You are on page 1of 3

4' 4' 4' 4' 4' 4'

3' 3' KETERANGAN : 3' KETERANGAN : 3' KETERANGAN : 3' KETERANGAN : 3'
KETERANGAN :
2000 2000 2000 2000 2000 2000
2' 10500 3550 2' 10500 4100 : M.C.F.A 2' 10500 4100 : M.C.F.A 2' 10500 4100 : M.C.F.A 2' 10500 4100 : M.C.F.A 2' 10500 4100
1' 1900
550 : M.C.F.A
6500
1' 1900
1' 1900
SCREEN 1' 1900
SCREEN 1' 1900
SCREEN 1' 1900
6147 7000 (lihat detail) (lihat detail) (lihat detail)
3000 3147 2500 1000 4000 1500 2500 13500 : TB - FA 1000 4500 1500 2500 : TB - FA 2500 : TB - FA 2500 : TB - FA 2500
D' : TB - FA D' D' D' D' D'
G G : MANUAL BREAK GLASS G : MANUAL BREAK GLASS G : MANUAL BREAK GLASS G : MANUAL BREAK GLASS G G
: MANUAL BREAK GLASS
1500

14 13 14 13 14 13 14 13 14 13
15 15 15 15 15
2550

2550

2550

2550

2550

2550
16 16 16 16 16
2000

2000

2000

2000
18 17 18 17 18 17 18 17 18 17
20 19 GARDEN
20 19 20 19 20 19 20 19
21 GL +4.57
21 : INDICATOR LAMP 21 : INDICATOR LAMP 21 : INDICATOR LAMP 21 : INDICATOR LAMP

2550
FSL +4.37

: INDICATOR LAMP

1200
JANITOR
DN
12 DN
12 12
FFL +0.80 DN FFL +12.22 DN
FFL +4.62 FFL +8.42
FSL +0.77 FFL +16.02

F F : ALARM BELL
F F
FSL +8.37

: ALARM BELL : ALARM BELL


F : ALARM BELL
F F
FSL +15.97
DN
FFL +0.80
FSL +0.77 FFL +19.92
FSL +19.87
4500

AREA TANGGA
FFL +0.80
FSL +0.77 : ALARM BELL
2000

PARKIR MOBIL
FSL +0.70

S 11 12
TOILET
FFL +4.60
FSL +4.55 S 11 12 R : HEAD DETECTOR
11
R : HEAD DETECTOR
11
R : HEAD DETECTOR
11
R : HEAD DETECTOR
UP UP
TOILET

10 10 10 10 10
R
2000

FFL +8.40 UP UP

08 09 : HEAD DETECTOR 08 FSL +8.35 PANTRY


08 09 08 09 08 09
06 07 06 07 FFL +8.42
FSL +8.37

06 07 06 07 06 07
04 05 04 05 04 05 04 05 04 05
03 PANTRY
03 03 03 03
02 02
S 02
S 02
S 02
S
FFL +4.62

01 FSL +4.57
01 : SMOKE DETECTOR GARDEN
01 : SMOKE DETECTOR 01 : SMOKE DETECTOR 01 : SMOKE DETECTOR
GL +8.32
FSL +8.02 JANITOR JANITOR
FFL +12.20 FFL +16.00

S
FSL +0.80 FSL +12.15 FSL +15.95

: SMOKE DETECTOR JANITOR


FFL +4.60
FSL +4.55
JANITOR
FFL +8.40
FSL +8.35

TB - FA : EAND OF LINE TB - FA : EAND OF LINE : EAND OF LINE : EAND OF LINE


TERRACE
FSL +12.20

E.O.L E.O.L E.O.L E.O.L


x 1,5 mm
E.O.L : EAND OF LINE
NYA 2 Ø20 mm
PARKIR MOBIL

R KABEL
FSL +0.70

R : NYA 2 x 1,5 mm R : NYA 2 x 1,5 mm CONDUIT : NYA 2 x 1,5 mm : NYA 2 x 1,5 mm


5450

5450

5450

5450

5450

5450
+ PIPA TB - FA
+ PIPA CONDUIT Ø20 mm
KABEL NYA 2 x 1,5 mm

6000
R

6000
R

6000
: NYA 2 x 1,5 mm
x 1,5 mm + PIPACONDUIT Ø20 mm + PIPACONDUIT Ø20 mm + PIPACONDUIT Ø20 mm + PIPACONDUIT Ø20 mm
NYA 2
PANTRY PANTRY PANTRY

DAK BETON
Ø20 mm
FFL +4.62 TOILET PANTRY

+ PIPACONDUIT Ø20 mm
FFL +8.42 FFL +16.02
FSL +4.57 TOILET FSL +8.37 FFL +8.40 FFL +12.22 FSL +15.97
FFL +4.60 FSL +8.35
FSL +12.17
FSL +4.55

KABEL FSL 4.57


R CONDUIT
x 1,5 mm
TOILET

+ PIPA
FFL +4.60
FSL +4.55
RECEPTION MEETING ROOM (9 ORG)

