(D FO224 FaEMA een CHINA CIVIL ENGINEFRING CONSTIMUICHTON CORPORATION TIMOR LTD, Dear Eng.Elidio Amaral Director Rachio Plan Consultant. Lda. & PT. Bennation Surya Cipta Dili, Timor-Leste Re: Responding to the order to start work on the Construction of Pediatric jing of the Guido Valadares National Hospital. and ICU Buil We received the Letter of Notification No.08/RPC/III/2023 on March 10, 2023 and provided the following kindly response to related issues. First of all, regarding self-precast reinforced concrete piles, we fully understand the concerns from the employer and supervision consultant. We therefore agree to select qualified manufacturers from third countries for the supply of piles. At present, we are in contact with the relevant manufacturers on this matter. Secondly, although we haven't got the modified drawings yet, in order to show our sincerity, we will try our best to cooperate with the requirements of the employer and supervision consultant within the acceptable range. We plan to start the installation of the temporary fence from March 20, 2023 (Next Monday) and then the construction of the site office. Finally, we reiterate here that the drawings have been changed on a larger scale. Therefore, the original Construction Plan and Time Schedule are no longer applicable to continue to guide the project construction. Therefore, after we get the modified drawings, we will make the Construction Plan and Time Schedule according to the latest drawings as soon as possible. Thanks for your kindly understanding and cooperation. Best Regards 2b. Gao Yuan Project Manager China Civil Engineering Construction Corporation

You might also like