You are on page 1of 46
Formal INDIAN INSTITUTE OF FOREST MANAGEMENT, BHOPAL MANDATORY DISCLOSURE (2021-22) | NAME OF THE INSTITUTION Address including telephone, Fax, e-mail Indian Insti Nehru Nagar Bhopal 462.003 Madhya Pradesh EPABX: —0755-2775716, 2773799, Fax: 0755-2671929 director@iifm.ac.in ite of Forest Management Il, Name and Address of the Trust/Society/Company and the Trusties. Il NAME AND ADDRESS OF THE DIRECTOR Shri Subhash Chandra, IFS. Director 1V, NAME OF THE AFFILIATING UNIVERSITY - Nil. V. GOVERNANCE + Members of the Board and their brief background. Members of the Board of Governors ~ available at the website. + Members of Academic Advisory Body Members of the Academic Council - available at the website. + Faculty Council: ‘The Members of the Faculty Council include the Director (as Chairman), the Dean (as Vice Chairman) and all the faculty members of the institute. The Faculty Council meetings are held at regular basis. + Frequency of the Board Meetings and Academic Advisory Body. Ordinarily 8.0.6. meets once in three months; and Academic Council once in a year. + Organizational chart and processes. Director is Head of the institution. All academic activities of the Institute are looked after by the faculty members as task heads (Chairperson/Coordinators). The Chief Administrative Officer, Managers, Library and Information Officer, and System Administrator, supported by other staff members perform administrative monitoring and supervision in effective implementation of the academic activities. + Nature and Extent of involvement of faculty and students in academic affairs/improvements. Faculty Council comprising of the Director, and all the faculty members decide and recommend {to the Academic Council and to the Board of Governors) all matters related to the academic activities of the institute. + Mechanism/Norms and Procedure for Democratic/Good Governance. + Students Feedback on institutional governance/faculty performance Feedback of all the courses taught by the faculty members are taken at the end of each classroom term. +. Grievance Redressal for Faculty, Staff and Students. Grievance Redressal Mechanism is available at the Institute. + Establishment of Anti Ragging Committee. Anti-Ragging Committee is formed and existing at the Institute + Establishment of Online Grievance Redressal Mechanism. ‘Online Grievance Redressal Mechanism is available at the Institute. + Establishment of Grievance Redressal Committee in the institution and appointment of OMBUDSMAN by the University. Grievance Redressal Committee is available at the Institute, + Establishment of Internal Compliant Committee. Internal Complaint Committee is available at the Institute. + Establishment of Committee for SC/ST SC/ST Committee is available at the Institute. + Internal Quality Assurance Cell Internal Quality Assurance Cell is available at the Institute. ‘© Students Affairs Council (SAC) under the guidance of the faculty member and managed by the students, The SAC works as an interface between the students and the institute and organizes various extra-curricular activities for the overall development of students as professionals. Vi, PROGRAMMES + Name of the Programme (Full Time) approved by the AICTE : © Post Graduate Programme in Forestry Management (PGDFM) © Post Graduate Programme in Sustainability Management (PGDSM) * Name of the programme accredited by NBA: © Post Graduate Diploma in Forestry Management (PGDFM). ‘¢ Status of Accreditation of the Courses : © Post Graduate Diploma in Forestry Management (PGDFM) is Accredited upto 30.06.2022 ‘© Total Number of Courses : 03, ‘* Number of Courses for which applied for Accreditation : 01 ‘+ Status of Accreditation : preliminary/applied for SAR and results awaited/applied for SAR and visits completed/results of the visits awaited/rejected/approved for courses (specify the number of courses) : © Post Graduate Diploma in Forestry Management (PGDFM) programme is accredited by NBA upto 30.06.2022. ‘* For each programme the following details have to be given: PGDFM O Name: Number of seats: 120 + 10% EWS Quota. 0 Duration: 02 years = Cut off mark for admission during the last year. Post Graduate Diploma in Forestry Management(PGDFM) The details of aggregate highest and lowest CAT percentile scores of candidates admitted in PGDFM 2020-22 batch were as follows (irrespective of IIFM rank) := PGDFM 2021-2023 BATCH Gen sc sT DA EWS | NC-OBC | Highest CAT percentile: 92.34 | 6323 | 51.15 - 90.36 | 80.99 Lowest CAT percentile 31.07 | 28.70 | 11.78 : 33.78 | 27.81 Total number of students 51 8 . | é 14 PGDFM 2020-2022 _ ~ Gen sc ST DA | EWS | NC-OBC Highest CAT percentile: 92.34 | 76.13 | 67.23 7 88.58 | 83.57 | Lowest CAT perce aca | 6150 | 5275 ~ | 71.73 | 60.14 Total number of students 44 7 3 2 1 22 PGDFM 2019-2021 - Gen SC sv DA | EWS | NC-OBC Highest CAT percentile: 9729 | 79.23 | 6197 : 39.99 | 84.89 Lowest CAT percentile 72.93 | 61.61 | 6197 = 83.62 | 62.69 | Total number of students 50 | 10 1 : 7 31 . Name: Post Graduate Diploma in Sustainability Management(PGDSM) . Number of seats: 60+ 10% EWS Quota 1 Duration : 02 years + Cut off mark for admission during the last year. + The details of aggregate highest and lowest CAT percentile scores of candidates admitted in PGDSM 2020-22 batch were as follows (irrespective of IIFM rank) :- PGDSM 2021-2023 BATCH Gen sc ST DA | EWS | NCOBC Highest CAT percentile: | 96.20 | 50.18 | - : 78.54 | 706 | Lowest CAT percentile 52.68 | 50.18 - = 78.54 | 70.60 Total number of students 16 2 = : 1 1 _ PGDSM 2020-2022 - Gen SC ST DA | EWS | NC-OBC Highest CAT percentile: 7356 | 65.3 : 74.28 | 67.71 Lowest CAT percentile 47.89 | 65.30 = 74.29 | 62.25 Total number of students 8 5 1 | 1 2 PGDSM 2019-2023 - Gen sc ST DA | EWS | NC-OBC Highest CAT percentile: 91.11 : : : - | 8084 Lowest CAT percentile soot | : ~ |= | 70.10 ‘Total number of students 9 o o | 0 0 1 Fee: For PGDFM & PGDSM programmes : Batch 2019-2021, 2020-2022 & 2021-2023: Rs.6,24,000/- lakhs for General/NCOBC/EWS/DA candidates and Rs. 3,74,400/- lakhs for SC/ST candidates. + Placement Facilities: Campus placement assistance is provided to students Campus placement of last year with salary. ___ PGDFM PROGRAMME Batch “Minimum Salary ‘Maximum Salary ‘Average Salary PGDFM 2020-2022 4.00 Lakhs 38.00 Lakhs 854 PGDFM 2019-2021 4.00 Lakhs 12.00 Lakhs 744 PGDFM 2018-2020 4.00 Lakhs 14.00 Lakhs 7.50 __ PGDSM PROGRAMME Batch | Minimum Salary ‘Maximum Salary ‘Average Salary PGDSM 2020-2022 6.00 Lakhs 13.50 Lakhs 9.08 Lakhs PGDSM 2019-2021 4,80 Lakhs ____ 13.50 Lakhs 8.50 Lakhs Placement details are uploaded at the web site. + Name and duration of programme(s) having Twinning and Collaboration with Foreign University(s) and being run in the same campus along with status of their AICTE approval. If there is foreign collaboration, give the following details : + Details of the Foreign institution/University: Not applicable + Name of the University/Institution: Not Applicable Vil. FACULTY + Number of faculty members 2 + Permanent faculty 22, Deputation - 1 + Visiting faculty Nil + Adjunct faculty : ONL + Guest faculty: Invited for various courses from time to time. + Profile of each faculty with qualifications, total experience, age and duration of employment. at the Institute concerned. Profile of faculty members — available at website. + Number of faculty employed and left during the last three years Employed - 4, Left~9. + Profile of Director/Principal with qualifications, total experience, age and duration of ‘employment at the Institute concerned ~ Available on the website. VIII PROFILE OF THE DIRECTOR/FACULTY Profile of the Director/Faculty ~ available on the website. 1X, FEE + Details of fee, as approved by State Fee Committee, for the Institution. Not applicable. + Time schedule for payment of fee for the entire programme. PGDFM & PGDSM : For first year, at the time of admission during Apritsune, and by 30 June next year for 2" year fee. + No. of Fee waivers granted with amount and name of students. No. + Number of scholarships offered by the institute with the name of students, duration and amount. * Central Sector Scholarship scheme for SC/ST students granted by the Ministry of Social Justice and Empowerment, and Tribal Affairs, respectively as per the rules and regulations stipulated by the respective Ministry. * 20 Nos. Merit based Scholarships are available for the students offered by the Institute. + Criteria for fee waivers/scholarships.: Not applicable + Estimated cost of Boarding and Lodging in Hostels. ‘Academic ee is inclusive of Lodging charges. Boarding charges: Rs. 2,700/- per month approx. Cooperative mess is run by the students and all infrastructure and staff facility is provided by the Institute. X. ADMISSION Number of seats sanctioned with the year of approval. 2019-2021 : 120 + 30 (EWS) seats for PGDFM programme and 60 + 15 (EWS) Seats for PGDSM programme. 