Save trees use e-Question Paper Go green DOWNLOAD THIS FREE AT www.vturesource.com COT = Seventh Semester B.E. Degree Examination, Dec.09/Jan.10 Quantity Surveying and Estimation Max. st Note: J. Answer Q. No. 1 and any four of the remaining questions. 2 Assume the necessary data suitably. 1) The accompanying Fig.1 shows the details of a three roomed building. Kstimate the quantities and {G00 ofthe following items of works: “2. ‘8. Earthwork excavation for foundation in hard soil at Rs. 140/m?, (0Rtarkes) ©. GC. bed 1:4°8 for all walls at Rs.2900/m". Marks) © $8M in CM 1:8 for footings and basement at Rs.2500/m" (10 Marks) 4. 2.5m damp proof course at Rs.80/m" 06 Marks) ° 0 Marks) 1 fo SBing items of work. Bi) First class brickwork with 1:4 CM. fil) 20 mm cement plaster on walls §¥) Floor finish in C.C. 1:2:4 with water proofing as Marks) > 4 asmarks) ° asMarks) Estimate the quantity of earthwork in cuting for a road of 10m formation width with the following data usliy mean sectional area method or trapezoidal formula method. Side slope is 2:1 (HV) and no Cheinge(my: 030. 6090120150 Groundievet. $0.50 7930 8140 8400 85.10 83.50 Formation level: 7500 « Rising gradient of 1 in 30-1 of cutting is Rs.140/m3, estimate the total cost of earthwork. as marks) Lof2 BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS A Vturesource Go Green initiative Save trees use e-Question Paper Go green DOWNLOAD THIS FREE AT www.vturesource.com Differentiate between: Administrative approval and technical sanction. Lump sum conteact and labour contract. Eamest money and security money. Briefly explain different types of estimates Briefly expl: 1) Measurement book ; ii) Schedule of rates, THREE ROOMED BLILDING WITH FRONT AND BACK VERANDAH Woon» soem Welton soe 7 0,S00n x 2t0er 2 Fig.t. (Question | - Compulsory) 20f2 BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS A Vturesource Go Green initiative

You might also like