You are on page 1of 1

Request for Selection (RfS) Document for setting up of Pilot Projects of 500 MW/1000

MWh Standalone Battery Energy Storage Systems in Gujarat under Tariff-Based Global
competitive Bidding (Phase-I) - RfS No. GUVNL/BESS/Phase I dated 10.08.2022

1) ‘Soil Investigation Reports’ prepared by GETCO of all locations can be


downloaded from below mentioned link.

https://drive.google.com/drive/folders/1AXgPI4K81yp1nTcZRKZXhZx276z25LuB?
usp=sharing

2) ‘GA drawings’ prepared by GETCO of all locations can be downloaded from


below mentioned link.

https://drive.google.com/drive/folders/1IYsIfFeKZ2EVpL6K6ISp5UMCAkvCFdqH?
usp=sharing

3) ‘SLDs for all locations’ prepared by GETCO of all locations can be downloaded
from below mentioned link.

https://drive.google.com/drive/folders/1azVCKCBr0z5vwF4m3E5XLe_Ofdv1w
Aep?usp=sharing