÖÓ¤ü³ÖÔ Îú´ÖÖӍú

†.Îú. •µÖÖ¾ÖÂÖá úÖ´Ö ÃÖã¹ý •µÖÖ ¾ÖÂÖÖÔŸÖ ×¤ü»Ö껵ÖÖ ú¯ÖÖŸÖ ³Ö¸üÖ


ú¸üµÖÖŸÖ †Ö»Öê ŸµÖÖ Óú¡ÖÖ™ü¤üÖ¸üÖÓ−ÖÖ ‹ãúÖ ú¸üµÖÖŸÖ ú¸üµÖÖŸÖ
¾ÖÂÖÖÔŸÖ ¤êüµÖÖŸÖ úÖ´ÖÖ“Öê ײֻÖê ײֻÖÖ“Öß †Ö»Ö껵ÖÖ †Ö»Ö껵ÖÖ
†Ö»Ö껵ÖÖ úÖ´ÖÖ“Öß †¤üÖ ú¸üµÖÖŸÖ ¸üŒú´Ö ˆ¯Öú¸üÖ“Öß ˆ¯Öú¸üÖ“Öß
ÃÖӏµÖÖ †Ö»Öß ¸üŒú´Ö ¸üŒú´Ö
ŸµÖÖ²ÖÖ²ÖŸÖ
úÖ´ÖÖ“µÖÖ
úÖ´ÖÖ“Öß
ÃÖӏµÖÖ
1. 2. 3. 4. 5. 6.
¯Ö׸ü׿Ö™ü-ü 4
†Ö¸ü֏֛êü ´ÖÓ•Öæ¸ü ú¸üÖÖ-µÖÖ ¯ÖÏÖ׬֍úÖ-µÖÖӍú›æü−Ö ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öê ¾ÖÖÙÂ֍ú ×¾Ö¾Ö¸üÖ
ÃÖ−Ö 2000- ú¸üߟÖÖ

úÖµÖÖÔ»ÖµÖÖ“Öê −ÖÖÓ¾Ö ¾Ö †Ö¸ü֏֛üÖ ´ÖÓ•Öæ¸ü ú¸üÖÖ-µÖÖÓ ¯ÖÏÖ׬֍úÖ-µÖÖÓ“ÖÖ Ææü¤ü¤ËüÖ :-

ÃÖÓ¤ü³ÖÔ Îú´ÖÖӍú
†.Îú †Ö٣֍ú ¾ÖÂÖÖÔŸÖ •Ö´ÖÖ ³Ö¸üÖÖ ÃÖ¾ÖÔ 12 •Ö´ÖÖ ú¸üµÖÖŸÖ ´ÖÓ›üôûÖŸÖ±ìú
´ÖÓ•Öæ¸ü ú¸üµÖÖŸÖ êú»Ö껵ÖÖ êú»Ö껵ÖÖ ´Ö×Æü−µÖÖ“Öê †Ö»Ö껵ÖÖ †Ö¸ü֏֛êü ´ÖÓ•Öæ¸ü
†Ö»Ö껵ÖÖ ˆ¯Öú¸üÖ“Öß ˆ¯Öú¸üÖ“Öß ´ÖÖ×Ã֍ú ˆ¯Öú¸üÖÃÖÓ²ÖÓ¬Öß ú¸üµÖÖŸÖ
†Ö¸ü֏֛üµÖÖ“Öß ¸üŒú´Ö ¸üŒú´Ö ×¾Ö¾Ö¸üÖ¯Ö¡Ö —ÖÖ»Öê»ÖÖ ¯ÖÏŸµÖÖ †Ö»Ö껵ÖÖ
ÃÖӏµÖÖ ¹ý¯ÖµÖê ¹ý¯ÖµÖê ÃÖÖ¤ü¸ü êú»Öê Ö“ÖÔ †×¬ÖúÖ-µÖÖÓ−ÖÖ
†ÖÆêüŸÖ úÖµÖ (1 % ¯ÖêÖ ˆ¯Öú¸
†Ö×Ö ³Ö¸üÖÖ •ÖÖÃŸÖ ÖÖêôûÖ
êú»Ö껵ÖÖ −ÖÃÖ»Öê»ÖÖ) ú¸üµÖÖÃÖÖšüß
ˆ¯Öú¸üÖ“Öß Ö“ÖÔ ú¸üµÖÖŸÖ
¸üŒú´Öê“ÖÖ †Ö»Ö껵ÖÖ
´Öêôû ²ÖÃÖ»ÖÖ ¸üŒú´Öê“Öß
úÖµÖ ú¸üµÖÖŸÖ
†Ö»Ö껵ÖÖ
¯Ö¸ü߯ÖãŸÖá
²ÖÖ²ÖŸÖ“ÖÖ
ŸÖ¯Ö׿ֻÖ
(´ÖÓ›üôû֍ú¸üߟÖÖ
1. 2. 3. 4. 5. 6. 7.
जलसंपदा विभागाने प्रवििर्षी दरसूचीिर
आधारीि भाििाढ वनदे शांक प्रवसध्द करणेबाबि