2020-22: 120 + 30 (EWS) seats for PGDFM programme and 60 + 15 (EWS) Seats for PGDSM programme 2021-23: 120 + 30 (EWS) seats for PGDFM programme and 60 + 15 (EWS) Seats for PGDSM programme Number of students admitted under various categories each year in the last 3 years. ‘¢ PGDFM Programme 2019-21: 99 students (GEN-54, NC-OBC-29, SC-10, ST-01, EWS-05, DA- Nil) + PGDSM Programme 2019-21: 10 students (GEN-09, NC-OBC-01, SC-Nil, ST-Nil, EWS-Nil, DA-Nil) + PGDFM Programme 2020-22: 87 students (GEN-44, NC-OBC-22, SC-07, ST-03, EWS-11, DA-Nil) + PGDSM Programme 2020-22: 18 students (GEN-09, NC-OBC-02, SC-05, ST-01, EWS-01, DA-Nil) + PGDFM Programme 2021-23: 87 students (GEN-51, NC-OBC-14, SC-8, ST-6, EWS-11, DA-Nil) ‘+ PGDSM Programme 2021-23: 20 students (GEN-16, NC-OBC-01, SC-02, ST-O, EWS-01, DA-Nil) Number of applications received during last two years. + PGDFM & PGDSM programme - 2020-22 : 531 applications + PGDFM & PGDSM programme - 2021-23 : 413 applications XI, ADMISSION PROCEDURE + Mention the admission test being followed, name and address of the Test Agency and its URL(website). PGDFM & PGDSM Admission through CAT or XAT being conducted by lIMs/XLRI. Website: https://iimcat.ac.in, httos://www.xatonline + Number of seats allotted to different Test Qualified candidates CAT, MAT, XAT, JMET, ATMA, CET, JEE (State conducted tests/University tests). All seats are filled through CAT or XAT for PGDFM & PGDSM Calendar for Admission Against Management/Vacant Seats ~ N/A + Last date for request for applications: For PGDFM & PGDSM programme : 01.03.2021 + Last date of Submission of Applications: 01.03.2021 + Dates for announcing final results: PGDFM & PGDSM : April 2021 + Release of admission list (main list and waiting should be announced on the same day] Yes. + Date for acceptance by the candidate (time given should in no case be less than 15 days) Yes + Last date for closing of admission: 28.7.2021 + Starting of the Academic session. First week of July with orientation programme and regular classes from 4° July 2022. + The wai should be activated only on the expiry of date of main list. Yes. + The policy of refund of the fee, in case of withdrawal, should be clearly notified, Refund of fee after deduction of processing fee of Rs.1000 is allowed for the PGDFM & PGDSM as per the AICTE notification and norms. XII. CRITERIA AND WEIGHTAGES FOR ADMISSION + Describe each criterion with its respective weightages i.e. Admission Test, WAT, Interview etc PGDFM & PGDSM: CAT/XAT total percentile 35%, Written Aptitude Test and Interview 45% (59% for extracurricular activities included in the Pl), Academic performance 10%, Gender & ‘Academic diversity 10%. ‘+ Mention the minimum level of acceptance, if any, for any criteria. PGDFM & PGDSM: Being decided by the Admission Committee each year. + Mention the cut-of levels of percentage & percentile scores (section -wise and /or total as case ‘may be) of the candidates in the admission test who are called for GD/Interview. PGDFM & PGDSM : Being decided by the Admission Committee each year. + Mention last three years’ cut-off percentage and percentile (section -wise and or total as the as the case may be) of the candidates called for GD/Interview. PGDFM & PGDSM: Cut-Off Percentage in Each Section ivear [Ben sc ST DA __NC-OBC Ews| PGDFM & PGDSM 2019-21 Overall so 55 5050 65 a) PGDFM&PGDSM 2020-22 Overall 7045-4550 60 PGDFM &PGDSM 2021-23 Overall 50 30-30-5050 ‘The cut-off percentile indicated above is for calling for WAT/Pl only. This does not indicate the aggregate or component wise percentile of the last candidate admitted. + Display marks scored in Test, GD, Interview etc. and in aggregate for all candidates who come for GD/Interview etc. ~ Available in records. Xill, LIST OF APPLICANTS. List of candidates whose applications have been received along with percentile/percentile/percentage score for each of the qualifying examination in separate categories for open seats. List of candidates who have applied along with percentage and percentile score for Management quota seats- N/A. Complete CAT/XAT scores of the candidates applied to the lIFM are being obtained directly from lIM/XLRI as per the M.O.U. being entered with them every year. There is no Management quota XIV, RESULTS ‘+ Composition of selection team for admission under management quota with the brief profile ‘of members (This information be made available in the public domain after the admission process is over — Not applicable. + Score of the individual candidates admitted arranged in order or merit ~ available on the Web site. + List of candidates who have been offered admission in each category - available on the Web Site. + Waiting list of the candidates in order of merit to be operative from the last date of joining of the first list candidates, category wise - available on the Web Site. + List of the candidates who joined within the date, vacancy position in each category before ‘operation of waiting list - made available on the Web Site. Information of infrastructure and Other Resources Available + Number of Class Rooms and size of each : Annexure-A, Pages 12-15 * Number of Tutorial rooms and size of each - Annexure-A, Page 14 * Number of Laboratories and size of each 261 - N/A + Number of Drawing Halls with capacity of each - Annexure-A, Pages 12-13 + Number of Computer Centres with capacity of each - Annexure-A, Pages 15-16 + Central Examination Facility, Number of rooms and capacity of each - Annexure-A, Page-13 + Online examination facility (Number of Nodes, Internet bandwidth, etc), Annexure-A, Pages No.15-16 + Barrier Free Built Environment for disabled and elderly persons ~ Available in the campus * Occupancy Certificate ~ Annexure-B + Fire and Safety Certificate ~ Annexure-C + Hostel Facilities ~ Annexure-A, Pages 10-12 & 15. + library + Number of Library books/Titles/ Journals available(Programme-wise) — Annexure-A, Page No.20 : List of online National/ International Journals subscribed — + E-Library facilities ~ Annexure-A, Page No.20. . National Digital Library (NDL) subscription details ~ Annexure-D Laboratory and Workshop List of Major Equipment/Facilties in each Laboratory/Workshop — N/A List of Experimental Setup in each Laboratory/Workshop ~ N/A Computing Facilities : Annexure-A, Pages 15-16 Internet Bandwidth - 200 Mbps Number and configuration of System - Total number of system connected by LAN - 170 Total number of system connected by WAN - Annexure-A, Pages 15-16 Major software packages available - Annexure-A, Pages 15-16 Special purpose facilities available (Conduct of online Meetings/Webinars/Workshops, etc.) ~ Available. Facilities for conduct of classes/courses in online mode (Theory & Practical) - Av innovation Cell - Available Social Media Cell - - Available Compliance of the National Academic Depository (NAD), applicable to PGCM/ PGDM Institutions and University Departments ~ Registered with NAD List of facilities available Games and Sports Facilities - Annexure-A, Page 7. Extra-Curricular Activities ~ Various students clubs have been formed for extracurricular activities : Annexure-t Soft Skill Development Facilities ~ Students have been provided with SKDF : Yes Teaching Learning Process Curricula and syllabus for each of the Programmes as approved by the University ~ N/A ‘Academic Calendar of the University : Prepared every year before the start of each academic year. ‘Academic Time Table with the name of the Faculty members handling the Course : Time table with name of the faculty members are being prepared and circulated 15 days prior to the start of each classroom term. Teaching Load of each Faculty Internal Continuous Evaluation System and place - Yes Student's assessment of Faculty, System in place - Yes For each Post Graduate Courses give the following: Title of the Course : Annexure ~ F Curricula and Syllabi : For each classroom term, course outlines containing curriculum and syllabus are being prepared, presented in the faculty council and circulated to the students before the start of the classes. Laboratory faci Special Purpose Software, all design tools in case ~ N/A Academic Calendar and framework: Shall be prepared before the start of the academic year. ble ies exclusive to the Post Graduate Course — N/A 16. Enrolment and placement details of students in the last 3 years : Batch (PGDFM) | No. ‘of | Minimum Salary | Maximum Salary | Average Salary Students Enrolled 2020-2022 87 4.00 Lakhs | 38.00 Lakhs asa 2019-2024 3 4.00 Lakhs 12.00 Lakhs 7.4 2018-2020 112 4,00 Lakhs 14.00Lakhs | 7.50 Average Salary 9.08 Lakhs 8.50 Lakhs Batch (PGDSM) ~__[ Minimum Salary | Maximum Salary 2020-2022 v 6.00 Lakhs | 13.50 Lakhs 2019-2021 10 4.80 Lakhs 13.50 Lakhs 17. list of Research Projects/ Consultancy Works ‘+ Number of Projects carried out, funding agency, Grant received - Uploaded on the website. + Publications (if any) out of research in last three years out of masters projects - Uploaded on the website, * Industry Linkage ~Yes * MoUs with Industries (minimum3(10)) - Yes, MOUS have been signed for Internship of Students. 18, LoAand subsequent EoA till the current Academic Year — Uploaded on the Website 19. Accounted audited statement for the last three years - Uploaded on the Website 20. Best Practices adopted, if any Note: Suppression and/or misrepresentation of information shall invite appropriate penal action. The Website shall be dynamically updated with regard to Mandatory Disclosures Important Instructions: + Avoid putting personal information in public domain. * The mandatory disclosure should be available freely to view/download to the public without any restrictions. + LoA/EoA letters (since inception) should form part of the mandatory disclosure and complete mandatory disclosure document should be converted into a single PDF file. | Programme WANAGEMENT PROGRAMS & COURSES PROGRAMS: Now! Existing Programme [exiting Programme ‘COURSE DETAILS ANNEXURE-A Land In Hilly Area: No FSUFSR: Data Not Avaliable ‘Number of Pieces: 1 Land Piece Area 2 in Acres: Data Not Available Land Piece Area 3 i | Data Not Available ‘Wax distance In farthest land | Data Not Available ‘places (Km) ‘Land registered with: Tim ‘Date of Registration: oaroiri962 ‘Land use certificate Issued | OFfice Of Addiional Director, | Land use certificate issued | 10/30/1982 by: Town & Country Planning Mp | Date: Bhopal ‘Ownership Details: ‘Government Land Is the Land Morigaged: No. North 2B 16 0 East 17 Longitude Minute: 36 o Printed By : 2010877601 agoot23 LAND DETAILS: MORE INFORMATION Sr.No, Land Registration @ Date of Registration: | 007001082 + Area of Land 2138 hasta Number: 223, 310,317, aa 312,313,314.318,916 Plot Number! Survey 0 Land Situated at Nohru Nagar | Number: | Land Registered inthe Government