Professional Documents
Culture Documents
Abstract Gom WRD CSR 2021-22
Abstract Gom WRD CSR 2021-22
INDEX
Pages
Sr.
Particulars
No.
From To
1.0 SECTION-1
SECTION-3
3.0 26 37
Concrete Work including Centering, UCR Masonry,
Brick Masonry & R.C.C. Pipes - Item No. 27 to 72
SECTION-4
4.0 38 41
Tunnel Works - Item No. 73 to 83
SECTION-5
5.0 42 46
Surveying & Investigation - Item No.84 to 100
SECTION-6
6.0 47 48
Hydrometeorology – Item No.101 to 107
SECTION-7
7.0 Valuation of Rehabilitation Works – 49 53
Item No.108 to 138
SECTION-8
8.0 Flow Measuring Devices - Item No.139 to 142 54 56
SECTION-9
9.0 57 58
Marking Blue Line & Red Line-Item No.143 to 149
SECTION-10
10.0 59 60
Land Reclamation Work & Soil Survey -
Item No.150 to 161
SECTION-11
11.0 61 68
Maintenance & Repairs - Item No. 162 to 193
SECTION-12
12.0 Lift and Gravity Pipe Irrigation Network - 69 130
Item No. 194 to 264
GOVERNMENT OF MAHARASHTRA
SECTION-1
1
महाराष्ट्र शासन, जलसंपदा विभाग
टनस्चचत केलेली हातची टकमत (offset price)}आटण उपरोक्त नमुद केल्याप्रमाणे रु.679.30
प्रटत घमी यामधील फरक टर्चारात घे ण्यात यार्ा .
(उदाहरण :- र्ाळूच्या टललार्ाचा दर रु. 900 प्रटत घमी. र्ाळूच्या दरात अटतटरक्त घ्यार्याची
र्ाढ =900-679.30 =220.70 प्रटतघमी.)
4) कृ मिि वाळू (Artificial / Crushed Sand):-
4.1 ज्या कामाांमध्ये कृ त्रीम र्ाळू र्ापरणे प्रस्ताटर्त आहे , अशा कामाांची अांदाजपत्रके तयार करताना
तयामध्ये कृ त्रीम र्ाळू र्ापरासाठी रु.1615.15 प्रटत घमी असा दर घेण्यात यार्ा.म्हणजेच
दरपृि:करण करताना हा दर (रु.1615.15प्रटतघमी )र् अ क्र ३ मधील नैसर्गगक र्ाळूचा दर
(रु.908.90 प्रटतघमी) यामधील फरक (रु.706.25 प्रटतघमी ) टर्चारात घे णेत यार्ा.
4.2 कृ टत्रम र्ाळूसाठी कच्चा माल म्हणून दगड (Rubble) र्ापरला जात असल्याने दगडाचे र्हन
अांतर हे च र्हन अांतर कृ टत्रम र्ाळूकटरता टर्चारात घ्यार्े.
5)िजुराांच्या सुमवधा :-
शासन टनणवय क्रमाांक.टडएसआर-1090/सीआर-6453/पीएलएन-3, टद.14.07.1993 नुसार
मजुराांच्या सुटर्धाांसाठी दरसूचीतील प्रतयेक बाबीमध्ये 1% तरतूद करण्यात आली आहे .
6)काििार कल्याण उपकर :-
उद्योग र् उजा टर्भागाचे शासन टनणवय क्रमाांक बीसीए-2009/सीआर-108/लेबर 7-अ,
टद.17/06/2010 नुसार कामगार कल्याण उपकरासाठीची १ %ची तरतूद सामाईक दरसूचीतील
बाबीमध्ये दर टनस्चचत करताना टर्चारात घेतलेली नाही. अांदाजपत्रक तयार करताना प्रतयेक
बाबीच्या दरपृि:करणामध्ये कामगार कल्याण उपकराची 1 िक्के इतकी तरतूद करण्यात यार्ी.
7) मविा :-
टर्त्त टर्भागाचा शासन टनणवय क्रमाांक टर्मासां-1008/प्र.क्र.28/98/शा.हमी, टद.19/08/1998
नुसार कामाच्या ककमतीच्या 1% ची टर्मा कटरताची तरतूद सामाईक दरसूचीतील बाबीमध्ये दर
टनस्चचत करताना टर्चारात घेतलेली नाही. अांदाजपत्रक तयार करताना टर्मा कटरताची 1 िक्के
इतकी तरतूद अांदाजपत्रकाच्या गोषर्ाऱ्यात करण्यात यार्ी. कांत्रािदाराने प्रतयक्ष भरल्यानुसार
टर्मा शुल्काची प्रटतपूती १% च्या मयादे त करार्ेत.
8) िजुराांचे दर :- सन 2021-22 या र्षाची सामाईक दरसूची तयार करताांना मजुराांचे दर हे
महाराष्र शासन, जलसांपदा टर्भाग, शासन टनणवय क्र.सांकीणव 2014/(289/14)/लपा-2,
मांत्रालय, मुांबई टद. 22.05.2017 नुसार र् र् कामगार उपायुक्त, कायालयाकडू न प्राप्त पत्र जा.
क्र./काउआ/3695 टदनाांक 25/02/2021 नुसार मजुराांचे दर टनस्चचत करणेत आलेले आहे त.
9) बाांधकाि सामित्याचे दर:-
9.1.लोह: दरसूची तयार करताना M.S./HYSD/TMT स्िीलचे round bar, MS plates,
structural steel इतयादी साठी टद.05/01/2021 रोजीचे जॉइन्ि प्लॅन्ि कटमिीने मुांबई साठी
टनस्चचत केलेले दर (GST टर्रटहत ) टर्चारात घेतलेले आहे त. (उदा. JPC प्रमाणे PIG IRON
चा मुांबईचा दर रु.49570/- , दरसूचीसाठी टर्चारात घेतलेला दर = 49570 / 1.18 =
2
महाराष्ट्र शासन, जलसंपदा विभाग
3
महाराष्ट्र शासन, जलसंपदा विभाग
12) मवमशष्ट क्षे िातील कािाच्या स्वरूपानुसार मवमवध दराांिधील अनुज्ञेय वाढ
12.1 जनजाती क्षेत्रातील तसेच टर्शेष कृ ती कायवक्रम अशा दोन्ही क्षेत्राांतगवत एखादे क्षेत्र समाटर्ष्ि होत
असल्यास तया टठकाणी 10 िक्के इतकी र्ाढ घ्यार्ी.
12.2 गडटचरोली टजल्यातील सर्व तालुक्यातील कामाकटरता 20 िक्के.
12.3 सटरतामापन केंद्राच्या फक्त उभारणीच्या कामाकरीता 30 िक्के.
12.4 योजनेच्या सांपण
ू व क्षेत्राांसाठी र्न्यजीर् प्राणी उपद्रर् असल्यास, ककर्ा सदर योजनेच्या काही
भागातील क्षेत्राांसाठी र्न्यजीर् प्राणी उपद्रर् असल्यास, जशी पटरस्स्िती असेल तया प्रमाणे सदर
योजनेच्या टर्टशष्ठ क्षेत्रासाठी महसुल र् र्न टर्भागाकडू न र्न्यजीर् प्राणी उपद्रर् असल्याचे
सक्षम स्तरार्रील प्रमाणपत्र घेऊन 5 % अटतटरक्त तरतूद अांदाजपत्रकात करण्यात यार्ी.
12.5 डोंगराळ क्षेत्र (टनयोटजत टर्भागाने घोटषत केलेले) अांतगवत एखादे क्षेत्र समाटर्ष्ि होत असल्यास
तयाटठकाणी 10% इतकी र्ाढ घ्यार्ी.
12.6 र्रील अ.क्र. 12.1 ते 12.5यापैकी एकार्ेळी केर्ळ एकच तरतूद (Completed Item साठी)
अनुज्ञेय राहील.
12.7 ज्या प्रकल्पामध्ये कसचन होत आहे अशा प्रकल्पाांच्या कालव्याच्या दुरुस्तीची / पुनस्िापनेची
कामे यांत्रसामुग्री र्ापरुन (कालर्ा बांद कालार्धीत) करताना सामाईक दरसूचीमधील टर्टर्ध
बाबींच्या दरामध्ये अटतटरक्त 10 िक्के र्ाढ टर्चारात घेण्यात यार्ी. सदर र्ाढ कसचन
व्यर्स्िापनाच्या सर्वसाधारण कामासाठी लागू राहणार नाही.
12.8 जलसांपदा टर्भाग शासन पत्र क्र. सांकीणव-२०२०/२२०/प्र.क्र.७२/टनर्सां-२ टदनाांक
२५/११/२०२० र् जा.क्र सांकीणव-२०१९/प्र.क्र.०३/२०१९/जसां(धोरण) टदनाांक
२३/०७/२०२०अन्र्ये मांजरू केलेल्या standard specification चा सांदभव दरसूची मधील स्तांभ
क्र. ३ मध्ये दशवटर्णेत आलेला आहे .
13) Section-2 (खोदकाि व िातीकाि): -
13.1 Section-2 (खोदकाम र् मातीकाम) मधील बाब क्र. 15.16,17 र् 19 बाबत Borrow
area from private land (Contractor’s own material) चे दर पृि:करणाांमध्ये मुरूम/माती
करीत खाजगी जमीन र्ापरासाठी रु.25 लक्ष प्रटत हे क्िर हा दर टर्चारात घेण्यात आला
आहे . तयार्रुन मुरुम/ मातीचा दर रु.46.88 प्रटत घमी आलेला आहे . परां तु, प्रतयक्षात
अांदाजपत्रक तयार करताांना सांबांधीत खाणीच्या जटमनीचा रे डी रे कनरचा दर टर्चारात घ्यार्ा. र्
तया प्रमाणामध्ये मुरुमाची/ मातीची ककमत कमी जास्त करार्ी.
उदािरण (1)
दरपृि:करणात गृहीत धरलेला जटमनीचा दर = रू. 25.00 लक्ष/हे .
जटमनीचा रे डीरे कनरचादर = रू. 30.00 लक्ष/हे .
फरक = रू. 5.00 लक्ष/हे .
मातीकामाच्या दरामधील र्ाढ = 5.00 X 1.8752 =रु.9.376
प्रटतघमी
4
महाराष्ट्र शासन, जलसंपदा विभाग
उदािरण(2)
दरपृि:करणात गृहीत धरलेला जटमनीचा दर = रू. 25.00 लक्ष/हे .
जटमनीचा रे डीरे कनरचादर = रू. 20.00 लक्ष/हे .
फरक = रू. (-)5.00लक्ष/हे .
मातीकामाच्या दरामधील घि = (-)5.00 X 1.8752 =रू. (-)9.376
प्रटतघमी
(म्हणजेच मातीकामाचा दर हा दरपृि:करणापेक्षा रु 9.376 प्रटतघमी ने कमी होईल.)
13.2 कालव्यार्रील बाांधकामाांसाठीच्या खोदकामाचे अर्घड स्र्रूप टर्चारात घे ता अशा
खोदकामासाठी या Section मधील खोदकाम याबाबीचे दरामध्ये 50% र्ाढ घेण्यात यार्ी.
14) Section.3 सांधानक कािे :-
14.1 सांधानकाच्याटर्टर्ध बाबींच्यादरपृिकरणामध्ये Concrete with batching plant & Transit
Mixer ची तरतूद गृहीत धरण्यात आलेली आहे . सांधानकाचे पटरणाम आटण कामाचे स्र्रुप
टर्चारात घेता ज्या कामासाठी Batching plant& transit mixer चा र्ापर सांयस्ु क्तक होत नाही
अशा टठकाणी सांधानकाचे काम Mixer ने करणे अपटरहायव असल्यास सांधानकाच्या बाबीचा
मूळ दर 5 िक्क्याने कमी करण्यात यार्ा. तसेच अपर्ादातमक पटरस्स्ितीत Self loading
टमक्सरच्या (eg. AJEX) सहाय्याने सांधानक करणे प्रस्ताटर्त असल्यास तया बाबीचे दर मूळ
दराच्या 2 िक्क्याने कमी करार्ेत.
14.2 जर सांधानकाचे काम 10 मी. पेक्षा जास्त उां चीर्र करार्याचे असेल अिर्ा सांधानकाचे काम
पांपाने अगर िॉर्र क्रेनच्या सहाय्याने करण्याचे टनयोजन असेल तर तयासाठी अटतटरक्त रू.
169.05/घमी एर्ढा दर अांतभूवत करण्यात यार्ा. तसेच सांधानकाच्या दर पृि:करणात 2%
sundries, 1% labour amenities र् 20% (ओव्हरहे ड चाजेस र् ठे केदाराांचा फायदा) याांचा
अांतभार् असल्याने ही तरतूद करताना याबाबी दुबार होणार नाहीत, याची दक्षता घ्यार्ी.
14.3 कामाच्या स्र्रूपानुसार टर्टर्ध बाबींच्या सांधानकासाठी लागणारे सेंिरींग र् शिरींग सांबांटधत
बाबींच्या दरात टर्चारात घेतलेले आहे . तयानुसार कामाचे स्र्रूप टर्चारात घेऊन दरसूचीतील
यिायोग्य दराची टनर्ड करण्यात यार्ी.
14.4 टर्टर्ध बाबीच्या सांधानकाकरीताचे लागणारे दर हे Centering, Shuttering and
Scaffolding सटहत असून हे पटरगटणत करताना तया घिकाची जटमनीपासुनची जास्तीत जास्त
उां ची 10 मी पयंत आहे असे गृहीत धरलेले आहे . ज्या टठकाणी यापेक्षा जास्ती उां चीर्र सांधानक
करने अपेटक्षत आहे , तयाकटरता जादा लागणारे शिकरग टर्चारात घेऊन दर पृि:करणामध्ये
आर्चयक ती जादाची तरतूद (अांदाजपत्रक मांजरू करण्यात समक्ष असणाऱ्या अटधकाऱ्याच्या
मान्यतेने) करण्यात यार्ी.
5
महाराष्ट्र शासन, जलसंपदा विभाग
6
महाराष्ट्र शासन, जलसंपदा विभाग
पमरमशष्ट 1
कसचन प्रकल्पासाठीचे र्षवटनहाय भार्र्ाढ टनदे शाांक
1 2000 100.00
2 2001 108.51
3 2002 110.77
4 2003 117.51
5 2004 128.07
6 2005 135.03
7 2006 142.37
8 2007 153.37 आधारभूत र्षव
9 2008 167.31 2000
10 2009 168.99
11 2010 186.68
12 2011 202.56
13 2012 219.69
14 2013 233.78
15 2014 243.62
16 2015 243.40
17 2016 247.23
18 2017 240.77
19 2018 258.11 आधारभूत र्षव
20 2019 273.94 2011
21 2020 277.36
22 2021 299.88
7
GOVERNMENT OF MAHARASHTRA
सामाईक दरसूची सन
2021-22 साठी ािवत
अ. . सािह एकक
दर
1 2 3 4
1 Acetylene Cum 387.40
2 Admixture Kg 74.95
3 Air hose hour 8.45
4 Aldrop 30 cm No. 118.75
5 Bamboo 25 mm Rmt. 19.50
6 Binding Wire Kg 64.25
7 Brick No. 6.55
8 Butt Hinges Iron 125 mm No. 35.00
9 Cement (50Kg Bag) Bag 228.00
10 Coal Tar Paint Kg 50.25
11 Copper Plate Kg 567.40
12 Copper water stopper 16 gauge Sqm 9034.25
13 Cotton waste Kg 51.40
Crushed Sand (Excluding Royalty
14 Cum. 1615.15
Charges)
15 Curing Compound Litre 133.35
16 Delay Detonator No. 19.50
17 Diesel Litre 86.56
18 Drill rod Rmt 11905.00
19 Electric Detonator No. 11.70
8
सामाईक दरसूची सन
2021-22 साठी ािवत
अ. . सािह एकक
दर
9
TABLE "2"
जलसंपदा िवभाग, सामाईक दरसूची सन 2021-22 साठी मजुरांचे ािवत दर
सामाईक दरसू ची सन
2021-22 साठी
अ. . मजूर एकक
ािवत दर
1 2 3 4
1 Bar Bender Day 597.00
2 Bhisti Day 597.00
3 CAD Operator / Civil Engg. Assistant Day 751.00
4 Carpenter Day 597.00
5 Civil Engineer Day 1215.00
6 Electrician Day 639.00
7 Fitter Day 597.00
8 Fitter for Shuttering Day 597.00
9 Foreman Day 597.00
10 Gas Cutter Day 597.00
11 Grinder Day 597.00
12 Gauge Inspector Day 597.00
13 Mason Day 597.00
14 Mazdoor (Heavy) Day 597.00
15 Mazdoor (Light) Day 551.00
16 Measurement Clerk Day 597.00
17 Mechanic / Operator Day 597.00
18 Mistri / Mukadam Day 597.00
19 Painter Day 597.00
20 Semiskilled Mazdoor Day 597.00
21 Skilled Mazdoor Day 597.00
22 Surveyor Day 837.00
23 Tile Turner Day 597.00
24 Tracer Day 714.00
25 Unskilled Mazdoor Day 551.00
26 Welder Day 597.00
10
TABLE "3"
"सामाईक दरसू ची सन 2021-22 साठी यं वापर दराचा तपशील
जलसं पदा िवभाग,
सामाईक दरसू ची सन
अ. . यं ाचे नाव एकक 2021-22 साठी ािवत
दर
Total POL
1 2 3 4 5
1 Excavator -0.9 Cum Hour 1767.00 1137.00
2 Compressor 510 CFM Hour 1012.00 812.00
3 Water tanker 10 T Hour 816.00 326.00
4 Breaker & slope compactor Hour
1983.00 1116.00
5 Tipper Hour 1039.00 559.00
6 Diesel pump Hour 272.00 98.00
7 Sismopactor TT 900 Hour 1892.00 877.00
8 JCB JS 3C /Back hoe Hour 1393.00 744.00
9 Generating set41-60 KVA Hour 659.00 559.00
10 Batching plant 25 Cum/Hour Hour 1712.00 ---
11 Concrete mixer 100 ltr capacity Hour 454.00 ---
12 Needle Vibrator Hour 158.00 ---
13 Air compressor 280 CFM Hour 955.00 713.00
14 Jack Hammer Day 40.00 ---
15 Pug machine for cutting Hour 16.00 4.33
16 Bending Machine Day 238.00 97.60
17 Welding Transformer Hour 100.00 98.66
18 Mobile crane 3 T Hour 608.00 312.00
19 Grinding Machine Hour 25.00 ---
20 Sand blasting equipment Hour 119.00 ---
21 Guniting equipment Hour 219.00 ---
22 Spinning Machine Hour 164.00 117.00
23 Dozer 300 hp /Dozer CAT D 8 K Hour 4196.00 2729.00
11
जलसं पदा िवभाग,
सामाईक दरसू ची सन
अ. . यं ाचे नाव एकक 2021-22 साठी ािवत
दर
24 Hydra crane Capacity (Upto 09 T) Hour 608.00 312.00
25 (10 to 15 T Hour 709.00 312.00
29 (16T to 20 T) Hour 1082.00 621.60
30 (11T to 25 T) Hour 1601.00 975.00
31 Tipper mounting Drilling Jumbo Hour 853.00 ---
32 Wheel loader Hour 2074.00 1116.00
33 Scraper Euclid B-FDT model Hour 2924.00 2002.00
34 Passanger wintch Hour 575.00 ---
35 Dozer (Beml BD 80) Hour 3446 1581
12
TABLE "4"
जलसंपदा िवभाग, सामाईक दरसूची सन 2021-22 साठी ीलचे ािवत दर
Rate of Item with GST are as per Joint Plant Committee as on 05/01/2021 vide letter of
JPC dated 05/01/2021
1 2 3
1 PIG IRON 42008
2 BILLETS 100 MM 41551
3 BLOOME 150X150 MM 41085
4 PENCIL INGOTS 38500
5 WIRE RODS 6 MM 49068
6 WIRE RODS 8 MM 48246
7 ROUNDS 12 MM 48508
8 ROUNDS 16 MM 48508
9 ROUNDS 25 MM 48508
10 TMT 10 MM 47890
11 TMT 12 MM 47390
12 TMT 25 MM 47407
13 ANGLES 50X50X6 MM 46746
14 ANGLES 75X75X6 MM 46305
15 JOISTS 125X70 MM 47008
16 JOISTS 200X100 MM 46958
17 CHANNELS 75X40 MM 48932
18 CHANNELS 150X75 MM 47763
19 PLATES 6 MM 55907
20 PLATES 10 MM 55466
21 PLATES 12 MM 55034
22 PLATES 25 MM 54161
23 H. R. COILS 2.00 MM 58466
24 H. R. COILS 2.50 MM 57585
25 H. R. COILS 3.15 MM 57585
26 C. R. COILS 0.63 MM 67415
27 C. R. COILS 1.00 MM 66958
28 G. P. SHEETS 0.40 MM 67525
29 G. P. SHEETS 0.63 MM 66169
30 G. C. SHEETS 0. 40 MM 67712
31 G. C. SHEETS 0. 63 MM 66627
32 MELTING SCRAP H M S - I 35653
33 MELTING SCRAP H M S - II 34305
34 SPONGE IRON (COAL BASED) 21941
13
GOVERNMENT OF MAHARASHTRA
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including Trip
(4 Rs (10 % of Truck Charges & Overhead (Rs)
Km/Litre) 86.56/Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)
1 2 3 4 5 6 7 8 9 10 11 12
col 6+col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 86.56 col 6 X 0.10 Rs 2616/day col 9 x 0.20 col 9+col 10 col 11/col 3
7+ col 8
0.50 15.00 48.00 54.00 13.50 1168.56 116.86 2616.00 3901.42 780.28 4681.70 97.54
1.00 16.00 35.56 77.12 19.28 1668.88 166.89 2616.00 4451.77 890.35 5342.12 150.23
1.50 16.50 28.39 91.17 22.79 1972.70 197.27 2616.00 4785.97 957.19 5743.16 202.30
2.00 17.00 23.86 101.44 25.36 2195.16 219.52 2616.00 5030.68 1006.14 6036.82 253.01
2.50 17.25 20.52 108.60 27.15 2350.10 235.01 2616.00 5201.11 1040.22 6241.33 304.16
3.00 17.50 18.06 114.36 28.59 2474.75 247.48 2616.00 5338.23 1067.65 6405.88 354.70
3.50 17.75 16.18 119.26 29.82 2581.22 258.12 2616.00 5455.34 1091.07 6546.41 404.60
4.00 18.00 14.69 123.52 30.88 2672.97 267.30 2616.00 5556.27 1111.25 6667.52 453.88
4.50 18.25 13.49 127.41 31.85 2756.94 275.69 2616.00 5648.63 1129.73 6778.36 502.47
5.00 18.50 12.49 130.90 32.73 2833.11 283.31 2616.00 5732.42 1146.48 6878.90 550.75
5.50 18.50 11.52 132.72 33.18 2872.06 287.21 2616.00 5775.27 1155.05 6930.32 601.59
6.00 18.75 10.81 135.72 33.93 2936.98 293.70 2616.00 5846.68 1169.34 7016.02 649.03
6.50 18.85 10.13 137.69 34.42 2979.40 297.94 2616.00 5893.34 1178.67 7072.01 698.13
7.00 19.00 9.56 139.84 34.96 3026.14 302.61 2616.00 5944.75 1188.95 7133.70 746.20
7.50 19.15 9.06 141.90 35.48 3071.15 307.12 2616.00 5994.27 1198.85 7193.12 793.94
8.00 19.30 8.61 143.76 35.94 3110.97 311.10 2616.00 6038.07 1207.61 7245.68 841.54
8.50 19.45 8.21 145.57 36.39 3149.92 314.99 2616.00 6080.91 1216.18 7297.09 888.81
14
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including Trip
(4 Rs (10 % of Truck Charges & Overhead (Rs)
Km/Litre) 86.56/Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)
1 2 3 4 5 6 7 8 9 10 11 12
col 6+col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 86.56 col 6 X 0.10 Rs 2616/day col 9 x 0.20 col 9+col 10 col 11/col 3
7+ col 8
9.00 19.60 7.86 147.48 36.87 3191.47 319.15 2616.00 6126.62 1225.32 7351.94 935.36
9.50 19.80 7.55 149.45 37.36 3233.88 323.39 2616.00 6173.27 1234.65 7407.92 981.18
10.00 20.00 7.27 151.40 37.85 3276.30 327.63 2616.00 6219.93 1243.99 7463.92 1026.67
11.00 21.00 6.97 159.34 39.84 3448.55 344.86 2616.00 6409.41 1281.88 7691.29 1103.48
12.00 22.00 6.72 167.28 41.82 3619.94 361.99 2616.00 6597.93 1319.59 7917.52 1178.20
13.00 23.00 6.50 175.00 43.75 3787.00 378.70 2616.00 6781.70 1356.34 8138.04 1252.01
14.00 24.00 6.32 182.96 45.74 3959.25 395.93 2616.00 6971.18 1394.24 8365.42 1323.64
15.00 25.00 6.15 190.50 47.63 4122.85 412.29 2616.00 7151.14 1430.23 8581.37 1395.34
20.00 25.00 4.71 194.40 48.60 4206.82 420.68 2616.00 7243.50 1448.70 8692.20 1845.48
25.00 25.00 3.81 196.50 49.13 4252.69 425.27 2616.00 7293.96 1458.79 8752.75 2297.31
30.00 30.00 3.81 234.60 58.65 5076.74 507.67 2616.00 8200.41 1640.08 9840.49 2582.81
35.00 30.00 3.29 236.30 59.08 5113.96 511.40 2616.00 8241.36 1648.27 9889.63 3005.97
40.00 30.00 2.89 237.20 59.30 5133.01 513.30 2616.00 8262.31 1652.46 9914.77 3430.72
45.00 30.00 2.58 238.20 59.55 5154.65 515.47 2616.00 8286.12 1657.22 9943.34 3854.01
50.00 30.00 2.33 239.00 59.75 5171.96 517.20 2616.00 8305.16 1661.03 9966.19 4277.33
60.00 35.00 2.27 278.40 69.60 6024.58 602.46 2616.00 9243.04 1848.61 11091.65 4886.19
70.00 35.00 1.95 279.00 69.75 6037.56 603.76 2616.00 9257.32 1851.46 11108.78 5696.81
80.00 35.00 1.71 279.60 69.90 6050.54 605.05 2616.00 9271.59 1854.32 11125.91 6506.38
90.00 35.00 1.53 281.40 70.35 6089.50 608.95 2616.00 9314.45 1862.89 11177.34 7305.45
15
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including Trip
(4 Rs (10 % of Truck Charges & Overhead (Rs)
Km/Litre) 86.56/Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)
1 2 3 4 5 6 7 8 9 10 11 12
col 6+col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 86.56 col 6 X 0.10 Rs 2616/day col 9 x 0.20 col 9+col 10 col 11/col 3
7+ col 8
100.00 35.00 1.38 282.00 70.50 6102.48 610.25 2616.00 9328.73 1865.75 11194.48 8111.94
125.00 40.00 1.26 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 9768.65
150.00 40.00 1.05 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 11722.38
175.00 40.00 0.90 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 13676.11
200.00 40.00 0.79 322.00 80.50 6968.08 696.81 2616.00 10280.89 2056.18 12337.07 15616.54
250.00 40.00 0.63 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 19537.30
300.00 40.00 0.53 324.00 81.00 7011.36 701.14 2616.00 10328.50 2065.70 12394.20 23385.28
350.00 40.00 0.45 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 27352.22
400.00 40.00 0.40 326.00 81.50 7054.64 705.46 2616.00 10376.10 2075.22 12451.32 31128.30
450.00 40.00 0.35 321.00 80.25 6946.44 694.64 2616.00 10257.08 2051.42 12308.50 35167.14
500.00 40.00 0.32 326.00 81.50 7054.64 705.46 2616.00 10376.10 2075.22 12451.32 38910.38
Note :
1) For calculation of carrying capacity, a tipper of 10 Tonne capacity is considered.
2) For loading and unloading of material on site, 6 minutes of ideal time i.e 0.1 hr is considered for working out No.of Trips.
3)The transportation charges beyond 15 km to 50 km are with 5 km interval, 50 km to 100 km are with 10 km interval ,100 km to 200 km are with 25 km interval and
200 km to 500 km are with 50 km interval.The transportation charges for intermediate Km within the range shall be worked out by lineraly interpolating between rates
of lower and upper values in the range.
4)For calculating additional lead charges , difference of lead charges i.e.(lead charges required -lead charges considered in basic rate analysis ) shall be considered)
16
Lead Charges Statement for 2021-22 (Excluding Loading and Unloading Charges)
Statement II
Cost of
Lead in
Trip Lead Charges in Rs / Unit
Km
( Rs)
Carrying
capacity 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
of Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
0.50 97.54 20.75 16.96 16.26 13.93 9.75 10.84 19.51
1.00 150.23 31.96 26.13 25.04 21.46 15.02 16.69 30.05
1.50 202.30 43.04 35.18 33.72 28.90 20.23 22.48 40.46
2.00 253.01 53.83 44.00 42.17 36.14 25.30 28.11 50.60
2.50 304.16 64.71 52.90 50.69 43.45 30.42 33.80 60.83
3.00 354.70 75.47 61.69 59.12 50.67 35.47 39.41 70.94
3.50 404.60 86.09 70.37 67.43 57.80 40.46 44.96 80.92
4.00 453.88 96.57 78.94 75.65 64.84 45.39 50.43 90.78
4.50 502.47 106.91 87.39 83.75 71.78 50.25 55.83 100.49
5.00 550.75 117.18 95.78 91.79 78.68 55.08 61.19 110.15
5.50 601.59 128.00 104.62 100.27 85.94 60.16 66.84 120.32
6.00 649.03 138.09 112.87 108.17 92.72 64.90 72.11 129.81
6.50 698.13 148.54 121.41 116.36 99.73 69.81 77.57 139.63
7.00 746.20 158.77 129.77 124.37 106.60 74.62 82.91 149.24
7.50 793.94 168.92 138.08 132.32 113.42 79.39 88.22 158.79
17
Cost of
Lead in
Trip Lead Charges in Rs / Unit
Km
( Rs)
Carrying
capacity 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
of Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
8.00 841.54 179.05 146.35 140.26 120.22 84.15 93.50 168.31
8.50 888.81 189.11 154.58 148.14 126.97 88.88 98.76 177.76
9.00 935.36 199.01 162.67 155.89 133.62 93.54 103.93 187.07
9.50 981.18 208.76 170.64 163.53 140.17 98.12 109.02 196.24
10.00 1026.67 218.44 178.55 171.11 146.67 102.67 114.07 205.33
11.00 1103.48 234.78 191.91 183.91 157.64 110.35 122.61 220.70
12.00 1178.20 250.68 204.90 196.37 168.31 117.82 130.91 235.64
13.00 1252.01 266.39 217.74 208.67 178.86 125.20 139.11 250.40
14.00 1323.64 281.63 230.20 220.61 189.09 132.36 147.07 264.73
15.00 1395.34 296.88 242.67 232.56 199.33 139.53 155.04 279.07
20.00 1845.48 392.66 320.95 307.58 263.64 184.55 205.05 369.10
25.00 2297.31 488.79 399.53 382.89 328.19 229.73 255.26 459.46
30.00 2582.81 549.53 449.18 430.47 368.97 258.28 286.98 516.56
35.00 3005.97 639.57 522.78 501.00 429.42 300.60 334.00 601.19
40.00 3430.72 729.94 596.65 571.79 490.10 343.07 381.19 686.14
45.00 3854.01 820.00 670.26 642.34 550.57 385.40 428.22 770.80
50.00 4277.33 910.07 743.88 712.89 611.05 427.73 475.26 855.47
60.00 4886.19 1039.61 849.77 814.37 698.03 488.62 542.91 977.24
70.00 5696.81 1212.09 990.75 949.47 813.83 569.68 632.98 1139.36
80.00 6506.38 1384.34 1131.54 1084.40 929.48 650.64 722.93 1301.28
90.00 7305.45 1554.35 1270.51 1217.58 1043.64 730.55 811.72 1461.09
100.00 8111.94 1725.94 1410.77 1351.99 1158.85 811.19 901.33 1622.39
18
Cost of
Lead in
Trip Lead Charges in Rs / Unit
Km
( Rs)
Carrying
capacity 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
of Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
125.00 9768.65 2078.44 1698.90 1628.11 1395.52 976.87 1085.41 1953.73
150.00 11722.38 2494.12 2038.67 1953.73 1674.63 1172.24 1302.49 2344.48
175.00 13676.11 2909.81 2378.45 2279.35 1953.73 1367.61 1519.57 2735.22
200.00 15616.54 3322.67 2715.92 2602.76 2230.93 1561.65 1735.17 3123.31
250.00 19537.30 4156.87 3397.79 3256.22 2791.04 1953.73 2170.81 3907.46
300.00 23385.28 4975.59 4067.01 3897.55 3340.75 2338.53 2598.36 4677.06
350.00 27352.22 5819.62 4756.91 4558.70 3907.46 2735.22 3039.14 5470.44
400.00 31128.30 6623.04 5413.62 5188.05 4446.90 3112.83 3458.70 6225.66
450.00 35167.14 7482.37 6116.02 5861.19 5023.88 3516.71 3907.46 7033.43
500.00 38910.38 8278.80 6767.02 6485.06 5558.63 3891.04 4323.38 7782.08
Note :
1) For calculation of carrying capacity, a tipper of 10 Tonne capacity is considered.