R R
TOILET

NYA 2
FFL +8.42
FFL +4.62 FFL +8.40
FSL +4.57 FSL +8.37
4000

FSL +8.35

Ø20 mm
FOYER

R S
FFL +8.42

KABEL
3500

FSL +8.37

S
LOUNGE
FFL +4.62 SECRETARY
FSL +4.57 FFL +12.22

CONDUIT

10900
FSL +12.17

+ PIPA TB - FA

KABEL
+ PIPA
7000

KABEL
+ PIPA
TOILET TOILET
FFL +16.00
FFL +12.20
FSL +15.95
FSL +12.15

C' S
PRINTER-FOTOCOPY / ARSIP
FFL +4.62
FSL +4.57
C' S
PRINTER-FOTOCOPY / ARSIP
FFL +8.42

C' C' 01
02
03
C' C'
04

NYA 2
CONDUIT
05
E E E E E E E

NYA 2
FSL +0.80

06

CONDUIT
07

x 1,5 mm
KABEL NYA 2 x 1,5 mm

TB - FA
+ PIPA CONDUIT Ø20 mm

ROOF TOP
ROOF TOP

x 1,5 mm
FFL +19.80
FFL +19.80 FSL +19.77
FSL +19.77

FFL +4.60
FSL +4.55

Ø20 mm
07

+ PIPA CONDUIT Ø20 mm


KABEL NYA 2 x 1,5 mm
MEETING ROOM

Ø20 mm
FFL +4.62

S
FSL +4.57

08

S 09
4000

KABEL NYA 2 x 1,5 mm


+ PIPA CONDUIT Ø20 mm

S 10
GLASS

PARKIR MOBIL
FSL +0.70

S S 11
R.SERVER
FFL +12.22
12
FSL +12.17

13
S R S
6000

6000

6000

6000
MANAGER ROOM
FFL +8.42

SKYLIGHT FSL +8.37

14
MANAGER ROOM

R
MUSHOLLA
24000

FFL +4.62
24000

24000

24000

24000

24000
FFL +0.90
FSL +0.87
FSL +4.57

S 15
8000

8000

8000

8000

8000

8000
KABEL NYA 2 x 1,5 mm
+ PIPA CONDUIT Ø20 mm

PRIVATE LOUNGE
FFL +12.22
16
KABEL

KABEL

FSL +12.17
+ PIPA

+ PIPA

17
MEETING ROOM (9 ORG)
FFL +8.42
FSL +8.37

18

19
MEETING ROOM
S CORIDOR
FFL +8.42
FSL +8.37
NYA 2

NYA 2

FFL +4.62
FSL +4.57 DIRECTOR'S ROOM
CONDUIT

CONDUIT

FFL +16.02
REFLECTING POOL FSL +15.97
WL +4.00
2000

STAFF ROOM (8 ORG)


FFL +8.42
FSL +8.37

S
FSL +0.80

DIRECTOR'S ROOM
FFL +12.22
FSL +12.17
x 1,5 mm

x 1,5 mm

MANAGER ROOM

R
FFL +0.75
FFL +4.62
FSL +0.72 FSL +4.57

KANTIN
FFL +0.80
FSL +0.77

D D D D D D D
Ø20 mm

Ø20 mm

R MANAGER ROOM
FFL +8.42

S S
FSL +8.37

KABEL
+ PIPA
E.O.L

R R S
PARKIR SEPEDA MOTOR

S S
30000

30000

30000

30000

30000

30000
FSL +0.70
E.O.L
STAFF (12 ORG)
2315

FFL +4.62
FSL +4.57
9500

B' B' B' B' B' B'

NYA 2
TOILET

CONDUIT
FFL +0.78
FSL +0.75

E.O.L
FSL +0.80
KABEL
+ PIPA

x 1,5 mmmm
DINDING PANEL
R
5000

DINDING PANEL ex. WALLPLUS

KABEL
Ø20

+ PIPA
NYA 2
CONDUIT

ex. WALLPLUS
6000

6000

6000
LVMDP
PANEL FSL +0.85

NYA 2
CONDUIT
x 1,5 mm

R GADEN
GL +4.37
FSL +4.02

LOCKER
3685

FFL +0.80
FSL +0.77
Ø20 mm

S R

x 1,5 mm
RUANG PANEL
FSL +0.75

LANTAI WIREMESH LANTAI WIREMESH


S S
STAFF ROOM (8 ORG)
FFL +8.42
FSL +8.37

ex. JILUMESH ex. JILUMESH

Ø20 mm
8000

8000

8000

8000

8000
ROOF TOP

8000
FFL +19.80
FSL +19.77
KABEL

KABEL
1000

+ PIPA

+ PIPA

FSL +0.85

CUBICAL
PANEL
C C C C C C C
FSL +0.80

72°

72°
NYA 2

NYA 2
CONDUIT

CONDUIT

1000

1000

1000
E.O.L

KABEL NYA 2 x 1,5 mm DIRECTOR'S ROOM


S
FFL +16.02
FSL +15.97

S
x 1,5 mm

x 1,5 mm

+ PIPA CONDUIT Ø20 mm RUANG TRAVO

S R
FSL +0.75

10000 10000
Ø20 mm

Ø20 mm

STORAGE
4000

FFL +0.80
4000

FSL +0.77

R.POMPA
R.POMPA
FFL +0.80
FSL +0.77

E.O.L
S
TRAVO
S S
MEETING ROOM
FSL +0.85 FFL +12.22
FSL +12.17

A' REFLECTING POOL


WL +4.40
FSL +4.25

MANAGER ROOM
A' MANAGER ROOM
FFL +8.42
FSL +8.37
A' A' A' A'
FFL +4.62
FSL +4.57
E.O.L

E.O.L

B B B B B B B
10000

E.O.L
9000

9000

9000
G.W.T
AIR BERSIH
G.W.T
R. SECURITY
FFL +0.80

Kap : 5M³
R
FSL +0.77

E.O.L

HYDRANT SPRINKLER MCFA


Kap : 35M³
DAK BETON
FFL +3.87
6000

6000

GLASS

MOBIL (4)
FFL +0.40
FSL +0.35
SCREEN ex. BYOLIVING SCREEN ex. BYOLIVING
(lihat detail) (lihat detail)

