EPP ANDRANOPASY PESPECTIVE

Project number 001


Date 14/06/19
A100
LATRINE Drawn by
Checked by
RNIE
CNI Scale
PLAN DE FONDATION PLAN RDC

1
A104
2.17 1.35 1.35
1.09 1.76 1.35 0.68
1.80 / 0.40 0.56 0.60 / 0.40 0.60 / 0.400.48
0.29 0.75
A
0.40 0.30
1.83

2.03
1.97 1.20 1.20

2.33
0.10
0.20

3.30
B

0.20
0.80
1.27

1.07
0.77
0.47
C
1.45 2.18 1.45
5.07
1 2 3 4

EPP ANDRANOPASY FONDATION ET RDC

Project number 001


Date 14/06/19
A101
LATRINE Drawn by
Checked by
RNIE
CNI Scale 1 : 50
FACADE PRINCIPALE FACADE POSTERIEURE

EPP ANDRANOPASY FACADE PLE / PSTR

Project number 001


Date 14/06/19
A102
LATRINE Drawn by
Checked by
RNIE
CNI Scale 1 : 50
FACADE LATERALE DROITE FACADE LATERALE GAUCHE

EPP ANDRANOPASY FACADE LTR DROITE / GAUCHE

Project number 001


Date 14/06/19
A103
LATRINE Drawn by
Checked by
RNIE
CNI Scale 1 : 50
Couverture en TOG 40/100ème

Panne en bois 5/15

5.00°
Acrotère en M. Parpaing

EPP ANDRANOPASY PLAN TOITURE

Project number 001


Date 14/06/19
A105
LATRINE Drawn by
Checked by
RNIE
CNI Scale 1 : 50