SELLING POINTS
‘The engine designed for large mining realized the high efficiency,
and low concumption, working effisency up by 8% and fuel
Consumption down by 10%, strengthen digging force optimized
the operation performance,
Naas y
Five part and core assembly service life improved greaty relying)
fon trinity experiment system assures the machine can working,
mote than 20000h in mining condition.
SYSOOH!
SY Kear Nel
ASSET OF GREAT VALUE
Sona)
‘Over 20 special working devic
system provide the engine «
radiator makes the machine working in a optimum temperature
allthe time.
MR Roya Le
‘The parts are easy to change and maintain and the cast down by
50% the maintenance period up by 100% by using high-quality
«il an filter element
KING OF MINING EQUIPMENT‘Aength(During Transportation)
{8 Width Tansportina/Operatin)
CC HeightiDuring Transportation)
DUper body With
Blade Height
Standard Teck Shoe Wicth
Track Gauge(Transporting/Operating)
Hin Geound Cease
all Rotating Radius
2 Wack Ground Contact Length
«Track Length
Operating Weight
Bucket Capacity m3
Rated Power KWirpm
Traveling Speeatiohy/Low kwh
Rotating speed ram
Gadesbilty
Ground Pressure KPa)
Bucket Digging Force KN
‘nm Digging Force KN
‘A Max. Digging Height
Max, Unloading Height
(C Mex Digging Dept
D Max Excavating Distance
Min, Kotatng Kactus
F Max Height at Min Rotating Radius
Fengyan Dict Sangha, China
ZpCodez01413
Sarco Hoting 4008-28-2518
Wels hpvmesanycomen
Inauting ard Compsint Number: 08-87-9318,
sysnoH
12095
3360
3790
3290
3470
600
2140
560
3765
aay
5440.
‘SYSO0H
49500,
22-31
300/1800
Da/3.h
80
70% /35°
874
287
245
‘SY500H
10950
7450
7490
11860
eau
100
@ Shanghai SanyHeavy MachineryiLTD)
AdiessSany Heary Machinery usta Park, Frgan foun,