2) For loading and unloading of material on site, 6 minutes of ideal time i.e 0.1 hr is considered for working out No.of Trips.
3)The transportation charges beyond 15 km to 50 km are with 5 km interval, 50 km to 100 km are with 10 km interval, 100 km to 200 km are with
25 km interval and 200 km to 500 km are with 50 km interval.The transportation charges for intermediate Km within the range shall be worked out
by lineraly interpolating between rates of lower and upper values in the range.
4)For calculating additional lead charges , difference of lead charges i.e.(lead charges required -lead charges considered in basic rate analysis ) shall
be considered)
19
SECTION-2
ITEM NO. 1 TO 26
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-2022
SECTION 2:- EXCAVATION & EMBANKMENT
2 Item No.2 :-
Excavation in hard murum including boulders upto 0.6
m diameter ( 0.113 cum) for canal, seating of
embankment, filter drains / catch water drains etc., and
placing the excavated stuff neatly in dump area or for
Section Ex. Cum. 108.55 17.26
formation of service road / embankment including cost
of all materials, machinery, labour, dressing bed and
sides to required level and profile etc., complete with
lead upto 1 km and all lifts as directed.
3 Item No.3 :-
Excavation in soft rock including boulders upto 0.6 m
diameter ( 0.113 cum) for canal, seating of
embankment, filter drain / catch water drains etc., and
placing the excavated soft rock neatly in dump area or
for formation of service road including cost of all Section Ex. Cum. 128.95 23.05
materials, machinery, labour, dressing bed and sides
to required level and profile etc. complete with lead
upto 1 km and all lifts as directed.
4 Item No.4 :-
Excavation in hard rock of all toughness by ordinary
blasting methods including boulders above 0.6 m
dia.(0.113Cum) minimising damage to side slopes of
excavation in water prism area by adopting any one or
combination of line drilling /pre-splitting /smooth Section Ex. Cum. 463.60 84.42
blasting techniques and placing the excavated rock
neatly in approved dump area including cost of all
materials, machinery, labour,levelling bed etc.,
complete with lead upto 1 km and all lifts as directed.
20
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
5 Item No.5 :-
Excavation in hard rock of all toughness by control
blasting methods including boulders above 0.6 m
dia.(0.113Cum)for canals cut-off trench of
embankment filter/catch water drains and other
appurtenent structures including control of vibrations
by use of delay detonators and control of fly rocks by
muffling arrangements and adopting only jack
hammers for drilling holes and minimising damage to Section Ex. Cum. 579.50 105.53
side slopes of canal in water prism area by adopting
any one or combination of line drilling /pre-splitting
/smooth blasting techniques including cost of all
materials,machinery, labour,placing excavated rock
neatly approved dump area as directed etc., complete
with lead upto 1 km and all lifts as directed.
6 Item No.6 :-
Excavation in hard rock of all toughness by breaker
including boulders above 0.6 m dia.(0.113Cum)
minimising damage to side slopes of excavation and As Directed by
placing the excavated rock neatly in approved dump Engineer-In- Cum. 525.30 41.36
area including cost of all materials, machinery, labour, Charge.
levelling bed etc., complete with lead upto 1 km and all
lifts as directed .
7 Item No.7 :-
Watering the embankment in proper layers including Section Em
cost of water, lead of water upto 1 km and all lifts etc. 2.13 Cum. 20.10 ---
complete as directed.
8 Item No.8 :-
Compaction of bankwork with vibratory Compactor
Section Em
to 95 % of Proctor density with a lead upto 1.00 Km. as Cum. 10.10 ---
2.13
directed.
9 Item No.9 :-
Providing cut off trench filling using selected
impervious soil directly available from material of
excavation including cost of all materials,
machinery,labour, all other operations such as
collection of soil, spreading soil in layer of specified
thickness, sorting out, breaking clods, levelling, Section Em Cum. 55.70 2.55
sectioning edges / sides, watering, compacting each
layer to density control of not less than 95 % of Proctor
density using vibratory compactor including cost of
water etc. complete with lead upto1 km for water and
all lifts as directed.
21
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
10 Item No.10 :-
Providing hearting embankment using selected
impervious material available directly from
excavation in layers including cost of all materials,
machinery, labour, all other operations such as
collection of material, spreading soil in layer of
specified thickness, sorting out, breaking clods, Section Em Cum. 55.70 2.55
levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95% of Proctor density using vibratory compactor
including cost of water etc.complete with lead upto1
km for water and all lifts as directed.
11 Item No.11 :-
Providing casing embankment using selected
pervious material available directly from
excavation in layers including cost of all materials,
machinery, labour, all other operations such as
collection of material, spreading material in layer of
specified thickness, sorting out, breaking clods, Section Em Cum. 74.35 3.31
levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc. complete with lead upto1
km for water and all lifts as directed.
12 Item No.12 :-
Providing cut off trench filling using selected
impervious soil from approved borrow areas
(Government acquired land) including cost of all
materials, machinery,labour, all other operations such
as collection of soil, spreading soil in layer of specified
thickness, sorting out, breaking clods, levelling, Section Em Cum. 155.35 2.65
sectioning edges / sides, watering, compacting each
layer to density control of not less than 95 % of Proctor
density using vibratory compactor including cost of
water etc. complete with lead upto1 km for water and
all lifts as directed.
13 Item No.13:-
Providing hearting embankment using selected
impervious soil from approved borrow areas
(Government acquired land) in layers including cost
of all materials, machinery, labour, all other operations
such as collection of soil, spreading soil in layer of
specified thickness, sorting out, breaking clods, Section Em Cum. 138.75 2.52
levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density kusing vibratory
compactor including cost of water etc., complete with
lead upto1 km for wtaer and all lifts as directed.
22
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
14 Item No.14 :-
Providing casing embankment using selected
pervious material from approved borrow areas
(Government acquired land) in layers including cost
of all materials, machinery,labour, all other operations
such as collection of soil, spreading soil in layer of
specified thickness, sorting out, breaking clods, Section Em Cum. 170.45 3.32
levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km and all lifts as directed.
15 Item No.15 :-
Providing cut off trench filling using selected
impervious soil from approved borrow areas
(Private land- contractors own material) including
cost of all materials, machinery,labour, all other
operations such as collection of soil, spreading soil in
layer of specified thickness, sorting out, breaking Section Em Cum. 216.10 3.01
clods, levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc. complete with lead upto1
km for water and all lifts as directed.
16 Item No.16 :-
Providing Hearting embankment using selected
impervious material from approved borrow areas
(Private land- contractor's own material) in layers
including cost of all materials, machinery,labour, all
other operations such as collection of soil, spreading
soil in layer of specified thickness, sorting out, breaking Section Em Cum. 185.65 2.54
clods, levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km for water and all lifts as directed.
17 Item No.17 :-
Providing casing embankment using selected
pervious material from approved borrow areas
(Private land- contractor's own material) in layers
including cost of all materials, machinery, labour, all
other operations such as collection of soil, spreading
soil in layer of specified thickness, sorting out, breaking
Section Em Cum. 217.35 3.30
clods, levelling, sectioning edges / sides, watering,
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km for water and all lifts as directed.
23
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
18 Item No.18 :-
Providing cohesive non-swelling (CNS) material
lining to canals using selected material from
approved borrow area (Government acquired land)
including cost of all materials, machinery, labour,
spreading soil in layers of thickness not more than 150
mm including providing 20 cm or so (perpendicular to As Directed by
side slope) of extra pride ,removing pride just prior to Engineer-In- Cum. 203.30 34.77
the placement of lining, breaking clods, watering, Charge
compacting to density control of not lessthan 95 % of
Proctor density, dressing to required profile including
cost of water etc. complete with lead upto1 km for
water and all lifts as directed.
19 Item No.19 :-
Providing cohesive non-swelling (CNS) material
lining to canals using selected material from
approved borrow area's (Private land- contractor's
own material) including cost of all materials,
machinery, labour, spreading soil in layers of thickness
not more than 150 mm including providing 20 cm or so As Directed by
(perpendicular to side slope) of extra pride ,removing Engineer-In- Cum. 248.95 34.76
pride just prior to the placement of lining, breaking Charge
clods, watering, compacting to density control of not
lessthan95 % of Proctor density, dressing to required
profile including cost of water etc. complete with lead
upto1 km for water and all lifts as directed .
21 Item No.21 :-
Providing and constructing 300 mm thick dry rubble
stone pitching with pin headers at 2 per sqm using
stones and stone chips from approved source As Directed by
including cost of all materials, labour,machinary ,hand Engineer-In- Sqm. 277.25 42.87
packing / wedging stone chips, finishing etc.,complete Charge
with lead upto 1km and all lifts as directed.
24
Rate for 2021-22
Sr. (Rate in Rs.)
Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
22 Item No.22 :- Providing and constructing 450 mm thick
dry rubble stone pitching with pin headers at 2 per
sqm using stones and stone chips from approved
source including cost of all materials, As Directed by
labour,hand,machinary ,packing / wedging stone chips, Engineer-In- Sqm. 351.50 42.86
finishing etc.complete with lead up to 1 km and all lifts Charge
as directed.
23 Item No.23 :-
Providing and constructing dry rubble rock-toe with
filter below and behind the rock toe using sand
,graded gravel ,quarry spaul ,rubble and stone chips As Directed by
from approved source including cost of all materials, Engineer-In- Cum. 2910.80 244.35
machinery, labour, hand packing rubble and stone Charge
chips, finishing top and sides to required slopes
etc.complete with lead upto 1 km and all lifts as
directed.(Specifications as per "Section 2 ,2.5 ")
24 Item No.24 :-
Providing and constructing longitudinal and cross
graded filter drains using sand and 20 mm down
approved clean, hard, graded aggregates satisfying
specified filter criteria in layers of specified thickness As Directed by
including cost of all materials, machinery, labour, laying Engineer-In- Cum. 1292.05 257.66
to required slopes, compaction etc., complete as per Charge
specifications and approved drawings with lead up to 1
km and all lifts as directed.
25 Item No.25 :-
Providing and constructing 0.50 m thick vertical or
inclined graded filter media consisting of 150 mm
thick sand layers and 200 mm thick 20 mm down
coarse approved clean, hard, graded aggregates
As Directed by
satisfying specified filter criteria in layers of specified
Engineer-In- Cum. 1336.80 257.69
thickness including cost of all materials, machinery,
Charge
labour, laying to required slopes, compaction etc.,
complete as per specifications and approved drawings
with lead up to 1 km and all lifts as directed .
26 Item no 26:-
Dewatering by pumping out water collected with
Diesel or Electrical pumps including cost of all
materials, machinery, labour, providing sump and all
other ancillary operations whenever necessary etc. As Directed by
complete under specific and indispensable Engineer-In- BHP Hr. 12.40 0.78
circumstances with prior approval from competent Charge
authority with authentic evidence of records justifying
dewatering etc. complete as directed .
25
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 3
ITEM NO. 27 TO 72
CONSUMPTION OF MATERIAL CONSIDERED IN RATE ANALYSIS
Item Item in brief Cement Coarse Fine
No. In bags Aggregate Aggregate
27 CC M-10 (20 MSA) 4.4 0.94 0.47
CC M-10 (40 MSA) 4.4 0.94 0.47
CC M-10 (80 MSA) 4.33 0.94 0.47
28 CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.89 0.45
29 CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.90 0.45
30 CC M-20 (20 MSA) 6.60 0.90 0.45
CC M-20 (40 MSA) 6.08 0.89 0.45
31 CC M-25 (20 MSA) 7.62 0.90 0.45
32 CC M-15 (20 MSA) for Bed lining per Cum 5.64 0.90 0.45
B) for side lining with curing compound 5.64 0.90 0.45
B) for side lining without curing compound 5.64 0.90 0.45
33 CC M-15 (20 MSA) Mechanised lining for bed lining 5.64 0.90 0.45
B) for side lining with curing compound 5.64 0.90 0.45
B) for side lining without curing compound 5.64 0.90 0.45
34 Chip Masonry behind concrete lining 1.25 1.24 0.35
(Rubble)
37 UCR Masonry in CM 1:5 for side lining 2.00 1.24 0.35
(Rubble)
38 Cement Plaster 6 mm thick in CM 1:3 0.057 0.006
39 CC M-10 (20 MSA) 4.40 0.94 0.47
CC M-10 (40 MSA) 4.40 0.94 0.47
CC M-10 (80 MSA) 4.33 0.94 0.47
40 CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.89 0.45
41 CC M-15 (20 MSA) for abutment, pier 5.64 0.90 0.45
CC M-15 (40 MSA) for abutment, pier 5.20 0.89 0.45
CC M-15 (80 MSA) for abutment, pier 4.99 0.90 0.45
42 CC M-20 (20 MSA) for abutment, wing wall, returns, 6.60 0.90 0.45
transition walls, piers, columns, beams & Slabs, road
slab, kerb, super passage/slab culvert, trough resting on
ground, trough for aqueduct, wearing coat & other
concrete
CC M-20 (40 MSA) for abutment, retaining walls, piers 6.08 0.89 0.45
43 CC M-25 (20 MSA) for column, beams and slabs, road 7.62 0.90 0.45
slab, kerb, super passage/slab culvert, trough resting on
ground, trough aqueduct, wearing coat
44 CC M-30 (20 MSA) for trough aqueduct, slab 9.20 0.85 0.425
51,53 UCR Masonry in CM 1:5 for foundation and super 1.71 1.15 0.30
structure (30% mortar) (Rubble)
(35% mortar) 2.00 1.1 0.35
(Rubble)
(45% mortar) 2.57 1.00 0.45
(Rubble)
52 UCR Masonry in CM 1:6 for foundation (30% mortar) 1.43 1.15 0.30
(Rubble)
(35% mortar) 1.67 1.1 0.35
(Rubble)
(45% mortar) 2.14 1.00 0.45
(Rubble)
56 Cement Pointing in CM 1:3 0.0295 0.003
Cement Pointing in CM 1:2 0.0449 0.003
61 B.B. Masonry in CM 1:5 1.77 480 0.31
(Bricks)
26
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2021-22
SECTION 3:- CONCRETE WORK INCLUDING CENTERING, UCR MASONRY,
BRICK MASONRY AND R.C.C. PIPES
Dam and Allied Works
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
Foundation and Bedding
27 Section CC
ITEM NO. 27 : Providing and laying in situ
cement concrete of grade M-10 of trap/ granite /
quartzite / graded metal for foundation and
bedding with Batching Plant and Transit Mixer
including placing, compacting, curing etc.
complete with all lifts as directed.
(A) M-10 (20 MSA) (Cement 4.4 bags/Cum) Cum 3715.55 736.73
(B) M-10 (40 MSA) (Cement 4.4 bags/Cum) Cum 3715.50 736.73
(C) M-10 (80 MSA) (Cement 4.33 bags/Cum) Cum 3650.20 736.73
28 Section CC
Item No. 28 : Providing and laying in situ
cement concrete of grade M-15 of trap / granite
/ gneiss / quartzite / graded metal for foundation
and bedding with Batching Plant and Transit
Mixer including placing, compacting, curing etc.
complete with all lifts as directed.
(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 3991.90 736.73
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 3863.95 736.73
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 3766.45 736.73
Sub and Super Structure
29 Section CC
Item No. 29 : Providing and laying in situ
cement concrete of grade M-15 of trap / granite
/ gneiss / quartzite / graded metal for PCC with or
without surface reinforcement/ RCC concreting
requiring heavy or special type of shuttering for
works of gallery, sluice, spillway crest, spillway
down stream face, energy dissipating structures,
intake structures, training walls, piers, abutments
etc. with Batching Plant and Transit mixer with
centering, centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all
lifts etc. complete as directed.
(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4849.10 1049.17
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4721.20 1049.17
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4628.40 1049.17
30 Section CC
Item No. 30 : Providing and laying in situ
cement concrete of grade M-20 of trap / granite
/ gneiss / quartzite / graded metal for RCC works
of gallery, sluice, spillway crest, spillway down
stream face, energy dissipating structures, intake
structures, training walls, piers, abutments, slab
etc. with Batching Plant and Transit mixer
including centering, shuttering ,scaffolding,
compacting, curing etc. complete with all lifts etc.
complete as directed.
(A) M-20 (20 MSA) (Cement 6.60 bags/Cum) Cum 5108.60 1049.17
(B) M-20 (40 MSA) (Cement 6.08 bags/Cum) Cum 5210.30 1049.17
27
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
31 Section CC
Item No. 31 : Providing and laying in situ
cement concrete of grade M-25 of trap / granite
/ gneiss / quartzite / graded metal for RCC works
of gallery, sluice, spillway crest, spillway down
stream face, energy dissipating structures, intake
structures, training walls, piers, abutments, slab
etc. with Batching Plant and Transit mixer
including centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all
lifts etc. complete as directed.
(A) M-25 (20 MSA) (Cement 7.62 bags/Cum) Cum 5383.80 1049.17
Section B : Canal and Allied Works
32 Section CC
ITEM NO. 32: Providing and laying in situ M-
15 (20 MSA)(28 days cube compressive strength
not less than 15N/sqmm) grade cement concrete
with clean, hard, graded aggregates for canal
lining for side and bed including cost of all
materials, machinery, labour, cleaning with
batching plant and transit mixer placing in
position, finishing with all slope of canal including
centering, scaffolding, formwork, compaction,
curing, by cutting grooves, filling with sealing
compound and providing porous plugs
preparation of sub grade etc. complete with all
lifts etc. complete as directed.
28
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
34 ITEM NO. 34 : Providing & laying chip As Directed by
masonry back filling behind concrete lining in Engineer-In-
CM 1:8 including striking joints, curing, centering, Charge
Cum 1813.65 468.06
scaffolding etc. complete but excluding pointing
etc. complete as directed (35% mortar) (Cement
1.25 bags/Cum)
35 Item No. 35: Providing, laying, erecting and As Directed by
dismantling M.S. plates form work for side Engineer-In-
lining etc. complete as Directed. (for steeper Charge Sqm 234.05 105.74
slopes only) (to be used with prior approval of
C.E.)
36 As Directed by
ITEM NO. 36 : Providing and laying polythene
Engineer-In-
film of 031 properly manufactured from 100%
Charge
virgin granules confirming to I.S. 2508-1984 with
1.5 to 2.5 m. package in rolls etccomplete as
directed.
29
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
Section C : Canal Structures
39 ITEM NO. 39 : Providing and laying in situ Section CC
cement concrete of grade M-10 of trap/ granite /
quartzite / graded metal for foundation and
bedding with Batching Plant and Transit Mixer
including placing, centering, shuttering,
compacting, curing, etc. complete with all lifts as
directed.
(A) M-10 (20 MSA) (Cement 4.4 bags/Cum) Cum 4163.45 910.38
(B) M-10 (40 MSA) (Cement 4.4 bags/Cum) Cum 4163.45 910.38
(C) M-10 (80 MSA) (Cement 4.33 bags/Cum) Cum 4098.15 910.38
40 Item No. 40 : Providing and laying in situ Section CC
cement concrete of grade M-15 of trap / granite
/ gneiss / quartzite / graded metal for foundation
and bedding by Batching Plant & Transit Mixer
including centering,shuttering, scaffolding,
placing, compacting, curing etc. complete with all
lifts as directed.
(A) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4439.80 910.38
(B) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4311.90 910.38
(C) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4214.35 910.38
41 Item No. 41 : Providing and laying in situ Section CC
cement concrete of grade M-15 of trap / granite
/ gneiss / quartzite / graded metal for RCC works
of retaining walls, piers, abutments, etc. with
Batching Plant and Transit mixer including
centering,shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts as
directed.
30
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
42 Item No. 42 : Providing and laying in situ Section CC
cement concrete of grade M-20 of trap / granite
/ gneiss / quartzite / graded metal for RCC works
of RCC works of abutment, wing walls, returns,
transition walls, piers, columns, beams and slabs,
diaphram walls, road slabs trough (Box Culvert)
trough for aqueduct, wearing coat, etc. . with
Batching Plant and Transit mixer including
centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts as
directed.
31
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
44 Section CC
Item No. 44 : Providing and laying in situ
cement concrete of grade M-30 for trough of
aqueduct etc. of trap / granite / gneiss / quartzite /
graded metal with Batching Plant and Transit
mixer including centering, shuttering, scaffolding
including placing, compacting, curing etc.
complete with all lifts as directed.
Centering Items
49 Section CC
Item No. 49 : Providing, erecting and laying 3.11 and As
steel shuttering formwork and making surface Directed by
suitable for concreting including dismantling etc. Engineer-In-
complete as directed. Charge
32
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
50 Item No. 50 (a) Providing and erecting steel Section CC
props centering up to 3.00 m height including 3.11 and As
Sqm 251.75 108.54
bracing, strengthening and dismantling etc. Directed by
complete as directed. Engineer-In-
(b) Rate for centering for every Additional 1.00 m Charge
Sqm 91.45 54.27
height
U.C.R. Masonry
51 Section M
ITEM NO. 51 : Providing U.C.R. masonry in
C.M. 1:5 in foundation upto 0.5 m above G.L.
with lift upto 1.5 m. including striking joints, curing Cum 2394.35 451.26
etc. complete as directed.
A)Thickness of wall upto 1 m. (30% mortar)
B) Walls of water retaining structures thinner
than 1.0 m. and walls of structures thicker than
Cum 2413.90 358.43
1.0 m. other than dams and water retaining
structures. (35% mortar).
C) For dams and water retaining structures (45%
Cum 2635.95 358.43
mortar) .
52 ITEM NO. 52 : Providing U.C.R. masonry in Section M
C.M. 1:6 in foundation upto plinth with lift upto
1.5 m. including striking joints, curing etc.
complete as directed.
(A) : (30% mortar). Cum 2318.65 451.26
(B) : (35% mortar) Cum 2358.05 391.81
(C) : (45% mortar). Cum 2553.10 391.81
53 Section M
ITEM NO. 53 : Providing U.C.R. masonry in
C.M. 1:5 in superstructure with lift upto 1.5 m.
including striking joints etc. complete as directed
33
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
57 ITEM NO. 57 : Providing and constructing Section M
coarse rubble masonry II sort in C.M. 1:4.5 for
super structure with lift upto 1.5m. including Cum 5317.45 758.94
striking joints, curing etc. complete as directed.
(30% mortar)
58 ITEM NO. 58 : Cutting rectangular grooves of As Directed by
size 10 cm. x 10 cm. in stone masonry Engineer-In-
including clearing pointing etc. to facilitate Charge Rmt 1302.40 1302.40
smooth working of needles etc. complete as
directed.
59 ITEM NO. 59 : Providing and laying rough As Directed by
dressed cut stone coping 23 cm. thick in C.M. Engineer-In-
1:5 excluding cement pointing but including Charge Cum 6349.50 2924.05
watering with lift upto 1.5 m.etc. complete as
directed.
60 Section M
ITEM NO. 60 : Providing coalgrout U.C.R.
masonry in C.M. 1:3 (43% mortar) proper
packing rubble and of the required shape and
quality with the coalgrout at required pressure Cum 3144.35 381.61
with lift upto 1.5 m. including centering,
scaffolding, watering etc. complete as directed.
(Excluding formwork and staging)
BRICK MASONRY
34
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
a) 1200 mm dia Rmt 4080.00
b) 1000 mm dia Rmt 2880.00
c) 900 mm dia Rmt 2448.00
d) 800 mm dia Rmt 2016.00
e) 600 mm dia Rmt 1380.00
f) 450 mm dia Rmt 780.00
As Directed by
ITEM NO. 63 B: Laying and jointing R.C.C.
Engineer-In-
pipe of NP2 class or IRC standard in C.M. 1:2,
Charge
proportion by volume including cost of all
materials (excluding pipes and collars), labour,
aligning pipes, batching and mixing mortar,
packing joints with hemp and mortar, finishing,
curing etc. complete with all lifts as directed.
a) 1200 mm dia Rmt 491.75 313.70
b) 1000 mm dia Rmt 367.25 234.78
c) 900 mm dia Rmt 354.10 234.78
d) 800 mm dia Rmt 340.75 234.78
e) 600 mm dia Rmt 262.55 195.31
f) 450 mm dia Rmt 203.70 155.84
64 ITEM NO. 64 A:Providing R.C.C. pipe of NP3 As Directed by
class conforming to IS 458-2003 of following Engineer-In-
class and diameter including cost of all material Charge
and labour required, inspection charges,
transportation to stores, transit insurance,
loading, unloading and stacking excluding GST
levied by GOI and GOM in all respect etc.
complete as directed.
a) 1200 mm dia Rmt 6540.00
b) 900 mm dia Rmt 4200.00
As Directed by
ITEM NO. 64 B: Laying and jointing R.C.C.
Engineer-In-
pipe of NP3 class or IRC standard in C.M. 1:2,
Charge
proportion by volume including cost of all
materials (excluding pipes and collars), labour,
aligning pipes, batching and mixing mortar,
packing joints with hemp and mortar, finishing,
curing etc. complete with all lifts as directed.
a) 1200 mm dia Rmt 585.85 407.82
b) 900 mm dia Rmt 424.55 305.21
65 As Directed by
ITEM NO. 65 : Laying and jointing R.C.C. pipe Engineer-In-
of P1 class of 900 mm dia or IRC standard in Charge
C.M. 1:2, proportion by volume including cost of
all materials (excluding pipes and collars), labour, Rmt 424.55 305.21
aligning pipes, batching and mixing mortar,
packing joints with hemp and mortar, finishing,
curing etc. complete with all lifts as directed.
35
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
67 As Directed by
ITEM NO. 67 : Providing and fixing RCC Engineer-In-
Boundary/Guard/Chainage blocks of size 75 x Charge
20 x 20 cm including excavation and fixing in a
No 739.55 158.75
block of 45 x 45 x 45 cm in M-15 Concrete with
oil painting of two coats, lettering etc. complete,
height of stone above GL 40 cm. as directed
36
Rates for 2021-22
Sr. (Rate in Rs.)
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
72 As Directed by
ITEM NO. 72 : Providing and constructing Engineer-In-
contraction joints by fixing 310 mm wide Charge
central bulb type approved quality PVC water
stop in two lines with 8 mm dia. Steel dowel rods
on either side at 1 m interval, forming 125*125
size groove in between 2 water stops for filling
asphalt, fixing 15 mm dia. two legged G.I. pipe Rmt 1952.70 165.82
with U-bend at bottom for circulating steam at
interval and forming 150 mm ida. formed drain
behing water seals including cost of all materials,
machinery, labour, filling asphalt in groove,
circulation of steam at intervals, vulcanizing water
seal joints etc. complete with all lifts as directed.
37
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-4
TUNNEL WORKS
ITEM NO. 73 TO 83
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2021-2022
SECTION 4:- TUNNEL WORKS
Rate for 2021-22
(Rate in Rs.)
Sr.No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
73 Item no. 73 - Excavation of tunnel through adit /
itself in all types of rock by drilling and smooth control
perimeter blasting, mucking, disposing muck in muck
yard, lighting, ventilation inside tunnel including
dewatering with initial lead of 1 Km (From average Section T Cum 2192.00 784.43
face to Dump yard including length of Adit) etc.
Complete
38
Rate for 2021-22
(Rate in Rs.)
Sr.No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
77 Item no. 77B - Providing and fixing anchor bar of 25
mm diameter 3.375 m length with resin bond cement
capsule anchorage through shaft including drilling
holes, inserting grout capsule, driving anchor, cost of As Directed by
all materials, machinery, labour, ventilation, lighting, Engineer-In- No. 2576.00 204.04
drainage and other ancillary operations etc complete Charge
with all lifts as Directed .
39
Rate for 2021-22
(Rate in Rs.)
Sr.No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
80 Item no. 80B- Providing, fabricating and placing in
position reinforcement steel for tunnel RCC works
through shaft including cleaning, straightening,
cutting, bending, hooking, lapping, welding joints Section T,
wherever required tying with binding wire including cost MT 79816.00 ---
SectionST
of all materials, machinery, labour, lighting, ventilation,
drainage etc. complete with all lifts.
40
Rate for 2021-22
(Rate in Rs.)
Sr.No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
83 Item no. 83B Providing and laying insitu vibrated M-20
grade cement concrete using 20 mm clean, hard,
graded aggregates for Invert (Kerb and bed) lining
of tunnel through shaft including cost of all materials,
machinery, labours, formwork, batching, mixing, Section T,
conveying upto placing point in agitator car, placing in Section CC, Cum 5795.55 623.18
position, laying, vibrating, finishing, curing, ventilation, Section L
lighting, draining and all other ancillary operations etc.,
complete with all lifts for Tunnel.
41
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-5
42
Rate for 2021-22
( Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
87 Item No. 87 : As Directed by
Block contour survey of 20m x 20m grid (Not less Engineer-In-
than 36 raw data points distributed uniformly over Charge
a Hector) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
design Software packages including contour plotting
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge and
the same shall be delivered in a CD format as well as
hard copy in six numbers including one print on
tracing paper,as directed.
43
Rate for 2021-22
( Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
90 Item No. 90 : As Directed by
Block contour survey of 150m x 30m grid (Not less Engineer-In-
than 5 raw data points distributed uniformly over a Charge
Hector) for irrigation projects using digital state of art
Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
design Software packages including contour plotting
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge and
the same shall be delivered in a CD format as well as
hard copy in six numbers including one print on
tracing paper,as directed.
44
Rate for 2021-22
( Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
93 Item No. 93 : As Directed by
Preparation of detailed construction plan for pipe Engineer-In-
distribution network system including necessary Charge
command survey, linear survey for pipe laying, chak
planning, designing of pipe network, and preparation
of estimates,as directed.
Ha.
A) Total Station 1029.65 588.74
CCA
Ha.
B) DGPS 544.20 150.00
CCA
94 Item No. 94 : As Directed by
Providing permanent bench mark dressed stone Engineer-In-
of basalt, granite or gniess of size 30cm X 30cm X Charge
45cm at least 15Cm below the ground and
embedding it to a depth of 30cm in grade M-15 insitu
concrete of size 90cm X 90cm X 60cm deep over 1M No. 5157.80 434.84
deep foundation concrete of grade M-10 including
excavation, concrete, providing and fixing dressed
stone and backfilling the pit up to ground level with
sand etc. complete,with all lifts as directed.