UP
RAMP
GENSET
FFL +0.70

A A A A A A A

2000 2000 2000 2000 2000

2000 DENAH LT. 1 6000


DENAH LT. 2 6000
10500
DENAH LT. 3 6000
8000 DENAH LT. MEZANINE 6000
8000 DENAH ROOF TOP 6000
8000
Skala 1 :100 10500 Skala 1 :100 Skala 1 :100 Skala 1 :100 Skala 1 :100
6000 2500 2500
3000 3500 3650
10500
2500
JALAN
N
1 2 3 FFL ±0.00
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
DENAH LT. DASAR
Skala 1 :100
Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title :
INSTALASI FIRE ALARM LANTAI 1 1 : 200 INSTALASI FIRE ALARM LANTAI 2 1 : 200 INSTALASI FIRE ALARM LANTAI 3 1 : 200 INSTALASI FIRE ALARM LANTAI MAZZENINE 1 : 200
Project Title : Drawing Title : Scale : No. Revision : Date : General Note : 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara

& & & & &


INSTALASI FIRE ALARM LANTAI DASAR PEMBANGUNAN GEDUNG PERKANTORAN YUSWANTORO PEMBANGUNAN GEDUNG PERKANTORAN YUSWANTORO PEMBANGUNAN GEDUNG PERKANTORAN YUSWANTORO PEMBANGUNAN GEDUNG PERKANTORAN YUSWANTORO PEMBANGUNAN GEDUNG PERKANTORAN YUSWANTORO
1 : 200 Drawing Number : ELK - FA - 003 File Name : gambar dgn kondisi dilapangan, maka Kontraktor Drawing Number : ELK - FA - 004 File Name : gambar dgn kondisi dilapangan, maka Kontraktor Drawing Number : ELK - FA - 005 File Name : gambar dgn kondisi dilapangan, maka Kontraktor Drawing Number : ELK - FA - 006 File Name : gambar dgn kondisi dilapangan, maka Kontraktor Drawing Number : File Name : gambar dgn kondisi dilapangan, maka Kontraktor
1. Apabila terdapat ketidaksesuaian ukuran antara 2. 2. 2. 2. 2.

& YUSWANTORO
MR .HARIYANTO harus berkoordinasi dulu dengan perencana atau pengawas
MR .HARIYANTO harus berkoordinasi dulu dengan perencana atau pengawas
MR .HARIYANTO harus berkoordinasi dulu dengan perencana atau pengawas
MR .HARIYANTO harus berkoordinasi dulu dengan perencana atau pengawas
MR .HARIYANTO harus berkoordinasi dulu dengan perencana atau pengawas
PEMBANGUNAN GEDUNG PERKANTORAN
Drawing Number : ELK - FA - 002 File Name : gambar dgn kondisi dilapangan, maka Kontraktor Designed by : Architect : Drawn by : Approved by Owner : 3. TEAM Designed by : Architect : Drawn by : Approved by Owner : 3. TEAM Designed by : Architect : Drawn by : Approved by Owner : 3. TEAM Designed by : Architect : Drawn by : Approved by Owner : 3. TEAM Designed by : Architect : Drawn by : Approved by Owner : 3. TEAM
2. dengan menunjukkan data actual lapangan / Shop Drawing MECHANIKAL,ELEKTRIKAL & PLUMBINK dengan menunjukkan data actual lapangan / Shop Drawing MECHANIKAL,ELEKTRIKAL & PLUMBINK dengan menunjukkan data actual lapangan / Shop Drawing MECHANIKAL,ELEKTRIKAL & PLUMBINK dengan menunjukkan data actual lapangan / Shop Drawing MECHANIKAL,ELEKTRIKAL & PLUMBINK dengan menunjukkan data actual lapangan / Shop Drawing MECHANIKAL,ELEKTRIKAL & PLUMBINK

MR .HARIYANTO Designed by : Architect : Drawn by : Approved by Owner : 3.


harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
YUSWANTORO
4.
5. Date : Code : Sheet : YUSWANTORO
4.
5. Date : Code : Sheet : YUSWANTORO
4.
5. Date : Code : Sheet : YUSWANTORO
4.
5. Date : Code : Sheet : YUSWANTORO
4.
5. Date : Code : Sheet :
4. JL.PARANG KUSUMO NO.10
SURABAYA
JL.PARANG KUSUMO NO.10
SURABAYA
JL.PARANG KUSUMO NO.10
SURABAYA
JL.PARANG KUSUMO NO.10
SURABAYA
JL.PARANG KUSUMO NO.10
SURABAYA
JL.PARANG KUSUMO NO.10
YUSWANTORO.ST 5. Date : Code : Sheet : 6. 6. 6. 6. 6.
SURABAYA
6. Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017
Copyright @ Stephanus and Paulus 2017
4' 4' 4' 4' 4' 4' 4'
3' 3' KETERANGAN : 3' KETERANGAN : 3' KETERANGAN : 3' KETERANGAN : 3' 3'
KETERANGAN :
2000 2000 2000 2000 2000 2000 2000
2' 10500 3550 2' 10500 4100 : M.C.F.A 2' 10500 4100 : M.C.F.A 2' 10500 4100 : M.C.F.A 2' 10500 4100 : M.C.F.A 2' 10500 4100 2' 10500 4100

