You are on page 1of 1

GRID LOCATION ELEVATION

BILL OF MATERIAL
C75-3 <1/<B EL. +2.800 THIS DOCUMENT PURPOSE FOR THIS PROJECT ONLY FOR, RE-PRODUCED OR
1 - ASSEMBLY - MAI-SB-99-C75-3 RECORDED FOR OTHER PUEPOSE IS PROHIBITED WITHOUT PRIOR PERMISSION
OF. PT. MEGUMI AGUNG INDONESIA
MARK DESCRIPTION MATERIAL Qty. LENGTH WEIGHT
u-3 UNP75X40X5X7 SS400 1 1525 10.56 NOTES AND LEGEND
Total 1 Assy 10.56
Grand Total 10.56 - ANY DIMENSIONS AND TECHNICAL SOLUTIONS DEPICTED ARE
BOLT LIST FOR ASSEMBLY : C75-3 1 No. Req. PURPOSE FOR DESIGN INTENT ONLY AND NEED TO BE DEVELOPED
FURTHER ON CONTRACTOR SHOP DRAWINGS AND SUBJECT TO
Bolt Grade Type QtY. Connected Member VERIFICATION AND APPROVAL BY A/E AND OWNER AND FIELD
VERIFICATION PRIOR TO CONSTRUCTION
M 19 x 51 A325N Site 4 SH150-9
- THE CONTRACTOR SHALL CHECK ALL DRAWINGS, VERIFY LEVEL AND
Total 1 Assy 4
DIMENSIONS ON SITE PRIOR TO COMMENCEMENT WORK HE SHALL
Grand Total 4 REPORT DISCREPANCIES IT ANY TO OWNER'S REPRESENTATIVE
BEFORE COMMENCEMENT OF WORKS

- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE


- ALL LEVELS ARE IN METERS UNLESS NOTED OTHERWISE
- ALL ANCHORS BOLTS INSTALLATION MUST BE APPROVED BY STEEL
CONSTRUCTOR AND SUPERVISOR BEFORE POURING CONCRETE.

ISSUED FOR

DRAF DRAWING

BASIC DESIGN DRAWING

TECHNICAL DESIGN DRAWING

FOR CONSTRUCTION

FOR APPROVAL

REVISION

SUFFIX DATE REVISION DETAILS

0 23.11.2022 ISSUE FOR CONSTRUCTIONS

OWNER

MK
1525

Ø22
Ø22

u-3
CONTRACTOR
38

38
40 60 1325 60 40

PT. MEGUMI AGUNG INDONESIA

APPROVED BY

PT. SOUTH PACIFIC VISCOSE TANGGAL

PT. INTI KARYA PERSADA TEHNIK TANGGAL

PT. MEGUMI AGUNG INDONESIA TANGGAL

PROJECT

PACKAGE 3
QIP
PT. SOUTH PACIFIC VISCOSE
DESA CICADAS, BABAKANCIKAO
KAB. PURWAKARTA 41101
INDONESIA

ITEM

L5 SECOND BATH CIRCULATION

DRAWING TITLE

ASSEMBLY DRAWING
JOIST

PROJECT NUMBER 01-MAI-T-2022

DRAWING NUMBER MAI-SB-99-C75-3


1 Qty. REQUIRED AS DRAWN MKD' MAI-SB-99-C75-3 ISSUED DATE

You might also like