45
Rate for 2021-22
( Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
98 Item No.98: As Directed by
Providing core box of M.S.of size 1.25m x 0.35m x Engineer-In-
0.15m for preserving core sample with all fixtures and Charge
fastening handles including locking arrangement etc. No. 3864.95 0.00
complete,as directed.
46
NMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-6
HYDROMETEROLOGY
47
Rate for 2021-22
Sr. (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed
Labour
Item
1 2 3 4 5 6
106 Item No. 106 : Gauge Discharge (Boat Driver)
Providing boat driver ( He must be good swimmer) to
drive the boat for taking measurements at G.D. Stations
near compartment in the Steady position. After taking the As Directed by
measurement bringing back the boat & concern persons Engineer-In- Per Month 22358.20 22358.20
in the boat safely, Installing the boat in out of danger Charge
area etc. complete, including accidiental insurance. As
Directed.
48
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
1 2 3 4 5 6
108 Item No.108 :
49
Rate for 2021-22 (Rate in
Rs.)
Sr.
Item Specifications Unit
No
Completed Item Labour
1 2 3 4 5 6
114 Item No.114 :
Providing 25 mm thick mud plaster to kud walls As Directed by
Sq.m 142.95 117.75
including cow dung wash etc.complete.As Engineer-In-
directed. Charge
115 Item No.115 :
Providing & Constructing Kud Walls with
clothing of grass/other vegetation with vertical As Directed by Sq.m 143.40 23.20
(100 mm Dia) posts and bamboos (25 mm Dia At Engineer-In-
450 mm c/c) excluding mud plaster Charge
etc.complete.As directed.
116 Item No.116 :
50
Rate for 2021-22 (Rate in
Rs.)
Sr.
Item Specifications Unit
No
Completed Item Labour
1 2 3 4 5 6
122 Item No.122 :
51
Rate for 2021-22 (Rate in
Rs.)
Sr.
Item Specifications Unit
No
Completed Item Labour
1 2 3 4 5 6
128 Item No.128 :
52
Rate for 2021-22 (Rate in
Rs.)
Sr.
Item Specifications Unit
No
Completed Item Labour
1 2 3 4 5 6
134 Item No.134 :
Providing & fixing xpm Jalli with teak wood/ non As Directed by
teak wood frame including fixing painting etc. Engineer-In-
complete.As directed. Charge
53
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-8
54
Rates for 2021-22
(Rates in Rs.)
Sr. No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
141 Item No 141 Providing , installing & erecting in As Directed by
correct line and level, fiber glass reinforced Engineer-In-
plastics(FRP) cut throat flume ( CTF ) Charge
measuring devices on calculated hump level
for accurate measurement of water flowing
through open channel , with prefabricated fiber
glass lining moulded engraved gauge marking
( in lit/sec and in cms.) including discharge
table, capacity marking, flow direction,sand
treatment on the back side of flume,testing, etc.
complete as directed.
(Excluding CBL and hump preparation,
canal section and other concrete required
for hump ,U/S and D/S slopes of hump etc.)
55
Rates for 2021-22
(Rates in Rs.)
Sr. No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
142 Item No 142 As Directed by
Providing , installing & erecting in correct line Engineer-In-
and level, fiber glass reinforced plastics(FRP) Charge
parshall flume on calculated hump level of
following sizes and discharge capacities, for
accurate measurement of water flowing through
open channel with prefabricated fiber glass
lining moulded engraved gauge marking ( in
lit/sec and in cms) including discharge table,
capacity marking, flow direction,sand treatment
on the back side of flume, testing, etc.
complete as directed.
( Excluding CBL and hump preparation ,
canal section and other concrete required
for hump ,U/sand D/S slopes of hump etc.)
56
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-9
57
Rate for 2021-22
(Rate in Rs.)
Sr.No. Discription of Item Specifications Unit
Completed Labour
Item
1 2 3 4 5 6
148 Item 148:
Providing computerised detailed river alignment with
contours on A-1 size paper with scale 1 cm equal to 15 m or
30m whichever is suitable as per site condition. (one sheet
for one Km. length of river) with contour at 0.50 m. interval
including marking 25 years return flood level (Blue line) & As Directed by
100 years return flood level (Red line) line & showing Engineer-In- Sheet 1174.05 --
locations of bridges, KT Weirs & other permanent structures Charge
on each drawing along and across the river as directed by
Engineer in Charge, including providing one color check print
& six hard copies(color print) with one soft copy etc. all
complete as directed.
58
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-10
59
Rate for 2021-22
(Rate in Rs.)
Sr. No. Discription of Item Specifications Unit
Completd rate Labour
1 2 3 4 5 6
157 Item No.:-157
Labour charges for removing grass, thorny
shurbs, Jungli shurb, Kubabul and alike grass As Directed by
along and in the drain/canal making the ground Engineer-In- Sqm 14.45 14.45
clean by showel and phavaras etc. complete as Charge.
Directed.
60
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-11
61
Rates for 2021-2022
Item. ( Rate in Rs.)
Description of item Specification Unit
No. Completed
Labour
Rate
1 2 4 5 6
172 Item No.172:- Providing and applying As Directed by
anticorrosive coal tar black paint IS 290- Engineer-In-
1961 in two coats including surface charge Sqm 317.60 258.82
preparation, chipping the welding, cleaning
spatters, dust etc. Complete as directed.
173 Item No.173:- Providing and applying As Directed by
anticorrosive Coal Tar Epoxy paint for Engineer-In-
upstream side in two coats including surface charge
Sqm 319.60 178.17
preparation, chipping the welding, cleaning
spatters, dust etc. Complete as directed.
62
Rates for 2021-2022
Item. ( Rate in Rs.)
Description of item Specification Unit
No. Completed
Labour
Rate
1 2 4 5 6
180 Item No.180:- Transportation of As Directed by
M.S.Needles from the river bank to the Engineer-In-
store shed / safe place or from store charge
shed/safe place to river bank by Bullock cart No 47.50 47.50
including loading unloading and stacking with
lifts etc. complete as directed. (lead half Km)
63
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
188 Providing,erecting,testing and As Directed by
commissioning of a Casagrande type Engineer-In-
Piezometer in a 100 mm dia.cased drilled charge
hole with all its required accessories as
follows as per IS -7356 part-I at the dam
site
64
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
H) 50 mm dia and 1.25 m long G.I
pipe,Heavy , (Schedule C) type for casing No. 815.00 187.00
protective cover
I) Construction of cement concrete
platform/block/muffing of size
700x700x700mm around the piezometer
pipe below ground with cavity around the
pipe of 300x300x300 mm in cement concrete
in M15 including excavation ,cantering ,
shutting arrangement of RCC cover ( frame Each 2866.00 661.00
300x300mm with lifting arrangement
including laying of angle iron frame of angle
size as 50x50x6 mm to be fixed /embedded
on the top of chamber complete.) cost of all
materials and labour and curing etc.complete.
65
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
C) Identification tag with nylon thread. Set 109.00 28.00
D) Brass compression connector between
twin tube tip assembly and tubing. No. 364.00 93.00
66
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
C) Manufacturing and supplying of fixing
point anchoring arrangement. as per Job 36366.00 0.00
specifications given & drawing provided.
D) Manufacturing & supplying oil tank &
stand for tank as per specifications given & Job 29635.00 0.00
drawing provided.
E) Supply of S.S. wire ø 1.6 x 100 mtr long.
Complete job . Job 8359.00 0.00
67
Rates for 2021-2022
Item ( Rate in Rs.)
Discription of item Specification Unit
No Completed
Labour
Rate
1 2 4 5
H) Supply of Vernier microscope - 2 Nos as
per specifications given which is having 18
cm scale in size, Horizontal scale Least
count of 0.01 mm Vertical scale Least count
of 0.01 mm. Microscope shall be of 20 -21 Job 25619.00 0.00
power and focusing through 37 mm having
cross hair in the eye piece.
68
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-12
196 Item No. 196 :- Excavation for deep trenches for laying
rising main in Soft Rock by crow bar and shavel
including trimming to correct line and level and to
specified width including trimming and levelling the bed
removing the excavated material and stacking the same
As Directed by
upto a distance of 1 km and all lifts as directed and
Engineer-In- cum 167.65 29.98
safety precautions to keep the trench undisturbed till
Charge.
pipe laying & fixing necessary specials etc complete as
per detailed specifications.
(Payable measurements with vertical excavation).
69
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
198 Item No. 198 :-Providing and laying Murum bedding
using available material from excavation in trenches
with murum of approved quality in layers not exceeding
150 mm to 200 mm, each layer shall be compacted by Section LIS cum 215.00 143.61
watering and ramming etc complete as directed.
70
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
203 Item No 203:- Lowering, laying in position to correct
line & level including M.S. pipes with / without any
outcoating on prepared bedding or on pedaetals or
chairs or upon prepared formation including loading,
unloading, hoisting, marginal cutting wherever required,
assembling , and transportation upto 500 m etc.
completed as specified with all leads & lifts etc.
complete including tack welding, field hydraulic Section LIS kg 8.20 3.70
testing at specified pressure and as per procedure
mentioned in section 11 of IS 5822: 1994. (item to be
used only in situations where pipes are already
procured ) For total quantity 7.5 rmt & 900 mm Dia. 6
mm thick).As Directed.
71
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
206 Item No 206 :- Providing and Erecting "Y" and "T"
branches with coller plate made out of MS plate
conforming to IS 2062:1992 including procurement of
plates, gas cutting to required size and shape, rolling,
tack welding, full welding on either automatic welding
machine or manually and forming 'V' edge on both ends
for welding it to pipe, including fabrication & full welding
of coller plate and stiffeners as per design
requirements, third party inspection charges ,lowering
& laying to correct position etc, complete as per IS -
3589 and IS - 5504 as applicable as per detailed
specifications. Cost of "V" edging, machining and Section LIS Kg 105.25 21.00
welding of collar plate in "Y" and "T" connection is
included in the rate. Cost of longitudinal welding and
"V" edging required for circumferencial welding
required to connect MS special to Rising main / delivery
pipes is inclusive in the rate however circumferencial
welding required to connect Y/T to Rising main or
manifold shall be paid separately on running meter
basis.As Directed. (No negative Tolerance in
thickness is permissible).
72
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
208 Item No 208 :- Providing and Erecting M S bends
made out of MS plate conforming to IS 2062:1992
including procurement of plates, gas cutting to required
size and shape, rolling, tack welding, full welding on
either automatic welding machine or manually and
forming 'V' edge on both ends for welding it to pipe,
including fabrication & full welding of stiffeners as per
design requirements, lowering & laying to correct
position, third party inspection charges etc,
complete as per IS - 3589 and IS - 5504 as
applicable as per detailed specifications. Cost of Section LIS kg 105.25 21.00
longitudinal welding and " V " edging required for
circumferencial welding required to connect MS special
to Rising main /delivery pipes is inclusive in the rate
however circumferencial welding required for
connecting M.S. special to Rising Main shall be paid
separately on running meter basis.
(No negative Tolerance in thickness is permissible).
73
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
211 Item No. 211 :- Ultrasonic testing of field welded
joints as per Procedure laid down in IS 4260:1986
including actual testing, interpreting and submitting test
report in detail including cost of all materials,
equipments & expert personnel required for testing, Section LIS Rmt 407.10 243.03
developing, interpreting and submitting report, including
all incidental charges, transportation to site and local
transportation on site etc. complete.As directed.
74
Sr. Rate for 2021-22
No. Description Specifications Unit
Completed rate Labour rate
1 2 3 4 5 6
216 Item No.216 :- Providing cement mortar lining of
specified thickness to inner surface of pipe in
proportion 1:1.5 using mechanical spinning machine, As Directed by
including all necessary labour, material, plants and Engineer-In-
equipments, local handling etc. complete as per Charge.
procedure laid down in IS 3589:2001.As Directed.
75
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-2022
1 2 3 4 5
I. DUCTILE IRON (D.I.) PIPES (K-7)
218 Item No 218 : Providing and supplying D.I. pipes (push on Section - PDN
joints pressure pipes of D. I. of following class and diameters D.I.Pipe
confirming to the I.S. specification inclusive cost of jointing (P.N. 1 to 30)
materials (Rubber gasket of EPDM Quality) excluding GST levied
by GOI & GOM in all respect including Third party inspection
charges of TPI Agency approved by WRD including Transit
insurance, Railway Freight, Unloading from railway wagon,
Loading into Truck, Transportation to departmental store,
unloading, stacking etc. completed as directed by Engineer-in-
charge (IS 1536/2001 for pipes and IS 158/1969 and IS
12820/1989 or latest edition/revision with amendments for Rubber
Gaskets. (IS:8329-2000 Latest Version) D.I. K-7
76
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-2022
1 2 3 4 5
220 Item No 220 : Providing and supplying ISI standard D. I. Section - PDN
specials & fitting with sealing rubber gasket of S.B.R, complete D.I.Pipe (P.N.
with cast iron follower gland and M. S. nut bolts coated or 1 to 30)
otherwise protected from rusting and suitable for D.I. pipes
including cost of labour, materials, and transportation to stores /
site, loading and unloading excluding GST levied by GOI & GOM
in all respect, as per IS-9523. For all types of specials, bends,
tees etc. complete
1 a) up to 300 mm dia. Kg 132.00
2 b) 350 mm & above dia. Kg 132.00
221 Item No 221 : Hydraulic testing of D.I. pipe line to specified Section - PDN
pressure including cost of all materials and labour and water for D.I.Pipe (P.N.
testing for specified length including cutting, placing end cap 1 to 30)
making arrangement for filling safe water using reciprocating type
pumps which should be able to provide specified test pressure
gauges and other necessary equipments, labour, operation
charges, etc. required for testing. The rate under this item shall
also include cost of retesting, if necessary and reinstating to
original position using water supplied by the contractor.
1 80 mm Km 6860.00
2 100 mm Km 7069.80
3 125 mm Km 7385.05
4 150 mm Km 8121.00
5 200 mm Km 9046.15
6 250 mm Km 10206.95
7 300 mm Km 12323.40
8 350 mm Km 15291.20
9 400 mm Km 18782.00
10 450 mm Km 22489.05
11 500 mm Km 26431.80
12 600 mm Km 31433.00
13 700 mm Km 37611.05
14 750 mm Km 41053.60
15 800 mm Km 44731.85
16 900 mm Km 52770.00
17 1000 mm Km 61802.00
18 1100 mm Km 71751.00
19 1200 mm Km 82643.00
77
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
II. POLYVINYL CHLORIDE (P.V.C.) PIPES
222 Item No 222: Providing and supplying in standard Section - PDN
lengths ISI mark rigid unplasticised PVC pipes suitable P.V.C. Pipe
for potable water with solvent cement joints including cost of (P.N. 1 to 23)
couplers, as per IS specification no. 4985 / 1988 excluding
GST levied by GOI and GOM in all respect, including
transportation, freight charges, inspection charges, loading,
unloading, conveyance to the departmental stores and
stacking the same in closed shed duly protected from sun
rays and rains including cost of jointing material i.e. solvent
cement, etc. complete (selffit type to be jointed with cement
solvent).
a) Working Pressure 4 Kg./Sq.cm
1 63 mm Rmt 76.00
2 75mm Rmt 106.00
3 90mm Rmt 148.00
4 110 mm Rmt 214.00
5 125 mm Rmt 285.00
6 140 mm Rmt 351.00
7 160 mm Rmt 460.00
8 180 mm Rmt 570.00
9 200 mm Rmt 732.00
10 225 mm Rmt 908.00
11 250 mm Rmt 1139.00
12 280 mm Rmt 1478.00
13 315 mm Rmt 1694.00
14 400 mm Rmt 4355.00
b) Working Pressure 6 Kg./Sq.cm
1 63 mm Rmt 103.00
2 75mm Rmt 146.00
3 90mm Rmt 214.00
4 110 mm Rmt 295.00
5 125 mm Rmt 416.00
6 140 mm Rmt 514.00
7 160 mm Rmt 664.00
8 180 mm Rmt 814.00
9 200 mm Rmt 1030.00
10 225 mm Rmt 1359.00
11 250 mm Rmt 1697.00
12 280 mm Rmt 2134.00
13 315 mm Rmt 2670.00
14 400 mm Rmt 6392.00
c) Working Pressure 8 Kg./Sq.cm
1 63 mm Rmt 138.00
2 75mm Rmt 197.00
3 90mm Rmt 277.00
4 110 mm Rmt 408.00
5 125 mm Rmt 537.00
6 140 mm Rmt 672.00
7 160 mm Rmt 888.00
8 180 mm Rmt 1067.00
9 200 mm Rmt 1355.00
10 225 mm Rmt 1762.00
11 250 mm Rmt 2202.00
12 280 mm Rmt 2766.00
13 315 mm Rmt 3467.00
14 400 mm Rmt 9010.00
d) Working Pressure 10 Kg./Sq.cm
1 63 mm Rmt 163.00
78
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
2 75mm Rmt 228.00
3 90mm Rmt 330.00
4 110 mm Rmt 501.00
5 125 mm Rmt 645.00
6 140 mm Rmt 805.00
7 160 mm Rmt 1066.00
8 180 mm Rmt 1269.00
9 200 mm Rmt 1656.00
10 225 mm Rmt 2096.00
11 250 mm Rmt 2628.00
12 280 mm Rmt 3262.00
13 315 mm Rmt 4144.00
14 400 mm Rmt 10494.00
e) Working Pressure 12.5 Kg./Sq.cm
1 110 mm Rmt 873.00
2 125 mm Rmt 1143.00
3 140 mm Rmt 1410.00
4 160 mm Rmt 1850.00
5 200 mm Rmt 2955.00
6 250 mm Rmt 4727.00
7 315 mm Rmt 7529.00
8 400 mm Rmt 13538.00
223 Item No 223 : Lowering, laying and jointing with P.V.C. Section - PDN
pipes and specials of following class and diameter including P.V.C. Pipe
cost of conveyance from stores to site of works including cost (P.N. 1 to 23)
of all labour, material, except cement solvent, rubber ring, as
per IS code, etc. complete (with cement solvent joint / ring fit
joint). (for all class of pipes)
1 63 mm Rmt 16.00
2 75mm Rmt 20.00
3 90mm Rmt 24.00
4 110 mm Rmt 29.00
5 125 mm Rmt 32.00
6 140 mm Rmt 34.00
7 160 mm Rmt 36.00
8 180 mm Rmt 49.00
9 200 mm Rmt 49.00
10 225 mm Rmt 57.00
11 250 mm Rmt 64.00
12 280 mm Rmt 71.00
13 315 mm Rmt 80.00
14 400 mm Rmt 100.00
224 Item No 224 : Providing and supplying ISI mark P.V.C. pipes Section - PDN
fitting/specials including loading , unloading , P.V.C. Pipe
trasnporatation upto departmental store, stacking excluding (P.N. 1 to 23)
GST levied by GOI & GOM in all respect.etc.complete.
79
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
225 Item No 225 : Hydraulic testing of PVC pipe line to Section - PDN
specified pressure including cost of all materials and labour P.V.C. Pipe
and water for testing for specified length including cutting, (P.N. 1 to 23)
placing end cap making arrangement for filling safe water
using reciprocating type pumps which should be able to
provide specified test pressure gauges and other necessary
equipments, labour, operation charges, etc. required for
testing. The rate under this item shall also include cost of
retesting, if necessary and reinstating to original position.
80
Rate
Sr. Specification
Description Unit (in Rs.) 2021-
No. Ref. No.
22
1 2 3 4 5
III. P.V.C.-O PIPES
226 Item No 226 : Providing and supplying in ISI mark rigid PVC- Section - PDN
O class-500 s/s pipes (push on joints) pressure pipes P.V.C-O Pipe
confirming to IS specifications no 16647- 2017 inclusive cost of (P.N. 1 to 25)
EPDM gasket seals on joints including all statutory duties
excluding GST levied by Government of India and Government
of Maharashtra in all respect including third party inspection
charges of agency approved by WRD, transit insurance loading,
unloading charges conveyance to the departmental store / site
and stacking the same in closed shade duly protected from
sunrays etc complete.
Note :-
Diameter wise overlapping lengths are respectively, 110mm
2.92%, 160mm- 3.33%, 200mm 3.75%, 250mm 4.5%, 315mm
5.42%, 400mm 6.25%
a) Class - 500 PN - 12.5
i) 110 mm Rmt 687.00
ii) 160 mm Rmt 1132.00
iii) 200 mm Rmt 1483.00
iv) 250 mm Rmt 2050.00
v) 315 mm Rmt 2760.00
vi) 400 mm Rmt 4162.00
b) Class - 500 PN - 16
i) 110 mm Rmt 760.00
ii) 160 mm Rmt 1273.00
iii) 200 mm Rmt 1689.00
iv) 250 mm Rmt 2203.00
v) 315 mm Rmt 2999.00
vi) 400 mm Rmt 4529.00
c) Class - 500 PN - 25
i) 110 mm Rmt 918.00
ii) 160 mm Rmt 1335.00
iii) 200 mm Rmt 1818.00
iv) 250 mm Rmt 2512.00
v) 315 mm Rmt 4093.00
vi) 400 mm Rmt 6059.00
227 Item No 227 : Lowering, laying and jointing with P.V.C.-O Section - PDN
pipes and specials of following class and diameter including cost P.V.C-O Pipe
of conveyance from stores to site of works including cost of all (P.N. 1 to 25)
labour, material, except cement solvent, rubber ring, as per IS
code, for all class of pipe, etc. complete (with cement solvent
joint / ring fit joint).
81
Rate
Sr. Specification
Description Unit (in Rs.) 2021-
No. Ref. No.
22
1 2 3 4 5
228 Item No 228 : Providing and supplying ISI mark P.V.C.-O Section - PDN
pipes fitting / specials including loading, unloading, P.V.C-O Pipe
trasnporatation upto departmental store, stacking excluding GST (P.N. 1 to 25)
levied by GOI & GOM in all respect.etc.complete.
229 Item No 229 : Hydraulic testing of PVC-O pipe line to Section - PDN
specified pressure including cost of all materials and labour and P.V.C-O Pipe
water for testing for specified length including cutting, placing (P.N. 1 to 25)
end cap making arrangement for filling safe water using
reciprocating type pumps which should be able to provide
specified test pressure gauges and other necessary equipments,
labour, operation charges, etc. required for testing. The rate
under this item shall also include cost of retesting, if necessary
and reinstating to original position.(for all class of pipe)
i) 110 mm Km 7188.80
ii) 160 mm Km 8287.20
iii) 200 mm Km 9046.15
iv) 250 mm Km 10206.95
v) 315 mm Km 12788.30
vi) 400 mm Km 18782.00
82
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
IV. PRE-STRESSED CEMENT CONCRETE PIPES (PSC)
230 Item No 230: Providing and supplying ISI standard Pre-stressed Section - PDN
Cement concrete pipes of following class and diameter including P.S.C. Pipe
cost of all meterial and labour required, cost, inspection charges, (P.N. 1 to 22)
transportaion to stores, unloading and stacking excluding GST levied
by GI & GOM in all respect etc. complete as per IS-784-2001.
ii) Site test pressure - 1.5 times working pressure pertaining to the
section or 1.1 times static pressure, whichever is more (such pressure
is to be control within 25% of pumphead incase of pumping main)
83
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
16 1700 mm Rmt 23926.00
17 1800 mm Rmt 26092.00
18 1900 mm Rmt 31643.00
19 2000 mm Rmt 34223.00
d) Factory Test Pressure 8 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3574.00
3 450 mm Rmt 3755.00
4 500 mm Rmt 3997.00
5 600 mm Rmt 4980.00
6 700 mm Rmt 5957.00
7 800 mm Rmt 7115.00
8 900 mm Rmt 8809.00
9 1000 mm Rmt 10226.00
10 1100 mm Rmt 11818.00
11 1200 mm Rmt 14024.00
12 1300 mm Rmt 16338.00
13 1400 mm Rmt 18058.00
14 1500 mm Rmt 20479.00
15 1600 mm Rmt 22511.00
16 1700 mm Rmt 24994.00
17 1800 mm Rmt 28276.00
18 1900 mm Rmt 32810.00
19 2000 mm Rmt 35525.00
e) Factory Test Pressure 10 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3574.00
3 450 mm Rmt 3773.00
4 500 mm Rmt 3997.00
5 600 mm Rmt 4980.00
6 700 mm Rmt 6079.00
7 800 mm Rmt 7115.00
8 900 mm Rmt 8809.00
9 1000 mm Rmt 10226.00
10 1100 mm Rmt 11818.00
11 1200 mm Rmt 14024.00
12 1300 mm Rmt 17268.00
13 1400 mm Rmt 18857.00
14 1500 mm Rmt 20479.00
15 1600 mm Rmt 22511.00
16 1700 mm Rmt 24994.00
17 1800 mm Rmt 28276.00
18 1900 mm Rmt 34032.00
19 2000 mm Rmt 36883.00
f) Factory Test Pressure 12 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3574.00
3 450 mm Rmt 3773.00
4 500 mm Rmt 3997.00
5 600 mm Rmt 4980.00
6 700 mm Rmt 6079.00
7 800 mm Rmt 7115.00
8 900 mm Rmt 8809.00
9 1000 mm Rmt 10226.00
10 1100 mm Rmt 11818.00
11 1200 mm Rmt 14024.00
12 1300 mm Rmt 17316.00
13 1400 mm Rmt 18857.00
14 1500 mm Rmt 20479.00
15 1600 mm Rmt 22511.00
84
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
16 1700 mm Rmt 24994.00
17 1800 mm Rmt 28276.00
18 1900 mm Rmt 36348.00
19 2000 mm Rmt 39420.00
g) Factory Test Pressure 14 kg/Sqcm
1 350 mm Rmt 3361.00
2 400 mm Rmt 3638.00
3 450 mm Rmt 3858.00
4 500 mm Rmt 4087.00
5 600 mm Rmt 5186.00
6 700 mm Rmt 6306.00
7 800 mm Rmt 7361.00
8 900 mm Rmt 9118.00
9 1000 mm Rmt 10600.00
10 1100 mm Rmt 12265.00
11 1200 mm Rmt 14521.00
12 1300 mm Rmt 17876.00
13 1400 mm Rmt 22382.00
14 1500 mm Rmt 22382.00
15 1600 mm Rmt 24656.00
16 1700 mm Rmt 27575.00
17 1800 mm Rmt 30196.00
18 1900 mm Rmt 37314.00
19 2000 mm Rmt 40663.00
h) Factory Test Pressure 16 kg/Sqcm
1 350 mm Rmt 3397.00
2 400 mm Rmt 3847.00
3 450 mm Rmt 4158.00
4 500 mm Rmt 4686.00
5 600 mm Rmt 5879.00
6 700 mm Rmt 6877.00
7 800 mm Rmt 8578.00
8 900 mm Rmt 11384.00
9 1000 mm Rmt 12812.00
10 1100 mm Rmt 15377.00
11 1200 mm Rmt 17749.00
12 1300 mm Rmt 20430.00
13 1400 mm Rmt 22550.00
14 1500 mm Rmt 26784.00
15 1600 mm Rmt 30043.00
16 1700 mm Rmt 33300.00
17 1800 mm Rmt 36556.00
18 1900 mm Rmt 39952.00
19 2000 mm Rmt 44424.00
i) Factory Test Pressure 18 kg/Sqcm
1 350 mm Rmt 3559.00
2 400 mm Rmt 3953.00
3 450 mm Rmt 4277.00
4 500 mm Rmt 4831.00
5 600 mm Rmt 6089.00
6 700 mm Rmt 7520.00
7 800 mm Rmt 9385.00
8 900 mm Rmt 11869.00
9 1000 mm Rmt 13948.00
10 1100 mm Rmt 16096.00
11 1200 mm Rmt 18604.00
12 1300 mm Rmt 21427.00
13 1400 mm Rmt 28277.00
14 1500 mm Rmt 31883.00
15 1600 mm Rmt 35938.00
85
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
16 1700 mm Rmt 39988.00
17 1800 mm Rmt 44040.00
j) Factory Test Pressure 20 kg/Sqcm
1 350 mm Rmt 3642.00
2 400 mm Rmt 4048.00
3 450 mm Rmt 4400.00
4 500 mm Rmt 4981.00
5 600 mm Rmt 6305.00
6 700 mm Rmt 8330.00
7 800 mm Rmt 11084.00
8 900 mm Rmt 13102.00
9 1000 mm Rmt 15761.00
10 1100 mm Rmt 18736.00
11 1200 mm Rmt 23562.00
12 1300 mm Rmt 25925.00
13 1400 mm Rmt 30287.00
14 1500 mm Rmt 34334.00
15 1600 mm Rmt 38400.00
16 1700 mm Rmt 42463.00
17 1800 mm Rmt 46529.00
231 Item No 231: Lowering, laying and jointing in proper grade and Section - PDN
alignment Pre-Stressed Cement Concrete Pipes with rubber ring P.S.C. Pipe
joints including cost of conveyance from stores to site of works, all (P.N. 1 to 22)
labour involved, etc. complete but excluding cost of rubber rings (for
all class of pipes)
86
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
233 Item No 233: Hydraulic testing of Pre-Stressed Cement Concrete Section - PDN
Pipes with rubber ring joints to specified pressure including cost of all P.S.C. Pipe
materials and labour and water for testing for the length upto 1 km., (P.N. 1 to 22)
using reciprocating type pumps which should be able to provide
specified test pressure guages and other necessary equipments,
labour, operation charges, etc. required for testing. The rate under this
item shall also include cost of retesting, if necessary.
i) 350 mm Km 15291.20
ii) 400 mm Km 18782.00
iii) 450 mm Km 22489.05
iv) 500 mm Km 26431.80
v) 600 mm Km 31433.00
vi) 700 mm Km 37611.05
vii) 800 mm Km 44731.85
viii) 900 mm Km 52770.00
ix) 1000 mm Km 61802.00
x) 1100 mm Km 71751.00
xi) 1200 mm Km 82643.00
xii) 1300 mm Km 94477.00
xiii) 1400 mm Km 107255.00
xiv) 1500 mm Km 124638.00
xv) 1600 mm Km 140636.00
xvi) 1700 mm Km 156242.00
xvii) 1800 mm Km 172790.00
xviii) 1900 mm Km 190281.00
xix) 2000mm Km 208715.00
87
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
V. BAR WRAPPED STEEL CYLINDER PIPES (BWSC)
234 Item No 234: Providing and supplying Bar Wrapped steel Section - PDN
cylinder pipes, conforming to IS-15155-2002 (suitable for B.W.S.C. Pipe
overlaping steel welded joint or butt welded steel joints) of (P.N. 1 to 20)
following class and diameter including cost of all material and
labour required, inspection charges, transportation to stores,
transit insurance, loading, unloding and stacking excluding GST
levied by GOI & GOM in all respect, etc. complete.