Ownership or Government | Government lang Name of: | Lease _ Landuse Certificate Yes Land Use Certificate OFfice OF Additional Director, | Issued | Issuing Authority: Town & Country Planning Mp i | Bhopal [TeitforChange of ite | No | BUILDING DETAILS i - ia Builaing Status: Raila Total built up Area (ready) | 28302 —] _ _ _ ‘Sqm: v | = | ‘Activities inthe building other | 0 Whether Access yes than courses approved by Acre: Tollet Area are maintained as per National Building Code (NBC) Norms? | Total Carpet instructional Area | 4409 jira (ready) Sam ‘Administrative Area (ceady) Sam ‘Access and Circulation Area | 1947 Total built up Area Sqm | 4977 (Sam): _ Planned: I Total Carpet Amenities Area | 10945 (c0ady) Sam 4 \ [ e BUILDING DETAILS: MORE INFORMATION | ‘sr. No, | Building Name idwan “Building Approval FCA 204 le ~ Nuinber: _ — Sanctioned Bult Up Constructed Built Up 132 (| aes: > | Area: | Approved Carpet Area- Constructed Carpet Area | 1142 Instructional: gu CF Instructional: - | | Abroved carpet Ara, Constructed Carpet Area- | #8 | ‘Administrative: Administrative: | ‘Approved Carpet Are Constructed Carpet Area | 20 | ‘Amenities: ‘Amenities: Total Area Approved: | 1342) Total Area Consinucted: | 1342 - Activities Conducted in. | ‘Teaching Non AICTE Approved Data Not Available the Building " courses running In the Building Plan Approving, | Bhopal Municipal Corporation Author Sr.No, Building Nass Library Building 2 Sanctioned Built ip 7202 roa: ‘Approved Carpet Area: 400 Instructional ) Approved Carpet Aea- | 150 1392 Area Approved: | 2292 — ‘Activities Conducted in | Teaching, Training, Reading, the Building Sol Study Building Plan Approving [ Bropat Development Authority Authority: Printed By : 2610577601 Circulation Area and | Bullding (if any): Building Plan Approval | 02/21/2011 Building Approval | 6-1264-FRE Number: Constructed Built Up | 2282 Area: _ | _ Constructed Garpet Area | 400 Instructional: Constructed Carpet Area- | 450 Administrative: Constructed Carpet Area- | 1382 _Amenities: [Total Area Constructed: | 2202 vata Not Available: Non AICTE Approved ‘courses running in the 4 Building (ifany): | Building Plan Approval | 06/25/1968 1 Date: Page 4of 23 Sr. No. | Building Name: 3 | Sanctioned Built Up | Area: ‘Approved Carpt Area- | Instructional: | Approved Carpet Area- | Administrative: ‘Approved Carpet Area- Amenities: Total Area Approved: ‘Activities Conducted in the Building: Building Plan Approving Authority: Building Name: Sr.No. Sanctioned Built Up Ara: ‘Approved Carpet Area Instruction ‘Approved Carpet Area: ‘Administrative: | ‘Approved Carpet Area: | Amenities: | Total Area Approved | Activities Conducted in the Building: Building Plan Approving Authority: | Building Name: Sr.No. ‘Sanctioned Bullt Up | Area: ‘Approved Carpat Ar Instructional: | Approved Carpet Are: ‘Administrative: | Total Area Approve ‘Activities Conducted in the Building: ~ | 4515 ‘Aravali Building Approval Number: 3620 [Constructed BuiltUp | | area: | ° Constructed Carpet Area- | Instructional: 50 Constructed Carpet Area- Administrative: 3450 Constructed Carpet Area- ‘Amenities: 3620 Total Area Constructed: Hostel Non AICTE Approved ‘courses running in the Building (any) "Building Plan Approval | Date Building Approval | Number: © Constructed Bult Up ‘rea: “Constructed Carpet Area- _____ Instructional "Constructed Carpet Area- | Administrative: Constructed Carpet Area: Amenities; | Total Area Constructed: Non AICTE Approved courses running in the Bhopal Development Authoniy Vindhyachal 0 0 7440 1518 Hostel 52/04-FRE 3620 Data Not Avaliable 6725/7988 BOG 51108 isis) | 0 7440 1515 Data Not Available Building Plan Approving Authority: oa Building Name ‘Sr.No. ‘Sanctionéd Built Up | Area: . | Approved Carpet Are Instructional ‘Approved Carpet Area ‘Administrative: ‘Approved Carpet Area- ‘Amenities: Total Area Approved: ‘Activities Conducted in the Building: | Building Plan Approving Authority: Building Name: | | Sr.No. ‘Sanctioned Built Up Prinios By : 2610577601 | courses running in the _ Building (any): ‘Bhopal Development Authoriy | Building Plan Approval | 08/25/1068 Date: Canteen Bulding Approval FoR Numbor: 76 — constructed BuiltUp | 476 de uilding GFany) Bhopal Development Authority | Bullding Plan Approval | 12/03/1998 | Dates | Neolgit | Bulging Approval S-71re008-RT _ Number 1195 ‘Constructed BulltUp | 1185 | Area: ° Constructed Carpet Area- | 0 instructional: | ° Constructed Carpet Area- | 0 | Aatministrativ 707 Constructed Carpet Area- | 1075 a ‘Amenities: 7195 Total Area Constructed: | 1195 Hosiét Non AICTE Approved | Data Not Avaiabie courses running in the te ___ Building Gifany}: ‘Bhopal Development Authority 0570872005 Mose | S12eeFRE —_ 7 + 987 Constructed Built Up | 967 | Aros jo "Constructed Carpet Area | 0 ~ j | _____ Instructional: % Constructed Carpet Area- | 50 | ‘Administrative - ur Constructed Carpet Area- | 647 | ‘Amenities: 7 (Total Area Constructed: | 987 Mess [Non AICTE Approved | Data Not Available Pago Sof28 | Area: Area: ‘Approved Carpet Area: 0 Constructed Carpet Area- | 0 Instructional: - instructional Approved Carpet Area 0 “Constructed Carpet Area- | 0 ‘Administrative ‘Administrative ‘Approved Carpet Area 168 Constructed Carpet Area- | 165 | amenities: ‘Amenities [Total area Approved: 176 _ Total rea Constructed: 176 | Activities Conducted in| Canteen Non AICTE Approved | Data Not Avaliable the Building | courses running in the | Building (f any} b Builng Plan Approving | Bhopal Devupren Autoriy Bullding Plan Approval 07272008 Authority Date: | Sr.No, | Building Name: Guest House Building Approval | oc xu \ ‘ Number: | % Sanctioned Built Up 947 Constructed Built Up 947 Area: Aa: ig ‘Approved Carpet Area: 0 Constructed Carpet Area- 0 Instructional | instructional L _ | Approved Carpet Area- | 0 Constructed Carpet Areas) 0 | Aaministrative: | Administrative: ‘Approved Carpet Area- | 851 Constructed Carpet Area- | 851 ‘Amenities: ‘Amenities: hh Total Area Approved: —_| 941 Total Area Constructed: | S41 ‘etvities Conducted in| Stay Non AICTE Approved | Data Not Available the Building: courses running In the __| Building (if any): | Building Plan Approving | Bhopal Desvelopment Building Plan Approval” | 11/20/995 | Authority Authoriy Sr.No, | Building Name Common Room | FCA 1408 | 9} Sanctioned Bult Up | 74% Constructed Bulk Up 747 | es A | ‘Approved Carpet Area- | 0 Constructed carpat Area | 0 instructional 5 inetructional ‘Approved Carpet Area | 0 | Constructed Carpet Area- | 0 Administrative: "Administrative: | | Approved Carpet Area- | Constructed Carpet Area | 141 | ‘Amenities: Amenities: | Total Area Approved: Total Area Constructed: | 141 ‘Activities Conducted in | Non AICTE Approved | Data Not Available the Building: courses running in the | | Bullaing (any): | Building Plan Approving | Building Plan Approval | 07/10/2007 | Authority: Dat “ Sr.No. | Building Name: Builaing Approval FCA iai08 Number: 70) Sanctioned Built Up Constructed Built Up | 588 | Area: Area: ‘Approved Carpet Are Constructed Carpet Area- | 0 instructional: instructional - ‘Approved Carpet Area: | 0 "Constructed Carpet Area- | 0 ‘Administrative: | Administrative: ‘Approved Carpet Area- | 553 | Constructed Carpet Area") 558 ‘Amenities: ‘Ame! _— Total Area Approved: 583 Total Area Constructed: — | 588 ‘etvities Conducted in| Hostel Non AICTE Approved | Data Not Available the Building: courses running in the | | Builaing (if any): - | Buiing Plan Approving | Bhipl Devine Aon | Bulg Plan Approval | 7702007 | |_ Authority: pe [ey No, | Building Name: Badminton Hal Bullaing Approval FCA tal02 Number {7 ‘Sanctioned Built Up 204 Constructed Built Up 204 | Area: _ ‘rea. ee | approved Carpet Area 0 Constructed Carpet Area- | 0 Instructional: Instructional: Page 60123 Printod By : 2610577601 Sr. No. % _Data not [se | Room 1D7 Name: "Ascoun Room Type: No. | _ ‘Approved Carpet Area- | 0 Constructed Carpet Area- ‘Administrative: | Administrative: ‘Approved Carpet Area- | 204 Constructed Carpet Area- LAmenities: Amenities: Total Area Approved: | 204 Total Area Constructed: Activities Conducted in| Sports Facility Non AICTE Approved ‘the Building: courses running in the | Building (if any) 0 204 208 Data Noi Available ‘Approved Carpet Area- | Data Not Available ‘onstructed Carpet Area~ Building Plan Approving | Bhopal Development Authority Bullding Plan Approval | 07/10/2007 Date: ‘Common Room Bullding Approval FCA 5216 | ___| Number: “Sanctioned Built Up 162 Constructed Built Up 182 Area: _ Area: __f ‘Approved Carpet Area Data Not Available Constructed Garpet Area- | Data Not Available Instructional: Instructional: ‘Approved Carpet Area- | Data Not Available Constructed Carpet Area- | Data Not Available ‘Administrativ | Administrative: é- ‘Approved Carpet Area | 152 Constructed Carpet Area- | 152 ‘Amenities: | | Amenities: ml Total Area Approved: | Data Not Available ‘Total Area Constructed: | Data Not Avaliable ‘Activities Conducted in| Common Room | Non AICTE Approved Data Not Available the Building: courses running in the | Building (fany: | Building Plan Approving | Bhopal Development Authority | Building Plan Approval | 07/29/2079 ‘Authority: _ Date | Building Name: Gym Hall Bullding Approval FCA Sia Number Sanctioned BuiltUp | 176 Constructed Built Up) 176 Area: ‘Area: ‘Approved Carpet Area. | Data Not Avalabi Constructed Carpet Area- | Data Not Available Instructional: Instructional ‘Approved Carpet Area- | Data Not Avaliable Constructed Carpet Area- | Data Not Available ‘Administrative: ‘Administrative: aia Not Avaiabie ‘Amenities: Amenities: Total Area Approved: | Data Not Available Total Area Constructed: | 176 ‘Activities Conducted in| Gym Hall ‘Non AICTE Approved Data Not Avaliable the Building: ‘courses running in the | Building (if any): Building Plan Approving | Bhopal Da¥eopmont Alor” | Bullaing