महाराष्ट्र शासन
जलसंपदा विभाग
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
मंत्रालय, मंबई - 400 032.
िारीख: 22 मे, 2017
प्रस्िािना:-

राज्यािील विविध पाटबंधारे विकास महामंडळाकडील सधारीि प्रशाकीय मान्यिा प्रस्िाि,


ससचनक्षमिा, ससवचि क्षेत्र यांची िपासणी करण्याकवरिा डॉ.माधिराि वचिळे ,जलिज्ञ िथा माजी सवचि,
केंद्रीय जलसंसाधन मंत्रालय,निी वदल्ली यांच्या अध्यक्षिेखाली विशेर्ष चौकशी सवमिी वनयक्ि करण्याि आली
होिी. या सवमिीने तयांचा अहिाल वद.1-3-2014 रोजी शासनास सादर केला. सवमिीच्या अहिालाि एकूण
42 सधारणा प्रस्िाविि करण्याि आल्या आहेि. सदर सवमिीच्या अहिालािरील कायणपालन अहिालाि सदर
सधारणा ितिि: मान्य करण्याि आल्या आहेि.

एखाद्या प्रकल्पाच्या बांधकामाचा कालािधी मोठा असिो िेव्हा भाििाढीमळे प्रकल्पाच्या खचाि
होणारी िाढ ही अवनिायण ि अपवरहायण असिे. तयामळे दीर्णकाळ चालि असलेल्या प्रकल्पािील सकमििाढीचे
विश्लेर्षण करिांना प्रथमि: भाििाढीमळे झालेली सकमििाढ वनविि करुन िी अपवरहायण म्हणून िेगळी
काढली पावहजे. सधारीि प्रकल्प अहिाल ियार करिाना सविस्िर पवरगणना कूनन भाििाढीमळे प्रकल्प
खचाि होणारी िाढ काढण्याि येिे. िथापी, सधारीि प्रकल्प अहिालाच्या िपासणीच्या प्रतयेक टप्पप्पयािर
भाििाढीमळे होणारी प्रकल्प खचािील िाढीच्या सविस्िर पवरगणनेची आकडे िारी िपासणी शक्य होि नाही.
यासाठी भाििाढीमळे होणारी सकमििाढ स्स्िकारिाना सधारीि प्रशासकीय मान्यिा दे णाऱ्या प्रावधकरणास
पडिाळणीसाठी सटसटीि, सलभ ि िकणसंगि कायणपध्दिी विकवसि करणे गरजेचे ठरिे. ससचन विर्षयक
विशेर्ष चौकशी सवमिीच्या अहिालािील प्रस्िाविि 42 सधारणांमध्ये सधारणा क्र.18 पढीलप्रमाणे आहे.

“जलसंपदा विभागाने प्रिीिर्षी दरसूचीिर आधावरि भाििाढ वनदे शांक प्रवसध्द करािा”.