88
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xi) 1000 mm Rmt 14820.00
xii) 1100 mm Rmt 20952.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27267.00
xv) 1400 mm Rmt 29244.00
xvi) 1500 mm Rmt 31538.00
xvii) 1600 mm Rmt 34202.00
xviii) 1700 mm Rmt 36281.00
xix) 1800 mm Rmt 38736.00
a) Factory Test Pressure 8 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3653.00
iii) 350 mm Rmt 4110.00
iv) 400 mm Rmt 4508.00
v) 450 mm Rmt 4987.00
vi) 500 mm Rmt 5594.00
vii) 600 mm Rmt 7252.00
viii) 700 mm Rmt 8370.00
ix) 800 mm Rmt 9217.00
x) 900 mm Rmt 12650.00
xi) 1000 mm Rmt 14833.00
xii) 1100 mm Rmt 20952.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27267.00
xv) 1400 mm Rmt 29244.00
xvi) 1500 mm Rmt 31538.00
xvii) 1600 mm Rmt 34213.00
xviii) 1700 mm Rmt 36293.00
xix) 1800 mm Rmt 38750.00
a) Factory Test Pressure 10 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3653.00
iii) 350 mm Rmt 4110.00
iv) 400 mm Rmt 4508.00
v) 450 mm Rmt 4987.00
vi) 500 mm Rmt 5594.00
vii) 600 mm Rmt 7252.00
viii) 700 mm Rmt 8370.00
ix) 800 mm Rmt 9236.00
x) 900 mm Rmt 12650.00
xi) 1000 mm Rmt 14849.00
xii) 1100 mm Rmt 20952.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27267.00
xv) 1400 mm Rmt 29244.00
xvi) 1500 mm Rmt 31538.00
xvii) 1600 mm Rmt 34229.00
xviii) 1700 mm Rmt 36311.00
xix) 1800 mm Rmt 38768.00
a) Factory Test Pressure 12 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3653.00
iii) 350 mm Rmt 4110.00
iv) 400 mm Rmt 4508.00
v) 450 mm Rmt 4987.00
vi) 500 mm Rmt 5594.00
vii) 600 mm Rmt 7252.00
viii) 700 mm Rmt 8370.00
ix) 800 mm Rmt 10350.00
x) 900 mm Rmt 12650.00
89
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xi) 1000 mm Rmt 15727.00
xii) 1100 mm Rmt 20952.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27267.00
xv) 1400 mm Rmt 29244.00
xvi) 1500 mm Rmt 31538.00
xvii) 1600 mm Rmt 34887.00
xviii) 1700 mm Rmt 37760.00
xix) 1800 mm Rmt 41994.00
b) Factory Test Pressure 14 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3659.00
iii) 350 mm Rmt 4117.00
iv) 400 mm Rmt 4511.00
v) 450 mm Rmt 5002.00
vi) 500 mm Rmt 5693.00
vii) 600 mm Rmt 7384.00
viii) 700 mm Rmt 9609.00
ix) 800 mm Rmt 11265.00
x) 900 mm Rmt 13896.00
xi) 1000 mm Rmt 16730.00
xii) 1100 mm Rmt 21039.00
xiii) 1200 mm Rmt 23351.00
xiv) 1300 mm Rmt 27983.00
xv) 1400 mm Rmt 31574.00
xvi) 1500 mm Rmt 35131.00
xvii) 1600 mm Rmt 39174.00
xviii) 1700 mm Rmt 43012.00
xix) 1800 mm Rmt 47056.00
c) Factory Test Pressure 16 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3661.00
iii) 350 mm Rmt 4121.00
iv) 400 mm Rmt 4517.00
v) 450 mm Rmt 5178.00
vi) 500 mm Rmt 6106.00
vii) 600 mm Rmt 7926.00
viii) 700 mm Rmt 10228.00
ix) 800 mm Rmt 12256.00
x) 900 mm Rmt 15157.00
xi) 1000 mm Rmt 18423.00
xii) 1100 mm Rmt 22191.00
xiii) 1200 mm Rmt 25877.00
xiv) 1300 mm Rmt 30826.00
xv) 1400 mm Rmt 34798.00
xvi) 1500 mm Rmt 38807.00
xvii) 1600 mm Rmt 43157.00
xviii) 1700 mm Rmt 47902.00
xix) 1800 mm Rmt 53450.00
d) Factory Test Pressure 18 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3842.00
iii) 350 mm Rmt 4307.00
iv) 400 mm Rmt 4802.00
v) 450 mm Rmt 5595.00
vi) 500 mm Rmt 6587.00
vii) 600 mm Rmt 8619.00
viii) 700 mm Rmt 11331.00
ix) 800 mm Rmt 13372.00
x) 900 mm Rmt 16528.00
90
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xi) 1000 mm Rmt 20163.00
xii) 1100 mm Rmt 24260.00
xiii) 1200 mm Rmt 28268.00
xiv) 1300 mm Rmt 33565.00
xv) 1400 mm Rmt 38356.00
xvi) 1500 mm Rmt 42364.00
xvii) 1600 mm Rmt 48057.00
xviii) 1700 mm Rmt 53299.00
xix) 1800 mm Rmt 58992.00
e) Factory Test Pressure 20 kg/Sqcm
i) 250 mm Rmt 3466.00
ii) 300 mm Rmt 3920.00
iii) 350 mm Rmt 4307.00
iv) 400 mm Rmt 5071.00
v) 450 mm Rmt 5792.00
vi) 500 mm Rmt 7023.00
vii) 600 mm Rmt 9187.00
viii) 700 mm Rmt 11945.00
ix) 800 mm Rmt 14580.00
x) 900 mm Rmt 18005.00
xi) 1000 mm Rmt 22028.00
xii) 1100 mm Rmt 26438.00
xiii) 1200 mm Rmt 30736.00
xiv) 1300 mm Rmt 36510.00
xv) 1400 mm Rmt 42077.00
xvi) 1500 mm Rmt 47388.00
xvii) 1600 mm Rmt 52929.00
xviii) 1700 mm Rmt 59129.00
xix) 1800 mm Rmt 65454.00
235 Item No 235: Lowering, laying and jointing in proper grade Section - PDN
and alignment Bar wrapped steel cylinder pipes with B.W.S.C. Pipe
couplings & gasket including cost of conveyance from stores to (P.N. 1 to 20)
site of works, all labour involved, etc. complete (for all class of
pipes)
i) 250 mm Rmt 316.00
ii) 300 mm Rmt 328.00
iii) 350 mm Rmt 338.00
iv) 400 mm Rmt 384.00
v) 450 mm Rmt 395.00
vi) 500 mm Rmt 470.00
vii) 600 mm Rmt 520.00
viii) 700 mm Rmt 622.00
ix) 800 mm Rmt 719.00
x) 900 mm Rmt 789.00
xi) 1000 mm Rmt 890.00
xii) 1100 mm Rmt 977.00
xiii) 1200 mm Rmt 1077.00
xiv) 1300 mm Rmt 1195.00
xv) 1400 mm Rmt 1271.00
xvi) 1500 mm Rmt 1417.00
xvii) 1600 mm Rmt 1450.00
xviii) 1700 mm Rmt 1634.00
xix) 1800 mm Rmt 1667.00
xx) 1900 mm Rmt 1700.00
xxi) 2000 mm Rmt 1947.00
xxii) 2100 mm Rmt 1979.00
xxiii) 2200 mm Rmt 2011.00
91
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
236 Item No 236: Providing and supplying ISI mark Bar wrapped Section - PDN
steel cylinder pipes fitting/specials including loading, B.W.S.C. Pipe
unloading, trasnporatation upto departmental store, stacking (P.N. 1 to 20)
excluding GST levied by GOI & GOM in all respect.etc.complete.
237 Item No 237: Hydraulic testing of Bar wrapped steel cylinder Section - PDN
pipes to specified pressure including cost of all materials and B.W.S.C. Pipe
labour and water for testing for the length upto 1 km., using (P.N. 1 to 20)
reciprocating type pumps which should be able to provide
specified test pressure guages and other necessary equipments,
labour, operation charges, etc. required for testing. The rate
under this item shall also include cost of retesting, if necessary.
i) 250 mm Km 10206.95
ii) 300 mm Km 12323.40
iii) 350 mm Km 15291.20
iv) 400 mm Km 18782.00
v) 450 mm Km 22489.05
vi) 500 mm Km 26431.80
vii) 600 mm Km 31433.00
viii) 700 mm Km 37611.05
ix) 800 mm Km 44731.85
x) 900 mm Km 52770.00
xi) 1000 mm Km 61802.00
xii) 1100 mm Km 71751.00
xiii) 1200 mm Km 82643.00
xiv) 1300 mm Km 94477.00
xv) 1400 mm Km 107255.00
xvi) 1500 mm Km 124638.00
xvii) 1600 mm Km 140636.00
xviii) 1700 mm Km 156242.00
xix) 1800 mm Km 172790.00
xx) 1900 mm Km 190281.00
xxi) 2000 mm Km 208715.00
xxii) 2100 mm Km 228092.00
xxiii) 2200 mm Km 249079.00
92
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
VI. GLASS FIBRE REINFORCED PLASTIC PIPES (GRP)
238 Item No 238: Providing and supplying Glass fibre Section - PDN
reinforced plastic (GRP) pipes confirming to IS 14402 with G.R.P. Pipe
double bell REKA GRP coupling EPDM rubber gaskets for (P.N. 1 to 26)
sealing of following pressure diameter and stiffness class
including cost of all material and labour required, insurance,
transportation to store, unloading and stacking excluding GST
levied by GOI & GOM in all respect etc. complete.
A. Class (SN) 2500 (124 kpa)
a) 3 Kg/Sq.cm :
i) 300 mm Rmt 2728.00
ii) 350 mm Rmt 3154.00
iii) 400 mm Rmt 3473.00
iv) 450 mm Rmt 3906.00
v) 500 mm Rmt 4420.00
vi) 600 mm Rmt 5610.00
vii) 700 mm Rmt 6960.00
viii) 800 mm Rmt 8610.00
ix) 900 mm Rmt 10512.00
x) 1000 mm Rmt 12468.00
xi) 1100 mm Rmt 15180.00
xii) 1200 mm Rmt 17700.00
xiii) 1300 mm Rmt 20028.00
xiv) 1400 mm Rmt 23160.00
xv) 1500 mm Rmt 26316.00
xvi) 1600 mm Rmt 30660.00
xvii) 1700 mm Rmt 36696.00
xviii) 1800 mm Rmt 40040.00
xix) 1900 mm Rmt 44760.00
xx) 2000 mm Rmt 48384.00
xxi) 2100 mm Rmt 54103.00
xxii) 2200 mm Rmt 58080.00
xxiii) 2300 mm Rmt 62760.00
xiv) 2400 mm Rmt 67080.00
xxv) 2500 mm Rmt 73002.00
xxvi) 2600 mm Rmt 79152.00
xxvii) 2700 mm Rmt 84480.00
xxviii) 2800 mm Rmt 90660.00
xxix) 2900 mm Rmt 97050.00
xxx) 3000 mm Rmt 103428.00
b) 6 Kg/Sq.cm :
i) 300 mm Rmt 2832.00
ii) 350 mm Rmt 3235.00
iii) 400 mm Rmt 3636.00
iv) 450 mm Rmt 4036.00
v) 500 mm Rmt 4502.00
vi) 600 mm Rmt 5843.00
vii) 700 mm Rmt 7303.00
viii) 800 mm Rmt 8959.00
ix) 900 mm Rmt 10932.00
x) 1000 mm Rmt 13014.00
xi) 1100 mm Rmt 15780.00
xii) 1200 mm Rmt 18302.00
xiii) 1300 mm Rmt 20934.00
xiv) 1400 mm Rmt 23974.00
xv) 1500 mm Rmt 27360.00
xvi) 1600 mm Rmt 31944.00
xvii) 1700 mm Rmt 38185.00
xviii) 1800 mm Rmt 41586.00
93
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xix) 1900 mm Rmt 46560.00
xx) 2000 mm Rmt 50384.00
xxi) 2100 mm Rmt 56220.00
xxii) 2200 mm Rmt 60612.00
xxiii) 2300 mm Rmt 65304.00
xiv) 2400 mm Rmt 69742.00
xxv) 2500 mm Rmt 77298.00
xxvi) 2600 mm Rmt 83100.00
xxvii) 2700 mm Rmt 89022.00
xxviii) 2800 mm Rmt 95280.00
xxix) 2900 mm Rmt 102264.00
xxx) 3000 mm Rmt 109260.00
c) 9 Kg/Sq.cm :
i) 300 mm Rmt 2922.00
ii) 350 mm Rmt 3394.00
iii) 400 mm Rmt 3784.00
iv) 450 mm Rmt 4290.00
v) 500 mm Rmt 4502.00
vi) 600 mm Rmt 6194.00
vii) 700 mm Rmt 7752.00
viii) 800 mm Rmt 9703.00
ix) 900 mm Rmt 11826.00
x) 1000 mm Rmt 14040.00
xi) 1100 mm Rmt 16978.00
xii) 1200 mm Rmt 19744.00
xiii) 1300 mm Rmt 22800.00
xiv) 1400 mm Rmt 26225.00
xv) 1500 mm Rmt 29778.00
xvi) 1600 mm Rmt 34788.00
xvii) 1700 mm Rmt 41736.00
xviii) 1800 mm Rmt 45624.00
xix) 1900 mm Rmt 50734.00
xx) 2000 mm Rmt 55020.00
xxi) 2100 mm Rmt 61272.00
xxii) 2200 mm Rmt 65904.00
xxiii) 2300 mm Rmt 71144.00
xiv) 2400 mm Rmt 76738.00
xxv) 2500 mm Rmt 87755.00
xxvi) 2600 mm Rmt 95170.00
xxvii) 2700 mm Rmt 101940.00
xxviii) 2800 mm Rmt 109440.00
xxix) 2900 mm Rmt 117132.00
xxx) 3000 mm Rmt 124800.00
94
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
d) 12 Kg/Sq.cm :
i) 300 mm Rmt 3095.00
ii) 350 mm Rmt 3571.00
iii) 400 mm Rmt 3978.00
iv) 450 mm Rmt 4770.00
v) 500 mm Rmt 4502.00
vi) 600 mm Rmt 6666.00
vii) 700 mm Rmt 8280.00
viii) 800 mm Rmt 10296.00
ix) 900 mm Rmt 12634.00
x) 1000 mm Rmt 15076.00
xi) 1100 mm Rmt 18516.00
xii) 1200 mm Rmt 21600.00
xiii) 1300 mm Rmt 24468.00
xiv) 1400 mm Rmt 28195.00
xv) 1500 mm Rmt 32238.00
xvi) 1600 mm Rmt 37438.00
xvii) 1700 mm Rmt 44951.00
xviii) 1800 mm Rmt 49320.00
xix) 1900 mm Rmt 54598.00
xx) 2000 mm Rmt 59388.00
xxi) 2100 mm Rmt 66204.00
xxii) 2200 mm Rmt 71422.00
xxiii) 2300 mm Rmt 79452.00
xiv) 2400 mm Rmt 86154.00
xxv) 2500 mm Rmt 116467.00
xxvi) 2600 mm Rmt 125350.00
xxvii) 2700 mm Rmt 134244.00
xxviii) 2800 mm Rmt 144174.00
xxix) 2900 mm Rmt 158202.00
xxx) 3000 mm Rmt 163136.00
e) 15 Kg/Sq.cm :
i) 300 mm Rmt 3222.00
ii) 350 mm Rmt 3721.00
iii) 400 mm Rmt 4140.00
iv) 450 mm Rmt 4770.00
v) 500 mm Rmt 5483.00
vi) 600 mm Rmt 7164.00
vii) 700 mm Rmt 8916.00
viii) 800 mm Rmt 11160.00
ix) 900 mm Rmt 13795.00
x) 1000 mm Rmt 16380.00
xi) 1100 mm Rmt 20122.00
xii) 1200 mm Rmt 23359.00
xiii) 1300 mm Rmt 26950.00
xiv) 1400 mm Rmt 30864.00
xv) 1500 mm Rmt 35052.00
xvi) 1600 mm Rmt 40680.00
xvii) 1700 mm Rmt 49584.00
xviii) 1800 mm Rmt 54154.00
xix) 1900 mm Rmt 60492.00
xx) 2000 mm Rmt 65874.00
xxi) 2100 mm Rmt 75588.00
95
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xxii) 2200 mm Rmt 81779.00
xxiii) 2300 mm Rmt 88236.00
xiv) 2400 mm Rmt 94212.00
xxv) 2500 mm Rmt 128114.00
xxvi) 2600 mm Rmt 137885.00
xxvii) 2700 mm Rmt 147668.00
xxviii) 2800 mm Rmt 158592.00
xxix) 2900 mm Rmt 174022.00
xxx) 3000 mm Rmt 179450.00
B. Class (SN) 5000 (248 kpa)
a) 3 Kg/Sq.cm :
i) 300 mm Rmt 2923.20
ii) 350 mm Rmt 3429.60
iii) 400 mm Rmt 3854.40
iv) 450 mm Rmt 4394.40
v) 500 mm Rmt 4917.60
vi) 600 mm Rmt 6328.80
vii) 700 mm Rmt 7904.40
viii) 800 mm Rmt 9828.00
ix) 900 mm Rmt 12140.40
x) 1000 mm Rmt 14446.80
xi) 1100 mm Rmt 17539.20
xii) 1200 mm Rmt 20569.20
xiii) 1300 mm Rmt 23558.40
xiv) 1400 mm Rmt 26918.40
xv) 1500 mm Rmt 30760.80
xvi) 1600 mm Rmt 35766.00
xvii) 1700 mm Rmt 42922.80
xviii) 1800 mm Rmt 47042.40
xix) 1900 mm Rmt 52381.20
xx) 2000 mm Rmt 57010.80
xxi) 2100 mm Rmt 63454.80
xxii) 2200 mm Rmt 68498.40
xxiii) 2300 mm Rmt 75998.40
xiv) 2400 mm Rmt 82118.40
xxv) 2500 mm Rmt 88476.00
xxvi) 2600 mm Rmt 95037.60
xxvii) 2700 mm Rmt 102194.40
xxviii) 2800 mm Rmt 109234.80
xxix) 2900 mm Rmt 117213.60
xxx) 3000 mm Rmt 125232.00
b) 6 Kg/Sq.cm :
i) 300 mm Rmt 2968.80
ii) 350 mm Rmt 3488.40
iii) 400 mm Rmt 3854.40
iv) 450 mm Rmt 4394.40
v) 500 mm Rmt 5061.60
vi) 600 mm Rmt 6466.80
vii) 700 mm Rmt 8109.60
viii) 800 mm Rmt 10066.80
ix) 900 mm Rmt 12438.00
x) 1000 mm Rmt 14774.40
xi) 1100 mm Rmt 18097.20
xii) 1200 mm Rmt 21046.80
xiii) 1300 mm Rmt 24188.40
xiv) 1400 mm Rmt 27598.80
xv) 1500 mm Rmt 31480.80
xvi) 1600 mm Rmt 36651.60
xvii) 1700 mm Rmt 43974.00
xviii) 1800 mm Rmt 48181.20
96
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xix) 1900 mm Rmt 53692.80
xx) 2000 mm Rmt 58538.40
xxi) 2100 mm Rmt 65100.00
xxii) 2200 mm Rmt 70384.80
xxiii) 2300 mm Rmt 78056.40
xiv) 2400 mm Rmt 84027.60
xxv) 2500 mm Rmt 90754.80
xxvi) 2600 mm Rmt 98106.00
xxvii) 2700 mm Rmt 105141.60
xxviii) 2800 mm Rmt 112579.20
xxix) 2900 mm Rmt 120685.20
xxx) 3000 mm Rmt 128832.00
c) 9 Kg/Sq.cm :
i) 300 mm Rmt 3076.80
ii) 350 mm Rmt 3606.00
iii) 400 mm Rmt 4057.20
iv) 450 mm Rmt 4618.80
v) 500 mm Rmt 5284.80
vi) 600 mm Rmt 7179.60
vii) 700 mm Rmt 8505.60
viii) 800 mm Rmt 10992.00
ix) 900 mm Rmt 13006.80
x) 1000 mm Rmt 15526.80
xi) 1100 mm Rmt 20346.00
xii) 1200 mm Rmt 23643.60
xiii) 1300 mm Rmt 26520.00
xiv) 1400 mm Rmt 29760.00
xv) 1500 mm Rmt 34200.00
xvi) 1600 mm Rmt 38520.00
xvii) 1700 mm Rmt 46440.00
xviii) 1800 mm Rmt 50548.80
xix) 1900 mm Rmt 55104.00
xx) 2000 mm Rmt 66120.00
xxi) 2100 mm Rmt 69900.00
xxii) 2200 mm Rmt 75588.00
xxiii) 2300 mm Rmt 85320.00
xiv) 2400 mm Rmt 91812.00
xxv) 2500 mm Rmt 96148.80
xxvi) 2600 mm Rmt 103813.20
xxvii) 2700 mm Rmt 111145.20
xxviii) 2800 mm Rmt 117000.00
xxix) 2900 mm Rmt 126000.00
xxx) 3000 mm Rmt 133800.00
d) 12 Kg/Sq.cm :
i) 300 mm Rmt 3164.40
ii) 350 mm Rmt 3753.60
iii) 400 mm Rmt 4149.60
iv) 450 mm Rmt 4804.80
v) 500 mm Rmt 5486.40
vi) 600 mm Rmt 7245.60
vii) 700 mm Rmt 9024.00
viii) 800 mm Rmt 11114.40
ix) 900 mm Rmt 13936.80
x) 1000 mm Rmt 16401.60
xi) 1100 mm Rmt 20346.00
xii) 1200 mm Rmt 23643.60
xiii) 1300 mm Rmt 27097.20
xiv) 1400 mm Rmt 31090.80
xv) 1500 mm Rmt 35298.00
xvi) 1600 mm Rmt 39616.80
97
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xvii) 1700 mm Rmt 49148.40
xviii) 1800 mm Rmt 52868.40
xix) 1900 mm Rmt 58753.20
xx) 2000 mm Rmt 71310.00
xxi) 2100 mm Rmt 76423.20
xxii) 2200 mm Rmt 82159.20
xxiii) 2300 mm Rmt 93903.60
xiv) 2400 mm Rmt 99160.80
xxiii) 2500 mm Rmt 149779.20
xiv) 2600 mm Rmt 160312.80
xxiii) 2700 mm Rmt 172256.40
xiv) 2800 mm Rmt 183914.40
xxiii) 2900 mm Rmt 197270.40
xiv) 3000 mm Rmt 209792.40
e) 15 Kg/Sq.cm :
i) 300 mm Rmt 3278.40
ii) 350 mm Rmt 3901.20
iii) 400 mm Rmt 4362.00
iv) 450 mm Rmt 5036.40
v) 500 mm Rmt 5748.00
vi) 600 mm Rmt 7508.40
vii) 700 mm Rmt 9495.60
viii) 800 mm Rmt 11859.60
ix) 900 mm Rmt 14679.60
x) 1000 mm Rmt 17514.00
xi) 1100 mm Rmt 21487.20
xii) 1200 mm Rmt 25177.20
xiii) 1300 mm Rmt 28610.40
xiv) 1400 mm Rmt 33061.20
xv) 1500 mm Rmt 37587.60
xvi) 1600 mm Rmt 42338.40
xvii) 1700 mm Rmt 51094.80
xviii) 1800 mm Rmt 55234.80
xix) 1900 mm Rmt 64256.40
xx) 2000 mm Rmt 74568.00
xxi) 2100 mm Rmt 81646.80
xxii) 2200 mm Rmt 85537.20
xxiii) 2300 mm Rmt 97746.00
xiv) 2400 mm Rmt 106800.00
98
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
xxiii) 2500 mm Rmt 164756.40
xiv) 2600 mm Rmt 176344.80
xxiii) 2700 mm Rmt 189482.40
xiv) 2800 mm Rmt 202305.60
xxiii) 2900 mm Rmt 216997.20
xiv) 3000 mm Rmt 230772.00
239 Item No 239: Lowering, laying and jointing in proper grade Section - PDN
and alignment Glass fibre reinforced plastic (GRP) pipes G.R.P. Pipe
with couplings & gasket including cost of conveyance from (P.N. 1 to 26)
stores to site of works, all labour involved, etc. complete (for all
class of pipes)
i) 300 mm Rmt 216.00
ii) 350 mm Rmt 216.00
iii) 400 mm Rmt 216.00
iv) 450 mm Rmt 216.00
v) 500 mm Rmt 216.00
vi) 600 mm Rmt 231.00
vii) 700 mm Rmt 231.00
viii) 800 mm Rmt 269.00
ix) 900 mm Rmt 336.00
x) 1000 mm Rmt 336.00
xi) 1100 mm Rmt 363.00
xii) 1200 mm Rmt 365.00
xiii) 1300 mm Rmt 402.00
xiv) 1400 mm Rmt 426.00
xv) 1500 mm Rmt 523.00
xvi) 1600 mm Rmt 526.00
xvii) 1700 mm Rmt 578.00
xviii) 1800 mm Rmt 617.00
xix) 1900 mm Rmt 615.00
xx) 2000 mm Rmt 631.00
xxi) 2100 mm Rmt 712.00
xxii) 2200 mm Rmt 768.00
xxiii) 2300 mm Rmt 929.00
xiv) 2400 mm Rmt 943.00
xxv) 2500 mm Rmt 1064.00
xxvi) 2600 mm Rmt 1064.00
xxvii) 2700 mm Rmt 1064.00
xxviii) 2800 mm Rmt 1064.00
xxix) 2900 mm Rmt 1064.00
xxx) 3000 mm Rmt 1064.00
240 Item No 240: Providing and supplying ISI mark Glass fibre Section - PDN
reinforced plastic pipes (GRP) fitting/specials including G.R.P. Pipe
loading, unloading, transportation upto departmental store, (P.N. 1 to 26)
stacking excluding GST levied by GOI & GOM in all
respect.etc.complete.
i) 90 DRG Bend with one coupling One 7 times x Pipe
Bend Per Mtr Price
ii) 60 DRG Bend with one coupling One 5 times x Pipe
Bend Per Mtr Price
99
Sr. Description Specification Unit Rate
No. Ref. No. (in Rs.)
2021-22
1 2 3 4 5
iii) 45 DRG Bend with one coupling One 4 times x Pipe
Bend Per Mtr Price
iv) 30 DRG Bend with one coupling One 3 times x Pipe
Bend Per Mtr Price
v) 22.5 DRG Bend with one coupling One 2.5 times x
Bend Pipe Per Mtr
Price
vi) 11.25 DRG Bend with one coupling One 2 times x Pipe
Bend Per Mtr Price
vii) GRP Equal Tee One Tee 5 times x Pipe
Per Mtr Price
viii) Flange Tail Piece (Length 0.65 m) One 4 times x Pipe
Flange Per Mtr Price
ix) Lamination joint (Butt strap joint) One 1.5 times x
joint Pipe Per Mtr
Price
x) GRP Double bell coupling One 1.5 times x
coupling Pipe Per Mtr
Price
241 Item No 241: Hydraulic testing of Glass fibre reinforced Section - PDN
plastic (GRP) pipes to specified pressure including cost of all G.R.P. Pipe
materials and labour and water for testing for the length upto 1 (P.N. 1 to 26)
km., using reciprocating type pumps which should be able to
provide specified test pressure guages and other necessary
equipments, labour, operation charges, etc. required for testing.
The rate under this item shall also include cost of retesting, if
necessary.
i) 300 mm Km 12323.40
ii) 350 mm Km 15291.20
iii) 400 mm Km 18782.00
iv) 450 mm Km 22489.05
v) 500 mm Km 26431.80
vi) 600 mm Km 31433.00
vii) 700 mm Km 37611.05
viii) 800 mm Km 44731.85
ix) 900 mm Km 52770.00
x) 1000 mm Km 61802.00
xi) 1100 mm Km 71751.00
xii) 1200 mm Km 82643.00
xiii) 1300 mm Km 94477.00
xiv) 1400 mm Km 107255.00
xv) 1500 mm Km 124638.00
xvi) 1600 mm Km 140636.00
xvii) 1700 mm Km 156242.00
xviii) 1800 mm Km 172790.00
xix) 1900 mm Km 190281.00
xx) 2000 mm Km 208715.00
xxi) 2100 mm Km 228092.00
xxii) 2200 mm Km 249079.00
xxiii) 2300 mm Km 270342.00
xiv) 2400 mm Km 292547.00
xxv) 2500 mm Km 315695.00
xxvi) 2600 mm Km 339785.00
xxvii) 2700 mm Km 364818.00
xxviii) 2800 mm Km 390794.00
xxix) 2900 mm Km 417713.00
xxx) 3000 mm Km 445575.00
100
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
VII. H.D.P.E. PIPES
242 Item No 242: Providing and supplying in standard lengths Section - PDN
Polyethelene Pipes, confirming to IS 4984 /14151 / 12786 / H.D.P.E. Pipe
13488 with nesessary jointing material like mechanical connector (P.N. 1 to 28)
i.e. thread / insert joint / quick release coupler joint / compression
fitting joint or flanged joint excluding coupler/specials, including
transportation and freight charges, inspection charges, loading /
unloading charges, conveyance to the departmental stores &
stacking the same in closed shade duly protecting from sunrays &
rains, excluding GST levied by GI & GOM in all respect etc.
complete.
a) PE-100 : 4 Kg/Sq.cm
1 75 mm Rmt 91.00
2 90 mm Rmt 133.00
3 110 mm Rmt 195.00
4 125 mm Rmt 248.00
5 140 mm Rmt 313.00
6 160 mm Rmt 408.00
7 180 mm Rmt 514.00
8 200 mm Rmt 616.00
9 225 mm Rmt 801.00
10 250 mm Rmt 982.00
11 280 mm Rmt 1232.00
12 315 mm Rmt 1562.00
13 355 mm Rmt 1978.00
14 400 mm Rmt 2510.00
15 450 mm Rmt 3381.00
16 500 mm Rmt 4161.00
17 560 mm Rmt 5214.00
18 630 mm Rmt 6586.00
19 710 mm Rmt 8400.00
20 800 mm Rmt 10631.00
21 900 mm Rmt 13435.00
22 1000 mm Rmt 16567.00
23 1200 mm Rmt 23875.00
b) PE-100 : 6 Kg/Sq.cm
1 75 mm Rmt 139.00
2 90 mm Rmt 196.00
3 110 mm Rmt 302.00
4 125 mm Rmt 381.00
5 140 mm Rmt 478.00
6 160 mm Rmt 626.00
7 180 mm Rmt 787.00
8 200 mm Rmt 975.00
9 225 mm Rmt 1230.00
10 250 mm Rmt 1517.00
11 280 mm Rmt 1893.00
12 315 mm Rmt 2388.00
13 355 mm Rmt 3030.00
14 400 mm Rmt 3856.00
101
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
15 450 mm Rmt 4501.00
16 500 mm Rmt 6416.00
17 560 mm Rmt 8030.00
18 630 mm Rmt 10144.00
19 710 mm Rmt 12917.00
20 800 mm Rmt 16353.00
21 900 mm Rmt 20715.00
22 1000 mm Rmt 25593.00
23 1200 mm Rmt 36808.00
c) PE-100 : 8 Kg/Sq.cm
1 75 mm Rmt 171.00
2 90 mm Rmt 240.00
3 110 mm Rmt 361.00
4 125 mm Rmt 463.00
5 140 mm Rmt 581.00
6 160 mm Rmt 762.00
7 180 mm Rmt 961.00
8 200 mm Rmt 1181.00
9 225 mm Rmt 1492.00
10 250 mm Rmt 1836.00
11 280 mm Rmt 2307.00
12 315 mm Rmt 2923.00
13 355 mm Rmt 3700.00
14 400 mm Rmt 4708.00
15 450 mm Rmt 6368.00
16 500 mm Rmt 7873.00
17 560 mm Rmt 9857.00
18 630 mm Rmt 12463.00
19 710 mm Rmt 15879.00
20 800 mm Rmt 20151.00
21 900 mm Rmt 25509.00
22 1000 mm Rmt 31498.00
23 1200 mm Rmt 45312.00
d) PE-100 : 10 Kg/Sq.cm
1 75 mm Rmt 208.00
2 90 mm Rmt 299.00
3 110 mm Rmt 440.00
4 125 mm Rmt 565.00
5 140 mm Rmt 710.00
6 160 mm Rmt 930.00
7 180 mm Rmt 1176.00
8 200 mm Rmt 1446.00
9 225 mm Rmt 1834.00
10 250 mm Rmt 2252.00
11 280 mm Rmt 2831.00
12 315 mm Rmt 3581.00
13 355 mm Rmt 4569.00
14 400 mm Rmt 5786.00
15 450 mm Rmt 7763.00
16 500 mm Rmt 9592.00
17 560 mm Rmt 12021.00
18 630 mm Rmt 15224.00
19 710 mm Rmt 19307.00
20 800 mm Rmt 24548.00
21 900 mm Rmt 31032.00
22 1000 mm Rmt 38344.00
23 1200 mm Rmt 55178.00
102
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
e) PE-100 : 12.5 Kg/Sq.cm
1 75 mm Rmt 250.00
2 90 mm Rmt 356.00
3 110 mm Rmt 530.00
4 125 mm Rmt 688.00
5 140 mm Rmt 864.00
6 160 mm Rmt 1138.00
7 180 mm Rmt 1421.00
8 200 mm Rmt 1752.00
9 225 mm Rmt 2217.00
10 250 mm Rmt 2738.00
11 280 mm Rmt 3430.00
12 315 mm Rmt 4363.00
13 355 mm Rmt 5504.00
14 400 mm Rmt 6986.00
15 450 mm Rmt 9583.00
16 500 mm Rmt 11624.00
17 560 mm Rmt 14559.00
18 630 mm Rmt 18430.00
19 710 mm Rmt 23425.00
20 800 mm Rmt 29737.00
21 900 mm Rmt 37632.00
22 1000 mm Rmt 46410.00
23 1200 mm Rmt 66831.00
f) PE-100 : 16 Kg/Sq.cm
1 75 mm Rmt 316.00
2 90 mm Rmt 425.00
3 110 mm Rmt 636.00
4 125 mm Rmt 817.00
5 140 mm Rmt 1029.00
6 160 mm Rmt 1341.00
7 180 mm Rmt 1693.00
8 200 mm Rmt 2108.00
9 225 mm Rmt 2638.00
10 250 mm Rmt 3260.00
11 280 mm Rmt 4094.00
12 315 mm Rmt 5168.00
13 355 mm Rmt 6576.00
14 400 mm Rmt 8346.00
15 450 mm Rmt 11222.00
16 500 mm Rmt 13866.00
17 560 mm Rmt 17391.00
18 630 mm Rmt 21989.00
19 710 mm Rmt 27932.00
20 800 mm Rmt 35459.00
21 900 mm Rmt 44868.00
22 1000 mm Rmt 55425.00
243 Item No 243: Lowering, Laying and Jointing H. D. P. E pipes Section - PDN
in proper position including all specials by compression H.D.P.E. Pipe
fitting/electrofusion and butt fusion jointing procedure as per (P.N. 1 to 28)
relevent IS Code complete with all materials for jointing procedure
like Electrofusion machine, Electric heater/butt fusion welding
machine with hydraulic jack, top loading clamp etc. and all labours
as directed by engineer in charge as per IS-7634 Part II For all
classes.