6147
1' 1900
550 : M.C.F.A
6500
1' 1900
1' 1900
SCREEN 1' 1900
SCREEN 1' 1900
SCREEN 1' 1900
1' 1900
7000 (lihat detail) (lihat detail) (lihat detail)
3000 3147 2500 1000 4000 1500 2500 13500 : TB - FA
1000 4500 1500 2500 : TB - FA 2500 : TB - FA 2500 : TB - FA 2500 2500
D' : TB - FA D' D' D' D' D' D'
G G : MANUAL BREAK GLASS G : MANUAL BREAK GLASS G : MANUAL BREAK GLASS G : MANUAL BREAK GLASS G G
: MANUAL BREAK GLASS
1500

14 13 14 13 14 13 14 13 14 13
15 15 15 15 15
2550

2550

2550

2550

2550

2550

2550
16 16 16 16 16
2000

2000

2000

2000

2000
18 17 18 17 18 17 18 17 18 17
20 19 GARDEN
20 19 20 19 20 19 20 19
21 21 21 21 21
: INDICATOR LAMP : INDICATOR LAMP : INDICATOR LAMP : INDICATOR LAMP
GL +4.57

2550
FSL +4.37

: INDICATOR LAMP

1200
JANITOR
12 DN
12 12
DN FFL +12.22
FFL +0.80 DN DN
FSL +0.77 FFL +4.62 FFL +8.42
FFL +16.02

F F : ALARM BELL
F : ALARM BELL
F : ALARM BELL
F : ALARM BELL
F F
FSL +8.37 FSL +15.97
DN
FFL +0.80
FSL +0.77 FFL +19.92
FSL +19.87
4500

PARKIR MOBIL
AREA TANGGA
FFL +0.80
FSL +0.77
: ALARM BELL DEK BETON
2000

FSL +0.70

FSL +23.17
S 11 12
TOILET
FFL +4.60
S 11 12 R : HEAD DETECTOR
11
R : HEAD DETECTOR
11
R : HEAD DETECTOR
11
R : HEAD DETECTOR
UP
FSL +4.55

UP
TOILET
10
2000

10 10 10 10
R
UP UP
FFL +8.40

08 09 : HEAD DETECTOR 08 FSL +8.35 PANTRY


08 09 08 09 08 09
06 07 06 07 FFL +8.42
FSL +8.37

06 07 06 07 06 07
04 05 04 05 04 05 04 05 04 05
02 03 PANTRY
02 03 02 03 02 03 02 03
S S S S
FFL +4.62

01 FSL +4.57
01 : SMOKE DETECTOR GARDEN
01 : SMOKE DETECTOR 01 : SMOKE DETECTOR 01 : SMOKE DETECTOR
GL +8.32
FSL +8.02 JANITOR JANITOR
FFL +12.20
FFL +16.00

S
FSL +0.80 FSL +12.15 FSL +15.95

: SMOKE DETECTOR JANITOR


FFL +4.60
JANITOR
FFL +8.40
FSL +8.35

TB - FA
FSL +4.55

: EAND OF LINE TB - FA : EAND OF LINE : EAND OF LINE : EAND OF LINE


TERRACE
FSL +12.20

E.O.L E.O.L E.O.L E.O.L


x 1,5 mm
E.O.L : EAND OF LINE
NYA 2 Ø20 mm
PARKIR MOBIL

R R R KABEL
CONDUIT
FSL +0.70

: NYA 2 x 1,5 mm : NYA 2 x 1,5 mm : NYA 2 x 1,5 mm : NYA 2 x 1,5 mm


5450

5450

5450

5450

5450

5450

5450
+ PIPA TB - FA
+ PIPA CONDUIT Ø20 mm
KABEL NYA 2 x 1,5 mm

6000

6000

6000

6000
R R
x 1,5 mm
: NYA 2 x 1,5 mm + PIPACONDUIT Ø20 mm + PIPACONDUIT Ø20 mm + PIPACONDUIT Ø20 mm + PIPACONDUIT Ø20 mm
NYA 2
PANTRY PANTRY PANTRY