केंवद्रय बांधकाम विभागाच्या धिीिर असे वनदे शांक ठरविण्यासाठी मख्य अवभयंिा (जसं) ि सह सवचि यांच्या
अध्यक्षिेखाली अधीक्षक अवभयंिा, जायकिाडी प्रकल्प मंडळ औरंगाबाद आवण अधीक्षक अवभयंिा, महाराष्ट्र
कृष्ट्णा खोरे विकास महामंडळ हे सदस्य सवचि असलेली सवमिी गवठि करण्याि आली होिी.

राज्यािील मोठे ,मध्यम ि लर्ू प्रकल्पांच्या विविध कामांच्या 6 वनविदांचा (मोठ्या प्रकल्पािील मािी
धरण, द्वारयक्ि उतसारी भागाची कामे, मध्यम प्रकल्पाचे मािी धरणाचे काम, उपसा ससचन योजनेची कामे,
लपा प्रकल्पांच्या धरणाचे काम, अस्िरीकरणासह कालव्यांची कामे आवण मोठ्या प्रकल्पािील बॅरेजेसची
कामे) अभ्यास कूनन िसेच दरम्यानच्या कालािधीि केंद्रीय जलआयोगाने एवप्रल 2016 मध्ये जलसंपदा
प्रकल्पाच्या अंदाजपत्रक ियार करणेसाठीच्या प्रवसध्द केलेल्या मसूदा मागणदशणक सूचनाचा अभ्यास कूनन
सवमिीने आपला अहिाल सादर केला.
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2

सवमिीच्या प्रमख वशफारशी खालीलप्रमाणे.

1) जलसंपदा विभागासाठी भाििाढ वनदे शांक पवरगवणि करिाना प्रकल्प सकमिीिर पवरणाम
करणाऱ्या र्टकांचे पढील प्रमाणे अवधमान (Weightage) वनविि करणेि यािे.

All Commodities :- 35 %

Cement :- 18 %

Steel :- 12 %

Fuel :- 10 %

Labour :- 25 %

2अ) वसमेंट, स्टील ि All Commodities साठी केंद्र शासनाचे Office of the Economic Advisor
Ministry of Commerce and Industries यांनी मवहना वनहाय प्रवसध्द केलेले Indices विचाराि
घ्यािेि. (http://eaindustry.nic.in)

2ब) इंधनासाठी Indian Oil यांनी मंबईसाठी प्रवसध्द केलेले दर विचाराि र्ेणेि यािेि.
(http://www.iocl.com)

2क) लेबर Indices साठी लेबर ब्यरोने प्रवसध्द केलेले Consumer Price Index for Industrial
workers विचाराि र्ेणेि यािेि. (http://labourbureau.nic.in) यासाठी मंबई, नागपूर , नावशक,
पणे, सोलापूर साठीच्या Indices ची सरासरी विचाराि र्ेणेि यािी.

(3) अथणसंकल्पाि िर्षासाठीची करप्रणाली वनविि होि असिे. तयामळे दरिर्षीचा भाििाढ वनदे शांक
पवरगवणि करिाना एवप्रल मवहन्यािील वनदे शांक विचाराि घ्यािेि.

सवमिीने उपरोक्ि गृहीिकािर आधारीि ससचन प्रकल्पासाठीचे सन 2000 पासनचे िार्षर्षक वनदेशांक
पवरगवणि कूनन शासनास सादर केले.

सवमिीचा अहिाल स्स्िकृि कूनन शासनाने ससचन प्रकल्पांचे भाििाढ वनदे शांकाबाबि पढील प्रमाणे वनणणय
र्ेिला आहे.

शासन वनणणय-

1) ससचन प्रकल्पांना सधारीि प्रशासवकय मान्यिा दे िाना भाििाढीमळे दशणविण्याि आलेल्या


सकमिीिाढीची व्यिहायणिा िपासणे साठी पवरवशष्ट्ठ 1 मधील भाििाढ वनदे शांकाचा िापर करािा.

2) एखाद्या िर्षी जलसंपदा विभागाची दरसूची प्रवसध्द न झाल्यास दरसूचीिील बाबीचे दर िदथणपणे
िाढििाना सदर वनदे शांकािील िाढ विचाराि घ्यािी.

