Quality checks/ audits
National checks
Second Level Auditors
2
Financial corrections
Following quality checks/ audit, irregularities
may be detected and corrected through a
financial correction:
3
Second level audit campaign 2018-2019
EUR
5,805,874.62
No systemic irregularities: checked by
second level
only individual irregularities auditors
4
Second level audit
campaign 2018-2019
5
Anti-fraud strategy
Irregularity Fraud
Consequences
7
Fraud risks identified
8
Fraud risks identified
9
Fraud risks - origin
10
Fraud prevention and detection
12
Reporting suspected or
established fraud
13
FLC reporting template on
suspected or established fraud
Available for download in iOLF from FLC
report tab of the partner report:
15
Basics
Public procurement applicable rules*
the EU public procurement directives (Directive 2014/24/EU)
national rules
internal rules of the partner organization
No programme-specific rules
Section 7.4.6 Public procurement of the programme manual
16
Private non-profit bodies
19
Direct award of contract
Common non-justified reasons:
“the only
“urgency”
one”
21
Group discussion (20 min)
info@interregeurope.eu
www.interregeurope.eu