DAK BETON
Ø20 mm
FFL +4.62 FFL +8.42 TOILET PANTRY FFL +16.02

+ PIPACONDUIT Ø20 mm
TOILET FFL +8.40
FSL +4.57 FSL +8.37 FFL +12.22 FSL +15.97
FFL +4.60 FSL +8.35 FSL +12.17
FSL +4.55

KABEL FSL 4.57


R CONDUIT
x 1,5 mm
TOILET

+ PIPA
FFL +4.60
FSL +4.55 MEETING ROOM (9 ORG)
RECEPTION

R R
TOILET

NYA 2
FFL +8.42
FFL +4.62 FFL +8.40
FSL +4.57 FSL +8.37 FSL +8.35
4000

Ø20 mm S
FOYER

R
FFL +8.42

KABEL
FSL +8.37
3500

LOUNGE

CONDUIT
FFL +4.62
FSL +4.57
S SECRETARY
FFL +12.22

10900
FSL +12.17

+ PIPA TB - FA

KABEL
+ PIPA
7000

KABEL
TOILET

+ PIPA
TOILET
FFL +16.00
FFL +12.20 FSL +15.95
FSL +12.15

C' S
PRINTER-FOTOCOPY / ARSIP
FFL +4.62
FSL +4.57
C' S
PRINTER-FOTOCOPY / ARSIP
FFL +8.42

C' C' 01
02
03
C' C' C'
04

NYA 2
CONDUIT
05
E FSL +0.80

E E E E E E

NYA 2
06

CONDUIT
07

x 1,5 mm
TB - FA
+ PIPA CONDUIT Ø20 mm
KABEL NYA 2 x 1,5 mm

ROOF TOP
ROOF TOP
FFL +19.80

x 1,5 mm
FFL +19.80 FSL +19.77
FSL +19.77

FFL +4.60
FSL +4.55

Ø20 mm
07

+ PIPA CONDUIT Ø20 mm


KABEL NYA 2 x 1,5 mm
MEETING ROOM

Ø20 mm
FFL +4.62

S
FSL +4.57

08

S 09
4000

+ PIPA CONDUIT Ø20 mm


KABEL NYA 2 x 1,5 mm

S 10
GLASS

PARKIR MOBIL

S S
FSL +0.70

11
R.SERVER
FFL +12.22
12
FSL +12.17

13
S R S
6000

6000

6000

6000

6000
MANAGER ROOM
FFL +8.42

SKYLIGHT FSL +8.37

MANAGER ROOM
14
R
24000

24000

24000
MUSHOLLA

S
FFL +4.62
24000

24000

24000

24000
FFL +0.90 FSL +4.57
FSL +0.87
15
8000

8000

8000

8000

8000

8000

8000
+ PIPA CONDUIT Ø20 mm
KABEL NYA 2 x 1,5 mm

PRIVATE LOUNGE
FFL +12.22
16
KABEL

KABEL

FSL +12.17
+ PIPA

+ PIPA

17
MEETING ROOM (9 ORG)
FFL +8.42
FSL +8.37

18
19
MEETING ROOM
FFL +4.62 S CORIDOR
FFL +8.42
FSL +8.37
NYA 2

NYA 2

DIRECTOR'S ROOM
FSL +4.57
CONDUIT

CONDUIT

FFL +16.02
REFLECTING POOL FSL +15.97
WL +4.00
2000

STAFF ROOM (8 ORG)

S
FFL +8.42
FSL +8.37
FSL +0.80

DIRECTOR'S ROOM
FFL +12.22
FSL +12.17
MANAGER ROOM
x 1,5 mm

x 1,5 mm

R PLAT BETON
FFL +0.75 FFL +4.62
FSL +0.72
FSL +4.57
KANTIN
FFL +0.80
FSL +0.77

FSL +21.02
D D D D D D D
Ø20 mm

R
Ø20 mm

MANAGER ROOM
FFL +8.42

S S
FSL +8.37

KABEL
+ PIPA
E.O.L

R R S PLAT BETON
PARKIR SEPEDA MOTOR
S S
30000

30000

30000

30000

30000

30000

30000
FSL +0.70
E.O.L
STAFF (12 ORG)
FFL +4.62
FSL +4.57
FSL +21.02
2315

9500

B' B' B' B' B' B' B'

NYA 2
TOILET

CONDUIT
FFL +0.78
FSL +0.75

E.O.L
FSL +0.80
KABEL
+ PIPA

x 1,5 mm
DINDING PANEL
R
5000

DINDING PANEL ex. WALLPLUS

KABEL
Ø20 mm

+ PIPA
NYA 2
CONDUIT

ex. WALLPLUS

6000

6000

6000

6000
LVMDP
PANEL FSL +0.85

NYA 2
CONDUIT
x 1,5 mm

R GADEN
GL +4.37
FSL +4.02

LOCKER
3685

FFL +0.80
Ø20 mm

FSL +0.77

S R

x 1,5 mm
RUANG PANEL
FSL +0.75

LANTAI WIREMESH LANTAI WIREMESH


S S
STAFF ROOM (8 ORG)
FFL +8.42
FSL +8.37

ex. JILUMESH ex. JILUMESH

Ø20 mm
ROOF TOP
8000

8000

8000

8000

8000

8000

8000
FFL +19.80
FSL +19.77
KABEL

KABEL
1000

+ PIPA

+ PIPA

FSL +0.85

CUBICAL
PANEL
C C C C C C C
FSL +0.80

72°
72°
NYA 2

NYA 2
CONDUIT

CONDUIT

1000

1000

1000

1000
E.O.L

KABEL NYA 2 x 1,5 mm DIRECTOR'S ROOM


S
FFL +16.02

S
FSL +15.97
x 1,5 mm

x 1,5 mmmm

+ PIPA CONDUIT Ø20 mm


10000 10000
RUANG TRAVO

S R
FSL +0.75
Ø20 mm

Ø20

STORAGE
FFL +0.80
4000

4000

FSL +0.77

R.POMPA
R.POMPA

S
FFL +0.80
FSL +0.77

E.O.L
S
TRAVO
S S
MEETING ROOM
FSL +0.85 FFL +12.22
FSL +12.17

A' REFLECTING POOL


WL +4.40
FSL +4.25

MANAGER ROOM
A' MANAGER ROOM
FFL +8.42
FSL +8.37
A' A' A' A' A'
FFL +4.62
FSL +4.57
E.O.L

E.O.L

B B B B B B B
10000

E.O.L
DAK BETON

9000

9000

9000

9000
G.W.T
AIR BERSIH FSL +20.97
G.W.T
R. SECURITY
FFL +0.80

R
FSL +0.77

Kap : 5M³ E.O.L


HYDRANT SPRINKLER MCFA
Kap : 35M³
DAK BETON
FFL +3.87
6000

6000

GLASS

MOBIL (4)
FFL +0.40
FSL +0.35
SCREEN ex. BYOLIVING SCREEN ex. BYOLIVING
(lihat detail) (lihat detail)