1 75 mm Rmt 57.00
2 90 mm Rmt 65.00
3 110 mm Rmt 70.00
103
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
4 125 mm Rmt 83.00
5 140 mm Rmt 95.00
6 160 mm Rmt 106.00
7 180 mm Rmt 112.00
8 200 mm Rmt 131.00
9 225 mm Rmt 164.00
10 250 mm Rmt 179.00
11 280 mm Rmt 218.00
12 315 mm Rmt 259.00
13 355 mm Rmt 301.00
14 400 mm Rmt 316.00
15 450 mm Rmt 332.00
16 500 mm Rmt 388.00
17 560 mm Rmt 406.00
18 630 mm Rmt 538.00
19 710 mm Rmt 561.00
20 800 mm Rmt 701.00
21 900 mm Rmt 934.00
22 1000 mm Rmt 971.00
23 1200 mm Rmt 1038.00
244 Item No 244: Providing and supplying ISI mark H. D. P. E Section - PDN
pipes fitting/specials including loading , unloading , H.D.P.E. Pipe
trasnporatation upto departmental store, stacking excluding GST (P.N. 1 to 28)
levied by GOI & GOM in all respect.etc.complete.
75 mm & above dia. Rmt 2 % of per
mtr. rate of
pipe
245 Item No 245: Hydraulic testing of H. D. P. E. pipe line to Section - PDN
specified pressure including cost of all materials and labour and H.D.P.E. Pipe
water for testing for specified length including cutting, placing end (P.N. 1 to 28)
cap making arrangement for filling safe water using reciprocating
type pumps which should be able to provide specified test
pressure gauges and other necessary equipments, labour,
operation charges, etc. required for testing. The rate under this
item shall also include cost of retesting, if necessary and
reinstating to original position.
1 75 mm Km 6813.45
2 90 mm Km 6960.20
3 110 mm Km 7188.80
4 125 mm Km 7385.05
5 140 mm Km 7964.25
6 160 mm Km 8287.20
7 180 mm Km 8647.80
8 200 mm Km 9046.15
9 225 mm Km 9597.10
10 250 mm Km 10206.95
11 280 mm Km 11016.60
12 315 mm Km 12788.30
13 355 mm Km 15467.40
14 400 mm Km 18782.00
15 450 mm Km 22489.05
16 500 mm Km 26431.80
17 560 mm Km 29550.00
18 630 mm Km 33187.40
19 710 mm Km 38280.70
20 800 mm Km 44731.85
21 900 mm Km 52770.00
22 1000 mm Km 61802.00
23 1200 mm Km 82643.00
104
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
VIII. PRE-STRESSED CONCRETE CYLINDER PIPES (PCC)
246 Item No 246: Providing and supplying Prestressed Concrete Section - PDN
Cylinder Pipes suitable for sliding ovrelap weld joint or confined P.C.C. Pipe
rubber ring joint with necessary rubber ring of following class (P.N. 1 to 20)
and diameter including cost of transportation, inspection charges
to store, transit insurance, unloading and stacking excluding GST
levied by GOI & GOM in all respect etc. complete.
105
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xiv) 1500 mm Rmt 26474.00
xv) 1600 mm Rmt 28231.00
xvi) 1700 mm Rmt 29987.00
xvii) 1800 mm Rmt 31744.00
xviii) 1900 mm Rmt 57876.00
xix) 2000 mm Rmt 62539.00
xx) 2100 mm Rmt 65333.00
xxi) 2200 mm Rmt 69011.00
c) Factory Test Pressure 7 kg/Sqcm
i) 350 mm Rmt 5186.00
ii) 400 mm Rmt 5737.00
iii) 450 mm Rmt 6310.00
iv) 500 mm Rmt 6887.00
v) 600 mm Rmt 8026.00
vi) 700 mm Rmt 9828.00
vii) 800 mm Rmt 11160.00
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 15619.00
x) 1100 mm Rmt 17316.00
xi) 1200 mm Rmt 19592.00
xii) 1300 mm Rmt 22158.00
xiii) 1400 mm Rmt 24352.00
xiv) 1500 mm Rmt 26513.00
xv) 1600 mm Rmt 28270.00
xvi) 1700 mm Rmt 30029.00
xvii) 1800 mm Rmt 31783.00
xviii) 1900 mm Rmt 58652.00
xix) 2000 mm Rmt 63440.00
xx) 2100 mm Rmt 66024.00
xxi) 2200 mm Rmt 70531.20
d) Factory Test Pressure 8.5 kg/Sqcm
i) 350 mm Rmt 5207.00
ii) 400 mm Rmt 5770.00
iii) 450 mm Rmt 6343.00
iv) 500 mm Rmt 6887.00
v) 600 mm Rmt 8098.00
vi) 700 mm Rmt 9943.00
vii) 800 mm Rmt 11319.00
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 15853.00
x) 1100 mm Rmt 17582.00
xi) 1200 mm Rmt 19933.00
xii) 1300 mm Rmt 22742.00
xiii) 1400 mm Rmt 24816.00
xiv) 1500 mm Rmt 26996.00
xv) 1600 mm Rmt 28752.00
xvi) 1700 mm Rmt 30509.00
xvii) 1800 mm Rmt 32264.00
xviii) 1900 mm Rmt 59435.00
xix) 2000 mm Rmt 65126.00
xx) 2100 mm Rmt 67765.00
xxi) 2200 mm Rmt 71642.00
e) Factory Test Pressure 10 kg/Sqcm
i) 350 mm Rmt 5225.00
ii) 400 mm Rmt 5792.00
iii) 450 mm Rmt 6383.00
iv) 500 mm Rmt 6904.00
v) 600 mm Rmt 8174.00
vi) 700 mm Rmt 10055.00
vii) 800 mm Rmt 11489.00
106
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 16085.00
x) 1100 mm Rmt 17850.00
xi) 1200 mm Rmt 20224.00
xii) 1300 mm Rmt 23148.00
xiii) 1400 mm Rmt 25290.00
xiv) 1500 mm Rmt 27491.00
xv) 1600 mm Rmt 29251.00
xvi) 1700 mm Rmt 31007.00
xvii) 1800 mm Rmt 32762.00
xviii) 1900 mm Rmt 61014.00
xix) 2000 mm Rmt 66028.00
xx) 2100 mm Rmt 68977.00
xxi) 2200 mm Rmt 72887.00
f) Factory Test Pressure 11.5 kg/Sqcm
i) 350 mm Rmt 5246.00
ii) 400 mm Rmt 5828.00
iii) 450 mm Rmt 6400.00
iv) 500 mm Rmt 6965.00
v) 600 mm Rmt 8256.00
vi) 700 mm Rmt 10169.00
vii) 800 mm Rmt 11762.00
viii) 900 mm Rmt 12833.00
ix) 1000 mm Rmt 16321.00
x) 1100 mm Rmt 18120.00
xi) 1200 mm Rmt 20564.00
xii) 1300 mm Rmt 23558.00
xiii) 1400 mm Rmt 25770.00
xiv) 1500 mm Rmt 27991.00
xv) 1600 mm Rmt 29747.00
xvi) 1700 mm Rmt 31504.00
xvii) 1800 mm Rmt 33260.00
xviii) 1900 mm Rmt 61990.00
xix) 2000 mm Rmt 67052.00
xx) 2100 mm Rmt 71346.00
g) Factory Test Pressure 13 kg/Sqcm
i) 350 mm Rmt 5287.00
ii) 400 mm Rmt 5876.00
iii) 450 mm Rmt 6457.00
iv) 500 mm Rmt 7004.00
v) 600 mm Rmt 8335.00
vi) 700 mm Rmt 10284.00
vii) 800 mm Rmt 11910.00
viii) 900 mm Rmt 13872.00
ix) 1000 mm Rmt 16663.00
x) 1100 mm Rmt 18432.00
xi) 1200 mm Rmt 20904.00
xii) 1300 mm Rmt 23974.00
xiii) 1400 mm Rmt 26243.00
xiv) 1500 mm Rmt 28487.00
xv) 1600 mm Rmt 30244.00
xvi) 1700 mm Rmt 31999.00
xvii) 1800 mm Rmt 33742.00
xviii) 1900 mm Rmt 62846.00
xix) 2000 mm Rmt 68078.00
xx) 2100 mm Rmt 72662.00
h) Factory Test Pressure 14.5 kg/Sqcm
i) 350 mm Rmt 5333.00
ii) 400 mm Rmt 5929.00
iii) 450 mm Rmt 6496.00
107
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
iv) 500 mm Rmt 7064.00
v) 600 mm Rmt 8420.00
vi) 700 mm Rmt 10478.00
vii) 800 mm Rmt 12073.00
viii) 900 mm Rmt 14018.00
ix) 1000 mm Rmt 16895.00
x) 1100 mm Rmt 18700.00
xi) 1200 mm Rmt 21245.00
xii) 1300 mm Rmt 24382.00
xiii) 1400 mm Rmt 27427.00
xiv) 1500 mm Rmt 29722.00
xv) 1600 mm Rmt 31480.00
xvi) 1700 mm Rmt 33235.00
xvii) 1800 mm Rmt 34991.00
xviii) 1900 mm Rmt 64741.00
xix) 2000 mm Rmt 70685.00
xx) 2100 mm Rmt 73985.00
i) Factory Test Pressure 17 kg/Sqcm
i) 350 mm Rmt 5375.00
ii) 400 mm Rmt 5984.00
iii) 450 mm Rmt 6572.00
iv) 500 mm Rmt 7145.00
v) 600 mm Rmt 8530.00
vi) 700 mm Rmt 10520.00
vii) 800 mm Rmt 12302.00
viii) 900 mm Rmt 14423.00
ix) 1000 mm Rmt 17154.00
x) 1100 mm Rmt 19147.00
xi) 1200 mm Rmt 21779.00
xii) 1300 mm Rmt 24798.00
xiii) 1400 mm Rmt 27955.00
xiv) 1500 mm Rmt 30276.00
xv) 1600 mm Rmt 32032.00
xvi) 1700 mm Rmt 33790.00
xvii) 1800 mm Rmt 35545.00
xviii) 1900 mm Rmt 66893.00
xix) 2000 mm Rmt 72698.00
xx) 2100 mm Rmt 77002.00
108
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
j) Factory Test Pressure 18.5 kg/Sqcm
i) 350 mm Rmt 5416.00
ii) 400 mm Rmt 6025.00
iii) 450 mm Rmt 6629.00
iv) 500 mm Rmt 7204.00
v) 600 mm Rmt 8638.00
vi) 700 mm Rmt 10652.00
vii) 800 mm Rmt 12466.00
viii) 900 mm Rmt 14605.00
ix) 1000 mm Rmt 17448.00
x) 1100 mm Rmt 19459.00
xi) 1200 mm Rmt 22646.00
xii) 1300 mm Rmt 25990.00
xiii) 1400 mm Rmt 28681.00
xiv) 1500 mm Rmt 30407.00
xv) 1600 mm Rmt 32165.00
xvi) 1700 mm Rmt 33922.00
xvii) 1800 mm Rmt 35677.00
xviii) 1900 mm Rmt 68916.00
xix) 2000 mm Rmt 74569.00
xx) 2100 mm Rmt 79225.00
k) Factory Test Pressure 20 kg/Sqcm
i) 350 mm Rmt 5459.00
ii) 400 mm Rmt 6060.00
iii) 450 mm Rmt 6666.00
iv) 500 mm Rmt 7264.00
v) 600 mm Rmt 8744.00
vi) 700 mm Rmt 10782.00
vii) 800 mm Rmt 12629.00
viii) 900 mm Rmt 14786.00
ix) 1000 mm Rmt 17750.00
x) 1100 mm Rmt 20161.00
xi) 1200 mm Rmt 23395.00
xii) 1300 mm Rmt 26549.00
xiii) 1400 mm Rmt 29315.00
xiv) 1500 mm Rmt 31068.00
xv) 1600 mm Rmt 32825.00
xvi) 1700 mm Rmt 34582.00
xvii) 1800 mm Rmt 36337.00
xviii) 1900 mm Rmt 69874.00
xix) 2000 mm Rmt 76697.00
xx) 2100 mm Rmt 81354.00
l) Factory Test Pressure 21.5 kg/Sqcm
i) 350 mm Rmt 5508.00
ii) 400 mm Rmt 6112.00
iii) 450 mm Rmt 6724.00
iv) 500 mm Rmt 7322.00
v) 600 mm Rmt 8873.00
vi) 700 mm Rmt 11000.00
vii) 800 mm Rmt 12758.00
viii) 900 mm Rmt 15049.00
ix) 1000 mm Rmt 18260.00
x) 1100 mm Rmt 20509.00
xi) 1200 mm Rmt 23774.00
xii) 1300 mm Rmt 27166.00
xiii) 1400 mm Rmt 30924.00
xiv) 1500 mm Rmt 32747.00
xv) 1600 mm Rmt 34507.00
xvi) 1700 mm Rmt 36263.00
xvii) 1800 mm Rmt 38380.00
109
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
xviii) 1900 mm Rmt 72342.00
xix) 2000 mm Rmt 79040.00
m) Factory Test Pressure 23 kg/Sqcm
i) 350 mm Rmt 5549.00
ii) 400 mm Rmt 6146.00
iii) 450 mm Rmt 6762.00
iv) 500 mm Rmt 7384.00
v) 600 mm Rmt 9059.00
vi) 700 mm Rmt 11185.00
vii) 800 mm Rmt 13040.00
viii) 900 mm Rmt 15374.00
ix) 1000 mm Rmt 18666.00
x) 1100 mm Rmt 20873.00
xi) 1200 mm Rmt 24421.00
xii) 1300 mm Rmt 27936.00
xiii) 1400 mm Rmt 31776.00
xiv) 1500 mm Rmt 33344.00
xv) 1600 mm Rmt 35102.00
xvi) 1700 mm Rmt 36859.00
xvii) 1800 mm Rmt 38612.00
xviii) 1900 mm Rmt 74602.00
xix) 2000 mm Rmt 79298.00
n) Factory Test Pressure 24.5 kg/Sqcm
i) 350 mm Rmt 5592.00
ii) 400 mm Rmt 6181.00
iii) 450 mm Rmt 6820.00
iv) 500 mm Rmt 7423.00
v) 600 mm Rmt 9422.00
vi) 700 mm Rmt 11339.00
vii) 800 mm Rmt 13086.00
viii) 900 mm Rmt 15764.00
ix) 1000 mm Rmt 18956.00
x) 1100 mm Rmt 21413.00
xi) 1200 mm Rmt 25646.00
xii) 1300 mm Rmt 30151.00
xiii) 1400 mm Rmt 32099.00
xiv) 1500 mm Rmt 33970.00
xv) 1600 mm Rmt 35726.00
xvi) 1700 mm Rmt 37481.00
xvii) 1800 mm Rmt 39239.00
247 Item No 247: Lowering, Laying and Jointing in proper grade Section - PDN
and alignment Prestressed Concrete Cylinder Pipes (PCCP) P.C.C. Pipe
with welding & mortor coating joints including cost of conveyance (P.N. 1 to 20)
from stores to site of works, loading, unloading, hoisting, all
labour involved,etc.complete but excluding cost of rubber rings
(For all class of pipes)
110
Rate
Sr. Specification
Description Unit (in Rs.)
No. Ref. No.
2021-22
1 2 3 4 5
iii) 450 mm Rmt 395.00
iv) 500 mm Rmt 470.00
v) 600 mm Rmt 520.00
vi) 700 mm Rmt 622.00
vii) 800 mm Rmt 719.00
viii) 900 mm Rmt 789.00
ix) 1000 mm Rmt 890.00
x) 1100 mm Rmt 977.00
xi) 1200 mm Rmt 1077.00
xii) 1300 mm Rmt 1195.00
xiii) 1400 mm Rmt 1271.00
xiv) 1500 mm Rmt 1417.00
xv) 1600 mm Rmt 1450.00
xvi) 1700 mm Rmt 1634.00
xvii) 1800 mm Rmt 1667.00
xviii) 1900 mm Rmt 1700.00
xix) 2000 mm Rmt 1947.00
xx) 2100 mm Rmt 1979.00
xxi) 2200 mm Rmt 2011.00
248 Item No 248: Providing and supplying ISI standard specials Section - PDN
& fitting suitable for P. C. C. pipes including cost of labour P.C.C. Pipe
,materials, and transportation to stores / site, loading and (P.N. 1 to 20)
unloading excluding GST levied by GOI & GOM in all respect,
complete.
i) above 300 mm dia. kg 107.00
111
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
250 Item No 250: Providing, supplying & erecting of As Directed
approved make CI D/F reflux valves (non-return valves by Engineer-
) of following dia with technical specifications as below In-Charge
i. Design, manfacturing & testing standard IS 5312 Part
1 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.Reflux valves as per I.S.5312 Part
I (1984)
112
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
d) With by pass arrangement - PN-1.6
1 100 mm 8370 1366 9736
2 150 mm 16596 1366 17962
3 200 mm 23812 1366 25178
4 250 mm 31028 5577 36605
5 300 mm 50511 5577 56088
6 350 mm 75044 5577 80621
7 400 mm 98135 5577 103712
8 450 mm 129884 10594 140478
9 500 mm 158748 10594 169342
10 600 mm 230906 10594 241500
251 Item No 251: Providing, supplying & erecting of As Directed
approved make multi door CI D/F reflux valves (non- by Engineer-
return valves ) of following dia with technical In-Charge
specifications as below
i. Design, manfacturing & testing standard IS 5312 Part
2 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete. Reflux valves as per I.S.5312 Part
II (1984)
a) Without by pass arrangement -PN -1
1 700 mm 320513 19365 339878
2 750 mm 354550 19365 373915
3 800 mm 368732 19365 388097
4 900 mm 496370 19365 515735
5 1000 mm 581462 22083 603545
6 1100 mm 737464 22083 759547
7 1200 mm 907648 22083 929731
b) With by pass arrangement -PN -1
1 700 mm 339744 19365 359109
2 750 mm 375823 19365 395188
3 800 mm 390856 19365 410221
4 900 mm 526152 19365 545517
5 1000 mm 616350 22083 638433
6 1100 mm 781712 22083 803795
7 1200 mm 962107 22083 984190
c) Without by pass arrangement -PN -1.6
1 700 mm 358975 19365 378340
2 750 mm 397096 19365 416461
3 800 mm 412980 19365 432345
4 900 mm 555934 19365 575299
5 1000 mm 651237 22083 673320
6 1100 mm 825960 22083 848043
7 1200 mm 1016566 22083 1038649
113
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
d) With by pass arrangement -PN -1.6
1 700 mm 380513 19365 399878
2 750 mm 420922 19365 440287
3 800 mm 437759 19365 457124
4 900 mm 589290 19365 608655
5 1000 mm 690312 22083 712395
6 1100 mm 875517 22083 897600
7 1200 mm 1077560 22083 1099643
252 Item No 252: Providing, supplying & erecting of As Directed
approved make DI or SGI D/F reflux valves (non- by Engineer-
return valves ) of following dia with technical In-Charge
specifications as below
i. Design, manfacturing & testing standard IS 5312 Part
1 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete. Reflux valves as per I.S.5312 Part
I (1984)
a) Without by pass arrangement -PN -1
1 100 mm 8531 1366 9897
2 150 mm 16915 1366 18281
3 200 mm 24269 1366 25635
4 250 mm 31624 5577 37201
5 300 mm 51481 5577 57058
6 350 mm 76486 5577 82063
7 400 mm 100020 5577 105597
8 450 mm 132379 10594 142973
9 500 mm 161796 10594 172390
10 600 mm 235340 10594 245934
b) With by pass arrangement - PN-1
1 100 mm 9043 1366 10409
2 150 mm 17930 1366 19296
3 200 mm 25726 1366 27092
4 250 mm 33521 5577 39098
5 300 mm 54569 5577 60146
6 350 mm 81075 5577 86652
7 400 mm 106021 5577 111598
8 450 mm 140322 10594 150916
9 500 mm 171504 10594 182098
10 600 mm 249461 10594 260055
114
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
c) Without by pass arrangement - PN -1.6
1 100 mm 9555 1366 10921
2 150 mm 18945 1366 20311
3 200 mm 27182 1366 28548
4 250 mm 35419 5577 40996
5 300 mm 57658 5577 63235
6 350 mm 85664 5577 91241
7 400 mm 112022 5577 117599
8 450 mm 148264 10594 158858
9 500 mm 181212 10594 191806
10 600 mm 263581 10594 274175
d) With by pass arrangement - PN-1.6
1 100 mm 10128 1366 11494
2 150 mm 20082 1366 21448
3 200 mm 28813 1366 30179
4 250 mm 37544 5577 43121
5 300 mm 61118 5577 66695
6 350 mm 90804 5577 96381
7 400 mm 118743 5577 124320
8 450 mm 157160 10594 167754
9 500 mm 192085 10594 202679
10 600 mm 279396 10594 289990
253 Item No 253: Providing, supplying & erecting of As Directed
approved make multi door DI D/F reflux valves (non- by Engineer-
return valves ) of following dia with technical In-Charge
specifications as below
i. Design, manfacturing & testing standard IS 5312 Part
2 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.Reflux valves as per I.S.5312 Part
II (1984)
a) Without by pass arrangement -PN -1
1 700 mm 387821 19365 407186
2 750 mm 429006 19365 448371
3 800 mm 446166 19365 465531
4 900 mm 600608 19365 619973
5 1000 mm 703569 22083 725652
6 1100 mm 892331 22083 914414
7 1200 mm 1098254 22083 1120337
b) With by pass arrangement -PN -1
1 700 mm 411090 19365 430455
2 750 mm 454746 19365 474111
3 800 mm 472936 19365 492301
4 900 mm 636644 19365 656009
5 1000 mm 745783 22083 767866
6 1100 mm 945871 22083 967954
7 1200 mm 1164149 22083 1186232
115
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
c) Without by pass arrangement -PN -1.6
1 700 mm 434359 19365 453724
2 750 mm 480486 19365 499851
3 800 mm 499706 19365 519071
4 900 mm 672681 19365 692046
5 1000 mm 787997 22083 810080
6 1100 mm 999411 22083 1021494
7 1200 mm 1230045 22083 1252128
d) With by pass arrangement -PN -1.6
1 700 mm 460421 19365 479786
2 750 mm 509315 19365 528680
3 800 mm 529688 19365 549053
4 900 mm 713041 19365 732406
5 1000 mm 835277 22083 857360
6 1100 mm 1059376 22083 1081459
7 1200 mm 1303847 22083 1325930
254 Item No 254: Providing, supplying & erecting of As Directed
approved make CS D/F reflux valves (non-return by Engineer-
valves ) of following dia with technical specifications as In-Charge
below
i. Design, manfacturing & testing standard IS 5312 Part
1 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete. Reflux valves as per I.S.5312 Part
I (1984)
a) Without by pass arrangement -PN -1
1 100 mm 9518 1366 10884
2 150 mm 18872 1366 20238
3 200 mm 27077 1366 28443
4 250 mm 35283 5577 40860
5 300 mm 57437 5577 63014
6 350 mm 85335 5577 90912
7 400 mm 111592 5577 117169
8 450 mm 147695 10594 158289
9 500 mm 180517 10594 191111
10 600 mm 262570 10594 273164
b) With by pass arrangement - PN-1
1 100 mm 10089 1366 11455
2 150 mm 20005 1366 21371
3 200 mm 28702 1366 30068
4 250 mm 37400 5577 42977
5 300 mm 60883 5577 66460
6 350 mm 90455 5577 96032
7 400 mm 118288 5577 123865
8 450 mm 156557 10594 167151
9 500 mm 191348 10594 201942
10 600 mm 278324 10594 288918
116
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
c) Without by pass arrangement - PN -1.6
1 100 mm 10660 1366 12026
2 150 mm 21137 1366 22503
3 200 mm 30327 1366 31693
4 250 mm 39517 5577 45094
5 300 mm 64330 5577 69907
6 350 mm 95575 5577 101152
7 400 mm 124983 5577 130560
8 450 mm 165419 10594 176013
9 500 mm 202179 10594 212773
10 600 mm 294078 10594 304672
d) With by pass arrangement - PN-1.6
1 100 mm 11300 1366 12666
2 150 mm 22405 1366 23771
3 200 mm 32146 1366 33512
4 250 mm 41888 5577 47465
5 300 mm 68189 5577 73766
6 350 mm 101310 5577 106887
7 400 mm 132482 5577 138059
8 450 mm 175344 10594 185938
9 500 mm 214309 10594 224903
10 600 mm 311723 10594 322317
255 Item No 255: Providing, supplying & erecting of As Directed
approved make multi door CS D/F reflux valves (non- by Engineer-
return valves ) of following dia with technical In-Charge
specifications as below
i. Design, manfacturing & testing standard IS 5312 Part
2 Including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.Reflux valves as per I.S.5312 Part
II (1984)
a) Without by pass arrangement -PN -1
1 700 mm 432693 19365 452058
2 750 mm 478643 19365 498008
3 800 mm 497788 19365 517153
4 900 mm 670100 19365 689465
5 1000 mm 784974 22083 807057
6 1100 mm 995576 22083 1017659
7 1200 mm 1225325 22083 1247408
b) With by pass arrangement -PN -1
1 700 mm 458654 19365 478019
2 750 mm 507361 19365 526726
3 800 mm 527655 19365 547020
4 900 mm 710305 19365 729670
5 1000 mm 832072 22083 854155
6 1100 mm 1055311 22083 1077394
7 1200 mm 1298844 22083 1320927
117
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
c) Without by pass arrangement -PN -1.6
1 700 mm 484616 19365 503981
2 750 mm 536080 19365 555445
3 800 mm 557523 19365 576888
4 900 mm 750511 19365 769876
5 1000 mm 879171 22083 901254
6 1100 mm 1115046 22083 1137129
7 1200 mm 1372364 22083 1394447
d) With by pass arrangement -PN -1.6
1 700 mm 513693 19365 533058
2 750 mm 568244 19365 587609
3 800 mm 590974 19365 610339
4 900 mm 795542 19365 814907
5 1000 mm 931921 22083 954004
6 1100 mm 1181948 22083 1204031
7 1200 mm 1454706 22083 1476789
256 Item No 256: Providing, supplying & erecting of CI As Directed
double flange sluice valve confirming for IS-14846 by Engineer-
including worm gear arrangements as per test pressure In-Charge
stainless steel spindle, caps Including transportation,
inspection, unloding, loading, stacking excluding GST
levied by GOI & GOM in all respect etc. complete.
118
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
b) Sluice valve - PN - 1.6
without by pass arrangement
1 100 mm 8637 1366 10003
2 150 mm 12657 1366 14023
3 200 mm 20550 1366 21916
4 250 mm 32760 5577 38337
5 300 mm 44673 5577 50250
6 350 mm 58075 5577 63652
7 400 mm 76540 5577 82117
8 450 mm 96197 10594 106791
9 500 mm 111683 10594 122277
10 600 mm 195073 10594 205667
11 700 mm 308246 19365 327611
12 750 mm 360365 19365 379730
13 800 mm 444499 19365 463864
14 900 mm 586709 19365 606074
15 1000 mm 662654 22083 684737
16 1100 mm 781783 22083 803866
17 1200 mm 960476 22083 982559
257 Item No 257: Providing, supplying & erecting of As Directed
double flange Ductile Iron non-rising spindle soft by Engineer-
seated Resilient seated sluice Valves in accordance In-Charge
with BS 5163/ EN 1074-1&2 of PN-10 / 16 rated, with
Body and bonnet of Ductile Iron confirming to EN1563/
GGG40 Wedge fully encapsulated high quality WRAS or
DVGW approved EPDM rubber (approved for drinking
water), Replaceble Wedge nut of Brass, Shaft of
Stainless Steel EN1.4105, Stem seals min. 4 nos. of
NBR, Internal fasteners of Stainless Steel A2. Body &
Bonnet coated inside & outside with electrostatically
applied epoxy powder coated blue colour RAL 5017
(suitable for drinking water) to DIN 30677-2 & GSK
guidelines with a coating thickness of min. 250 microns.
Valves should be full bore & 100% tight shut-off. Flange
drilling as per IS 1538 raised face. Gate valve shall be
compatible for buried applications without valve chamber.
Manual operation by Handwheel. Operating torque shall
be less than that mentioned in EN 1171. Testing shall be
as per BS 5163 / EN 12266-1&2 / IS 14846.
