(Xi - Xm) (Xi - Xm)2

Sno. Name Age Deviation Deviation Square Normal Distribution


1 ABC 23 -0.555555556 0.308641975308644 27%
2 DEF 22 -1.555555556 2.41975308641976 15%
3 GHI 24 0.4444444444 0.197530864197529 28%
4 JKL 26 2.4444444444 5.9753086419753 6%
5 MNO 24 0.4444444444 0.197530864197529 28%
6 PQR 22 -1.555555556 2.41975308641976 15%
7 STU 22 -1.555555556 2.41975308641976 15%
8 VWX 25 1.4444444444 2.08641975308642 17%
9 YZA 24 0.4444444444 0.197530864197529 28%
16.2222222222222
Variance 1.80246913580247
Sigma 1.34256066373273

Normal Distributi on
30%

25%

20%

15%

10%

5%

0%
21.5 22 22.5 23 23.5 24 24.5 25 25.5 26 26.5
Normal Distribution Column1
0.259626223 1%
0.154268571 0% Mean 23.56 Mean
0.266837605 1% Median 24 Standard Error
0.064198684 1% Mode 22 Median
0.266837605 1% Range 4 Mode
0.154268571 0% Standard Deviation
0.154268571 0% Sample Variance
0.167483833 0% Kurtosis
0.266837605 1% Skewness
Range
Minimum
Maximum
Sum
Count

Age-Map
27

26

25

24

23

22

21

20
ABC DEF GHI JKL MNO PQR STU VWX YZA
Column1

23.55555555556
0.47466687474
24
22
1.42400062422
2.027777777778
-0.803903171327
0.357307611792
4
22
26
212
9
ABC Analysis

ITEM UNITS UNIT-PRICE USAGE PERCENTAGE CUMULATIVE %AGE


2 2400 ₹ 30.00 ₹ 72,000.00 28.95054282268 28.9505428226779
5 3800 ₹ 15.00 ₹ 57,000.00 22.91917973462 51.8697225572979
1 700 ₹ 50.00 ₹ 35,000.00 14.0731805388 65.9429030960997
6 4000 ₹ 5.00 ₹ 20,000.00 8.041817450744 73.9847205468436
3 150 ₹ 100.00 ₹ 15,000.00 6.031363088058 80.0160836349015
4 60 ₹ 220.00 ₹ 13,200.00 5.307599517491 85.3236831523924
7 6000 ₹ 2.00 ₹ 12,000.00 4.825090470446 90.1487736228388
10 2900 ₹ 4.00 ₹ 11,600.00 4.664254121431 94.8130277442702
8 300 ₹ 35.00 ₹ 10,500.00 4.221954161641 99.0349819059107
9 30 ₹ 80.00 ₹ 2,400.00 0.965018094089 100

SUM ₹ 248,700.00
MAX % 28.950542823

A 000 - 070
B 070 - 090
C 090 - 100
A

C
A firm producting wheel barrows is expected to deliver 40 wheelbarrows
in week 1, 60 in week 2, and 50 in week 8. Among the requirements for
each wheelbarrow are two handlebars, a wheel assembly, and one tire
for the wheel assembly. Orders quantities, lead times, and inventories on
hand at the beginning of period 1 are shown in table below.

Parts Order Quantity Lead Time Inventory on


hand

Handlebars 300 2 week 100


Wheel Assemblies 200 3 week 220
Tires 400 1 week 50
MASTER SCHEDULE AND
MRP

Master Schedule (wheel


Week Numbers 1 2 3 4 5 6 7
barrow)

Quantity 40 60 60
Item ID: HB Gross requirements 80 120 120
Level code: 1 Scheduled receipts 300
On hand; 100 On hand/Available 20 320 320 200 200 80 80
Lot size: 300 Net Requirements
LT (wk): 2 Planned-order receipts
Safety stock: 0 Planned-order release 300

Item ID: WA Gross requirements 40 60 90* 60


Level code: 1 Scheduled receipts
On hand: 220 On hand/Available 180 180 180 120 30 170 170
Lot size: 200 Net Requirements 30
LT (wk): 3 Planned-order receipts 200
Safety stock: 0 Planned-order release 200

Item ID: Tire Gross requirements 200


Level code: 2 Scheduled receipts
On hand: 50 On hand/Available 50 50 250 250 250 250 250
Lot size: 400 Net Requirements 150
LT (wk): 1 Planned-order receipts 400
Safety stock: 0 Planned-order release 400
8

50
100

280
20
300

50

120

250