UP
RAMP
GENSET
FFL +0.70

A A A A A A A

2000 2000 2000 2000 2000 2000

2000 DENAH LT. 1 6000


DENAH LT. 2 6000
10500
DENAH LT. 3 6000
8000 DENAH LT. MEZANINE 6000
8000 DENAH ROOF TOP 6000
8000 DENAH ATAP 6000
8000
Skala 1 :100 10500 Skala 1 :100 Skala 1 :100 Skala 1 :100 Skala 1 :100 Skala 1 :100
6000 2500 2500
3000 3500 3650
10500
2500
JALAN
N
1 2 3 FFL ±0.00
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
DENAH LT. DASAR
Skala 1 :100
Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note :
INSTALASI FIRE ALARM LANTAI 1 1 : 200 INSTALASI FIRE ALARM LANTAI 2 1 : 200 INSTALASI FIRE ALARM LANTAI 3 1 : 200 INSTALASI FIRE ALARM LANTAI MAZZENINE 1 : 200
Project Title : Drawing Title : Scale : No. Revision : Date : General Note : 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
INSTALASI FIRE ALARM LANTAI DASAR

ELK - FA - 002
Architect :
File Name :
Drawn by :
1 : 200

Approved by Owner :
1.
2.
3.
Apabila terdapat ketidaksesuaian ukuran antara
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas & YUSWANTORO
TEAM
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
ELK - FA - 003
Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
ELK - FA - 004
Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
ELK - FA - 005
Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
ELK - FA - 006
Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by : Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by : Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK

dengan menunjukkan data actual lapangan / Shop Drawing MECHANIKAL,ELEKTRIKAL & PLUMBINK
YUSWANTORO
4. JL.PARANG KUSUMO NO.10 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet :
SURABAYA SURABAYA SURABAYA SURABAYA SURABAYA SURABAYA
JL.PARANG KUSUMO NO.10 YUSWANTORO.ST 5. Date : Code : Sheet : 6. 6. 6. 6. 6. 6.
SURABAYA
6. Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017
Copyright @ Stephanus and Paulus 2017
4' 4' 4' 4' 4' 4' 4'
3' 3' KETERANGAN : 3' KETERANGAN : 3' KETERANGAN : 3' KETERANGAN : 3' 3'
KETERANGAN :
2000 2000 2000 2000 2000 2000 2000
2' 10500 3550 2' 10500 4100 : M.C.F.A 2' 10500 4100 : M.C.F.A 2' 10500 4100 : M.C.F.A 2' 10500 4100 : M.C.F.A 2' 10500 4100 2' 10500 4100

6147
1' 1900
550 : M.C.F.A
6500
1' 1900
1' 1900
SCREEN 1' 1900
SCREEN 1' 1900
SCREEN 1' 1900
1' 1900
7000 (lihat detail) (lihat detail) (lihat detail)
3000 3147 2500 1000 4000 1500 2500 13500 : TB - FA
1000 4500 1500 2500 : TB - FA 2500 : TB - FA 2500 : TB - FA 2500 2500
D' : TB - FA D' D' D' D' D' D'
G G : MANUAL BREAK GLASS G : MANUAL BREAK GLASS G : MANUAL BREAK GLASS G : MANUAL BREAK GLASS G G
: MANUAL BREAK GLASS
1500

14 13 14 13 14 13 14 13 14 13
15 15 15 15 15
2550

2550

2550

2550

2550

2550

2550
16 16 16 16 16
2000

2000

2000

2000

2000
18 17 18 17 18 17 18 17 18 17
20 19 GARDEN
20 19 20 19 20 19 20 19
21 21 21 21 21
: INDICATOR LAMP : INDICATOR LAMP : INDICATOR LAMP : INDICATOR LAMP
GL +4.57

2550
FSL +4.37

: INDICATOR LAMP

1200
JANITOR
12 DN
12 12
DN FFL +12.22
FFL +0.80 DN DN
FSL +0.77 FFL +4.62 FFL +8.42
FFL +16.02

F F : ALARM BELL
F : ALARM BELL
F : ALARM BELL
F : ALARM BELL
F F
FSL +8.37 FSL +15.97
DN
FFL +0.80
FSL +0.77 FFL +19.92
FSL +19.87
4500

PARKIR MOBIL
AREA TANGGA
FFL +0.80
FSL +0.77
: ALARM BELL DEK BETON
2000

FSL +0.70

FSL +23.17
S 11 12
TOILET
FFL +4.60
S 11 12 R : HEAD DETECTOR
11
R : HEAD DETECTOR
11
R : HEAD DETECTOR
11
R : HEAD DETECTOR
UP
FSL +4.55

UP
TOILET
10
2000

10 10 10 10
R
UP UP
FFL +8.40

08 09 : HEAD DETECTOR 08 FSL +8.35 PANTRY


08 09 08 09 08 09
06 07 06 07 FFL +8.42
FSL +8.37

06 07 06 07 06 07
04 05 04 05 04 05 04 05 04 05
02 03 PANTRY
02 03 02 03 02 03 02 03
S S S S
FFL +4.62

01 FSL +4.57
01 : SMOKE DETECTOR GARDEN
01 : SMOKE DETECTOR 01 : SMOKE DETECTOR 01 : SMOKE DETECTOR
GL +8.32
FSL +8.02 JANITOR JANITOR
FFL +12.20
FFL +16.00