119
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
10 600 mm 224799 10594 235393
11 700 mm 355217 19365 374582
12 750 mm 415277 19365 434642
13 800 mm 512233 19365 531598
14 900 mm 676113 19365 695478
15 1000 mm 763630 22083 785713
16 1100 mm 900912 22083 922995
17 1200 mm 1106834 22083 1128917
b) Sluice valve - PN - 1.6
without by pass arrangement
1 100 mm 10451 1366 11817
2 150 mm 15315 1366 16681
3 200 mm 24865 1366 26231
4 250 mm 39640 5577 45217
5 300 mm 54055 5577 59632
6 350 mm 70271 5577 75848
7 400 mm 92614 5577 98191
8 450 mm 116398 10594 126992
9 500 mm 135137 10594 145731
10 600 mm 236039 10594 246633
11 700 mm 372977 19365 392342
12 750 mm 436041 19365 455406
13 800 mm 537844 19365 557209
14 900 mm 709918 19365 729283
15 1000 mm 801811 22083 823894
16 1100 mm 945957 22083 968040
17 1200 mm 1162176 22083 1184259
258 Item No 258:Providing, supplying & erecting of As Directed
double flanged short body pattern type manually by Engineer-
operated C.I. Butterfly Valve confirming in to IS-13095- In-Charge
1991, Synthetic rubber faced ring secured on disc by
retaining ring with stainless steel screw stub shaft of
stainless steel riding in teflon bearing including
transportation, inspection, unloding, loading, stacking
excluding GST levied by GOI & GOM in all respect etc.
complete.
a) Butterfly valves - PN -1
1 100 mm 6807 1366 8173
2 150 mm 9360 1366 10726
3 200 mm 12480 1366 13846
4 250 mm 17018 5577 22595
5 300 mm 26946 5577 32523
6 350 mm 34179 5577 39756
7 400 mm 40561 5577 46138
8 450 mm 45099 10594 55693
9 500 mm 59990 10594 70584
10 600 mm 98849 10594 109443
11 700 mm 140118 19365 159483
12 750 mm 144656 19365 164021
13 800 mm 168908 19365 188273
120
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
14 900 mm 192875 19365 212240
15 1000 mm 284065 22083 306148
16 1100 mm 323350 22083 345433
17 1200 mm 414398 22083 436481
b) Butterfly valves - PN -1.6
1 100 mm 7148 1366 8514
2 150 mm 9828 1366 11194
3 200 mm 13104 1366 14470
4 250 mm 17869 5577 23446
5 300 mm 28293 5577 33870
6 350 mm 35888 5577 41465
7 400 mm 42589 5577 48166
8 450 mm 47354 10594 57948
9 500 mm 62989 10594 73583
10 600 mm 103791 10594 114385
11 700 mm 147124 19365 166489
12 750 mm 151889 19365 171254
13 800 mm 177353 19365 196718
14 900 mm 202519 19365 221884
15 1000 mm 298269 22083 320352
16 1100 mm 339517 22083 361600
17 1200 mm 435118 22083 457201
259 Item No 259: Providing, supplying & erecting of Ductile As Directed
Iron Double Flanged Double Eccentric Butterfly by Engineer-
Valves.in accordance with EN 593 /BS 5155 /IS 13095 In-Charge
/API 609 with Body & disc of Ductile Iron confirming to
EN1563/ GGG40 / IS 1865 Gr. 400/12, Body seat of
PTFE seated with Stainless Steel backed , disk seat of
S.S. AISI 304/316 , Shaft of S.S. AISI 420(Dry Shaft
Design , (to ensure 100% drop tight shut off as per EN
Std suitable for drinking water application), Internal
fasteners of Stainless Steel . Body & disc coated inside &
outside with electrostatically applied epoxy powder
coated blue colour (suitable for drinking water) to DIN
30677-2 & GSK guidelines with a coating thickness of
min. 250 microns. Valves should be 100% tight shut-off.
Leakages not allowed. Flange drilling as per IS 1538/ IS
9523/ ASME B 16.5 / EN1092-2 raised face. Testing as
per EN 12266-1&2. Features required for Butterfly valves
will be suitable to water work application for continuous
operation up to 70 degree Celsius as per above general
specification or otherwise the standard BS 5155/ EN593
121
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
a) Butterfly valves - PN -1
1 100 mm 8237 1366 9603
2 150 mm 11326 1366 12692
3 200 mm 15101 1366 16467
4 250 mm 20592 5577 26169
5 300 mm 32604 5577 38181
6 350 mm 41356 5577 46933
7 400 mm 49078 5577 54655
8 450 mm 54569 10594 65163
9 500 mm 72588 10594 83182
10 600 mm 119607 10594 130201
11 700 mm 169543 19365 188908
12 750 mm 175034 19365 194399
13 800 mm 204378 19365 223743
14 900 mm 233379 19365 252744
15 1000 mm 343719 22083 365802
16 1100 mm 391253 22083 413336
17 1200 mm 501422 22083 523505
b) Butterfly valves - PN -1.6
1 100 mm 8649 1366 10015
2 150 mm 11892 1366 13258
3 200 mm 15856 1366 17222
4 250 mm 21622 5577 27199
5 300 mm 34235 5577 39812
6 350 mm 43424 5577 49001
7 400 mm 51532 5577 57109
8 450 mm 57298 10594 67892
9 500 mm 76217 10594 86811
10 600 mm 125587 10594 136181
11 700 mm 178020 19365 197385
12 750 mm 183786 19365 203151
13 800 mm 214597 19365 233962
14 900 mm 245048 19365 264413
15 1000 mm 360905 22083 382988
16 1100 mm 410816 22083 432899
17 1200 mm 526493 22083 548576
122
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
260 Item No 260: Providing, supplying & erecting of Air As Directed
Valves confirming IS-14845-2000 and standard by Engineer-
specifications double orifice type combined with isolating In-Charge
sluice valve, mounted in horzontal position and operated
by wheel gearing, small orifice elastic ball resting on a
gun metal orifice nipple, large orifice vulcanite ball
seating on moulded seat ring, inlet face and drilled,
including transportation, inspection, unloding, loading,
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.
123
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
262 Item No 262: Electric Valve Actuator for non rising
spindle type
sluice valve, PN 1 & PN 1.6 rating
Providing, erecting electric Valve actuators totally As Directed
enclosed, weather-proof and dust proof construction with by Engineer-
IP-67, protection class suitable for installation in any In-Charge
position without lubrication, leakage or other operational
difficulty with special grease filled gear box and hand
wheel for emergency manual operation which will
automatically disengage on restoration of power to motor
and with 10 watt single phase space heater and
continuous local mechanical position indicator and
individually replaceable counter gear assembly and with
two torque and four limit switches with S.S. flap and
operated with gear driven cams and of rating 250 Volt, 5
Amp, AC/DC, torque switch dial and with TEFC squirrel
cage induction motor working on 440 Volts +/- 10%, 3
phase, 50 Hz AC of intermittent duty rating S-2, insulation
class "F" and temp rise restricted to class "B" with IP - 67
protection class suitable for DOL starting and with three
thermostat and 30% over load margin. The torque rating
of reduction gear box shall be at least 1.5 times max.
torque required for opening and closing of valve with
integral starter controls having four limit switches 1 for
OPEN, 1 for CLOSE & 2 Nos. for intermediate positions
for interlocking etc complete.
1 150 mm 65732
2 200 mm 68306
3 250 mm 72596
4 300 mm 77395
5 350 mm 79421
6 400 mm 81447
7 450 mm 84857
8 500 mm 92304
9 600 mm 103474
10 700 mm 107675
11 750 mm 109701
12 800 mm 112474
13 900 mm 121959
14 1000 mm 128887
124
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
263 Item No 263: Dismantling Joints
Providing, erecting and commissioning M.S. Dismantling As Directed
joint as per requirement and Department's approved by Engineer-
drawing and specifications, including machining and In-Charge
rubber rings and suitable for working pressure with
required flanges of suitable size with nut bolts etc
complete. The joint should have through long bolts so
that during normal working pressure there should be no
sliding movement of sliding flanges. L.O.F. ( length over
flange ) should not be less than 75% of dia.
PN 1.0
1 100 mm 3936 79 4015
2 150 mm 6559 131 6690
3 200 mm 8246 165 8411
4 250 mm 11619 232 11851
5 300 mm 14055 281 14336
6 350 mm 19678 394 20072
7 400 mm 26237 525 26762
8 450 mm 31484 630 32114
9 500 mm 37481 750 38231
10 600 mm 46102 922 47024
11 700 mm 58845 1177 60022
12 750 mm 72338 1447 73785
13 800 mm 79647 1593 81240
14 900 mm 86956 1739 88695
15 1000 mm 113755 2275 116030
16 1100 mm 147300 2946 150246
17 1200 mm 180658 3613 184271
PN 1.6
1 100 mm 4172 83 4255
2 150 mm 6953 139 7092
3 200 mm 8741 175 8916
4 250 mm 12316 246 12562
5 300 mm 14899 298 15197
6 350 mm 20858 417 21275
7 400 mm 27811 556 28367
8 450 mm 33373 667 34040
9 500 mm 39730 795 40525
10 600 mm 48868 977 49845
11 700 mm 62376 1248 63624
12 750 mm 76679 1534 78213
13 800 mm 84426 1689 86115
14 900 mm 92173 1843 94016
15 1000 mm 120580 2412 122992
16 1100 mm 156138 3123 159261
17 1200 mm 191498 3830 195328
125
S. N. Item Description Specification Supply Erection Total Rate
Ref. No. Rate in Rate in Rs. in Rs.
Rs.
1 2 3 4 5 6
264 Item No 264: Metallic Expansion Joints
Providing, erecting and commissioning M.S. fabricated As Directed
Metallic Expansionjoint as per requirement and by Engineer-
Department's approved drawing and specifications, In-Charge
including machining and rubber rings and suitable for
working pressure with required flanges of suitable size
with nut bolts etc complete. The joint should have
through long bolts so that during normal working
pressure there should be no sliding movement of sliding
flanges. L.O.F. ( length over flange ) should not be less
than 75% of dia.
PN 1.0
1 100 mm 6372 127 6499
2 150 mm 10307 206 10513
3 200 mm 13868 277 14145
4 250 mm 17991 360 18351
5 300 mm 22114 442 22556
6 350 mm 30172 603 30775
7 400 mm 37481 750 38231
8 450 mm 40854 817 41671
9 500 mm 46851 937 47788
10 600 mm 80959 1619 82578
11 700 mm 94827 1897 96724
12 800 mm 107196 2144 109340
13 900 mm 117878 2358 120236
14 1000 mm 180658 3613 184271
15 1100 mm 187405 3748 191153
16 1200 mm 214204 4284 218488
PN 1.6
1 100 mm 6754 135 6889
2 150 mm 10926 219 11145
3 200 mm 14700 294 14994
4 250 mm 19070 381 19451
5 300 mm 23441 469 23910
6 350 mm 31983 640 32623
7 400 mm 39730 795 40525
8 450 mm 43306 866 44172
9 500 mm 49662 993 50655
10 600 mm 85816 1716 87532
11 700 mm 100517 2010 102527
12 800 mm 113627 2273 115900
13 900 mm 124950 2499 127449
14 1000 mm 191498 3830 195328
15 1100 mm 198649 3973 202622
16 1200 mm 227056 4541 231597
126
PDN CSR 2021-22 PIPE FITTINGS/SPECIALS ABSTRACT
S.N. Classification/ diameter Ductile Polyvinyl Oriented Polyvinyl Pre-Stressed Bar Warapped Glass Reinforced High Density Pre-Stressed
Iron (D.I.) Chloride Chloride (P.V.C - O) Cement Steel Cylinder Plastic (G.R.P) Polyethylene Concrete
Pipes (P.V.C) Pipes Pipes Concrete (B.W.S.C) Pipes (H.D.P.E) Cylinder
(P.S.C) Pipes Pipes (P.C.C)
Pipes Pipes
1 2 3 4 5 6 7 8 9 10
1 75mm & above dia 2 % of per mtr.
rate of pipe
3 above 300 mm dia. 132/ kg 5 % of per mtr. 5 % of per mtr. rate 107/ kg
rate of pipe of pipe
127
S.N. Classification/ diameter Ductile Polyvinyl Oriented Polyvinyl Pre-Stressed Bar Warapped Glass Reinforced High Density Pre-Stressed
Iron (D.I.) Chloride Chloride (P.V.C - O) Cement Steel Cylinder Plastic (G.R.P) Polyethylene Concrete
Pipes (P.V.C) Pipes Pipes Concrete (B.W.S.C) Pipes (H.D.P.E) Cylinder
(P.S.C) Pipes Pipes (P.C.C)
Pipes Pipes
128
PDN CSR 2021-22 HYDRAULIC TESTING ABSTRACT
Hydraulic testing of All types of pipe line to specified pressure including cost of all
materials and labour and water for testing for specified length including cutting,
placing end cap making arrangement for filling safe water using reciprocating type
pumps which should be able to provide specified test pressure gauges and other
necessary equipments, labour, operation charges, etc. required for testing. The rate
under this item shall also include cost of retesting, if necessary and reinstating to
original position.
1 2 3 4
1 63 mm km 6043.55
2 75 mm km 6813.45
3 80 mm km 6860.00
4 90 mm km 6960.20
5 100 mm km 7069.80
6 110 mm km 7188.80
7 125 mm km 7385.05
8 140 mm km 7964.25
9 150 mm km 8121.00
10 160 mm km 8287.20
11 180 mm km 8647.80
12 200 mm km 9046.15
13 225 mm km 9597.10
14 250 mm km 10206.95
15 280 mm km 11016.60
16 300 mm km 12323.40
17 315 mm km 12788.30
18 350 mm km 15291.20
19 355 mm km 15467.40
20 400 mm km 18782.00
21 450 mm km 22489.05
22 500 mm km 26431.80
23 560 mm km 29550.00
24 600 mm km 31433.00
25 630 mm km 33187.40
26 700 mm km 37611.05
27 710 mm km 38280.70
28 750 mm km 41053.60
29 800 mm km 44731.85
30 900 mm km 52770.00
31 1000 mm km 61802.00
32 1100 mm km 71751.00
33 1200 mm km 82643.00
34 1300 mm km 94477.00
35 1400 mm km 107255.00
36 1500 mm km 124638.00
129
Sr No. Dia of pipe Unit Rate for 2021-22 (Rate in Rs.)
37 1600 mm km 140636.00
38 1700 mm km 156242.00
39 1800 mm km 172790.00
40 1900 mm km 190281.00
41 2000 mm km 208715.00
42 2100 mm km 228092.00
43 2200 mm km 249079.00
44 2300 mm km 270342.00
45 2400 mm km 292547.00
46 2500 mm km 315695.00
47 2600 mm km 339785.00
48 2700 mm km 364818.00
49 2800 mm km 390794.00
50 2900 mm km 417713.00
51 3000 mm km 445575.00
130
ANNUXURE- 2
GOVERNMENT RESOLUTION FOR REFERANCE
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×−ÖµÖ´Ö−Ö
¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ) †×¬Ö×−ÖµÖ´Ö 1996 ŸÖÃÖê“Ö ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü
×−ÖµÖ´Ö 1998 †ÓŸÖÖÔŸÖ ˆ¯Öú¸ü ¾ÖÃÖæ»Ö
ú¸üÖ¾ÖµÖÖ“Öß úÖµÖÔ¯Ö¬¤üŸÖß ×−ÖÛ¿“ÖŸÖ ú¸üÖê²ÖÖ²ÖŸÖ
´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−Ö
ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úÖ´ÖÖÖ¸ü ×¾Ö³ÖÖÖ,
¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ Îú´ÖÖÓú : ²ÖßÃÖß‹ 2009/¯ÖÏ.Îú. 108/úÖ´ÖÖÖ¸ü 7-†
´ÖÓ¡ÖÖ»ÖµÖ, ´ÖÓã²Ö‡Ô- 32.
פü−ÖÖÓú 17 •Öã−Ö 2010
¯ÖÏßÖÖ¾Ö−ÖÖ :-
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996 ¾Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü
²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ †×¬Ö×−ÖµÖ´Ö 1996 Æêü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö Öê¡ÖÖŸÖ úÖµÖÔ¸üŸÖ
†ÃÖ»Ö껵ÖÖ ²ÖÖÓ¬ÖúÖ´Ö ´Ö•Öæ¸üÖÓ−ÖÖ, •Öê ¸üÖ•µÖ ¿ÖÖÃÖ−ÖÖ−Öê ÖךüûŸÖ êú»Ö껵ÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö ú»µÖÖÖ ´ÖÓ›üôûÖŸÖ
»ÖÖ³ÖÖ£Öá ´ÆüÖæ−Ö −ÖÖëפüŸÖ —ÖÖ»Öê»Öê ×Óú¾ÖÖ •µÖÖ úÖ´ÖÖÖ¸üÖÓ“Öß »ÖÖ£ÖÖ£Öá ´ÆüÖã−Ö −ÖÖë¤üÖß ú¸üµÖÖŸÖ µÖêÖÖ¸ü †ÖÆêü †¿ÖÖ
úÖ´ÖÖÖ¸üÖÓ“Öê ú»µÖÖÖ ú¸üµÖÖ“µÖÖ ˆ§êü¿ÖÖ−Öê ¯ÖÖ¸üßŸÖ êú»Öê»Öê †ÖÆêüŸÖ. ÃÖ¤ü¸ü úÖµÖªÖ“Öß ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖÖŸÖ
†Ó´Ö»Ö²Ö•ÖÖ¾ÖÖß ú¸üµÖÖ“µÖÖ ¥üÛ™üü−Öê ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 2007
ŸÖµÖÖ¸ü ú¸üµÖÖŸÖ †Ö»Öê †ÖÆêüŸÖ. †×¬Ö×−ÖµÖ´ÖÖŸÖᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü פü.26.6.1997 “µÖÖ †×¬ÖÃÖã“Ö−Öê−ÖãÃÖÖ¸ü ¯ÖÖÓ“Ö
¿ÖÖÃÖúßµÖ ÃÖ¤üõÖÖÓ“Öê ´ÖÓ›üôû ãÖÖ¯Ö−Ö ú¸üµÖÖŸÖ †Ö»Öê»Öê †ÖÆêü. µÖÖ †×¬Ö×−ÖµÖ´ÖÖÓŸÖÖÔŸÖ ˆ¯Öú¸ü ÖÖêôûÖ ú¸üµÖÖ²ÖÖ²ÖŸÖ“Öß
ŸÖÃÖê“Ö ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê ´Ö㻵ÖÖÓÓú−Ö ú¸üµÖÖ“Öß ŸÖ¯Ö¿Ö߻־ÖÖ¸ü úÖµÖÔ¯Ö¬¤üŸÖß ŸÖµÖÖ¸ü ú¸üµÖÖÃÖÖšüß ´ÖÓÓסִÖÓÓ›üôûÖ−Öê פü−ÖÖÓú
12/05/2010 ¸üÖê•Öß ŸÖŸ¾ÖŸÖ: ´ÖÖ−µÖŸÖÖ ‘ÖêµÖÖŸÖ †Ö»Öß, ŸµÖÖ −ÖãÃÖÖ¸ ´ÖÖ. ´ÖãµÖÃÖד־ÖÖÓ“µÖÖ †¬µÖÖŸÖêÖÖ»Öᯙ ÃÖ×´ÖŸÖß−Öê
×−ÖÛ¿“ÖŸÖ êú»Öê»Öß úÖµÖÔ¯Ö¬¤üŸÖß ¯Öãלü»Ö¯ÖÏ´ÖÖÖê †ÖÆêü.
¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ:-
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá) †×¬Ö×−ÖµÖ´Ö 1996 (ëúצüµÖ †×¬Ö×−ÖµÖ´Ö
27/1996) †Ö×Ö ŸµÖÖ †ÓŸÖÖÔŸÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996 (ëúצüµÖ
†×¬Ö×−ÖµÖ´Ö 28/1996) (ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö ) Æêü úÖµÖ¤êü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö Öê¡ÖÖŸÖ úÖµÖÔ¸üŸÖ
†ÃÖ»Ö껵ÖÖ ²ÖÖÓ¬ÖúÖ´Ö ´Ö•Öæ¸üÖÓ“µÖÖ ú»µÖÖÖúÖ¸üß ˆ«êü¿µÖÖ−Öê •ÖÃÖê úß,†Ö¸üÖêµÖ, ÃÖã¸üÖÖ †Ö×Ö ú»µÖÖÖ ‡ŸµÖÖ¤üß µÖÖê•Ö−ÖÖ
²ÖÖÓ¬ÖúÖ´Ö Öê¡ÖÖŸÖ úÖ´Ö ú¸üÖÖ·µÖÖ úÖ´ÖÖÖ¸üÖ−Ó ÖÖ ¯Öã¸ü×¾ÖµÖÖ²ÖÖ²ÖŸÖ“µÖÖ ŸÖ¸üŸÖã¤üß ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ †ÖÆêüŸÖ. êÓ¦ü
¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998 †Ó´Ö»ÖÖŸÖ †ÖÖ»Öê»Öê †ÖÆêüŸÖ. ´ÖãµÖ
†×¬Ö×−ÖµÖ´ÖÖŸÖᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü ´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−ÖÖ−Öê ²ÖßÃÖß‹ 32003/ÃÖ߆ָü 146/ úÖ´ÖÖÖ¸ü 7 פü.5.2.2007
†−¾ÖµÖê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá) ×−ÖµÖ´Ö 2007 ŸÖµÖÖ¸ü êú»Öê»Öê
†ÖÆêüŸÖ. ŸÖÃÖê“Ö ×¤ü.18.9.2007 “µÖÖ šü¸üÖ¾ÖÖ−ÖãÃÖÖ¸ü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö •Ö´ÖÖ ú¸üµÖÖÃÖÖšüß ÖÖŸÖê Îú´ÖÖÓú
004220110000153 ²ÖÑú †Öò±ú ‡Ó×›üµÖÖ µÖê£Öê ˆ‘Ö›üµÖÖŸÖ †Ö»ÖÖ †ÖÆêü.
2. ´ÖãµÖ †×¬Ö×−ÖµÖ´Ö ¾Ö ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ´ÖÆüŸ¾ÖÖ“µÖÖ ŸÖ¸üŸÖã¤üß ¯Ö׸üÛ¿Ö™ü 1 ´Ö¬µÖê −Ö´Öã¤ü êú»Ö껵ÖÖ †ÖÆêüŸÖ.
3. ÖÖ•ÖÖß Øú¾ÖÖ ÃÖÖ¾ÖÔ•Ö×−Öú ˆ¯ÖÎú´ÖÖ“µÖÖ ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ ÃÖÓ¤ü³ÖÖÔŸÖ •Öê ×¾Ö³ÖÖÖ ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ †Ö¸üÖÖ›ü¶ÖÃÖ
´ÖÖ−µÖŸÖÖ ¤êüµÖÖÃÖ ÃÖÖ´Ö †ÖÆêüŸÖ, •ÖÃÖê úß (1) ´ÖÆüÖ−ÖÖ¸ü ¯ÖÖ×»ÖúÖ,−ÖÖ¸ü¯ÖÖ×»ÖúÖ ¯ÖÏ¿ÖÖÃÖ−Ö †Ö×Ö −ÖÖ¸ü ×¾ÖúÖÃÖ ×¾Ö³ÖÖÖ
(ÃÖ¾ÖÔ ¿ÖÆü¸üß Ã£ÖÖ×−Öú ÃÖÓãÖÖÓ“µÖÖ ²ÖÖ²ÖŸÖߟÖ). (2) וֻÆüÖ¯Ö׸üÂÖ¤ü, ÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ †Ö×Ö ÖÏÖ´Ö ×¾ÖúÖÃÖ ×¾Ö³ÖÖÖ (ÃÖ¾ÖÔ ÖÏÖ´Ö
¯ÖÓ“ÖÖµÖŸÖß). (3) ˆªÖêÖ ×¾Ö³ÖÖÖ (‹´Ö.†ÖµÖ.›üß.ÃÖß. †Ö×Ö ×¾ÖúÖÃÖ †ÖµÖ㌟Ö, ‹ÃÖ‡Ô—Öê›ü) †Ö×Ö ÃÖ¾ÖÔ ¸üÖ•µÖ /ëú¦ü
¿ÖÖÃÖ−ÖÖ“Öê ×¾Ö³ÖÖÖ •µÖÖ´Ö¬µÖê ²ÖÖÓ¬ÖúÖ´Ö “ÖÖ»Öæ †ÖÆêü ¾Ö ŸµÖÖŸÖ úÖ´ÖÖÖ¸ü ×−ÖµÖãŒŸÖ êú»Öê †ÖÆêüŸÖ, ŸµÖÖÓ−ÖÖ ŸµÖÖÓ“µÖÖ ×¾Ö³ÖÖÖßµÖ
¯ÖÏ´ÖãÖÖÓ−Öß ŸÖÖŸÖ›üß−Öê ÃÖæ“Ö−ÖÖ ªÖ¾µÖÖ.
(1). ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ¾ÖÃÖæ»Ö ú¸üŸÖÖ−ÖÖ, ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ ‹æÖ
´Ö㻵ÖÖ−ÖãÃÖÖ¸ü(•Ö´Öß−Öß“Öß Øú´ÖŸÖ ¾ÖÖôæû−Ö )ŸÖÃÖê“Ö ÃÖÓ²ÖÓ×¬ÖŸÖ †ÖãÖÖ¯Ö−Öê−Öê úÖ´ÖÖÖ¸üÖÓ−ÖÖ Øú¾ÖÖ ŸµÖÖÓ“µÖÖ −ÖÖŸÖ»ÖÖÖÓ−ÖÖ
úÖ´ÖÖÖ¸üÖÓÃÖÖšüß −ÖãúÃÖÖ−Ö ³Ö¸ü¯ÖÖ‡Ô †×¬Ö×−ÖµÖ´Ö 1923 ´Ö¬Öᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü úÖêÖŸµÖÖÆüß ¯ÖÏúÖ¸ü“Öß ³Ö¸ü¯ÖÖ‡Ô ×¤ü»Öê»Öß
†ÃÖê»Ö ŸÖß ¸üŒú´Ö ¾ÖÖôæû−Ö ˆ¾ÖÔ¸üßŸÖ ²ÖÖÓ¬ÖúÖ´Ö ´Ö㻵ÖÖ¾Ö¸ü 1 % ˆ¯Öú¸ ¾ÖÃÖã»Ö ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ÆüÖ ˆ¯Öú¸ü ÖÖ•ÖÖß
ŸÖÃÖê“Ö ¿ÖÖÃÖúßµÖ ²ÖÖÓ¬ÖúÖ´ÖÖ¾Ö¸ü ¤êü×Ö»Ö ¾ÖÃÖæ»Ö ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü.
(2). ²ÖÖÓ¬ÖúÖ´ÖÖ“Öß †Ó¤üÖ×•ÖŸÖ ´Öã»µÖ šü¸ü×¾ÖµÖÖ²ÖÖ²ÖŸÖ −ÖÖë¤üÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓ−ÖÖ ´ÖÖÖÔ¤ü¿ÖÔú ŸÖŸ¾Öê ×−ÖÖÔ×´ÖŸÖ
ú¸üµÖÖÃÖÖšüß ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ †Ö»Öê †ÖÆêüŸÖ. ¾Ö −ÖÖë¤üÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓ−Öß µÖÖ²ÖÖ²ÖŸÖßŸÖ Ã¾ÖŸÖÓ¡Ö†Ö¤êü¿Ö ×−ÖÖÔ×´ÖŸÖ ú¸üÖ¾ÖêŸÖ.
†¿ÖÖ ¯ÖÏúÖ¸êü ×−ÖÛ¿“ÖŸÖ êú»Ö껵ÖÖ ´ÖÖÖÔ¤ü¿ÖÔú ŸÖŸ¾ÖÖÓ“ÖÖ †Ö×Ö ŸµÖÖ ´Ö¬µÖê ¾ÖêôûÖê¾Öêôßü êú»Ö껵ÖÖ ÃÖã¬ÖÖ¸üÖÖÓ“ÖÖ †Ö¬ÖÖ¸ü
²ÖÖÓ¬ÖúÖ´ÖÖ“Öê †Ó¤üÖ×•ÖŸÖ ´Öã»µÖ šü¸ü×¾ÖŸÖÖ−ÖÖ ‘µÖÖ¾ÖÖ.
(3) −ÖÖë¤ü¾ÖÆüß šêü¾ÖÖê ¾Ö ´ÖÖ×ÃÖú ×¾Ö¾Ö¸üÖ ¯Öãœüᯙ ´Ö×Æü−µÖÖ“µÖÖ 10 ŸÖÖ¸üÖê¯Öã¾Öá †¬µÖÖ, ´ÖÆüÖ¸üÖÂ™Ò ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü
²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ ú»µÖÖÖ ´ÖÓ›üô, ´ÖãÓ²Ö‡Ô (¯Ö׸ü׿Ö™ü 2 ¯ÖÏ´ÖÖÖê)µÖÖÓ“µÖÖ ú›êü ¯ÖÖšü¾ÖÖ¾Öê. •ÖêÖêú¹ý−Ö µÖÖÓ−ÖÖ •Ö´ÖÖ
êú»Ö껵ÖÖ ˆ¯Öú¸üÖ“µÖÖ ¸üŒú´Öê“ÖÖ ŸÖÃÖê“Ö ²ÖÑúêŸÖ/úÖêÂÖÖÖÖ¸üÖŸÖ •Ö´ÖÖ —ÖÖ»Ö껵ÖÖ ¸üŒú´Öê“ÖÖ (¯Ö׸ü׿Ö™ü 3 ¯ÖÏ´ÖÖÖê)
ŸÖÖôû´Öêôû ‘ÖêÖê ¿ÖŒµÖ ÆüÖê‡Ô»Ö. ŸÖÃÖê“Ö ˆ¯Öú¸ü¾ÖÃÖã»Öß“µÖÖ −ÖÖë¤üß šêü¾ÖµÖÖÃÖÖšüß −ÖÖê¤ü¾ÖÊÖ ¾Ö ´ÖÖ×ÃÖú ×¾Ö¾Ö¸üÖ¯Ö¡Ö
šêü¾ÖµÖÖ²ÖÖ²ÖŸÖ ×¤ü.1.12.2009 ¯Ö׸ü¯Ö¡ÖúÖ´Ö‘µÖê −Ö´Öæ¤ü êú»Ö껵ÖÖ ÃÖã“Ö−ÖÖÓ“ÖêÆüß ¯ÖÖ»Ö−Ö ú¸üÖ¾Öêü.
(4) ‡´ÖÖ¸üŸÖ ¾Ö ‡üŸÖ¸ü ²ÖÖÓ¬ÖúÖ´ÖÖÃÖ ´ÖÓ•Öæ¸üß ¤êüÖÖ¸êü ¾Ö ŸµÖÖÃÖÓ¤ü³ÖÖÔŸÖᯙ ˆ¯Öú¸ü •Ö´ÖÖ ú¸üÖÖ·µÖÖ ×¾Ö³ÖÖÖ/ãÖÖ×−Öú
þָüÖ•µÖ ÃÖÓãÖÖ/¯ÖÏÖ׬Öú¸üÖ µÖÖÓ−Öß ŸµÖÖÓ“Öê µÖÖÃÖÓ¤ü³ÖÖÔŸÖß»Ö ×¾Ö¾Ö¸üÖ¯Ö¡Öê ¾Ö ¾ÖÖÙÂÖú †Æü¾ÖÖ»Ö ¯Ö׸ü׿Öšü 4 ¯ÖÏ´ÖÖÖê ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖÃÖ ¯ÖÏŸµÖêú ¯Öãלü»Ö†ÖÙ£Öú ¾ÖÂÖÖÔ“µÖÖ 15 ´Öê ¯Öæ¾Öá ÃÖÖ¤ü¸ü ú¸üÖ¾ÖêŸÖ. Æêü
¾ÖÖÙÂÖú ×¾Ö¾Ö¸üÖ¯Ö¡Ö ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ¯ÖÖÃÖæ−Ö 30 פü¾ÖÃÖÖÓ“µÖÖ †ÖŸÖ ´ÖÓ›üôû ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ †Ö¸üÖÖ›üµÖÖÃÖ ´ÖÓ•Öæ¸üß ¤êüÖÖ·µÖÖ ¾Ö
ˆ¯Öú¸ü ÖÖêôûÖ ú¸üÖÖ·µÖÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖÏÖ׬Öú¸üÖÖÃÖ ÃÖ¤ü¸ü ˆ¯Öú¸ü ÖÖêôûÖ ú¸üµÖÖÃÖÖšüß —ÖÖ»Ö껵ÖÖ Ö“ÖÖÔ“ÖÖ ( •Ö´ÖÖ -
— ÖÖ»Öê»ÖÖ ˆ¯ÖúÖ¸üÖ“µÖÖ 1 ™üŒúÖ¯ÖêÖÖü †×¬Öú −ÖÖÆüß) ¯Ö¸üŸÖÖ¾ÖÖ ú¸üß»Ö.