पृष्ट्ठ 4 पैकी 2
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2

3) दरिर्षीचे भाििाढ वनदे शांक एवप्रल मवहन्याचे प्रसावरि होणाऱ्या वनदे शांकाचे आधारािर प्रवसध्द
करािेि.

सदर शासन वनणणय महाराष्ट्र शासनाच्या www.maharashtra.gov.in या संकेिस्थळािर


उपलब्ध करण्याि आला असून तयाचा संकेिाक 201705261504066127 असा आहे. हा आदे श
वडजीटल स्िाक्षरीने साक्षांवकि करुन काढण्याि येि आहे.
महाराष्ट्राचे राज्यपाल यांच्या आदे शानसार ि नािाने.
Digitally signed by Rajendra Baburao Kshirsagar

Rajendra Baburao DN: c=IN, o=Government Of Maharashtra, ou=Water


Resources, postalCode=400032, st=Maharashtra,
2.5.4.20=0d5a1f5709281445b9117f5316c6c720edc1a56

Kshirsagar ac9bda2e00ed1169efc12f9e9, cn=Rajendra Baburao


Kshirsagar
Date: 2017.05.26 15:08:14 +05'30'

(रा. बा. क्षीरसागर)


अिर सवचि, महाराष्ट्र शासन
प्रि-
1) मा.राज्यपालांचे सवचि
2) मा.मख्यमंत्री यांचे प्रधान सवचि
3) सिण मंत्री/राज्यमंत्री यांचे खाजगी सवचि
4) सिण मंत्रालयीन विभागाचे अप्पपर मख्य सवचि/प्रधान सवचि/सवचि,मंत्रालय,मंबई
5) सवचि, मख्य सवचि कायालय,मंत्रालय,मंबई.
6) सवचि, महाराष्ट्र विधानमंडळ सवचिालय,विधानभिन,मंबई.
7) सवचि, संसवदय कायण विभाग,मंत्रालय,मंबई
8) महासंचालक, मावहिी ि जनसंपकण महासंचालनालय,मंबई
9) अप्पपर मख्य सवचि(वनयोजन),मंत्रालय,मंबई.
10) अप्पपर मख्य सवचि (वित्त), मंत्रालय,मंबई
11) अप्पपर मख्य सवचि (कृर्षी ि पणन),मंत्रालय,मंबई
12) अप्पपर मख्य सवचि (महसूल),मंत्रालय,मंबई
13) प्रधान सवचि (जलसंपदा),मंत्रालय,मंबई.
14) सवचि (जलसंपदा,लाक्षेवि),मंत्रालय,मंबई.
15) सवचि (जलसंपदा, प्रकल्प समन्िय),मंत्रालय,मंबई.
16) प्रधान सवचि (जलसंधारण, रो.ह.यो.),मंत्रालय,मंबई.
17) प्रधान सवचि (पाणी परिठा ि स्िच्छिा),मंत्रालय,मंबई.
18) प्रधान सवचि (िने),मंत्रालय,मंबई.
19) प्रधान सवचि (ग्रामविकास),मंत्रालय,मंबई.
20) सवचि (मदि ि पनिणसन),मंत्रालय,मंबई.
21) महासंचालक,महाराष्ट्र अवभयांवत्रकी संशोधन संस्था,नावशक.
22) सिण कायणकारी संचालक, पाटबंधारे विकास महामंडळे ,ठाणे,पणे,नागपूर,औरंगाबाद,जळगांि
23) सिण मख्य अवभयंिा ि सहसवचि/सहसवचि,जलसंपदा विभाग,मंत्रालय, मंबई -32
24) वनिड नस्िी, लपा-2, जलसंपदा विभाग, मंत्रालय,मंबई.६

पृष्ट्ठ 4 पैकी 3
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2

पवरवशष्ट्ट -1

ससचन प्रकल्पासाठीचे िर्षणवनहाय भाििाढ वनदे शांक


(आधारभूि िर्षण-2000)