Pan Approval 729078 Authori f Date Building Name Builaing Approval Number: Sanctioned Bui Up Constructed BulltUp | 9755 Area: a | area ‘Approved Carpet Area Constructed Carpet Area- | 2837 Instructional __| instructional | Approved Carpet Area Constructed 5575 ‘Administrative: | ‘Administrative ‘Approved GarpotAroa- | 63 Constructed Carpet Area | 63 ‘Amenities: _ Amenities: Total Area Approved: "| 9755 Total Area Constructed: | 9755 - ‘Activities Conducted in” Teaching, Training. Non AICTE Approved | Data Not Avalabie the Building: Consultancy, Research courses running In the Building (it any): Building Plan Approval Date: 3 entored by Institution ‘O6r2571988 Other Office Printed By: 2610877601 Page 7029 {| Areain Sqm: i070 Building Name: Adminisraive Block Building Number: 4 Readiness of Flooring | Ready Readiness of Wall Ready Readiness of Ready Painting _ __| Electrification and Lighting Air Conditioning Raalable Readiness of Ready - | furniturofixturos | sr. Room D/ Name: ‘amin Room Type: Oie Allincusive No. | 2 | Area in Sqm: 7160) _ ~~ | ‘Administrative Block | Building Number: 4 —_ Ready Readiness of Wall and | Ready Readiness of Ready Painting Electrification and Lighting Air Conditioning Available Readiness of Ready . _ furniturttistures q % ‘sr,_| Room D/Name: Board Room Type: Board Room | No. 3 | Area in Sqm: [oo Building Name alive Bioek | Building Number: 1 Readiness of Flooring | F Readiness of Wall and Ready Readiness of j Painting Electrification and Lighting | Air Conditioning ‘Rvailable Readiness of _ er furniturofixtures | | Sr | Room 107 Nam | Canis Room Type: Panitjor Sta? No. @ | Area in Sqm: ie - Building Number: 8 Readiness of Wall and | Ready Painting ____ Electrification and tighting Air Conditioning | Not Available Readiness of Ready | | furnitureixtures | | Se_| Room iB/ Name: Doan Room Type: Cabin Tor Head of Dept _ & ie - ‘Area in Sams 50 - (Building Name —I | Building Number: 1 Readiness of Flooring ~ Readiness of Wall and Ready Ready ting Electrification Lighting - Air Conditioning ‘valabio Readiness of Ready Room ID/ Name: Dont Dapariment Ofc f ‘rea in Sqm 77 Deparment Ofice | Bullding Number Roady Readiness of Wall and =: Rady Readiness of Ready Painting y+ _| Electrification and Li Air Conditioning ‘Available Roadiness of Ready { _ meh — furnitureixtures _ | sr. | Room ID/ Name: for Room Type: Principal Directors Office 7 Area ii Sq 720" Building Name: ‘Adminitrative Block z [BulldingNumber 1 — Roady Readinoss of Wall snd) | Ready Ready Painting Electrification and Lig ” ‘ir Conditiohing ‘Available Readiness of Ready furnitureifixtures _ _| [gr | Room 1b/ Name: Bam Room Type: Exam Control Ofc | We. (8 | Aveain Sam: 0 | Building Name: | Academie Block | Building Number: 1 - Readiness of Flooring | Ready — | Readiness of Walland | Ready Readiness of Ready | __| Electrification and Lighting ‘vaiable Readiness of Ready | furniturefixtures | Sr, | Room ID/ Name: Facut Room Type: Facully Room —] Printed By : ae10577601 Pago 23 9 | Areain Sqm: 2065 Name: | Academie Block Building Number: 4 Readiness of Flooring Ready Readiness of Wall and Ready Readiness of Ready Painting Electrification and Lighting | Ali Conditioning Available Readiness of Ready ____ turnitureffixtures sr, Room ID/ Name: Housek Room Type: Housekeeping No. 10 | Area in Sqm: 50 | Building Name: Administrative Bio : | Bullding Number: 1 Readiness of Flooring Ready Readiness of Wall and Ready Readiness of Ready | Painting Electrification and Lighting Ai Conditioning Not Available Readiness of Ready I _ furniturelfixtures | = | Room ID/ Name: Maint Room Type: | Maintenance No ‘Area in Sam: ¥20 | Building Name ‘Adminitrative Block — Bling Number 1 Readiness of Flooring’ | Ready Readiness of | Electrification and Lighting Not Avaliable Readiness of | furnituroffictures | | Room ID/ Nam Place Room Type’ No. [12 RreainSqmi 780 | Buitaing Nam ‘Academic Block — | Building Number: 1 | Readiness of Flooring [Ready | Readiness of Wall and Ready Readiness of Ready | ining ___| Bleetritication and Lighting | ‘Ar Conditioning ‘alae Readiness of Ready ft _ | farnituretixtures _ = Sr_| Room ID/ Name: | Recept Room Type: Reception Area No. 14S" [Area in Sam: 783 | ulding Name: | Adminisrtive Bock ing Number 4 © SReaainess of Flooring | Ready ~ [Readiness of Wall and | Ready Readiness of Ready Painting ae ee | Etectrteation and Lighting, Ai Conditioning Not Avaliable Readiness of Ready on @ | furniturelfixtures hia - ‘Secu Room Type: ‘Seoutiy Building Name: | Aaiministrative Block” Building Number: Readiness of Flooring | Ready Readiness of Wall and Readiness of Ready | Painting % Electrification and Lighting _ ‘ic Condition | Readiness of Ready furiturefxtures | Room iD/ Name: ‘Store "Central Store — | Raministraive Book | I { 7 4 - ~ [Ready | Ready Ready "Not Avaliable Readiness of Ready furniture/fixtures Basket J Student aay [GOR Rreain’ Sami 48 Basketbal Court Building Number: Data Not Avalable| Readiness of Flooring | Ready Readiness of Wall and Ready Readiness of Ready Painting | ___| Electrification and Pogo 929 Printed By : 2010577601 | Lighting | ‘Air Conditioning Not Available | Readiness of Ready furiturefixtures | | loom 1O/ Name: | Canteen Room Type: Cafeteria ‘Area in Sq 176 - Building Name: Canteen “Building Number: 8 Readiness of Flooring | Ready | Readiness of Wall and Ready Readiness of Ready | Painting Electification and "Air Conditioning Not Available Ready | | - | furniturelfixtures: = Sr. Room ID/ Name: Croom Room Type: ‘Boys Common Room No. 3 | Area in Sqm: 162 | Building Name: _ Vindhyachal i Building Number: is | Readiness of Flooring | Ready | Readiness of Wall and | Ready Readiness of | Reedy | | Painting Electrification and | | | Lighting , % | | ‘ir Conditioning Not Avaliable Readiness of Ready | { ee furniture/fxtures _ _ | ‘Sr. | Room ID/ Name Croom2 Room Type: Boys Common Room No. | rv" 6 i “ 4 | Area in Sqm: are - Buliding Name: | Neel | Building Number: 6 Readiness of Flooring | Ready | Readiness of Wall and | Ready Readiness of Ready | Painting Electicatonjand’ | Lighting | | ‘Air Conditioning Rabie Readiness of Ready - furniture/ixtures Se) Rom Name: [Coons Room Type its Common Room | ne | ae 8 | Areain vai Building Wam aval | Building Number: [4 Readiness of Flooring Read) | | Readiness of Wall and | Ready Readiness of Ready | Painting | Electification and Lighting | ‘Air Conditioning Not Available Readiness of Ready > furniturelfcures _ _| Room iD/ Name: Dies Room Type: Principat Quarter | | ‘Areain Sam: 272 ul Building Namez Diresio’s Bungiow | Building Number: Readiness of Flooring | Ready | Readiness of Wall and Readiness of Ready Painting | Electrification and Lighting _ Readiness of Ready furiturefixtures Room Type: First aid cum Sick Room Building Name: | Administrative Block iness of Flooring | Ready Ready Painting | “X& — | Lighting | ‘Air Conditioning ‘valabia Readiness of Roady 1} . furniturelfixturs P 7S Room Name Guest Room Type: Guest House No. 8 | Areain 8 ~ Building Name: Guest House - Building Number: ~ Readiness of Flooring | Ready feadinoss of Wall and Readiness of Ready Painting Electrification and \. {| _ [Lighting ‘Air Conditioning Rovalable Readiness of Roady Finlod By : 2610577601 furniturelfixtures Poe 10023 ‘sr. | Room [Dy Name: Gym Room Room Type: | Sports Ciub No. 9° | Areain Sam: 176 Building Name: Ginsu Building Number: 8 Readiness of Flooring Ready Readiness of Wall and Ready Readiness of Ready Painting Electrification and “Lighting Air Conditioning | Not Avaliable Readiness of Ready | furitureftures Sr. | Room ID/ Name: Hostel Room Type: Boys Hostel No, 10 | Area in Sqm: 7195 Building Name: Neelgiri 1 Building Number: 5 Readiness of Flooring | Ready ae Readiness of Wall and | Ready Readiness of Ready | Painting Electrification and Lighting Alr Conditioning Not Available. Readiness of Ready : ~ I { furniture/fixtures £ A eat } ‘Sr. | Room Ib/ Name: Phasei Room Type: Girs' Hostal | No. | 1 | Areain Sam: 3620 | Building Name: Arava | Buitaing Number? | 8 Readiness of Flooring [Ready 2 | Readiness of Wall and Ready Readiness of Ready | Painting | | Electrification and | Lightings 9 a | =| ‘ir Conditioning Not Availabe Readiness of Ready furniturelfixtures. Room ID/ Nam Phasi Room Type: Boys Hostel ‘Area in Sami sis —| Building Names Vindtyachal Building Number: | 5 “|[Readiness of Flooring | Ready Readiness of Wall and | Ready Readiness of Ready Painting Electication and L _ (tiatting _ | Air Conditioning Not Avaiabie Readiness of Ready oe | - | turitureifixtures _ Room DV Name: Samaga Room Type: ‘Ruditorary ‘Area in Sqm: 80 TS | Baitang Nam | Administrative Buling | Building Number: 4 Readiness of Flooring y Readiness of Wall and Ready Roady | Painting | ii Lighting | | Air Conditioning Readiness of Ready | surniturefitures “ Room Type ‘Sports OND ing Name: Sports Cub 4 Readiness of Flooring | Ready Readiness of Ready Painting ‘Air Conditioning "> "| Not Available | Ready | tuminirertatures | - Sr. | Room ID/ Nam Siore Room Type: Stalionery Store No. [18 [eee a Building Name ‘Adminsiatve buding Building Number: cis — [Readiness of Flooring | Ready Readiness of Wall and | Ready Readiness of Ready | Painting Electrification and ‘ir Conaltioning Nat Availabe dy | Room ID/ Name: | Tennis ‘Sports Club | Pago 18 28 Pinos By : 010577601 ilding Number. | 12 Readiness of Flooring | Ready Readiness of Walland | Ready Readiness of Ready Painting Electrification and Lighting Air Conditioning Not Available Readiness of Ready | furniturefixtures ‘Sr. | Room ID/ Name: Toilet Room Type: Toilet No. 17 Area in Sqm: 400 Building Name ‘AiBuiings | Building Number: 1 Readiness of Flooring | Readiness of Wall and | Ready | Readiness of | Painting Electrification and Lighting Air Conditioning Not Available Readiness of a " furiturefixtures | Tans | Room Type _ | 588 Building Nam A A Building Number: [a1 Readiness of Flooring |. Readiness of Walland | Ready Readiness of Painting Electrification and ‘ir Conditioning | Avaliable Ready furniturelfocures - CIRCULATION AREA Sr. | Area Type Conidors 183 No. | | + | Flooring Yes_ "Painting Don Ready Electrification and Ready "Building Name: “Acme Building Lighting _ a. - Building Number ti — Sr. | Area Type. Other Common Area 1397 | No. | 2 | Flooring ~ [Yes [Ready Electrification and Ready ‘Building Name: ‘Adminsirative Bulking, Lighting Vievan, Library, Hostels, Mess, | we | anteen, Guest house | | BuildingNumber | 1,2. 