4. ÃÖÖ¾ÖÔ•Ö×−Öú ²ÖÖÓ¬ÖúÖ´Ö, •Ö»ÖÃÖÓ¯Ö¤üÖ ¾Ö ¾Ö−Ö ×¾Ö³ÖÖÖ ŸÖÃÖê“Ö ×•Ö»ÆüÖ ¯Ö׸üÂÖ¤ü µÖÖÓ“µÖÖ«üÖ¸êü êú»Öß •ÖÖÖÖ¸üß •Öß úÖ´Öê
"‡´ÖÖ¸üŸÖ ¾Ö ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ ¯Ö׸ü³ÖÖÂÖêŸÖ µÖêŸÖÖŸÖ †¿ÖÖ úÖ´ÖÖÓÃÖÖšüß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê Óú¡ÖÖ™ü ‘ÖêÖÖ·µÖÖ
ÓúÓ¡ÖÖ™ü¤üÖ¸ü/†×³Öú¸üÖ µÖÖÓ“µÖÖ ¤êüµÖúÖŸÖæ−Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×¾Ö×ÆüŸÖ ¤ü¸üÖ−Öê ¾ÖÃÖæ»Ö
ú¸üµÖÖŸÖ µÖÖ¾ÖÖ." ÃÖ¤ü¸ü •Ö²ÖÖ²Ö¤üÖ¸üß ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖÖ“Öß †ÃÖê»Ö ŸÖÃÖê“Ö •Öß ¤êüµÖêú úÖêÂÖÖÖÖ¸üÖŸÖ ÃÖÖ¤ü¸ü ÆüÖêŸÖᯙ †¿ÖÖ
¤êüµÖúÖŸÖ ÃÖÓ²ÖÓ×¬ÖŸÖ †ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ·µÖÖ−Öê "‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü" µÖÖ“Öß
¾ÖÃÖæ»Öß ¤ü¿ÖÔ¾ÖÖ¾Öß ¾Ö ŸµÖÖ−ÖãÃÖÖ¸ü úÖêÂÖÖÖÖ¸üÖ−Öê ÃÖ¤ü¸ü ¾ÖÃÖæ»Öß ú¸üÖ¾Öß.
5. ÃÖ¾ÖÔ †ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ-µÖÖÓ−ÖÖ ¾Ö ÃÖ¾ÖÔ ¿ÖÖÃÖúßµÖ †×³ÖúŸµÖÖÕ−ÖÖ ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ µÖÖ¾ÖêŸÖ úß, µÖÖ
ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 3 †Ö×Ö ëú¦ü¿ÖÖÃÖ−ÖÖ“µÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö
1998 “µÖÖ ×−ÖµÖ´Ö 3 −ÖãÃÖÖ¸ü ×−ÖÖÔ×´ÖŸÖ êú»Ö껵ÖÖ ×¤ü.26.9.1996 “µÖÖ †×¬ÖÃÖã“Ö−Öê−ÖãÃÖÖ¸üü 1 ™üŒúÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö
ŸµÖÖÓ−Öß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖŸÖ ¾Ö¸üᯙ ¯Ö¬¤üŸÖß−Öê פü.1.7.2010 ¯ÖÖÃÖæ−Ö −Ö “ÖãúŸÖÖ •Ö´ÖÖ
ú¸üÖ¾Öß.
6. •Öß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Öê ‘‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá)
†×¬Ö×−ÖµÖ´Ö, 1996’ “µÖÖ ú»Ö´Ö 2 (1) (›üß) †−ÖãÂÖÓÖÖ−Öê ¯Ö׸ü³ÖÖÂÖêŸÖ µÖêŸÖÖŸÖ ¾Ö •µÖÖ“Öê úÖ´Ö ‘ÖêµÖÖÃÖÖšüß“ÖÖ ú¸üÖ¸ü
פü−ÖÖÓú 01 •Öã»Öê 2010 ¾ÖÖ ŸÖ¤Ëü−ÖÓŸÖ¸ü ú¸üµÖÖŸÖ µÖê‡Ô»Ö †¿ÖÖ ÃÖ¾ÖÔ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´ÖÖÓ−ÖÖ ¾Ö¸üᯙ ¯Ö¬¤üŸÖ »ÖÖÖæ
¸üÖÆüß»Ö.
7. ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖÖÓ¿Öß ×¾Ö“ÖÖ¸ü×¾Ö×−Ö´ÖµÖ ú¹ý−Ö ˆ¯Öú¸ü ¾ÖÃÖæ»Öß´Ö¬µÖê ÃÖãÃÖæ¡ÖŸÖÖ µÖêµÖÖÃÖÖšüß ¯ÖÏŸµÖêú
¯ÖÏú¸üÖÖÃÖ µÖã×−Ö Îú´ÖÖÓú ¤êüµÖÖ²ÖÖ²ÖŸÖ ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Ö פü.26.10.2009 †−¾ÖµÖê ÃÖ×¾Ößָü ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ
†Ö»Öê»Öê †ÖÆêüŸÖ. ŸµÖÖ−ÖãÃÖÖ¸ü ÃÖ¤ü¸ü µÖã×−Öú Îú´ÖÖÓúÖ“Öß ¯Ö¬¤üŸÖ ™ü¯µÖÖ™ü¯µÖÖ−Öê ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖÖú›æü−Ö ¸üÖ²Ö×¾ÖµÖÖŸÖ µÖÖ¾Öß
¾Ö ¯ÖÏ£Ö´Ö ™ü¯¯µÖÖŸÖ −ÖÖ¸ü ×¾ÖúÖÃÖ ×¾Ö³ÖÖÖ ¾Ö ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ ´ÖÆüÖ−ÖÖ¸ü¯ÖÖ×»ÖúÖ, −ÖÖ¸ü¯ÖÖ×»ÖúÖ, ÃÖ¾ÖÔ ¿ÖÆü¸üß Ã£ÖÖ×−Öú
ÃÖÓãÖÖ ¾Ö ¯ÖÏÖ׬Öú¸üÖê ‡ŸµÖÖ¤üß ŸÖÃÖê“Ö ÖéÆü×−Ö´ÖÖÔÖ ×¾Ö³ÖÖÖ ¾Ö ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ ÃÖ¾ÖÔ ÃÖÓãÖÖ/¯ÖÏÖ׬Öú¸üÖ µÖÖÓ−ÖÖ ¯ÖÏ£Ö´Ö
™ü¯¯µÖÖŸÖ »ÖÖÖæ ¸üÖÆüß»Ö, ŸÖÃÖê“Ö ¯Öãœüᯙ ™ü¯¯µÖÖÓÃÖÖšüß úÖ´ÖÖÖ¸ü ×¾Ö³ÖÖÖÖú›æü−Ö Ã¾ÖŸÖÓ¡Ö¯ÖÖê ÃÖæ“Ö−ÖÖ ¤êüµÖÖŸÖ µÖêŸÖß»Ö.
8. ÃÖ¤ü¸ü ¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ ÆüÖ ´ÖãµÖÃÖד־ÖÖÓ“µÖÖ †¬µÖÖŸÖêÖÖ»Öᯙ ÃÖ×´ÖŸÖß“µÖÖ ²ÖîšüúßŸÖ —ÖÖ»Ö껵ÖÖ “Ö“Ö쓵ÖÖ
†−ÖãÂÖÓÖÖ−Öê ¾Ö ÃÖ¤ü¸ü ²ÖîšüúßÃÖ ˆ¯ÖÛÃ£ÖŸÖ †ÃÖ»Ö껵ÖÖ ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖÖÓ“µÖÖ ¯ÖϬÖÖ−Ö ÃÖד־Ö/ÃÖד־ÖÖÓ“µÖÖ ÃÖÆü´ÖŸÖß−Öê
×−ÖÖÔ×´ÖŸÖ ú¸üµÖÖŸÖ µÖêŸÖ †ÖÆêü.
(ú×¾ÖŸÖÖ Ö㯟ÖÖ )
ÃÖד־Ö,úÖ´ÖÖÖ¸ü
¯ÖÏŸÖ-
´ÖÖ.¸üÖ•µÖ¯ÖÖ»Ö µÖÖÓ“Öê ÃÖד־Ö,
´ÖÖ.´ÖãµÖ´ÖÓ¡Öß µÖÖÓ“Öê ¯ÖϬÖÖ−Ö ÃÖד־Ö,
´ÖÖ.ˆ¯Ö´ÖãµÖ´ÖÓ¡Öß µÖÖÓ“Öê ÃÖד־Ö,
´ÖÖ.´ÖÓ¡Öß (úÖ´ÖÖÖ¸ü) µÖÖÓ“Öê ÖÖ•ÖÖß ÃÖד־Ö,
´ÖÖ.¸üÖ•µÖ´ÖÓ¡Öß (úÖ´ÖÖÖ¸ü) µÖÖÓ“Öê ÖÖ•ÖÖß ÃÖד־Ö,
´ÖãµÖ ÃÖד־Ö, ´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−Ö,
†¯Ö¸ü ´ÖãµÖ ÃÖ×“Ö¾Ö / ¯ÖϬÖÖ−Ö ÃÖ×“Ö¾Ö / ÃÖ×“Ö¾Ö ÃÖ¾ÖÔ ´ÖÓ¡ÖÖ»ÖµÖß−Ö ×¾Ö³ÖÖÖ, ´ÖÓ¡ÖÖ»ÖµÖ,´ÖãÓ²Ö‡Ô.
(´ÖÓ¡ÖÖ»ÖµÖß−Ö ÃÖ¾ÖÔ ×¾Ö³ÖÖÖÖÓú›æü−Ö ÆüÖ ¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ †ÃÖ»Ö껵ÖÖ ÃÖ¾ÖÔ ÃÖÖ¾ÖÔ•Ö×−Öú
ˆ¯ÖÎú´ÖÖÓ“µÖÖ ×−Ö¤ü¿ÖÔ−ÖÖÃÖ †ÖÖµÖÖŸÖ µÖÖ¾ÖÖ.)
´ÖãµÖ †×³ÖµÖÓŸÖÖ, ÃÖÖ¾ÖÔ•Ö×−Öú ²ÖÖÓ¬ÖúÖ´Ö ×¾Ö³ÖÖÖ,
´ÖãµÖ †×³ÖµÖÓŸÖÖ, •Ö»ÖÃÖÓ¯Ö¤üÖ ×¾Ö³ÖÖÖ,
ÃÖ¾ÖÔ ×¾Ö³ÖÖÖßµÖ †ÖµÖ㌟Ö,
úÖ´ÖÖÖ¸ü †ÖµÖ㌟Ö, ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖ, ´ÖãÓ²Ö‡Ô.
ÃÖ¾ÖÔ ×•Ö»ÆüÖ׬ÖúÖ¸üß,
ÃÖ¾ÖÔ ´ÖãµÖ úÖµÖÔúÖ¸üß †×¬ÖúÖ¸üß, וֻÆüÖ ¯Ö׸üÂÖ¤üÖ,
ÃÖ¾ÖÔ ´ÖÆüÖ−ÖÖ¸ü¯ÖÖ×»ÖúÖ †ÖµÖ㌟Ö,
ÃÖ¾ÖÔ Ö™ü×¾ÖúÖÃÖ †×¬ÖúÖ¸üß, ¯ÖÓ“ÖÖµÖŸÖ ÃÖ×´ÖŸÖß,
ÃÖ¾ÖÔ ´ÖãµÖÖ׬ÖúÖ¸üß, −ÖÖ¸ü ¯Ö׸üÂÖ¤üÖ,
ÃÖ¾ÖÔ −ÖÖë¤üÖß †×¬ÖúÖ¸üß,
úÖ †×¬ÖúÖ¸üß (¯ÖÏ¿ÖÖÃÖ−Ö-2) ˆªÖêÖ,‰ú•ÖÖÔ ¾Ö úÖ´ÖÖÖ¸ü ×¾Ö³ÖÖÖ µÖÖÓ−ÖÖ ÃÖ¤ü¸ü ¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ ¾Öê²ÖÃÖÖ‡Ô™ü¾Ö¸ü
™üÖúµÖÖ“µÖÖ ×¾Ö−ÖÓŸÖßÃÖÆü †ÖÏê×ÂÖŸÖ./×−Ö¾Ö›ü−ÖßÖß.
¯Ö׸ü׿Ö™ü -1
´ÖÖÖÔ¤ü¿ÖÔú ŸÖŸ¾Öê.
×−ÖµÖ´Ö ¾Ö †×¬Ö×−ÖµÖ´Ö
1) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996
2) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996
3) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998
4) ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) ×−ÖµÖ´Ö 2007
פü.5.2.2007
´ÖÆüŸ¾ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß ¾Ö ŸµÖÖ“µÖÖ †Ó´Ö»Ö²Ö•ÖÖ¾ÖÖß²ÖÖ²ÖŸÖ ´ÖÖÖÔ¤ü¿ÖÔú ŸÖŸ¾Öê.
1. ‘‘‡´ÖÖ¸üŸÖ Øú¾ÖÖ ‡ŸÖ¸ü ²ÖÖ¬ÖúÖ´Ö ü úÖ´Ö’’ “Öß ¾µÖÖµÖÖ (ú»Ö´Ö 2 (d) ) ´Ö¬µÖê פü»Öê»Öß †ÖÆêü.
²ÖÖÓ¬ÖúÖ´Ö, ±êú¸ü±úÖ¸ü, ¤ãü¹ýßÖß,¤êüÖ³ÖÖ»Ö, Øú¾ÖÖ ¯ÖÖ›æü−Ö ™üÖúÖê ‡ŸµÖÖ¤üß ‡´ÖÖ¸üŸÖ, ¸üßÖê,´ÖÖÖÔ, ¸êü»¾Öê,
™ÒüÖ´Ö¾Öê•Ö,‹†¸ü ×±ú»›üÃÖË, ¯ÖÖšü²ÖÓ¬ÖÖ¸êü, •Ö»Ö×−ÖÃÃÖÖ¸üÖ,²ÖÓ¬ÖÖ¸üÖ ¾Ö −Öê¾ÆüßÖê¿Ö−Ö úÖ´Ö, ¯Öã¸ü ×−ÖµÖÓ¡ÖÖÖ“Öê
úÖ´Ö (¾ÖÖ¤üôûÖ´Öãôêû •Ö»Ö×−ÖÃÃÖÖ¸üÖÖ“µÖÖ úÖ´ÖÖÃÖÆüߟÖ), ŸÖê»Ö ¾Ö ¾ÖÖµÖã“Öß •ÖÖê›üÖß ™üÖúÖê, ×¾ÖªãŸÖ
»ÖÖ‡Ô−ÃÖ, ¾ÖÖµÖ¸ü»ÖêÃÖ, ¸êü›ü߆Öê, ™êü×»Ö¾Æüß•Ö−Ö, ™êü×»Ö±úÖê−Ö, ™êü×»ÖÖÏÖ±ú, †Ö×Ö ÃÖ´Öã¦üÖ¯ÖÖ¸ü ¤üôûÖ¾ÖôûÖ,
¬Ö¸üÖê, úÖ»Ö¾Öê,•Ö»ÖÖ¿ÖµÖê,•Ö»Ö¯ÖϾÖÖÆü, ²ÖÖêÖ¤êü, ¯Öã»Ö, ÃÖêŸÖã, ÃÖêŸÖã¯ÖÏÖÖ»Ö, ¯ÖÖ‡Ô¯Ö»ÖÖ‡Ô−Ö, ™üÖò¾ÖÃÖÔ, ãú»ÖßÖ
™üÖò¾Ö¸üÃÖÔ, ¯ÖÖ¸êüÂÖÖ ™üÖò¾ÖÃÖÔ †Ö×Ö µÖÖ ¯ÖÏúÖ¸ü“Öê ‡ŸÖ¸ü úÖ´Öê ÃÖ´Öã×“ÖŸÖ ¿ÖÖÃÖ−Ö †×¬ÖÃÖã“Ö−Öê«üÖ¸êü »ÖÖÖã ú¹ý
¿ÖúŸÖê ¯Ö¸ÓüŸÖæ úÖ¸üÖÖ−Öê †×¬Ö×−ÖµÖ´Ö, 1948 Øú¾ÖÖ ÖÖÖ †×¬Ö×−ÖµÖ´Ö, 1952 “µÖÖ ŸÖ¸üŸÖæ¤üß •µÖÖ
†ÖãÖÖ¯Ö−ÖêÃÖ »ÖÖÖã ÆüÖêŸÖÖŸÖ ŸµÖÖÓ−ÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß »ÖÖÖã
ÆüÖêÖÖ¸ü −ÖÖÆüߟÖ.
2. úÖêÖŸµÖÖÆüß ×¤ü¾Ö¿Öß 10 Øú¾ÖÖ ŸµÖÖ¯ÖêÖÖ •ÖÖÃŸÖ úÖ´ÖÖÖ¸ü úÖ´ÖÖ¾Ö¸ü šêü¾Ö»Öê †¿ÖÖ ÃÖ¾ÖÔ †ÖãÖÖ¯Ö−ÖÖ−ÖÖ
ÆüÖ úÖµÖ¤üÖ »ÖÖÖã ÆüÖêŸÖÖê. ‘‘†ÖãÖÖ¯Ö−ÖÖ’’ ´ÆüÖ•Öê ú»Ö´Ö 2 (•Öê) úÖêÖŸÖßÆüß †ÖãÖÖ¯Ö−ÖÖ •Öß
¿ÖÖÃÖ−ÖÖ“µÖÖ ×−ÖµÖÓ¡ÖÖÖŸÖ †ÖÆêü. úÖêÖŸµÖÖÆüß ×−ÖÖ´Ö“µÖÖ ×−ÖµÖÓ¡ÖÖÖÖÖ»Öß †ÖÆêü Øú¾ÖÖ ¾µÖ¾ÖÃÖÖµÖ
ÃÖÓãÖꓵÖÖ ×−ÖµÖ¡ÖÖÖÖÖ»Öß †ÖÆêü †Ö×Ö ¾ÖîµÖŒŸÖßú Øú¾ÖÖ †ÃÖÖêÃÖß‹¿Ö−Ö Øú¾ÖÖ ‡ŸÖ¸ü ¾ÖîµÖŒŸÖßú
ÃÖÓãÖÖÓ“µÖÖ †ÓŸÖÖÔŸÖ •Öê ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ×−ÖµÖãŒŸÖ ú¸üŸÖÖŸÖ †Ö×Ö •µÖÖŸÖ Óú¡ÖÖ™ü¤üÖ¸üÖÓ“ÖÖ ÃÖ´ÖÖ¾Öê¿Ö
ÆüÖêŸÖÖê ¯Ö¸ÓüŸÖæ ¾µÖŒŸÖßÖŸÖ׸üŸµÖÖ •Öê †ÃÖê úÖ´ÖÖÖ¸ü ŸµÖÖÓ“Öê þ֟Ö:“Öê ‘Ö¸ü ²ÖÖÓ¬ÖµÖÖú¸üߟÖÖ ¹ý¯ÖµÖê 10 »ÖÖÖ
¯ÖµÖÔŸÖ ¯ÖêÖÖ •ÖÖßÖ
−ÖÃÖê»Ö ŸÖê ŸµÖÖÓ−ÖÖ †ÖãÖÖ¯Ö−Öê“Öß ¾µÖÖµÖÖ »ÖÖÖã ÆüÖêÖÖ¸ü −ÖÖÆüß.
3. ‘‘ ´ÖÖ»Öú ’’ “Öß ¾µÖÖµÖÖ ú»Ö´Ö 2 (i) ´Ö¬µÖê ‡Ã™üÖ²»Öß¿Ö´Öë™ü ÃÖÓ²ÖÓ¬ÖÖŸÖ −Ö´Öã¤ü êú»Öê»Öß †ÖÆêü.
ŸµÖÖŸÖ ÖÖ»Öᯙ ¯ÖÏ´ÖÖÖê †ÓŸÖ³ÖÖÔ¾Ö ÆüÖêŸÖÖê :-
i) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´Ö Ã£ÖÖ×−Öú ÃÖÓãÖÖÓŸÖ±ìú Øú¾ÖÖ ‡ŸÖ¸ü †ÖãÖÖ¯Ö−Öê´ÖÖ±ÔúŸÖ ú¸üµÖÖŸÖ
µÖêŸÖ †ÃÖ»µÖÖÃÖ ¾Ö •µÖÖŸÖ ¯ÖÏÖ׬ÖúÖ¸üß −Öê´Öã−Ö ×¤ü»Öê»ÖÖ −ÖÃÖ»µÖÖÃÖ †¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ ×¾Ö³ÖÖÖÖ“ÖÖ
¯ÖÏ´ÖãÖ.
ii) •Öê£Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê úÖ´Ö Ã£ÖÖ×−Öú ¯ÖÏÖ׬Öú¸üÖÖ´ÖÖ±ÔúŸÖ ü Øú¾ÖÖ ‡ŸÖ¸ü
†ÖãÖÖ¯Ö−ÖÖ´ÖÖ±ÔúŸÖ, £Öê™ü Óú¡ÖÖ™ü¤üÖ¸üÖ ×¿Ö¾ÖÖµÖ ú¸üµÖÖŸÖ µÖêŸÖê †¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ ŸµÖÖ ¯ÖÏÖ׬ÖúÖ¸üÖÖ“ÖÖ
Øú¾ÖÖ †ÖãÖÖ¯Ö−Öê“ÖÖ ´ÖãµÖ úÖµÖÔúÖ¸üß †×¬ÖúÖ¸üß,
iii) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü Óú¡ÖÖ™ü¤üÖ¸üÖ´ÖÖ±ÔúŸÖ Øú¾ÖÖ ´ÖÖ»ÖúÖ´ÖÖ±ÔúŸÖ ú¸üµÖÖŸÖ µÖêŸÖê
†¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ Óú¡ÖÖ™ü¤üÖ¸ü
4. ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 3 ¾Ö ×−ÖµÖ´Ö 4 (3) −ÖãÃÖÖ¸ü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‹ÃÖ†Öê −ÖÓ.2899,
פü−ÖÖÓú 26.3.1996 †−¾ÖµÖê ײֻÖÖŸÖæ−Ö 1 % ˆ¯Öú¸ü ú¯ÖÖŸÖ ú¸üµÖÖ²ÖÖ²ÖŸÖ ×−ÖÖÔ×´ÖŸÖ êú»Ö껵ÖÖ
†×¬ÖÃÖã“Ö−ÖꓵÖÖ †−ÖãÂÖÓÖÖ−Öê ú¯ÖÖŸÖ êú»Ö껵ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Öê“ÖÖ ¬Ö−ÖÖúÂÖÔ ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖ ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖúÖ¸üß ´ÖÓ›üôû, ´ÖãÓ²Ö‡Ô µÖÖÓ“ÖÖ ÖÖŸÖê Îú´ÖÖÓú
004220110000153 ²ÖÑú †Öò±ú ‡Ó×›üµÖÖ ´ÖãÓ²Ö‡Ô µÖÖ ²ÖÑêú“µÖÖ ´ÖÆüÖ¸üÖ™ÒüÖŸÖᯙ úÖêÖŸµÖÖÆüß ¿ÖÖÖêŸÖ
ÃÖÖê²ÖŸÖ •ÖÖê›üµÖÖŸÖ †Ö»Ö껵ÖÖ ×¾Ö×ÆüŸÖ “Ö»Ö−ÖÖ«üÖ¸êü •Ö´ÖÖ ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü.
5. ˆ¯Öú¸ü ×−ÖµÖ´ÖÖ“µÖÖ ×−ÖµÖ´Ö, 4 (4) †−ÖãÃÖÖ¸ü •Öê£Öê ²ÖÖÓ¬ÖúÖ´ÖÖú¸üߟÖÖ Ã£ÖÖ×−Öú ÃÖÓãÖê“Öß ´ÖÓ•Öæ¸üß
†Ö¾Ö¿µÖú †ÖÆêü. ŸÖê£Öê †¿ÖÖ ´ÖÓ•Öæ¸üßú¸üߟÖÖ ¯ÖÏÖ¯ŸÖ —ÖÖ»Ö껵ÖÖ ¯ÖÏŸµÖêú †•ÖÖÔ ÃÖÖê²ÖŸÖ ´ÖÓ›üôûÖ“µÖÖ −ÖÖÓ¾Öê
ˆ¯Öú¸üÖÃÖÓ²ÖÓ¬Öß“ÖÖ ¸êüÖÖÓ×úŸÖ ¬Ö−ÖÖúÂÖÔ (‹úÖ ¾ÖÂÖÖÔ“µÖÖ ²ÖÓÖ¬ÖúÖ´ÖÖ“µÖÖ †Ó¤üÖ•ÖßŸÖ Ö“ÖÖÔ“µÖÖ 1 %
¸üŒú´Öê ‹¾ÖœüÖ)ÃÖ¤ü¸ü ãÖÖ×−Öú ÃÖÓãÖêÃÖ ÃÖÖ¤ü¸ü ú¸üÖê †Ö¾Ö¿µÖú †ÖÆêü.
6. ¯Öãœêü ×−ÖµÖ´Ö 5 −ÖãÃÖÖ¸ü ¿ÖÖÃÖ×úµÖ úÖµÖÖÔ»ÖµÖ/ÃÖÖ¾ÖÔ•Ö×−Öú ˆ¯ÖÎú´Ö/ãÖÖ×−Öú ÃÖÓãÖÖ“µÖÖ ²ÖÖ²ÖŸÖߟÖ
¾ÖÃÖæ»Öß †×¬ÖúÖ-µÖÖÓ−Öê ×−ÖµÖ´Ö 4 †ÓŸÖÖÔŸÖ •Ö´ÖÖ êú»Öê»ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö “Ö»Ö−ÖÖ«üÖ¸êü ¯ÖÏŸµÖÖ Ö“ÖÔ
—ÖÖ»Öê»Öß ¸üŒú´Ö •Öß 1 % ¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖÖÖ¸ü ŸÖê¾Öœüß ú´Öß ú¹ý−Ö ˆ¾ÖÔ¸üßŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö
•Ö´ÖÖ ú¸êü»Ö.
7. ×−ÖµÖ´Ö 5 (3) −ÖãÃÖÖ¸ü •Ö´ÖÖ êú»Öê»Öß ¸üŒú´Ö ´ÖÓ›üôûÖú›êü 30 פü¾ÖÃÖÖÓŸÖ •Ö´ÖÖ ú¸üÖê †Ö¾Ö¿µÖú †ÖÆêü.
8. úÖêÖŸµÖÖÆüß ²ÖÖÓ¬ÖúÖ´Ö †ÖãÖÖ¯Ö−Öê−Öê Øú¾ÖÖ ²ÖÖÓ¬ÖúÖ´Ö ´ÖÖ»ÖúÖ−Öê Øú¾ÖÖ ˆ¯Öú¸ü ¾ÖÃÖã»Öß †×¬ÖúÖ-µÖÖ−Öê
Øú¾ÖÖ Ã£ÖÖ×−Öú ÃÖÓãÖê−Öê Øú¾ÖÖ ¿ÖÖÃÖúßµÖ úÖµÖÖÔ»ÖµÖÖ−Öê Øú¾ÖÖ ÃÖÖ¾ÖÔ•Ö×−Öú ˆ¯ÖÎú´ÖÖ−Öê Øú¾ÖÖ »ÖÖ³ÖÖ£Öá
úÖ´ÖÖÖ¸üÖ−Öê ´ÆüÖ•Öê“Ö •Öê úÖêÖß ú»µÖÖÖ ´ÖÓ›üôû ×−Ö¬Öß´Ö¬µÖê ˆ¯Öú¸ü †£Ö¾ÖÖ »ÖÖ³ÖÖ£Öá −ÖÖë¤üÖß ¿Öã»ú
µÖÖ“ÖÖ ³Ö¸üÖÖ ú¸üÖÖ¸ü †ÃÖŸÖᯙ ŸÖê ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖ“µÖÖ ²ÖÑú †Öò±ú ‡Ó×›üµÖÖ
´Ö¬Öᯙ ´ÖÆüÖ¸üÖ™ÒüÖŸÖᯙ úÖêÖŸµÖÖÆüß ¿ÖÖÖêŸÖ ú¸üµÖÖú׸üŸÖÖ ÃÖÖê²ÖŸÖ •ÖÖê›üµÖÖŸÖ †Ö»Ö껵ÖÖ ×¾Ö×ÆüŸÖ
“Ö»Ö−ÖÖ«üÖ¸êü ÃÖ¤ü¸ü ³Ö¸üÖÖ ú¸üŸÖß»Ö. µÖÖ “Ö»Ö−ÖÖ“Öß 4 ¯ÖÏŸÖßŸÖ ×¾Ö³ÖÖÖÖß †ÃÖæ−Ö 2 ¯ÖÏŸÖß ²ÖÑú
þ֟Ö:ú›êü šê¾Öæ−Ö ˆ¾ÖÔ׸üŸÖ 2 ¯ÖÏŸÖß ³Ö¸üÖÖ ú¸üÖÖ-µÖÖ ¾µÖŒŸÖßÃÖ (¸êü×´Ö™ü¸üú›êü) ¤êüµÖÖŸÖ µÖê‡Ô»Ö. ÃÖ¤ü¸ü
³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê 1 ¯ÖÏŸÖ ÃÖ×“Ö¾Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôû µÖÖÓ−ÖÖ
¯ÖÖšü¾ÖÖ¾ÖµÖÖ“Öß †ÖÆêü. ¤ü¸ü ´Ö×Æü−µÖÖ“µÖÖ 10 ŸÖÖ¸üÖê¯Öæ¾Öá ˆ¯Öú¸üÖ¯ÖÖê™üß •Ö´ÖÖ ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ
¸üú´Öê“ÖÖ ŸÖ¯Ö×¿Ö»Ö ¤ü¿ÖÔ×¾Ö»Ö껵ÖÖ ´ÖÖ×ÃÖú ŸÖŒŸµÖÖŸÖ •ÖÖê›ü¯Ö¡Ö-3 ´Ö¬µÖê ˆ¯Öú¸ü ³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê
ú»µÖÖÖ ´ÖÓ›üôûÖú›êü ´ÖÖ×ÆüŸÖß ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öß †ÖÆêü. ŸÖÃÖê“Ö •ÖÖê›ü¯Ö¡Ö-4 ´Ö¬µÖê −Ö´Öæ¤ü êú»Ö껵ÖÖ
ŸÖŒŸµÖÖŸÖ ¿ÖÖÃÖúßµÖ ×¾Ö³ÖÖÖ, ãÖÖ×−Öú ÃÖÓãÖÖ ¾Ö ÃÖÖ¾ÖÔ•Ö×−Öú ˆ¯ÖÎú´Ö µÖÖÓ−Öß ¾ÖÖÙÂÖú ×¾Ö¾Ö¸üÖ¯Ö¡Ö
ú»µÖÖÖ ´ÖÓ›üôûÖú›êü ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öê †ÖÆêü. †Ö¸üÖÖ›üÖ ´ÖÓ•Öæ¸ü ú¸üÖÖ-µÖÖ ¯ÖÏÖ׬ÖúÖ-µÖÖ−Öê ¤êüÖß»Ö
ˆ¯Ö¸üÖêŒŸÖ ¯ÖÏ´ÖÖÖê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ−ÖÓŸÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖú›êü “Ö»Ö−ÖÖ«üÖ¸êü ³Ö¸üÖÖ
ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ŸÖÃÖê“Ö ŸµÖÖ²ÖÖ²ÖŸÖ“ÖÖ ´ÖÖ×ÃÖú †Æü¾ÖÖ»Ö •ÖÖê›ü¯Ö¡Ö-3 ´Ö¬µÖê ¾Ö ¾ÖÖÙÂÖú
×¾Ö¾Ö¸üÖÖ¯ÖÖê™üß •ÖÖê›ü¯Ö¡Ö-5 ´Ö¬µÖê ú»µÖÖÖ ´ÖÓ›üôûÖÃÖ ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. “Ö»Ö−ÖÖ“Öß ˆ¾ÖÔ׸üŸÖ ¯ÖÏŸÖ
³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê þ֟Ö:ú›êü šêü¾Öæ−Ö ¸üú´ÖꓵÖÖ ‡ŸÖ¸ü ŸÖ¯Ö׿ֻÖÖÃÖÆü ´ÖÓ›üôûÖ−Öê ŸÖ¯ÖÖÃÖÖßú׸üŸÖÖ
´ÖÖ×ÖŸÖ»µÖÖÃÖ ÃÖÖ¤ü¸ü ú¸üÖê †Ö¾Ö¿µÖú †ÃÖê»Ö.