S
FSL +0.80 FSL +12.15 FSL +15.95

: SMOKE DETECTOR JANITOR


FFL +4.60
JANITOR
FFL +8.40
FSL +8.35

TB - FA
FSL +4.55

: EAND OF LINE TB - FA : EAND OF LINE : EAND OF LINE : EAND OF LINE


TERRACE
FSL +12.20

E.O.L E.O.L E.O.L E.O.L


x 1,5 mm
E.O.L : EAND OF LINE
NYA 2 Ø20 mm
PARKIR MOBIL

R R R KABEL
CONDUIT
FSL +0.70

: NYA 2 x 1,5 mm : NYA 2 x 1,5 mm : NYA 2 x 1,5 mm : NYA 2 x 1,5 mm


5450

5450

5450

5450

5450

5450

5450
+ PIPA TB - FA
+ PIPA CONDUIT Ø20 mm
KABEL NYA 2 x 1,5 mm

6000

6000

6000

6000
R R
x 1,5 mm
: NYA 2 x 1,5 mm + PIPACONDUIT Ø20 mm + PIPACONDUIT Ø20 mm + PIPACONDUIT Ø20 mm + PIPACONDUIT Ø20 mm
NYA 2
PANTRY PANTRY PANTRY

DAK BETON
Ø20 mm
FFL +4.62 FFL +8.42 TOILET PANTRY FFL +16.02

+ PIPACONDUIT Ø20 mm
TOILET FFL +8.40
FSL +4.57 FSL +8.37 FFL +12.22 FSL +15.97
FFL +4.60 FSL +8.35 FSL +12.17
FSL +4.55

KABEL FSL 4.57


R CONDUIT
x 1,5 mm
TOILET

+ PIPA
FFL +4.60
FSL +4.55 MEETING ROOM (9 ORG)
RECEPTION

R R
TOILET

NYA 2
FFL +8.42
FFL +4.62 FFL +8.40
FSL +4.57 FSL +8.37 FSL +8.35
4000

Ø20 mm S
FOYER

R
FFL +8.42

KABEL
FSL +8.37
3500

LOUNGE

CONDUIT
FFL +4.62
FSL +4.57
S SECRETARY
FFL +12.22

10900
FSL +12.17

+ PIPA TB - FA

KABEL
+ PIPA
7000

KABEL
TOILET

+ PIPA
TOILET
FFL +16.00
FFL +12.20 FSL +15.95
FSL +12.15

C' S
PRINTER-FOTOCOPY / ARSIP
FFL +4.62
FSL +4.57
C' S
PRINTER-FOTOCOPY / ARSIP
FFL +8.42

C' C' 01
02
03
C' C' C'
04

NYA 2
CONDUIT
05
E FSL +0.80

E E E E E E

NYA 2
06

CONDUIT
07

x 1,5 mm
TB - FA
+ PIPA CONDUIT Ø20 mm
KABEL NYA 2 x 1,5 mm

ROOF TOP
ROOF TOP
FFL +19.80

x 1,5 mm
FFL +19.80 FSL +19.77
FSL +19.77

FFL +4.60
FSL +4.55

Ø20 mm
07

+ PIPA CONDUIT Ø20 mm


KABEL NYA 2 x 1,5 mm
MEETING ROOM

Ø20 mm
FFL +4.62

S
FSL +4.57

08

S 09
4000

+ PIPA CONDUIT Ø20 mm


KABEL NYA 2 x 1,5 mm

S 10
GLASS

PARKIR MOBIL

S S
FSL +0.70

11
R.SERVER
FFL +12.22
12
FSL +12.17

13
S R S
6000

6000

6000

6000

6000
MANAGER ROOM
FFL +8.42

SKYLIGHT FSL +8.37

MANAGER ROOM
14
R
24000

24000

24000
MUSHOLLA

S
FFL +4.62
24000

24000

24000

24000
FFL +0.90 FSL +4.57
FSL +0.87
15
8000

8000

8000

8000

8000

8000

8000
+ PIPA CONDUIT Ø20 mm
KABEL NYA 2 x 1,5 mm

PRIVATE LOUNGE
FFL +12.22
16
KABEL

KABEL

FSL +12.17
+ PIPA

+ PIPA

17
MEETING ROOM (9 ORG)
FFL +8.42
FSL +8.37

18
19
MEETING ROOM
FFL +4.62 S CORIDOR
FFL +8.42
FSL +8.37
NYA 2

NYA 2

DIRECTOR'S ROOM
FSL +4.57
CONDUIT

CONDUIT

FFL +16.02
REFLECTING POOL FSL +15.97
WL +4.00
2000

STAFF ROOM (8 ORG)

S
FFL +8.42
FSL +8.37
FSL +0.80

DIRECTOR'S ROOM
FFL +12.22
FSL +12.17
MANAGER ROOM
x 1,5 mm

x 1,5 mm

R PLAT BETON
FFL +0.75 FFL +4.62
FSL +0.72
FSL +4.57
KANTIN
FFL +0.80
FSL +0.77

FSL +21.02
D D D D D D D
Ø20 mm

R
Ø20 mm

MANAGER ROOM
FFL +8.42

S S
FSL +8.37

KABEL
+ PIPA
E.O.L

R R S PLAT BETON
PARKIR SEPEDA MOTOR
S S
30000

30000

30000

30000

30000

30000

30000
FSL +0.70
E.O.L
STAFF (12 ORG)
FFL +4.62
FSL +4.57
FSL +21.02
2315

9500

B' B' B' B' B' B' B'