3. 456,78 _ I mae INSTRUCTIONAL AREA [sn | Programme ] MANAGEMENT Level Post Graduate No. 1 | Room Type i Reem 10/Name 14 — ‘Area of Room in Sqm | Building Name [Dharohar Building Number [Readiness of Flooring | Ready Readiness of Wall and Readiness of Ready Painting Electrifeation and . Lighting — Readineas of Ready Ae Conditioning Reailable furniturefitures | _| E ‘sr. | Programme MANAGEMENT vel Post Graduaie No. 2 | Room Type | Seminar Hai Room 1D/ Name 7s 7 ‘Area of Room in Sqm | 100 | Building Name Manthan — | Building Number 1 Readiness of Flooring | Ready | Readiness of Wall and | Ready | Readiness of Ready Painting | Electrification and | Lees __| Lightin - Readiness of Roady ‘Air Conditioning Araiable furniturelfixtures - - Tee Programme MANAGEMENT Level Post Graduate Diploma LN. Printed By : 201057601 Pope 120125 3 [Room Type — Tutorial Room | Room ID/ Name ‘Area of Room in Sqm 160 “Building Name Building Number 1 | Readiness of Flooring feadiness of Wall and | Roady Readiness of Painting Electrification and | an Lighting Readiness of Ready Air Concitioning furniturlfixtures : se | Programme ‘WANAGEMENT Level No. 4 [Room Type Seminar Hall Room ID/ Name “Area of Room in Sqm | 180 Building Name Building Number 1 Readiness of Flooring Readiness of Wali and | Ready Readiness of Painting Electrification and Lighting Readiness of Roady Air Conditioning = | MANAGEMENT Level No. os | Classroom Room Di Name [ie Building Name + | Readiness of Flooring Readiness of Wall and | Ready Readinass of _ | furniture/fixtures Painting Electrification and _ — Lighting Wy Readiness of Ready Ar Conditioning furiturefixtures 2 Programme MANAGEMENT Level WY Room Type | Classroom) Room 6/Name ‘Area of Room In Sam [112 Balding Name Building Number Readiness of Wall and Painting Readiness of 1 Ready Post Graduate Diploma 19 ‘Samagem Ready Ready Rvalable ‘Avaliable | Post Graduate iat | Wyaknyan Ready Ready ‘Available ‘Sr. | Programme Level Posi Graduate No. i [Ream b7Name | 122 ‘Area of Roor Building Name Building Number ~s [Readiness of Flooring Readiness of Wall and™) Ready Readiness of Painting Electrification and 4 | tgting Roadiness of Roady ‘Air Conditioning Arabia | furiturelfixtures ‘Sr. Programme MANAGEMENT "| Level Post Graduate No. Classio6ni 18 112 — Vagarth Building Number 1 [Readiness of Flooring | Ready Readiness of Wall and | Ready Readiness of Ready Painting Electrification and __| Lighting. Readiness of Ready ‘Air Conditioning Availabe furnitureffxtures - Programme MANAGEMENT Level Fellowship [Room Id/ Name 72 [Building Name Vinarsh Readiness of Flooring | Ready —_ [Readiness of ~~ | Ready Print By : ae10577601 Pag 130123 10 ze 6 | Readinoss of Ready Electrification and Lighting ‘Air Conditioning ‘Avaliable | turnivurettxtures Programme MANAGEMENT Level Post Graduste “Room Type Tutorial Room Room DY Name a3 ‘Area of Room in Sqm 43 Building Name ois 4 Readiness of Flooring | Ready | Ready Readiness of | Ready Electrification and | | Lighting | | Readiness of | Ready Air Conditioning | Available. furnitureltixtures fh —-}/ Programme MANAGEMENT ‘Level | Post Gradiate | | | “Room Typo ater aba “Room Name —. | Area of Room in Sqm | 200 | Building Name | Ramanujan BuildingNumber 3 “Readiness of Flooring Ready. | Readiness of Wall and | Ready Readiness of Ready | Painting Electrification and | Lighting gy Ee | Readiness of Ready ‘i Conditioning ‘Avalabie furnitureixtures v Programme MANAGEMENT Lovel ‘ Post Graduate Diploma | Room Type | Computer Laboratory [Ra | ‘Area of Room in Sam | 200 | Remangjam | | Bunging Number | 3 | Ready | Readiness of Wall and | Ready Readiness of Ready | Painting Electrification and | Lighting Readiness of | Ready ‘Air Conditioning Available | furnitureixtures | . _ Programme MANAGEMENT Level Post Graduate Diploma coom Typ Classroom ‘Area of Room in Sqm [471 —t Na — Builaing Number 2 a Readiness of Flooring | - Readiness of Wall and | Ready Readiness of Painting Electrification and ___} Lighting Le __} Readiness of Ready ‘Ai Conditioning Available | furniturelfixtures | Programme WANAGEMENT Level Post Graduate | tee AL LS | | Room Type ah.) Tori | Room 107 Ni - | ‘Area of Room inSqm_ | 51 — Building Name VIDHVAN — Building Number [2 Readiness of Flooring | Ready Readiness of Wall and | Ready Readiness of Ready Painting Electifieation and 4 - Lighting Readiness of Roady ‘Al Conditioning Raila | furnitureltixtures Programme Tove Posi Gadde Diora | Room Type Ciasszoom [RoomipiName [Vi ‘Area of Room in Sqm | 117.3 | Building Name Vidvan | Bulging Number 2 Readiness of Flooring | Ready | Readiness of Wall and | Ready Readiness of Roady Paintin Erocieaton and — Lighting Ready Ae Consitoning Rrailable Printed 8y : ae10577601 Page 140123 Sr. | Programme No, 16 | Room Type ‘Area of Room in Sqm Building Number Readiness of Wall and Painting Readiness of | furnituretfixtures Sr. | Programme No. 7 | Room Type ‘Area of Room in Sqm | Building Number Readiness of Wall and Painting Readiness of fumiturelfitures sr. | Room Type: No. 1 ‘of Room in Sqm: Readiness of Wall and Painting MANAGEMENT Classroom 1173 2 Ready Ready | MANAGEMENT Classroom Level Room ID/ Name Building Name Readiness of Flooring Readiness of Electrification and Lighting Air Conditioning Level | Room D/ Name | Building Name | Readiness of Flooring Readiness of Electrification and Lighting Air Conditioning INSTRUCTIONAL AREA - COMMON FACILITIES Computer Centar 216 Ready | Building Name [Ramanujam “ge Room Type: | LovaryéReading Room DM | % (2 rea of Room in Sqm: 2076 YS | Readiness of Wall and | Ready Painting | Readiness of Ready hd furituretixtures Building Name | Vidya Bharall ‘sr. Room Type: Languagé Laboratory No. 3 [Area of Room in Sqm B16 Readiness of Wall and | Racy Painting Readiness off >| Roady - furnitures Building Name Ramanujan Yes ‘Avallable(¥iN) ? 1 | No. of Rooms: [30 y 228 ‘Within the Campus PCsiLaptop exclusively available | 75 to students: | PCeiLaptop avaliable in 4 Printed By: a€10577601 Hoste FACiLies (COMPUTATIONAL FACILITIES: Room ID/ Name: adiness of Flooring: Readiness of Electric Lighting {Ai Conditioning and, S| Readiness of Flooring: Readiness of Electrification and Lighting ‘Air Conditioning — | Building Number: Room ID/ Name Readiness of Flooring — Readiness of Electrification and Lighting ‘Ait Conditioning Gir's Hostel (YIN): | Hostel Capaciy [ No. of Rooms for Boye? | Apply for Site Change [ Hostel Faciity ~ | PGsiLaptop available ia Library: - PCsiLaptop available to i Post Graduate Dipioma v2 vVidvan Ready Ready ‘Available Post Graduate Diploma v3 vVidvan Ready Ready " valabe Ready Ready ‘Available 3 LIBRAR (Ready Ready | Available w Ready — Ready ‘Available TY Yea so (oe ie LY Pago 15028 Administrative Office: | Faculty Members: ‘Number of PCs/Laptop in 20 Internet Bandwidth in 200 language lab: Mbps: Number of Legal Application | 317 Printers available to 4 software: student Number of At Size Color ° Number of Legal System 78 Printer — software: Number of Open Source [4 ‘Number of Proprietary Data Not Available Software | ‘SOLAR PANEL INSTALLATION DETAILS Total and available | ssedoe No. of buildings with roof | 20 tops: lable for placing solar 40000 ‘Annual electricity 796595 photovoltaic panels (Sqm) consumption No, of units | during 2019-20: | Total approximate roof-top area | 1350 ‘Average rate per unit paid | 11.567 available for placing solar during 2019-20 (Rs. unt): | photovoltaic panel (Sqm) a | Renewable Energy Type Solar Remarks: Alig were replaced wth LED | | __| lamps. a Whether policy has been | Renewable Energy used at adopted to use only LED lamps: | present ifany | _ | ‘ODL INFRASTRUCTURE J Data not entered by Institution E a OL INFRASTRUCTURE ] Data not entered by institution | _OMBUDSMAN & ANTI-RAGGING ANTI-RAGGING u Sr.No. Particulars — Status 4. Constitution of Anti-Ragging Committee (willbe set automatically afer adding Anti: | Yor Ragging Committee detals ss 2. Constitution of Anti-Ragging Sua (wil be set automatically after adding Anti- Ragging Squad details) Yor Affidavit obtained from parents of students staying in Hostel: Yos 3. Affidavit obtained from all Stent: Yes 4. Affidavit obtained from parents of all he students: Yos 5... Affidavit obtained from students staying in Hostel: Yes 6 T. "| Appointment of Counselors: ANTHRAGGING COMMITTEE DETAILS Sr. | Cofwnltee Typ ‘Ant-Ragging Saied | Appointment Order IFMUSPSVAdr 18720211117 No. Reference Number: 1 Date of Appointment: OTr26F2018 Name of the Committee ‘Dr, Manmohan Vadav . Member: - Profession: Chalrorson ‘Associated Wit inaitaon Mobile Number: ‘942443670 ‘manmohan@im acin | ‘se. | Committee Type: ‘Ant-Regoing ‘Appointment Ord IFNVAAIACA2I201464 No. | Commitoe Reference Number: 2 | Date of Appointme ‘arorr20%2 Name of the Committee | Or. Advait Eagaonkar Member: Profession: | Member Associated Wit Institution | Mobile Number: | 7828566626, Email Addres: advatto@itmacin sr. | Committee Type: ‘ni-Ragging ‘Appointment Order IiFMUAAIACA02204 No. Commitee Reference Number: 3° | Date of Appointment: ura Name of the Committee | Or. Dhanya Bhaskar Pinta By : 2610577601 Member: Page 160123 sr. No. sr. No. sr. No. sr No. sr. No. sr. No. sr. No. 10 sr. No. 1 sr. No. 2 Profession: Mobile Number: Committee Type: Date of Appointment: Profession: Mobile Number: Committee Type: Date of Appointment: Profession: Mobile Number: Committee Type: Date of Appointment: Profession: Mobile Number: ‘Committee Ty Date of Appointment: Profession: Mobile Number: Committee Type: Date of Appointment: Profession: Mobile Number: ‘Committee Typ. Date of Appointment: Profession: Mobile Number: Committee Type: Date of Appointment: Profession: Mobile Number: Committee Type: Date of Appointment: Professiai Mobile Number: Date of Appointment: Profession: Mobile Number: ‘Committee Type! Date of Appointment: Profession: Pintod By - 3010577601 Gis Hostel Warden 44316406 ‘Abs Raggi Cemeitos oat 2022 Boys Hostel Warden ‘425400009 ‘ant-Ragoing Commitee own 2022 Member 9009990735 Ant-Ragging Squad ors0i9 Gis Hostel Warden 9000900733, Ani Ragging Squad o72si2018 Boy's Hosiel Warden 9425403029, ‘AntiRagoing Commitee oan Associated With: Email Address: Appointment Order Reference Number: Name of the Committee Member: ‘Associated With: Email Address: ‘Appointment Order Reference Number: Name of the Committee Member: Associated With: Email Address: Appointment Order Reference Number: Name of the Committee Member: Associated With: Email Address: ‘Appointment Order Reference Number Name of the Committee Momber; Associated With: Email Address: ‘Appointment Order Reference Number: Naife of the Cominittee Member: | Dredorchaiparon_| Agsoclat6a With: B00 1468 ‘aii Rog Conte OarT200 PAni-Ragaing ‘Cominitae, ‘iowrveoz “Vitembor 9055272047 Ant-Ragging Commitee oari20z Mombor 9409686549 Commitee oartr2022 Member 24410025 ‘COMPLAINT CowMrrree arosiz0z2 ‘Appointment Order Reference Number: ~TNarie of the Committee & Member: Associated With: Email Address: ‘Appointment Order Reference Number: Name of the Committ _Member: ‘Associated With: Emall Address: | Appointment Order Reference Number: Name ofthe Committee Member: {Associated With: __Email Address. ‘Appointment Order Reference Number: Name ofthe Committee Member: Associated With: Email Address “INTERNAL COMPLAINT COMMITTEE (ICC) DETAILS ‘Appointment Order Reference Number: Name of the Committ Member: Associated With: “tutes sshubsn@imac i Inston ‘hanyabe@itm ac. IFMAAACA2O22404 Dr, Ujal Sarma ination uijal@ifm acin IFMANIACA20221484 Dr Jayashvee Dubey Inattaton Jayasheeot@ifm nein MFMeSPSIAdmn. 15720047477 ‘Dr Uayashree Dubey instiuion jayoshieo@ifm.ac in TIFMSBSIAdM. 15120217977 jal Sarma Institution ‘al@itm ain 1 IFMANACAL20221484 ‘Shi Subhash Chandra inettuton rector@ifm ain IFMAN/ACAL20221464 ‘rilesh Bhadauria ination abhadauria@ifm acin EMIAAIACAL20221404 “yot Solanki ‘Studenis Jsolanki22@iinbhopal edu in NEMAA/ACAL2O221464 ‘Soumira Marathe Students ‘sourstram23@ibhopal ein iEMAAIACA20221464 Dr. Ashutosh Verma ‘WeRI99- Adm 720221208 Dr Parut Rishi Intute Pago 47 28 Sr.No. Sr.No. Sr.No. Sr. No. Sr.No. Sr.No. Sr.No. Mobile Number: so08992144 Committee Designation Committee Type: ‘COMPLAINT committee Date of Appointment: ‘ai0s2022 Profession: - Mobile Number: 425008146 Committee Designation Committee Type ‘COMPLAINT CoumirTEe Date of Appointment: aioer20z2 Profession: — Mobile Number: 3827043022 Committee Designation | ‘Committee Typé COMPLAINT CommiTTe® Date of Appointment: oev2022 Profession: | Mobile Number: ‘969387675 ‘Committee Designation | Committee Type: "COMPLAINT ConairTee Date of Appointment: oamoaraoze Profession: Mobile Number: 9668507387 __ Committee Designation Committee Type: ‘COMPLAINT COMMITTEE Date of Appointment: ~ | aisraoee Profession: 4 Mobile Number: | seaas06 Committee Designation . Committee Type: | compo | | comartes Date of Appointment: 03082622 ° Profession’ aw Mobite Number: 5 A hzsomsto00 Committee Designation “\ Veowpuant COMMITTEE Dato of Appointment! cainer2022 Mobile Number: 568219679 | CominttimDesitation — | Committee Type ‘COMPLAINT COMMITTEE Date of Appointment: oamoareoz Profession: Mobile Number? TATOSIS5@0 Committee Designation Committee Type: | COMPLAINT | CommarTTEs ~~) Date of Appointment: oanevanz2 Profession Mobile Number: ‘Committee Designation 588214867 Printod By : 8010577601 Email Address: Committee Gender ‘Appointment Order Reference Number: Name of the Committee _Member: Associated With: Email Address: ‘Committee Gender Appointment Order Reference Number Name of the Cor Member: “Associated With: Email Address: Committee Gender ‘Appointment Order Reference Number: Namo of the Committee | Member: | Associated With: | Email Address: | Committee Gender’ | Appointment Order itee Reference Numbe Name of the Committee Member: | Associated With: [Email Address: Committee Gonder Appointment Order Reference Number: Name of the Commitioe Member ‘Associated With: Email Address: Coramittee Gender ‘Appointment Order Reference Number: Name of the Committee Member: Associated With: Email Address: Committee Gender ‘Appointment Order Roference Number: Name of the Committee Member Associated With: Email Address: Committee Gender ‘Appointment Order Reference Number: Name of the Committee Member: Associated With: Email Address: ‘Committee Gender Appointment Order Reference Number: Name of the Committee Member Associated With: Email Address: ‘Committee Gender pani sein Female "8109-Ademn /2022720% Dr. Jgyasa Bisa insttue gyasa@iiim.acin Female */28198-Aaimn Dr. Rta Tu Exiernal Member alwebhopal@amaitéom Female *128/00- Ran 720221201 irs. Shinpa Ghoshat Inatts | 128168-arn 720222204 ‘Rachel Mathews Institute rachel@itn- ain Female ~ *128/98-Adin 20227203 Dr. Dhanya Bhaskar Inetute chanyab@itm Female *13809-Adin 20222201 agit Acwrag Inst | jagitaz3@imbhopaleduin Female *128199-Admn 20227201 Devanshu Sigh inttute evanshus23@iinbhopal edu Male "V28199-Ad 9202272021 ‘Abeer Wacnerkar inate ‘ie wadnerisi@ameal.com Hale *200-Adrmn (8022201 ‘Shatin’ Dagar ~~ institute ‘sdagur23@¥mbhopal edn [Female Page 18023 Sr.No. | Committee Type: 1 Date of Appointment: Profession: | Mobile Number: | ‘Committee Designation: Caste: Committee Type: 2 Date of Appointment: Professior Mobile Number: ‘Committee Designation: Caste: _ Committee Type: 3 Date of Appointment: Committee Desig Caste Committee Type: 4 Date of Appointment: Profession: Mobile Number: Committee Designation: Casto: Sr.No. | Committee Type: 5 Date of Appointment: Profession: ‘Mobile Number: | ‘Committee Designation: Caste: ‘Sr.No. | Committee Typs 7 Date of Appointment Profession: Mobile Number: Sr.No. | Committed Type: 1 Date of Appointment: Mobile Number: Committee Type: Sr.No. 3 [Date of Appointment: Printed By : 9610577601 ‘SC/ST COMMITTEE DETAILS SCISC COMMITTEE, ain 2022 ‘Sa2s0T70N5 Other SCISC COMMITTEE coairvi2022 apsra72 se SCISC COMMITTEE ‘oarT20 aa7e805773 Other ‘SCISC COMMITTEE on w2022 ois6e0468 ot ‘sso cote | own ean saat, aS Appointment Order Reference Number: Name of the Committee Momber: Associated With: Email Address: Committee Gender: Gonder: Appointment Order Reference Number: Name of the Committee ‘Member: Associated With: Email Address: Committee Gender: Gender: Appointment Order Reference Number Name of the Committee Momber: Associated With: Email Address: Committee Gender: Gender: ‘Appointment Order Reference Numbor: Name of the Committee Memb Associated With: ‘Email Address: Committee Gender: “Gender: ‘Appointment Order Reference Number: ‘Name of the Committee Member: ‘Associated With: Email Address: ‘Committee Gender: Gender: STUDENT COUNSELLOR DETAILS |, COUNSELLO ‘commirrEe | orii2019 | Boossezias ‘Appointment Order Reference Number: Name of the Committee Member: Associated Wit Email Address: INSTITUTIONANDUSTRY CELL DETAILS INoUSTRY COMMITTEE oareizazi ‘9500076525 INDUSTRY COMMITTEE arar2024 425403020 INDUSTRY COMMITTEE oariareo24 ‘Appointment Order Referonco Number: Name of the Committee Member: ‘Associated With: Emall Address: ‘Appointment Order Reference Number: Name of the Committee Member ‘Associated With: Email Address: Appointment Order Reference Number: Name of the Committee IEMIAAIACA20201466 ‘Amabh Panday ‘Students pradeep@itmacin Male NE WAAIACA20221466 8. Singh ‘Sludents spsingh@ilfh cin [Mate UF WAAINCADOZA8 ‘Anup. Upadhyay | Sider) ‘anupechhyay@iin ac in Male NEMIAAIACA/2O72I486 Dr. Cvs Vaya Kumar Institute esi acin Male IFMANTACA20221408 Manjlata Une | Female ‘WiT86 Rae MABBN Dr. Pav Rishi | NEMYSPSIAdm 187202128 "Dr Sharadindu Pandey Inatturion ~/ spanciey@iim sein IFMISPS Asm 1572020128 i Ujar Sarma ination ‘wjat@atm cin WEM/SPSiAam. 1872021123 1. Amitabh Pandey Page 18.023 Profession: Mobile Number: ‘sr Programme No. 1 Number of Volumes. Number of Journals published at Abroad Number of eBook Volumes-PG Number of eBook Titles-UG Number of eBook Titles- Diploma Working hours from to Current Annual Budget Rs. Reading Room Seating Capacity Name of € Journal Subscription available Number of Multimedia PCs Particulars Status Potable Water Supply Yes Barrier free Environment Yes General Insurance Yes Post & Banking/ATM Ye Staff Quarters Yes Electrical Grid Power | Yes Supply Connection Rain Water Harvesting Yes. First Aid Yes Sports Facilities Yes Establishment of Yes Committe For SC/ST Implementation of Yes ‘examination reforms Pinto By : 9910877601 Member: Associated With: 9425017045 Email Address: LIBRARY & FACILITIES LIBRARY BOOKS MANAGEMENT Number of Tiles. "35880 43189 Number of Journals, 136 published in india 6 Number of oB00k 0 Volumes-UG 23000 Number of eBook 29000 Volumes-Dipioma ° Number of eBook Titles- 23000 PG 23000 LIBRARY FACILITIES Zz 9.00 hrs. to 23.00 | Reprographic Facility Yes: brs, 8229000 Bar Code or RF Tab Book | Yes handling 460 Library Networking DELNET CMIE,EBSCO.EME | Library Management Yes RALD.INDIASTAT.