अ.क्र. िर्षण दरसूची भाििाढ वनदे शांक


1 2000 100.00
2 2001 108.51
3 2002 110.77
4 2003 117.51
5 2004 128.07
6 2005 135.03
7 2006 142.37
8 2007 153.37
9 2008 167.31
10 2009 168.99
11 2010 186.68
12 2011 202.56
13 2012 219.69
14 2013 233.78
15 2014 243.62
16 2015 243.40
17 2016 247.23

पृष्ट्ठ 4 पैकी 4
जलसंपदा विभागाने प्रवििर्षी दरसूचीिर
आधारीि भाििाढ वनदे शांक प्रवसध्द करणेबाबि

महाराष्ट्र शासन
जलसंपदा विभाग
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
मंत्रालय, मंबई - 400 032.
िारीख: 22 मे, 2017
प्रस्िािना:-

राज्यािील विविध पाटबंधारे विकास महामंडळाकडील सधारीि प्रशाकीय मान्यिा प्रस्िाि,


ससचनक्षमिा, ससवचि क्षेत्र यांची िपासणी करण्याकवरिा डॉ.माधिराि वचिळे ,जलिज्ञ िथा माजी सवचि,
केंद्रीय जलसंसाधन मंत्रालय,निी वदल्ली यांच्या अध्यक्षिेखाली विशेर्ष चौकशी सवमिी वनयक्ि करण्याि आली
होिी. या सवमिीने तयांचा अहिाल वद.1-3-2014 रोजी शासनास सादर केला. सवमिीच्या अहिालाि एकूण
42 सधारणा प्रस्िाविि करण्याि आल्या आहेि. सदर सवमिीच्या अहिालािरील कायणपालन अहिालाि सदर
सधारणा ितिि: मान्य करण्याि आल्या आहेि.

एखाद्या प्रकल्पाच्या बांधकामाचा कालािधी मोठा असिो िेव्हा भाििाढीमळे प्रकल्पाच्या खचाि
होणारी िाढ ही अवनिायण ि अपवरहायण असिे. तयामळे दीर्णकाळ चालि असलेल्या प्रकल्पािील सकमििाढीचे
विश्लेर्षण करिांना प्रथमि: भाििाढीमळे झालेली सकमििाढ वनविि करुन िी अपवरहायण म्हणून िेगळी
काढली पावहजे. सधारीि प्रकल्प अहिाल ियार करिाना सविस्िर पवरगणना कूनन भाििाढीमळे प्रकल्प
खचाि होणारी िाढ काढण्याि येिे. िथापी, सधारीि प्रकल्प अहिालाच्या िपासणीच्या प्रतयेक टप्पप्पयािर
भाििाढीमळे होणारी प्रकल्प खचािील िाढीच्या सविस्िर पवरगणनेची आकडे िारी िपासणी शक्य होि नाही.
यासाठी भाििाढीमळे होणारी सकमििाढ स्स्िकारिाना सधारीि प्रशासकीय मान्यिा दे णाऱ्या प्रावधकरणास
पडिाळणीसाठी सटसटीि, सलभ ि िकणसंगि कायणपध्दिी विकवसि करणे गरजेचे ठरिे. ससचन विर्षयक
विशेर्ष चौकशी सवमिीच्या अहिालािील प्रस्िाविि 42 सधारणांमध्ये सधारणा क्र.18 पढीलप्रमाणे आहे.

“जलसंपदा विभागाने प्रिीिर्षी दरसूचीिर आधावरि भाििाढ वनदे शांक प्रवसध्द करािा”.

केंवद्रय बांधकाम विभागाच्या धिीिर असे वनदे शांक ठरविण्यासाठी मख्य अवभयंिा (जसं) ि सह सवचि यांच्या
अध्यक्षिेखाली अधीक्षक अवभयंिा, जायकिाडी प्रकल्प मंडळ औरंगाबाद आवण अधीक्षक अवभयंिा, महाराष्ट्र
कृष्ट्णा खोरे विकास महामंडळ हे सदस्य सवचि असलेली सवमिी गवठि करण्याि आली होिी.

