You are on page 1of 1
amet ter ates Hise fort solferer(ar. fa.) arate, ater ter earor INDIAN RAILWAY Office of the Sr.Div.Blect.Eng. (TRD), Central Railway, Kalyan Rly.Ph.: 63063_BSNL Ph. (0251)2362235 Fax: (0251}2364644 Email: srdeetrdkyner) @gmailcom Hie: KYN.LD.585.Augmentation/MUTP. Fee: 04.04.2022 Sr.DEN(Co)CSMT Sub: Submission of sanctioned Estimate copy for Engineering portion for the work cf Augmentation of existing NE-1, NE-II & SE-I, SE-Il 110 KV transimiseron line fittings of Mumbai division of Central Railway. Ref: ), Letter No. CEE/P/WB/MUTP/Phase-IIIA/2019-20/01 vide e-office Note No. 1 dated 21.04.2021 (Copy enclosed) ii). This office letter of even No. dated 19.03.2022, in connection with the above subject, the Estimates for the work of Augmentation of existing NE-l, NE-I & SE-I, SE-II 110 KV transmission line fittings of Mumbai division of I Railway sanctioned by GM/CR vide e-office Note No. #6 dated 29.04.2021 is forwarded herewith for your ready reference. In continuation to this office letter quoted under Ref.(ii), the sanctioned estimate also covers Engineering portion for the work of “Provision of Depots for maintenance” under estimate item No. 16 of NE & SE section, as given below: - [ Sr.-] Section | Sanctioned | Total Cost of Engineering Portion (Item No. 16) & No. Estimate No. _| Estimate (Rs.) Total Cost (Rs,) 1 | NE-I & | KYN/Detailed {1,14,24,34,142/-| Provision of Depots for | 15,15,937.47 NE-II | Estimate.2019- maintenance iE 20/02.R | Z| 2 | SET &/ KYN/Detailed | 1,25,42,15,250/- | Provision of Depots for 15,15,937.47 SEI | Estimate.2019- maintenance 20/02. Total I a 30,31,874.94 In view of the above, itis requested to process for further necessary action at your end, ewer (Ved Prakash Sahu) ‘ADEE(TD)KYN ff -Sr.DEE(TD)KYN DA: As above. C/- ADEN(W)KYN: For information pl.

You might also like