- Software GATE,SCIENCE DIRECT 18, ‘Total Library Area in Sqm__| 2076sqm. OTHER FACILITIES | z aH Particulars Status Particulars Status Backup Electric Yes CCTV Security Yes ‘Supply. ae | _ Institution Web Site Yes Insurance for Yes Students, All Weather Yes Fire and Safety —-Yos ‘Approach Certificate (Motorized Road) Projectors in ‘Yes Medical & Yes | Snssroome Counselling | Public ‘Yes "Group insurance Yes ‘Announcement for Employees System Telecom & FAX Yes Safety Provisions Yes ERP Software ‘Yes Transport Facility Yes | Sewage Disposal Yes. ‘Appointment of Yes. System Student Counselor Innovation Yes Participation in the | No Celiclub National Innovation Ranking Vehicle Parking | Yes Establishment of Yes Anti Raging Committee Yes Implementation of Yes teacher training policy. Page 20.123 institution ‘pandoy@iim acin tion-Industry Cell Yes Media Celt Yes Atleast 5MoUs Yes with Industries Intellectual Property of No Implementation of Yes internal Quality Yes right cet Startup Poley Assurance Cell Implementing Food Yos Applied for yes Enter Membership evaovinach Safety and Hombership of Number Standard Act2008in the National Digital insttuton Library Participation inthe Yes Estabishment of Yes Group Accident Yes National etttional Online Grievance Potey tobe Ranking Framework Rederssal provided by (NIRF) Mechanism Employees Provision to watch Yes Implementation of Yes General otice Yes MOOCS Courses through the schemes Bonrd and Swayam anounced by Departmental evermentor Notice Board ind offering of Ski No implementation of | Yes Establishment of Yes Development Courses mandatory | Internal Complaint. fapprowed by the Counc iehpotey | | Gemmivee vee) or Students somites Compliance ofthe Yes Implementation of | Yes inetallation of |) Ves National Acadom Unnat Bharat Grid Connectod | Daposttory WAD) as per Abhiyan! Soansad Solar Yejan (SAG) Systents Whether he Institution | Yos jonFaclity | No Digital Payment for Yes fas implomeonted Safety Laboratory alfrnapect and Security measures in astns) Transactions | the Campus? Tinkering ‘as per MHRD | | Laboratory! Directives Innovation Lihorntony Whether your Institution | Yes Efforts to. \,No! Inthe classrooms — Yes hasintoduced online encourae Find available, at east fachar inked Biometric Year students to ONE shal boa attendance for regular | appear for GATE smart Classroom faeuttymembers? | Exariaton | per Department OTHER FACILITIES I Sr.No. Particulars Status 4, __ Copies of AICTE Approvals (LOA and EOA of subsequent years) obtained since Inception of Yes. Institution til date shall be placed in the Website of the Institution 2, __ Display Board within the premises.as well as in the Website of the Insiitution indicating the Yes Feedback Facility of Students and Factty Members Available inthe AICTE Web Portal a, __ Establishment of Grievance Redressal Committe inthe Inttution and Appointment of ver OMBUDSMAN bythe University " 4. Display of Course(s) and "Approved Intake" in the Institution at the entrance of the institution. | Yes _ Course(s) taken through duly recognized MOOCs shall be used as Supplementary Course(s) | Avallabilty f quay safitary napkins through sanitary napkin vending machines and ensuring | Vos sMeand environment friendly disposal of ustd sanltary napkin J Display ofinformation submited fo AICTE (including the accreditation status and Board of Yes Governors) along with mandatory disclosures In the Web ste ofthe inttution 7.___ | Displayof Course(s) and “Approved Intake” in the University athe entrance ofthe University Yes z z i (OTHER FACILITIES Ill Sr. No. Particulars Status 1. | Whethor mandatory disclosure is uploaded in Institution's website? — Yes Whether the Institution following ICA\ (Institute of Chartered Accountants of India) Accounting Formats? Yea _ | Fees to be charged, Reservation policy, Admission poliey and Document retention policy are yo | duly approved by State Govt? Fees tobe charged, Reservation policy, Admission poliey and Document retention poly are duly approved by Aiating Unversity? | Fees to be chargod, Reservation policy, Adiission policy and Document retention policy fe aq Uploaded in Institution's Website? 6 Courses/Approvedintake displayedat the enivance af the institution? Yes Pago 2 of23 Printed By a¢10577601 7. Is the Cafeteria shared among other institution? No 8. Is Library and Reading Room shared among other institution? No 8. _ Is the Computer Centre shared among other institution? No 10. Whether institution is operating from Permanent Site/Temporary Site? Permanent Site 11. Whether you are registered on NAD? Yes Whether all the students documents are uploaded or not? Yes Whether your University is having approval for EWS Quota from your State? No BANK DETAILS, INCOME & EXPENDITURE BANK DETAILS Bank Name: 881 | Bank iFsc: SBINOO12194, Bank Account: 30662291254 Do You wish to change Bank Name? : No INCOME & EXPENDITURE DETAILS INCOME Income from Central | 2350 Income from State) Data Not Available Govt | Government a Income from Student | 530.67 Income from Donations: Data Not Available | | Data Not Available Income from Other Bodies! ala\Not Avaliable ] 799.56 | EXPENDITURE | Salary Teaching Staff: 962 ‘Salary Non-Teachiig Staff: 1254 | Library: 52.29 _ Equipment: (37, Building Maintenance: 46, Other Expenditure: (499 Total Expenditure: 279029 DECLARATION BY THE AUTHORIZED SIGNATORY.OF THE/NSTITUTION DEPARTMENT 1.8 the Head ofthe Institution, hereby declare that: 4) I have carefully gone through the AICTE Regulations 2021, publlshed.in the Gazette of india Extraordinary Part Il, Section: 4 dated O4th February, 2021, alco all provisions mentioned Inthe Approval Process Handbook 2022-23 'b} am fully aware ofthe data uploaded by, me In respect of my Institution on the web portal. «) | am aware that thore Is no provision for correction of data, alteration of dat, subsequent editing and appeal etc. forthe online application | once submitted on the web portal | 4) 1am aso aware that application for seeking Extension of Approval{EOA), IncreaselReduction of intake, Addition of new courses, Change of site, Closure of course, Supernumerary Seats under FNIGuIf quota Approval status/OCI, NRI, Change of name, and Conversion of women Institution Into Coved institution arid vice versa (as applicable), shall be processed as per relevant provisions enumerated in the Approval focess Handbook 2022.23. ©) Lam aware of the Deficiencigs (any) pointed out in the Report generated online, based on the factual data uploaded by my Institution on the portal 4) Lam also aware that University is eligible for grant of Extension of Approval to the Existing Institution, Extended EoA( Appll ‘APH 2022-23) only on fulfllment of prescribed norms & requirements as mentioned inthe Approval Process Handbook 2022-23, ble as por Signature of Authorized Signatory Pago 2 28 Printed By : 261057760% w ANNEXURE-B 7 Pe Santo a2 homer Renee ger yee eteeer w a Pinata yPr er syir uiwver vere Par meg met e WIM) ao Rerie ig Ascari aeae a pales we F Warmer, Ctape ge Reigtnve um ay Teles Une eer URN TRE 13-00 may Wer Veer gee WT 201-60 By, ! OMT sre we aR & wemrc ear By ay > mln ‘ Myre, mpl (Pha ene? dee JEM cong apn Biol = atechorn. ; By ‘ OE , i sf - i “hb aU UT J vw Tre HM 7 22 Joe (BD) 5th, trate maz ot wet Pea -0s0) fiwe- fee Aye gia tema ya TA aa ~ 2Olebe pee Ut TAT setae a HTT TH TT 290) Psy (eo Pet yp) aw cet AST vd aay WO A at THe Ta wa gaa Sart ot 83 at Peta at Bee age wan dat Tae | 293 aa jas | wo Aa 18-00 33 9A 480 | a4 it leat a5 We 7 4920 q a6 12 15-00 3 12940 obey wae 5-67) di 15/1 oad o nA) A 700 y, ee aged * am 201+60 —— gra vada THT ots atwan arta cet ran ery ATM Roa ere 1 aires 2303 Bf alms tar. aiiwer 8 a ore fe eae ar ya eataDr es fafa aa a S1Y awe ona at 404F9 Ty ae (storaodta) sat area Meg AT, Te Heyy 4as0 S240/r15(9)/a2 Date, Fale. & 282 ati I aga, faa tr, Tart o tA 7 cw ago Ore > aa irae , sos ate ve site, sata ed FT, sexo % AAT reat, tet hte or nt] Rake, 45/120, atte aia, Yate an eae ada BY eres 4 wal aegFa We, TR RUPT , ANNEXURE-C a Resi: 41, Jyoti Nagar, Near Central School-3 Danish Nagar, Hoshangabad Road, Bhopal (4.2) Office : Matrix Sales & Services . 10, Basement Centre Point Bullcing tee rea Jinsi Square, Jehangirabad, Bhopal 462008 (MP) eprtent Person & Fite Consultants (Serving Since 1988) 55-4009074, Mobs: 94244-39060 itrvselesandservices@gmail,com Ref No, “IFM/BPL/2018 09/07/2018 CERTIFICATE This is to certify that Educational Building Named “VIOWAN" at Indian institute of forest ‘management, Nehru Nagar, Bhopal(M.P.) has successfully installed Fire fighting system as per National Building Code Part 4 2016 with below listed items in the system. Extinguishers (on each floor ABC and BC type) First aid hose reel (on each Floor) 450 LPM pump (booster pump) 10000 litre overhead tank for fire system fire brigade inlet (at ground level) required Gl piping for above system 2nos. staircases evauwne All the above system must be checked and tested within regular interval and proper technical person should be appointed for the system. The above apie is. Casal and checked by P.K. DIWAN (BE. FIRE) FIRE Consin ++ COMPETENT AUTHORITY FOR FIRE AUDIT, SURVEY & TRAINING 2 [r 4 Resi.: 41, Jyoti Nagar, Near Central School-3 y pratt er | ne hens cman N 202t Office : Matrix Sales & Services NX. unis = GJ sins Square, Jenangvabad, Bhopal 462008 (MP) rary NG bh 0755-00807, Mobs S244 39080 seen Serving Since 1980) E-mail: mticalesnderee sama com 21/66/2015 CERTIFICATE {hss to certify that Library building block and Class room section at INDIAN INSTITUTE oF FOnEST MANAGEMENT, Nehru Nagar Bhopal (v.P,) has Successfully completed the fire | Lighting system as per National building code part 4 2016 norms with below listed items in the systems, AL Library building block 1. Extinguishers ( ABC and 8C type ) on each floor 2. Landing Valve on each floor 3. First aid hose reel Drum on each floor ‘4 Hose Box with’ RRL hose pipe and Branch Pipe on each floor | 5. Booster pump for the system 6. Fire brigade inlet in block 7 Fire alarm system with Manaul call point on each floor and Hooter. 