NYA 2
TOILET

CONDUIT
FFL +0.78
FSL +0.75

E.O.L
FSL +0.80
KABEL
+ PIPA

x 1,5 mm
DINDING PANEL
R
5000

DINDING PANEL ex. WALLPLUS

KABEL
Ø20 mm

+ PIPA
NYA 2
CONDUIT

ex. WALLPLUS

6000

6000

6000

6000
LVMDP
PANEL FSL +0.85

NYA 2
CONDUIT
x 1,5 mm

R GADEN
GL +4.37
FSL +4.02

LOCKER
3685

FFL +0.80
Ø20 mm

FSL +0.77

S R

x 1,5 mm
RUANG PANEL
FSL +0.75

LANTAI WIREMESH LANTAI WIREMESH


S S
STAFF ROOM (8 ORG)
FFL +8.42
FSL +8.37

ex. JILUMESH ex. JILUMESH

Ø20 mm
ROOF TOP
8000

8000

8000

8000

8000

8000

8000
FFL +19.80
FSL +19.77
KABEL

KABEL
1000

+ PIPA

+ PIPA

FSL +0.85

CUBICAL
PANEL
C C C C C C C
FSL +0.80

72°
72°
NYA 2

NYA 2
CONDUIT

CONDUIT

1000

1000

1000

1000
E.O.L

KABEL NYA 2 x 1,5 mm DIRECTOR'S ROOM


S
FFL +16.02

S
FSL +15.97
x 1,5 mm

x 1,5 mmmm

+ PIPA CONDUIT Ø20 mm


10000 10000
RUANG TRAVO

S R
FSL +0.75
Ø20 mm

Ø20

STORAGE
FFL +0.80
4000

4000

FSL +0.77

R.POMPA
R.POMPA

S
FFL +0.80
FSL +0.77

E.O.L
S
TRAVO
S S
MEETING ROOM
FSL +0.85 FFL +12.22
FSL +12.17

A' REFLECTING POOL


WL +4.40
FSL +4.25

MANAGER ROOM
A' MANAGER ROOM
FFL +8.42
FSL +8.37
A' A' A' A' A'
FFL +4.62
FSL +4.57
E.O.L

E.O.L

B B B B B B B
10000

E.O.L
DAK BETON

9000

9000

9000

9000
G.W.T
AIR BERSIH FSL +20.97
G.W.T
R. SECURITY
FFL +0.80

R
FSL +0.77

Kap : 5M³ E.O.L


HYDRANT SPRINKLER MCFA
Kap : 35M³
DAK BETON
FFL +3.87
6000

6000

GLASS

MOBIL (4)
FFL +0.40
FSL +0.35
SCREEN ex. BYOLIVING SCREEN ex. BYOLIVING
(lihat detail) (lihat detail)

UP
RAMP
GENSET
FFL +0.70

A A A A A A A

2000 2000 2000 2000 2000 2000

2000 DENAH LT. 1 6000


DENAH LT. 2 6000
10500
DENAH LT. 3 6000
8000 DENAH LT. MEZANINE 6000
8000 DENAH ROOF TOP 6000
8000 DENAH ATAP 6000
8000
Skala 1 :100 10500 Skala 1 :100 Skala 1 :100 Skala 1 :100 Skala 1 :100 Skala 1 :100
6000 2500 2500
3000 3500 3650
10500
2500
JALAN
N
1 2 3 FFL ±0.00
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
DENAH LT. DASAR
Skala 1 :100
Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note : Project Title : Drawing Title : Scale : No. Revision : Date : General Note :
INSTALASI FIRE ALARM LANTAI 1 1 : 200 INSTALASI FIRE ALARM LANTAI 2 1 : 200 INSTALASI FIRE ALARM LANTAI 3 1 : 200 INSTALASI FIRE ALARM LANTAI MAZZENINE 1 : 200
Project Title : Drawing Title : Scale : No. Revision : Date : General Note : 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara 1. Apabila terdapat ketidaksesuaian ukuran antara
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
INSTALASI FIRE ALARM LANTAI DASAR

ELK - FA - 002
Architect :
File Name :
Drawn by :
1 : 200

Approved by Owner :
1.
2.
3.
Apabila terdapat ketidaksesuaian ukuran antara
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas & YUSWANTORO
TEAM
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
ELK - FA - 003
Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
ELK - FA - 004
Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
ELK - FA - 005
Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by :
ELK - FA - 006
Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by : Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK
PEMBANGUNAN GEDUNG PERKANTORAN

MR .HARIYANTO
Drawing Number :
Designed by : Architect :
File Name :
Drawn by : Approved by Owner :
2.
3.
4.
gambar dgn kondisi dilapangan, maka Kontraktor
harus berkoordinasi dulu dengan perencana atau pengawas
dengan menunjukkan data actual lapangan / Shop Drawing
& YUSWANTORO
TEAM
MECHANIKAL,ELEKTRIKAL & PLUMBINK

dengan menunjukkan data actual lapangan / Shop Drawing MECHANIKAL,ELEKTRIKAL & PLUMBINK
YUSWANTORO
4. JL.PARANG KUSUMO NO.10 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet : JL.PARANG KUSUMO NO.10 YUSWANTORO 5. Date : Code : Sheet :
SURABAYA SURABAYA SURABAYA SURABAYA SURABAYA SURABAYA
JL.PARANG KUSUMO NO.10 YUSWANTORO.ST 5. Date : Code : Sheet : 6. 6. 6. 6. 6. 6.
SURABAYA
6. Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017 Copyright @ Stephanus and Paulus 2017
Copyright @ Stephanus and Paulus 2017

You might also like