9. ˆ¯Öú¸ü ŸÖÃÖê“Ö »ÖÖ³ÖÖ£Öá −ÖÖê¤ÓüÖß ¿Öã»ú ²ÖÑêú“µÖÖ •µÖÖ ¿ÖÖÖê´Ö¬µÖê •Ö´ÖÖ ÆüÖêŸÖ †ÃÖê»Ö ŸÖß ¿ÖÖÖÖ ¤ü¸ü´ÖÆüÖ
²ÖÑú †Öò±ú ‡Ó×›üµÖÖ µÖÖÓ“µÖÖ ´ÖãÓ²Ö‡Ô µÖê£Öᯙ ŸÖÖ›ü¤êü¾Ö ¿ÖÖÖêŸÖ “Ö»Ö−ÖÖ“µÖÖ ˆ¾ÖÔ¸üßŸÖ ¯ÖÏŸÖß ‹úס֟֯ÖÖê ÃÖÖ¤ü¸ü
ú¸êü»Ö. •ÖêÖêú¹ý−Ö ²ÖÑú †Öò±ú ‡Ó×›üµÖÖ, ú»µÖÖÖ ´ÖÓ›üôû µÖÖÓ−ÖÖ †Ö¯ÖÖ¯ÖÃÖÖŸÖ •Ö´ÖÖ ˆ¯Öú¸ü ¾Ö »ÖÖ³ÖÖ£Öá
−ÖÖë¤üÖß ¿Öã»úÖ“ÖÖ ŸÖÖôû´Öêôû ‘ÖÖ»ÖÖê ¿ÖŒµÖ ÆüÖê‡Ô»Ö.
10.ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 6 (1) −ÖãÃÖÖ¸ü ¯ÖÏŸµÖêú ´ÖÖ»Öú ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê úÖ´Ö ÃÖã¹ý
—ÖÖ»µÖÖ¯ÖÖÃÖæ−Ö 30 פü¾ÖÃÖÖŸÖ Øú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸ü»µÖÖ −ÖÓŸÖ¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-
µÖÖÃÖ ¯ÖÏ¯Ö¡Ö 1 ´Ö¬µÖê ´ÖÖ×ÆüŸÖß ÃÖÖ¤ü¸ü ú¸êü»Ö (¯ÖÏŸÖ •ÖÖê›ü»Öß †ÖÆêü.)
11.×−ÖµÖ´Ö 7 −ÖãÃÖÖ¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ŸµÖÖÓ−ÖÖ ±úÖò´ÖÔ 1 ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ−ÖÓŸÖ¸ü 6
´Ö×Æü−µÖÖ¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖ»Ö껵ÖÖ úÖ»ÖÖ¾Ö¬ÖßŸÖ ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ²ÖÖ²ÖŸÖ“Öê †Ö¤êü¿Ö ¯ÖÖ¸üߟÖ
ú¸êü»Ö.•Ö¸ü ŸÖÖê ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ“µÖÖ ²ÖÖ²ÖŸÖßŸÖ ÃÖ´ÖÖ¬ÖÖ−Öß †ÃÖê»Ö ŸÖ¸ü
12. µÖã×−Öú úÖê›ü −ÖÓ. :- i) ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖ ¿ÖÖÃÖúßµÖ/×−Ö´Ö ¿ÖÖÃÖúßµÖ ˆ¯ÖÎú´Ö µÖÖÓ−Öß
²ÖÖÓ¬ÖúÖ´ÖÖÃÖ ¯Ö¸ü¾ÖÖ−ÖÖß ¤êüµÖÖ“µÖÖ ¯ÖÏŸµÖêú ¯ÖÏú¸üÖÖÃÖ ÆüÖ µÖã×−Öú Îú´ÖÖÓú ªÖ¾ÖÖ. †Ö×Ö
ÆüÖ Îú´ÖÖÓú ²ÖÖÓ¬ÖúÖ´Ö ÃÖã¹ý ú¸üµÖÖ“µÖÖ ¯ÖÏ´ÖÖÖ¯Ö¡ÖÖ´Ö¬µÖê −Ö´Öæ¤ü ú¸üÖ¾ÖÖ. ´ÖÆüÖ¸üÖ™Òü ¾Ö ‡ŸÖ¸ü
²ÖÖÓ¬ÖúÖ´Ö ˆ¯Öú¸üÖ ÃÖÓ²ÖÓ¬Öß“ÖÖ ÆüÖ µÖã×−Öú úÖê›ü −ÖÃÖê»Ö ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö ÃÖã¹ý ú¸üµÖÖ“Öê ¯ÖÏ´ÖÖÖ¯Ö¡Ö
†¯ÖæÖÔ †ÃÖ»µÖÖ“Öê ´ÖÖ−ÖµÖÖŸÖ µÖÖ¾Öê. ÆüÖ µÖã×−Öú úÖê›ü Îú´ÖÖÓú ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖ−Öê ªÖ¾ÖµÖÖ“µÖÖ
µÖã×−Öú úÖê›ü“µÖÖ ¬ÖŸÖá¾Ö¸ü †ÃÖê»Ö.
ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖ−Öê ªÖ¾ÖµÖÖ“ÖÖ µÖã×−Öú úÖê›ü −ÖÓÓ. ÆüÖ ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Öú
פü.26.10.2009 †−¾ÖµÖê ×−Ö¬ÖÖÔ׸üŸÖ êú»µÖÖ−ÖãÃÖÖ¸ü †ÃÖê»Ö.
13. ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö, ¾Ö ŸµÖÖ †ÓŸÖÖÔŸÖ ×−ÖµÖ´ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß−ÖãÃÖÖ¸ü •Ö¸ü ¯ÖãŸÖÔŸÖÖ êú»Öß −ÖÖÆüß ŸÖ¸ü
ÖÖ»Öᯙ ¯ÖÏ´ÖÖÖê úÖ¸ü¾ÖÖ‡Ô“Öß ŸÖ¸üŸÖæ¤ü ú¸üµÖÖŸÖ †Ö»Öê»Öß †ÖÆêü :-
¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 12 −ÖãÃÖÖ¸ü ¤Óü›ü :- (1) ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓÃÖ †ÃÖê •Ö¸ü †ÃÖê
†Öœüôæ−Ö †Ö»Öê úß, ´ÖÖ»ÖúÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ×−Ö¬ÖÖÔ¸üÖ †Ö¤êü¿ÖÖŸÖ −Ö´Öã¤ü êú»µÖÖ−ÖãÃÖÖ¸ü ³Ö¸ü»Öß
−ÖÃÖê»Ö Øú¾ÖÖ ú´Öß ³Ö¸ü»Öß †ÃÖê»Ö Øú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ‹ãúÖ ¸üŒú´Öê¾Ö¸ü ú´Öß úÖ¯Ö»Öß
†ÃÖê»Ö ŸÖ¸ü ´ÖÖ»ÖúÖÃÖ ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß −ÖÖê™üßÃÖ £Öú²ÖÖúß †ÃÖ»µÖÖ“Öê úôû×¾Ö»Ö †Ö×Ö µÖÖêµÖ
ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ´ÖÖ»ÖúÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Öê»Ö.•ÖÖê ˆ¯Öú¸üÖ“µÖÖ
¸üŒú´Öê¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖê»Ö.
¯Ö¸ÓüŸÖæ †ÃÖÖ ¤Óü›ü »ÖÖ¾ÖµÖÖ¯Öã¾Öá ´ÖÖ»ÖúÖÃÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ‹îãú−Ö ‘ÖêµÖÖú¸üߟÖÖ ÃÖÓ¬Öß ¤êüµÖÖŸÖ µÖê‡Ô»Ö ¾Ö
´ÖÖ»ÖúÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸üµÖÖ ´ÖÖÖÖß úÖ¸üÖê µÖÖêµÖ ¾Ö ¯Öã¸êü¿Öß †ÖÆêüŸÖ †ÃÖê ×−Ö¬ÖÖÔ¸üÖ
†×¬ÖúÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ŸµÖÖÓ“µÖÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Ö»ÖÖ •ÖÖÖÖ¸ü −ÖÖÆüß.
3) •ÖÖê úÖêÖß ÆêüŸÖã¯Öã¸üïָü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸üµÖÖÃÖ ™üÖôûÖ™üÖôû ú¸üŸÖÖê †¿ÖÖÓ−ÖÖ 6
´Ö×Æü−µÖÖ¯ÖµÖÔŸÖ“Öß îú¤ü †£Ö¾ÖÖ ¤Óü›ü †£Ö¾ÖÖ ¤üÖê−Æüß ÆüÖê‰ú ¿ÖúŸÖê.
4) úÖêÖŸÖêÆüß −µÖÖµÖÖ»ÖµÖ †¿ÖÖ Öã−ÆüµÖÖÓ“Öê ¤üÖ»Ö ‘ÖêÖÖ¸ü −ÖÖÆüß •ÖÖê ¯ÖµÖÔŸÖ êú¦ü ¿ÖÖÃÖ−ÖÖ“µÖÖ ¯ÖÏÖ׬ÖúÖ-
µÖÖÓ−Öê ŸÖÎúÖ¸ü êú»Öê»Öß −ÖÃÖê»Ö.
¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 12 −ÖãÃÖÖ¸ü ¤Óü›ü :- (1) ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓÃÖ †ÃÖê •Ö¸ü †ÃÖê
†Öœüôæ−Ö †Ö»Öê úß, ´ÖÖ»ÖúÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ×−Ö¬ÖÖÔ¸üÖ †Ö¤êü¿ÖÖŸÖ −Ö´Öã¤ü êú»µÖÖ−ÖãÃÖÖ¸ü ³Ö¸ü»Öß
−ÖÃÖê»Ö Øú¾ÖÖ ú´Öß ³Ö¸ü»Öß †ÃÖê»Ö Øú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ‹ãúÖ ¸üŒú´Öê¾Ö¸ü ú´Öß úÖ¯Ö»Öß
†ÃÖê»Ö ŸÖ¸ü ´ÖÖ»ÖúÖÃÖ ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß −ÖÖê™üßÃÖ £Öú²ÖÖúß †ÃÖ»µÖÖ“Öê úôû×¾Ö»Ö †Ö×Ö µÖÖêµÖ
ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ´ÖÖ»ÖúÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Öê»Ö.•ÖÖê ˆ¯Öú¸üÖ“µÖÖ
¸üŒú´Öê¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖê»Ö.
¯Ö¸ÓüŸÖæ †ÃÖÖ ¤Óü›ü »ÖÖ¾ÖµÖÖ¯Öã¾Öá ´ÖÖ»ÖúÖÃÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ‹îãú−Ö ‘ÖêµÖÖú¸üߟÖÖ ÃÖÓ¬Öß ¤êüµÖÖŸÖ µÖê‡Ô»Ö ¾Ö
´ÖÖ»ÖúÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸üµÖÖ ´ÖÖÖÖß úÖ¸üÖê µÖÖêµÖ ¾Ö ¯Öã¸êü¿Öß †ÖÆêüŸÖ †ÃÖê ×−Ö¬ÖÖÔ¸üÖ
†×¬ÖúÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ŸµÖÖÓ“µÖÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Ö»ÖÖ •ÖÖÖÖ¸ü −ÖÖÆüß.
•ÖÖê›ü¯Ö¡Ö - 1 “Öê ¯Ö׸ü׿Ö™ü
¯ÖÏ¯Ö¡Ö 1 (×−ÖµÖ´Ö 7)
−ÖÖë¤üÖß Îú.
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü
(¸üÖê•ÖÖÖ¸ü ×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá)
†×¬Ö×−ÖµÖ´Ö, 1996 †ÓŸÖÖÔŸÖ
−ÖÖë¤üÖß ¯ÖÏÖ׬ÖúÖ¸üß
1) †ÖãÖÖ¯Ö−Öê“Öê −ÖÖÓ¾Ö :-
2) ¯Ö¢ÖÖ
3) úÖ´ÖÖ“Öê −ÖÖÓ¾Ö/þֹý¯Ö
4) ×−ÖµÖãŒŸÖ êú»Öê»Öê úÖ´ÖÖÖ¸ü ÃÖÓµÖÖ
5) úÖ´Ö ÃÖã¹ý¾ÖÖŸÖ —ÖÖ»µÖÖ“Öß úÖ´ÖÖ“Öê †Ó¤üÖ•Öê úÖ»ÖÖ¾Ö¬Öß
ŸÖÖ¸üßÖ/´Ö×Æü−ÖÖ/¾ÖÂÖÔ ´Ö×Æü−Öê / ¾ÖÂÖÔ
6) ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê ˆ¯Öú¸ü
†Ó¤üÖ•ÖßŸÖ ´Öã»µÖ ³Ö¸üµÖÖ²ÖÖ²ÖŸÖ“ÖÖ
ŸÖ¯Ö׿ֻÖ.
™ü¯¯Öê ´Öã»µÖ ¸üŒú´Ö, “Ö»Ö−Ö Îú.¾Ö †ÖÏß´Ö - ‹
פü−ÖÖÓú ¾Ö•ÖÖ¾Ö™ü - †
†ÓŸÖß´Ö - ‹±ú
¯ÖÆüß»Öê ¾ÖÂÖÔ
¤ãüÃÖ¸êü ¾ÖÂÖÔ
ןÖÃÖ¸êü ¾ÖÂÖÔ
“ÖÖî£Öê ¾ÖÂÖÔ
‹ãúÖ
---------------------------------------------------------------------------------------------------
´ÖÖ»ÖúÖ“Öß Ã¾ÖÖÖ¸üß
´ÖÖ»ÖúÖ“Öê −ÖÖÓ¾Ö
פü−ÖÖÓú
×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓ−Öê ³Ö¸üÖ¾ÖµÖÖ“Öê
7.¯ÖãÖÔŸ¾ÖÖ“Öß ŸÖÖ¸üßÖ 8. †Ó×ŸÖ´Ö ´Ö㻵Ö
9) ×−Ö¬ÖÖÔ¸üÖÖ“Öß ŸÖÖ¸üßÖ 10) ×−Ö¬ÖÖÔ¸üßŸÖ ¸üŒú´Ö
11) †×¯Ö»ÖÖ“Öß ŸÖÖ¸üßÖ †ÃÖ»µÖÖÃÖ 12) †×¯Ö»ÖÖÃÖÓ²ÖÓ¬Öß“µÖÖ †Ö¤êü¿ÖÖ“Öß ŸÖÖ¸üßÖ
13) †×¯Ö»ÖÖ“µÖÖ †Ö¤êü¿ÖÖ−ÖãÃÖÖ¸ü 14) ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ´ÖÓ›üôûÖŸÖ •Ö´ÖÖ êú»µÖÖ“Öß
¸üŒú´Ö ŸÖÖ¸üßÖ
15) ÆüßÖÖÓŸÖ¸üßŸÖ ¸üŒú´Ö - “Ö»Ö−Ö Îú. ¾Ö פü−ÖÖÓú
þÖÖÖ¸üß
Ææü¤ü¤ËüÖ
¯Ö׸ü׿Ö™ü- 2
ˆ¯Öú¸üÖ¯ÖÖê™üß •Ö´ÖÖ ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ ¸üŒú´Öê“ÖÖ ŸÖ¯Ö×¿Ö»Ö ¤ü¿ÖÔ×¾ÖÖÖ¸üÖ ´ÖÖ×ÃÖú ŸÖŒŸÖÖ
ÃÖÓ¤ü³ÖÔ Îú´ÖÖÓú
†.Îú †ÖÙ£Öú ¾ÖÂÖÖÔŸÖ •Ö´ÖÖ ³Ö¸üÖÖ ÃÖ¾ÖÔ 12 •Ö´ÖÖ ú¸üµÖÖŸÖ ´ÖÓ›üôûÖŸÖ±ìú
´ÖÓ•Öæ¸ü ú¸üµÖÖŸÖ êú»Ö껵ÖÖ êú»Ö껵ÖÖ ´Ö×Æü−µÖÖ“Öê †Ö»Ö껵ÖÖ †Ö¸üÖÖ›êü ´ÖÓ•Öæ¸ü
†Ö»Ö껵ÖÖ ˆ¯Öú¸üÖ“Öß ˆ¯Öú¸üÖ“Öß ´ÖÖ×ÃÖú ˆ¯Öú¸üÖÃÖÓ²ÖÓ¬Öß ú¸üµÖÖŸÖ
†Ö¸üÖÖ›üµÖÖ“Öß ¸üŒú´Ö ¸üŒú´Ö ×¾Ö¾Ö¸üÖ¯Ö¡Ö —ÖÖ»Öê»ÖÖ ¯ÖÏŸµÖÖ †Ö»Ö껵ÖÖ
ÃÖÓµÖÖ ¹ý¯ÖµÖê ¹ý¯ÖµÖê ÃÖÖ¤ü¸ü êú»Öê Ö“ÖÔ †×¬ÖúÖ-µÖÖÓ−ÖÖ
†ÖÆêüŸÖ úÖµÖ (1 % ¯ÖêÖ ˆ¯Öú¸
†Ö×Ö ³Ö¸üÖÖ •ÖÖÃŸÖ ÖÖêôûÖ
êú»Ö껵ÖÖ −ÖÃÖ»Öê»ÖÖ) ú¸üµÖÖÃÖÖšüß
ˆ¯Öú¸üÖ“Öß Ö“ÖÔ ú¸üµÖÖŸÖ
¸üŒú´Öê“ÖÖ †Ö»Ö껵ÖÖ
´Öêôû ²ÖÃÖ»ÖÖ ¸üŒú´Öê“Öß
úÖµÖ ú¸üµÖÖŸÖ
†Ö»Ö껵ÖÖ
¯Ö¸ü߯ÖãŸÖá
²ÖÖ²ÖŸÖ“ÖÖ
ŸÖ¯Ö׿ֻÖ
(´ÖÓ›üôûÖú¸üߟÖÖ
1. 2. 3. 4. 5. 6. 7.
जलसंपदा विभागाने प्रवििर्षी दरसूचीिर
आधारीि भाििाढ वनदे शांक प्रवसध्द करणेबाबि
महाराष्ट्र शासन
जलसंपदा विभाग
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
मंत्रालय, मंबई - 400 032.
िारीख: 22 मे, 2017
प्रस्िािना:-
एखाद्या प्रकल्पाच्या बांधकामाचा कालािधी मोठा असिो िेव्हा भाििाढीमळे प्रकल्पाच्या खचाि
होणारी िाढ ही अवनिायण ि अपवरहायण असिे. तयामळे दीर्णकाळ चालि असलेल्या प्रकल्पािील सकमििाढीचे
विश्लेर्षण करिांना प्रथमि: भाििाढीमळे झालेली सकमििाढ वनविि करुन िी अपवरहायण म्हणून िेगळी
काढली पावहजे. सधारीि प्रकल्प अहिाल ियार करिाना सविस्िर पवरगणना कूनन भाििाढीमळे प्रकल्प
खचाि होणारी िाढ काढण्याि येिे. िथापी, सधारीि प्रकल्प अहिालाच्या िपासणीच्या प्रतयेक टप्पप्पयािर
भाििाढीमळे होणारी प्रकल्प खचािील िाढीच्या सविस्िर पवरगणनेची आकडे िारी िपासणी शक्य होि नाही.
यासाठी भाििाढीमळे होणारी सकमििाढ स्स्िकारिाना सधारीि प्रशासकीय मान्यिा दे णाऱ्या प्रावधकरणास
पडिाळणीसाठी सटसटीि, सलभ ि िकणसंगि कायणपध्दिी विकवसि करणे गरजेचे ठरिे. ससचन विर्षयक
विशेर्ष चौकशी सवमिीच्या अहिालािील प्रस्िाविि 42 सधारणांमध्ये सधारणा क्र.18 पढीलप्रमाणे आहे.
“जलसंपदा विभागाने प्रिीिर्षी दरसूचीिर आधावरि भाििाढ वनदे शांक प्रवसध्द करािा”.
केंवद्रय बांधकाम विभागाच्या धिीिर असे वनदे शांक ठरविण्यासाठी मख्य अवभयंिा (जसं) ि सह सवचि यांच्या
अध्यक्षिेखाली अधीक्षक अवभयंिा, जायकिाडी प्रकल्प मंडळ औरंगाबाद आवण अधीक्षक अवभयंिा, महाराष्ट्र
कृष्ट्णा खोरे विकास महामंडळ हे सदस्य सवचि असलेली सवमिी गवठि करण्याि आली होिी.
राज्यािील मोठे ,मध्यम ि लर्ू प्रकल्पांच्या विविध कामांच्या 6 वनविदांचा (मोठ्या प्रकल्पािील मािी
धरण, द्वारयक्ि उतसारी भागाची कामे, मध्यम प्रकल्पाचे मािी धरणाचे काम, उपसा ससचन योजनेची कामे,
लपा प्रकल्पांच्या धरणाचे काम, अस्िरीकरणासह कालव्यांची कामे आवण मोठ्या प्रकल्पािील बॅरेजेसची
कामे) अभ्यास कूनन िसेच दरम्यानच्या कालािधीि केंद्रीय जलआयोगाने एवप्रल 2016 मध्ये जलसंपदा
प्रकल्पाच्या अंदाजपत्रक ियार करणेसाठीच्या प्रवसध्द केलेल्या मसूदा मागणदशणक सूचनाचा अभ्यास कूनन
सवमिीने आपला अहिाल सादर केला.
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
1) जलसंपदा विभागासाठी भाििाढ वनदे शांक पवरगवणि करिाना प्रकल्प सकमिीिर पवरणाम
करणाऱ्या र्टकांचे पढील प्रमाणे अवधमान (Weightage) वनविि करणेि यािे.
All Commodities :- 35 %
Cement :- 18 %
Steel :- 12 %
Fuel :- 10 %
Labour :- 25 %
2अ) वसमेंट, स्टील ि All Commodities साठी केंद्र शासनाचे Office of the Economic Advisor
Ministry of Commerce and Industries यांनी मवहना वनहाय प्रवसध्द केलेले Indices विचाराि
घ्यािेि. (http://eaindustry.nic.in)
2ब) इंधनासाठी Indian Oil यांनी मंबईसाठी प्रवसध्द केलेले दर विचाराि र्ेणेि यािेि.
(http://www.iocl.com)
2क) लेबर Indices साठी लेबर ब्यरोने प्रवसध्द केलेले Consumer Price Index for Industrial
workers विचाराि र्ेणेि यािेि. (http://labourbureau.nic.in) यासाठी मंबई, नागपूर , नावशक,
पणे, सोलापूर साठीच्या Indices ची सरासरी विचाराि र्ेणेि यािी.
(3) अथणसंकल्पाि िर्षासाठीची करप्रणाली वनविि होि असिे. तयामळे दरिर्षीचा भाििाढ वनदे शांक
पवरगवणि करिाना एवप्रल मवहन्यािील वनदे शांक विचाराि घ्यािेि.
सवमिीने उपरोक्ि गृहीिकािर आधारीि ससचन प्रकल्पासाठीचे सन 2000 पासनचे िार्षर्षक वनदेशांक
पवरगवणि कूनन शासनास सादर केले.
सवमिीचा अहिाल स्स्िकृि कूनन शासनाने ससचन प्रकल्पांचे भाििाढ वनदे शांकाबाबि पढील प्रमाणे वनणणय
र्ेिला आहे.
शासन वनणणय-
2) एखाद्या िर्षी जलसंपदा विभागाची दरसूची प्रवसध्द न झाल्यास दरसूचीिील बाबीचे दर िदथणपणे
िाढििाना सदर वनदे शांकािील िाढ विचाराि घ्यािी.
पृष्ट्ठ 4 पैकी 2
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
3) दरिर्षीचे भाििाढ वनदे शांक एवप्रल मवहन्याचे प्रसावरि होणाऱ्या वनदे शांकाचे आधारािर प्रवसध्द
करािेि.
पृष्ट्ठ 4 पैकी 3
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
पवरवशष्ट्ट -1
पृष्ट्ठ 4 पैकी 4
जलसंपदा विभागाने प्रवििर्षी दरसूचीिर
आधारीि भाििाढ वनदे शांक प्रवसध्द करणेबाबि
महाराष्ट्र शासन
जलसंपदा विभाग
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
मंत्रालय, मंबई - 400 032.
िारीख: 22 मे, 2017
प्रस्िािना:-
एखाद्या प्रकल्पाच्या बांधकामाचा कालािधी मोठा असिो िेव्हा भाििाढीमळे प्रकल्पाच्या खचाि
होणारी िाढ ही अवनिायण ि अपवरहायण असिे. तयामळे दीर्णकाळ चालि असलेल्या प्रकल्पािील सकमििाढीचे
विश्लेर्षण करिांना प्रथमि: भाििाढीमळे झालेली सकमििाढ वनविि करुन िी अपवरहायण म्हणून िेगळी
काढली पावहजे. सधारीि प्रकल्प अहिाल ियार करिाना सविस्िर पवरगणना कूनन भाििाढीमळे प्रकल्प
खचाि होणारी िाढ काढण्याि येिे. िथापी, सधारीि प्रकल्प अहिालाच्या िपासणीच्या प्रतयेक टप्पप्पयािर
भाििाढीमळे होणारी प्रकल्प खचािील िाढीच्या सविस्िर पवरगणनेची आकडे िारी िपासणी शक्य होि नाही.
यासाठी भाििाढीमळे होणारी सकमििाढ स्स्िकारिाना सधारीि प्रशासकीय मान्यिा दे णाऱ्या प्रावधकरणास
पडिाळणीसाठी सटसटीि, सलभ ि िकणसंगि कायणपध्दिी विकवसि करणे गरजेचे ठरिे. ससचन विर्षयक
विशेर्ष चौकशी सवमिीच्या अहिालािील प्रस्िाविि 42 सधारणांमध्ये सधारणा क्र.18 पढीलप्रमाणे आहे.
“जलसंपदा विभागाने प्रिीिर्षी दरसूचीिर आधावरि भाििाढ वनदे शांक प्रवसध्द करािा”.
केंवद्रय बांधकाम विभागाच्या धिीिर असे वनदे शांक ठरविण्यासाठी मख्य अवभयंिा (जसं) ि सह सवचि यांच्या
अध्यक्षिेखाली अधीक्षक अवभयंिा, जायकिाडी प्रकल्प मंडळ औरंगाबाद आवण अधीक्षक अवभयंिा, महाराष्ट्र
कृष्ट्णा खोरे विकास महामंडळ हे सदस्य सवचि असलेली सवमिी गवठि करण्याि आली होिी.
राज्यािील मोठे ,मध्यम ि लर्ू प्रकल्पांच्या विविध कामांच्या 6 वनविदांचा (मोठ्या प्रकल्पािील मािी
धरण, द्वारयक्ि उतसारी भागाची कामे, मध्यम प्रकल्पाचे मािी धरणाचे काम, उपसा ससचन योजनेची कामे,
लपा प्रकल्पांच्या धरणाचे काम, अस्िरीकरणासह कालव्यांची कामे आवण मोठ्या प्रकल्पािील बॅरेजेसची
कामे) अभ्यास कूनन िसेच दरम्यानच्या कालािधीि केंद्रीय जलआयोगाने एवप्रल 2016 मध्ये जलसंपदा
प्रकल्पाच्या अंदाजपत्रक ियार करणेसाठीच्या प्रवसध्द केलेल्या मसूदा मागणदशणक सूचनाचा अभ्यास कूनन
सवमिीने आपला अहिाल सादर केला.
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
1) जलसंपदा विभागासाठी भाििाढ वनदे शांक पवरगवणि करिाना प्रकल्प सकमिीिर पवरणाम
करणाऱ्या र्टकांचे पढील प्रमाणे अवधमान (Weightage) वनविि करणेि यािे.
All Commodities :- 35 %
Cement :- 18 %
Steel :- 12 %
Fuel :- 10 %
Labour :- 25 %
2अ) वसमेंट, स्टील ि All Commodities साठी केंद्र शासनाचे Office of the Economic Advisor
Ministry of Commerce and Industries यांनी मवहना वनहाय प्रवसध्द केलेले Indices विचाराि
घ्यािेि. (http://eaindustry.nic.in)
2ब) इंधनासाठी Indian Oil यांनी मंबईसाठी प्रवसध्द केलेले दर विचाराि र्ेणेि यािेि.
(http://www.iocl.com)
2क) लेबर Indices साठी लेबर ब्यरोने प्रवसध्द केलेले Consumer Price Index for Industrial
workers विचाराि र्ेणेि यािेि. (http://labourbureau.nic.in) यासाठी मंबई, नागपूर , नावशक,
पणे, सोलापूर साठीच्या Indices ची सरासरी विचाराि र्ेणेि यािी.
(3) अथणसंकल्पाि िर्षासाठीची करप्रणाली वनविि होि असिे. तयामळे दरिर्षीचा भाििाढ वनदे शांक
पवरगवणि करिाना एवप्रल मवहन्यािील वनदे शांक विचाराि घ्यािेि.
सवमिीने उपरोक्ि गृहीिकािर आधारीि ससचन प्रकल्पासाठीचे सन 2000 पासनचे िार्षर्षक वनदेशांक
पवरगवणि कूनन शासनास सादर केले.
सवमिीचा अहिाल स्स्िकृि कूनन शासनाने ससचन प्रकल्पांचे भाििाढ वनदे शांकाबाबि पढील प्रमाणे वनणणय
र्ेिला आहे.
शासन वनणणय-
2) एखाद्या िर्षी जलसंपदा विभागाची दरसूची प्रवसध्द न झाल्यास दरसूचीिील बाबीचे दर िदथणपणे
िाढििाना सदर वनदे शांकािील िाढ विचाराि घ्यािी.
पृष्ट्ठ 4 पैकी 2
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
3) दरिर्षीचे भाििाढ वनदे शांक एवप्रल मवहन्याचे प्रसावरि होणाऱ्या वनदे शांकाचे आधारािर प्रवसध्द
करािेि.
पृष्ट्ठ 4 पैकी 3
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
पवरवशष्ट्ट -1
पृष्ट्ठ 4 पैकी 4