8. Required G1. piping in the system AUClass room section 1, Extinguishers ( ABC and BC type J on each floor 2. First aid hose reel Drum on each floor ° 3. Booster pump for the system 4. Fire brigade inlet in block, 5. Required G.i. piping in the system {ithe above system must be checked and tested on regular infSiva eat pro Pha person should be appointed for the system. FIRE CONSULTA The above system consulted and checked by TT COMPETENT AUTHORITY FOR FIRE AUDIT, SURVEY & TRAINING @ Resi.: 41, Jyot| Nagay, Near Central School-3 Danish Nagar, Hoshangabad Road, Bhopal (§,?) PK. DIWAN Ofes: Ma a seven Jinsi Square, Jehangirabad, Bhopal 462008 (M.P) 4 Fire) Comoe en 8 Fie Cotas Pr 075-400507, Mo 94248-9060 (Serving Since 1988) E-mall: matisaesandservices@gmalcom Hef no, HFM /BPL/2019-20/1, 21/6/2013 CERTIFICATE This isto certify that Hostel building blocks (blocks name : Nilgiri, Vindhyanchal and Aravall)at INDIAN INSTITUTE OF FOREST MANAGEMENT, Nehru Nagar, Bhopal (M.P.) has Successfully completed the fire fighting system as per National building code part 4 2016 norms with below listed Items in the systems Extinguishers ( ABC and BC type ) on each floor First aid hose reel Drum on each floor Booster pump for the system Fire brigade inlet in each blocks. Required G.I. piping in the system All the above system must be checked and tested on regular interval and proper technical person should be appointed for the system. The above system consulted and checked by ee P.K. DI (8. FIRE) FIRE CONSULTANT COMPETENT AUTHORITY FOR FIRE AUDIT, SURVEY & TRAINING ; 2 @ ) Resi.: 41, Jyoti Nagar, Near Central School: Danish Nagar, Hoshangabad Road, Bhopal (1.2) IK Di AN Office: Matrix Sales & Services WA. Jo, esement Corre Pont Sulona este Sil Sare Setongrebo, Shope’ 4208 (2) (Serving Since 1988) E-mail : matrixsalesandsé-vices@gmnail.com 21fo6/2015 Ref no, IEM/BPL/2019-20/3 CERTIFICATE This is to’certify that Mess block at INDIAN INSTITUTE OF FOREST MANAGEMENT, Nehru Nagar Bhopal (M.P.) has Successfully completed the fire fighting system as per National building code part 4 2016 norms with below listed items in the systems. 1. Extinguishers ( ABC and BC type } in kitchen and exit ways for the block (As mess block is separate building block having only ground floor) All the above system must be checked and tested on regular interval and proper technical person should be appointed for the system. The above system consulted and checked by les Ss K. DIWAN’S. (8.£. FIRE) FIRE CONSULTANT COMPETENT AUTHORITY FOR FIRE AUDIT, SURVEY & TRAINING Indian Institute of Forest Management, Bhopal Distribution of Fire Extinguisher Type of | Capacity Remarks _| Sylender ling a ABC Skg | 05.07.2021 I | ‘Skg | 05.07.2021 — — | ABC Ske | 05.07.2021 Director's section ABC _|Skg | 05.07.2021 I “MDP room (108) ABC | Ske |05.07.2021 | Room No.119 ABC Skg | 05.07.2021 | Computer Centre_ CO: 4.5 kg | 05.07.2021 — ‘Computer Centre CO 4.5ke [05.07.2021 | Computer Centre CO? 2kg | 05.07.2021 Library ABC [Skg 05.07.2021 Reception Library ‘ABC Skg {05.07.2021 Reference Library ‘ABC Skg | 05.07.2021 —_| Stack room (Lib.) —|asc | Skg [05.07.2021 Stack room (Lib.) ‘ABC Skg [05.07.2021 Library 2" floor ABC ‘Skg | 05.07.2021 [16 [Library2"'floor «| ABC Skg | 05.07.2021 | 17 | Aravali Hostel(G.floo) | ABC | Skg | 05.07.2021 18 | Aravali Hostel (F.floor) | ABC Skg | 05.07.2021 19 _| Reception (back) Or 4.5 ky | 14.07.2021 7 20 |D.GSet DCP ‘Skg | 14.07.2021 21_|DG. Set Dep | Skg 14.07.2021 22_| Panel room (sub.st.) Dep 5 14.07.2021 23__| Panel room (sub.st.) Der Ske 14.07.2021 24 | Transformer (sub.st.) DCP. Skg 14.07.2021 | |25__| Transformer (sub.st.) [Dep Skg 14,07.2021_|_ | 26 | Mess CO, 45 kg | 14.07.2021 27_| Mess. ‘ABC Skg 14.07.2021 28 | Vindhyachal Hostel ‘ABC Skg | 20.07.2021 (G.oor) 29. | Vindhyachal Hostel ‘ABC Skg | 20.07.2021 (E.floor) | 30_| Nilgiri Hostel (Gfloor) | ABC Skg__ | 20.07.2021 31 | Nilgiri Hostel (F-floor) | ABC Skg | 20.07.2021 32_| Guest House ‘ABC Sky [20.07.2021 G-3UNXIN cel Toys H a-aunx™ ‘NV ANNEXURE-F POST GRADUATE DIPLOMA IN FORESTRY MANAGEMENT (PGDFM) 2021-2023 PROGRAMME LIST OF COURSES Term 4 S.No. | Gore Subjects Credits | Course Code 1__| Quantitative Technique) (QT) 1.0 FM-101 2__| Managerial Computing ((MC) 1.0 FMi02__ __3__| Accounting for Managers (AM) 1.0 FM-103 4 | Marketing Management (MKT) 1.0 FM-104 5 _| Foundations of Forest Management (FFM) 1.0 FM-105 6 | Society & Polity (SP) 4.0 FM-106 Core Skilisiideas 8 | Critical Thinking (CT) 0.25 FM-107_ 9 | Soft Skills (SS) 0.25 FM-108 10 _| Ethos of Conservation (EC) 0.50 FM-109 Term 2 S.No. | Core Subjects Credits 1 | Financial Management (FM) 4.0 FM-201 2 _| Micro Economic Analysis (MEA) 1.0 FM-202 3__| Business Communication (BC) 4.0 FM-203 4 | Organizational Behavior (OB) 1.0 FM-204 5__| Supply Chain Management (SCM) 1.0 FM-205 6 | Climate Change, Adaptation & Mitigation 1.0 FM-206 (CCAM) Core Skills/ideas 7 __| Design Thinking (DT) 0.25 FM-207, 8 | Emotional intelligence (El) 0.25 FM-208 Field Work - 4 Woeks 0.75* FM-FW Tobe addedwith Term-l Term3 S.No. | Core Subjects Credits Course Code 1 | Foundations of Sustainable Development 10 FM-301 (FSD) 2 | Macro Economic Policy and Analysis (MEPA) 71.0 FM-302 [3 | Management Information Systems (MIS) 4.0 FM-303 4 | Research Methods & Business Analysis 1.0 FM-304 (RMBA) 5 | Human Resource Management (HRM) 1.0 FM-305 6 _| Strategic Management (SM) 1.0 FM-306 Core Skilis/ideas 1 | Leadership (LOS) 025 | __-FM-307 2 | Ethics (ETH) 0.25 FM-308 Summer Internship - 10 Weeks 2.50 FM-SI Term 4 S.No. | Elective Subjects Credits Course Code Core Skilisidea 1 | Laws & Conventions on Forest & Biodiversity 0.50 FM-401 (LCFB) 2 _ | Entrepreneurship (ETNP _ 025 | ELECTIVES OPTED BY STUDENTS DURING THE AY 2 - Applied Agro-forestry ee a [Advanced Data Analysis 1.00 EFM-404 | Applied Rural Planning and Livelinoods 4.00 | EFM-405 | Corporate Social Responsibility and 1.00 EFM-406 Governance jf | Eco-tourism and Nature Conservation 7.00 EFM-407 Integrated Water Resources Development 1,00 EFM-408 andManagement Micro Finance 7.00 EFM-409 Public Policy and Policy Analysis 4.00 EFM-410 | People, Parks and Wildlife 1.00 EFM-411 Renewable Energy Management 7.00 EFM-412, ‘Social Ecological Systems Approaches for 7.00 EFM-413 Ecosystem Management 14 | Sustainability and Green Marketing 7.00 EFM-414 15 | Social impact Assessment 1.00 EFM-415 16 | Sustainable Livelihood and Rural 7.00 EFM-416 Development 17 | Social and Rural Marketing 7.00 EFM-417 168 | Visual Analytics 7.00 EFM-418 Project Work — 8 Weoks 2.00 FMPW. Term 5 ELECTIVES OPTED BY STUDENTS DURING THE AY 2021-2022 S.No. | Elective Subjects Credits | Course Code 1 Disaster Risk Management 7.00 EFM-501 2 ‘The Economics of Development and Growth 1.00 EFM-502 Models 3 Forest Plantation Management 7.00 EFM-503 4 Green Sustainable Finance 1.00 EFM-504 5 International Business 7.00 EFM-505, 6 Impact Evaluation 7.00 EFM-506 7 Medicinal Aromatic Plants and Enterprise 4.00 EFM-507 __| Development 3 Metrics and Reporting of Business 7.00 EFM-508 Responsibility 9 Management Science Methods for Decision 7.00 EFM-509 Making : 10 | Management 7.00 EFM-510 11 | NRM for Rural Development 4.00 EFM-511 12__| Project Management 7.00 EFM-512 13 | Rural Adaptation Strategies 7.00 EFM-513 14 | Wildlife Conservation and Management 4.00 EFM-514 15 | Wood Technology and Management 1.00 EFM-515, POST GRADUATE DIPLOMA IN SUSTAINABILITY MANAGEMENT 2021-2023 PROGRAMME PROGRAM STURCTURE OF PGDSM PROGRAM Course Code | Credit Point Term: - 60 Paper: Principles of Sustainability - SM-101 10 Paper Ii: Business Communication sM-102 10 Paper ill: Business Research Methods SM-103, 100 Paper IV: Financial Accounting 7 SM-104 10 7 Paper V: Managerial Computing 7 SM-105 10 Paper Vi: Managerial Economics SiM-106 10 Term tl [60 Paper I: Decision Methods SM-201 10 Paper I: Marketing Management for Sustainability SM-202 10 Paper ll: Development & Business Ethics M203 10 Paper V: Governance, Policy & Legal Issues in SM-204 1.0 Sustainability a Paper V: Financial Management SM-205 1.0 Paper Vi: Systems & Design Thinking in Sustainability sm206 [05 Paper Vil: Stakeholder Engagement and Materiality SM-207 05 Assessment Field work: Environmental Data Collection & Analysis (2 weeks) | SM-FW 1.0 Term ill 7.0 Paper k: Environmental Economics & Green Accounting M302 1.0 Paper I Green Operations & Supply Chain Management SM-302 10 Paper ll: Strategic Management SM-303 10 Paper IV: Business Certification & Audits for SM-304 05 Sustainability Paper V: Geo-informatics for designing sustainable solutions SM-305 10 Paper Vi: Climate Change : Sustainable Energy & SM-306 10 Carbon Management Paper VII: CSR & Sustainability Reporting siv-307 10 Paper Vill:Consumer Behavior =—Ssi(iti‘éstw*!#*#*C«*dS SMO LOS ‘Summer Internship (12 week) mst - Term | | Compulsory course | Paper |: Measuring Sustainability & Aligning SOG's sM-401 10 Paper I Environmental Finance and Sustainable sM-402 100 investment Electives courses/ Course of Independent Study (CIS) esm.403.— | 40 {one Cis +3 electives) onwards Environmental Assessment for Sustainability esmao3 | 1.0 Social and Cause Marketing esmaos | 1.0 ‘Strategie Risks & Responsibility ESM406 10 Visual Analytics in Sustainability esmao7 | 1.0 Industry Project (08 weeks) SMP 2.0 Term V: 5.0 Compulsory course Paper I: Sustainable Innovation and Entrepreneurship SM-501 10 Paper Il: Leadership for sustainable development sms0z, | 1.0 Electives courses (3 electives) €sm-503 | 3.0 fa onwards DM - Disaster Management esm-s03 | 1.0 1B- international Business esw-soa | 1.0 ‘SWRM - Sustainable Water Resource Management Esm-s0s | 1.0 SPP - Urban Sustainability - Principles and Practice esm-s06 | 1.0 ‘Writing, final submission & Evaluation of Industry project report | esM-S07 | 1.0 TOTAL CREDITS| 36

You might also like