राज्यािील मोठे ,मध्यम ि लर्ू प्रकल्पांच्या विविध कामांच्या 6 वनविदांचा (मोठ्या प्रकल्पािील मािी
धरण, द्वारयक्ि उतसारी भागाची कामे, मध्यम प्रकल्पाचे मािी धरणाचे काम, उपसा ससचन योजनेची कामे,
लपा प्रकल्पांच्या धरणाचे काम, अस्िरीकरणासह कालव्यांची कामे आवण मोठ्या प्रकल्पािील बॅरेजेसची
कामे) अभ्यास कूनन िसेच दरम्यानच्या कालािधीि केंद्रीय जलआयोगाने एवप्रल 2016 मध्ये जलसंपदा
प्रकल्पाच्या अंदाजपत्रक ियार करणेसाठीच्या प्रवसध्द केलेल्या मसूदा मागणदशणक सूचनाचा अभ्यास कूनन
सवमिीने आपला अहिाल सादर केला.
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2

सवमिीच्या प्रमख वशफारशी खालीलप्रमाणे.

1) जलसंपदा विभागासाठी भाििाढ वनदे शांक पवरगवणि करिाना प्रकल्प सकमिीिर पवरणाम
करणाऱ्या र्टकांचे पढील प्रमाणे अवधमान (Weightage) वनविि करणेि यािे.

All Commodities :- 35 %

Cement :- 18 %

Steel :- 12 %

Fuel :- 10 %

Labour :- 25 %

2अ) वसमेंट, स्टील ि All Commodities साठी केंद्र शासनाचे Office of the Economic Advisor
Ministry of Commerce and Industries यांनी मवहना वनहाय प्रवसध्द केलेले Indices विचाराि
घ्यािेि. (http://eaindustry.nic.in)

2ब) इंधनासाठी Indian Oil यांनी मंबईसाठी प्रवसध्द केलेले दर विचाराि र्ेणेि यािेि.
(http://www.iocl.com)

2क) लेबर Indices साठी लेबर ब्यरोने प्रवसध्द केलेले Consumer Price Index for Industrial
workers विचाराि र्ेणेि यािेि. (http://labourbureau.nic.in) यासाठी मंबई, नागपूर , नावशक,
पणे, सोलापूर साठीच्या Indices ची सरासरी विचाराि र्ेणेि यािी.

(3) अथणसंकल्पाि िर्षासाठीची करप्रणाली वनविि होि असिे. तयामळे दरिर्षीचा भाििाढ वनदे शांक
पवरगवणि करिाना एवप्रल मवहन्यािील वनदे शांक विचाराि घ्यािेि.

सवमिीने उपरोक्ि गृहीिकािर आधारीि ससचन प्रकल्पासाठीचे सन 2000 पासनचे िार्षर्षक वनदेशांक
पवरगवणि कूनन शासनास सादर केले.

सवमिीचा अहिाल स्स्िकृि कूनन शासनाने ससचन प्रकल्पांचे भाििाढ वनदे शांकाबाबि पढील प्रमाणे वनणणय
र्ेिला आहे.

शासन वनणणय-

1) ससचन प्रकल्पांना सधारीि प्रशासवकय मान्यिा दे िाना भाििाढीमळे दशणविण्याि आलेल्या


सकमिीिाढीची व्यिहायणिा िपासणे साठी पवरवशष्ट्ठ 1 मधील भाििाढ वनदे शांकाचा िापर करािा.

2) एखाद्या िर्षी जलसंपदा विभागाची दरसूची प्रवसध्द न झाल्यास दरसूचीिील बाबीचे दर िदथणपणे
िाढििाना सदर वनदे शांकािील िाढ विचाराि घ्यािी.

पृष्ट्ठ 4 पैकी 2
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2

3) दरिर्षीचे भाििाढ वनदे शांक एवप्रल मवहन्याचे प्रसावरि होणाऱ्या वनदे शांकाचे आधारािर प्रवसध्द
करािेि.

