You are on page 1of 2
SELLING POINTS ‘The engine designed for large mining realized the high efficiency, and low concumption, working effisency up by 8% and fuel Consumption down by 10%, strengthen digging force optimized the operation performance, Naas y Five part and core assembly service life improved greaty relying) fon trinity experiment system assures the machine can working, mote than 20000h in mining condition. SYSOOH! SY Kear Nel ASSET OF GREAT VALUE Sona) ‘Over 20 special working devic system provide the engine « radiator makes the machine working in a optimum temperature allthe time. MR Roya Le ‘The parts are easy to change and maintain and the cast down by 50% the maintenance period up by 100% by using high-quality «il an filter element KING OF MINING EQUIPMENT ‘Aength(During Transportation) {8 Width Tansportina/Operatin) CC HeightiDuring Transportation) DUper body With Blade Height Standard Teck Shoe Wicth Track Gauge(Transporting/Operating) Hin Geound Cease all Rotating Radius 2 Wack Ground Contact Length «Track Length Operating Weight Bucket Capacity m3 Rated Power KWirpm Traveling Speeatiohy/Low kwh Rotating speed ram Gadesbilty Ground Pressure KPa) Bucket Digging Force KN ‘nm Digging Force KN ‘A Max. Digging Height Max, Unloading Height (C Mex Digging Dept D Max Excavating Distance Min, Kotatng Kactus F Max Height at Min Rotating Radius Fengyan Dict Sangha, China ZpCodez01413 Sarco Hoting 4008-28-2518 Wels hpvmesanycomen Inauting ard Compsint Number: 08-87-9318, sysnoH 12095 3360 3790 3290 3470 600 2140 560 3765 aay 5440. ‘SYSO0H 49500, 22-31 300/1800 Da/3.h 80 70% /35° 874 287 245 ‘SY500H 10950 7450 7490 11860 eau 100 @ Shanghai SanyHeavy MachineryiLTD) AdiessSany Heary Machinery usta Park, Frgan foun,

You might also like