सदर शासन वनणणय महाराष्ट्र शासनाच्या www.maharashtra.gov.in या संकेिस्थळािर


उपलब्ध करण्याि आला असून तयाचा संकेिाक 201705261504066127 असा आहे. हा आदे श
वडजीटल स्िाक्षरीने साक्षांवकि करुन काढण्याि येि आहे.
महाराष्ट्राचे राज्यपाल यांच्या आदे शानसार ि नािाने.
Digitally signed by Rajendra Baburao Kshirsagar

Rajendra Baburao DN: c=IN, o=Government Of Maharashtra, ou=Water


Resources, postalCode=400032, st=Maharashtra,
2.5.4.20=0d5a1f5709281445b9117f5316c6c720edc1a56

Kshirsagar ac9bda2e00ed1169efc12f9e9, cn=Rajendra Baburao


Kshirsagar
Date: 2017.05.26 15:08:14 +05'30'

(रा. बा. क्षीरसागर)


अिर सवचि, महाराष्ट्र शासन
प्रि-
1) मा.राज्यपालांचे सवचि
2) मा.मख्यमंत्री यांचे प्रधान सवचि
3) सिण मंत्री/राज्यमंत्री यांचे खाजगी सवचि
4) सिण मंत्रालयीन विभागाचे अप्पपर मख्य सवचि/प्रधान सवचि/सवचि,मंत्रालय,मंबई
5) सवचि, मख्य सवचि कायालय,मंत्रालय,मंबई.
6) सवचि, महाराष्ट्र विधानमंडळ सवचिालय,विधानभिन,मंबई.
7) सवचि, संसवदय कायण विभाग,मंत्रालय,मंबई
8) महासंचालक, मावहिी ि जनसंपकण महासंचालनालय,मंबई
9) अप्पपर मख्य सवचि(वनयोजन),मंत्रालय,मंबई.
10) अप्पपर मख्य सवचि (वित्त), मंत्रालय,मंबई
11) अप्पपर मख्य सवचि (कृर्षी ि पणन),मंत्रालय,मंबई
12) अप्पपर मख्य सवचि (महसूल),मंत्रालय,मंबई
13) प्रधान सवचि (जलसंपदा),मंत्रालय,मंबई.
14) सवचि (जलसंपदा,लाक्षेवि),मंत्रालय,मंबई.
15) सवचि (जलसंपदा, प्रकल्प समन्िय),मंत्रालय,मंबई.
16) प्रधान सवचि (जलसंधारण, रो.ह.यो.),मंत्रालय,मंबई.
17) प्रधान सवचि (पाणी परिठा ि स्िच्छिा),मंत्रालय,मंबई.
18) प्रधान सवचि (िने),मंत्रालय,मंबई.
19) प्रधान सवचि (ग्रामविकास),मंत्रालय,मंबई.
20) सवचि (मदि ि पनिणसन),मंत्रालय,मंबई.
21) महासंचालक,महाराष्ट्र अवभयांवत्रकी संशोधन संस्था,नावशक.
22) सिण कायणकारी संचालक, पाटबंधारे विकास महामंडळे ,ठाणे,पणे,नागपूर,औरंगाबाद,जळगांि
23) सिण मख्य अवभयंिा ि सहसवचि/सहसवचि,जलसंपदा विभाग,मंत्रालय, मंबई -32
24) वनिड नस्िी, लपा-2, जलसंपदा विभाग, मंत्रालय,मंबई.६

पृष्ट्ठ 4 पैकी 3
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2

पवरवशष्ट्ट -1

ससचन प्रकल्पासाठीचे िर्षणवनहाय भाििाढ वनदे शांक


(आधारभूि िर्षण-2000)

अ.क्र. िर्षण दरसूची भाििाढ वनदे शांक


1 2000 100.00
2 2001 108.51
3 2002 110.77
4 2003 117.51
5 2004 128.07
6 2005 135.03
7 2006 142.37
8 2007 153.37
9 2008 167.31
10 2009 168.99
11 2010 186.68
12 2011 202.56
13 2012 219.69
14 2013 233.78
15 2014 243.62
16 2015 243.40
17 2016 247.23