Estimate,
Costing &
Valuation
Email ⇒ civilengineeringmcqz@gmail.com
© Copyright
All rights are reserved. No part of this book may be reproduced in any form or by any electronic or mechanical
means without permission in writing from the publisher. The publishers have taken all possible precautions in
publishing this book, yet if any mistake has crept in, the publishers shall not be responsible for the same.
CHANDAN’s Guidance will be grateful if you could point out any such error. Your suggestions will be
appreciated.
1. The rate of payment is made for 100 cum (d) All of the above
(per % cum) in case of _____. Ans. (d)
(a) Earth work in excavation 5. Brick walls are measured in sq. m if the
(b) Rock cutting thickness of the wall is _____.
(c) Excavation in trenches for foundation
(d) All of the above (a) 10 cm
Ans. (d) (b) 15 cm
(c) 20 cm
2. The rate of an item of work depends on _____. (d) None of the above
Ans. (a)
(a) Specifications of works
(b) Specifications of materials 6. The plinth area of a building not includes ____.
(c) Proportion of mortar
(d) All of the above (a) Area of the walls at the floor level
Ans. (d) (b) Internal shaft for sanitary installations up
to 2 sqm in area
(c) Lift and wall including landing
(d) Area of cantilevered porch
Ans. (d)
Ans. (a)
43. The expected out turn of 2.5 cm cement 47. The most reliable estimate is _____.
concrete floor per mansion per day _____.
(a) Detailed estimate
(a) 2.5 sqm (b) Preliminary estimate
(b) 5.0 sqm (c) Plinth area estimate
(c) 7.5 sqm (d) Cube rate estimate
(d) 10 sqm Ans. (a)
Ans. (c)
48. The reduced levels of points, 30 metres apart
44. Pick up the correct statement from the along the longitudinal section of a road portion
following. between chainages 5 and 9 are shown in the
given figure. If there is a uniform up-gradient of
(a) The bent up bars at a support resist the the road 120 in 1, the chainage of the point with
negative bending moment no filling or cutting is _____.
(b) The bent up bars at a support resist the
sharing force
(c) The bending of bars near supports is
generally at 45°
(d) All of the above
Ans. (d)
(a) (6 + 15) chains
45. While preparing a detailed estimate _____. (b) (6 + 12) chains
(c) (6 + 18) chains
(a) Dimension should be measured correct (d) None of the above
to 0.01 m
60. Carpet area does not include the area of _____. 63. The correct Prismoidal formula for volume is
(a) The walls along with doors and other (a) D [first area + last area + Ʃ Even area + 2
openings Ʃ odd areas]
(b) Bath room and lavatory (b) D/3 [first area + last area + 4 Ʃ Even area
(c) Kitchen and pantry + 2 Ʃ odd areas]
(d) All of the above (c) D/3 [first area + last area + 2 Ʃ Even area
(a) 0.200 m³
(b) 0.247 m³
(c) 0.274 m³
(d) 0.295 m³
80. The expected out turn for earth work in Ans. (c)
excavation in ordinary soil per workman per day
is _____.
81. The expected out turn of brick work in (a) Collapsible gates
cement mortar in foundation and plinth per (b) Rolling shutters
mason per day, is _____. (c) Ventilators and glazing
(d) All of the above
(a) 1.00 m³ Ans. (d)
(b) 1.25 m³
(c) 1.50 m³ 86. The damp proof course (D.P.C.) is measured
(d) 1.75 m³ in _____.
Ans. (b)
(a) Cub. m
82. The brick work is measured in sq metre, in (b) Sq. m
case of _____. (c) Meters
(d) None of the above
(a) Honey comb brick work Ans. (b)
(b) Brick flat soling
(c) Half brick walls or the partition 87. The volume is measured correct to the
(d) All of the above
(a) 0.90 m³
(b) 0.94 m³ 94. The weight of an item is measured correct to
(c) 0.98 m³ nearest _____.
(d) 1.00 m³
Ans. (b) (a) 0.25 kg
(b) 0.50 kg
90. Size, capacity and materials need be (c) 0.75 kg
specified for _____. (d) 1.00 kg
Ans. (d)
(a) Bib-cocks
(b) Stop-cocks 95. Berms are provided in canals if these are ___.
(c) Ball valves
(d) All of the above (a) Fully in excavation
Ans. (d) (b) Partly in excavation and partly in
embankment
91. The expected out turn of half brick partition (c) Fully in embankment
wall per mason per day is _____. (d) All of the above
Ans. (b)
(a) 1.5 m³
(b) 2.0 m³
97. Contingency fund generally forms _____ of the 101. If 'b' is the width of formation, 'd' is the
estimated cost. height of the embankment, of length 'L' and side
slope n : 1 for a road, the quantity of earthwork
(a) 1% to 3% is _____.
(b) 3% to 5%
(c) 5% to 8% (a) (b/d + nd) L
(d) 8% to 10% (b) (bd + nd²) L
Ans. (b) (c) (bd – n√d) L²
(d) L/2 (bd + nd²)
Ans. (b)
(a) 4% to 5%
(b) 5% to 7%
(a) 26.20 π m (c) 7% to 9%
(b) 28 π m (d) 9% to 12%
(c) 28.60 π m Ans. (c)
(d) 196 π m
Ans. (b) 103. The expected outturn of 2.5 cement
concrete floor per mason per day _____.
99. For 2.5 cubic meter thick cement concrete
(1 : 2 : 4) damp proof course, the number of (a) 2.5 square meter
stone chips required will be _____. (b) 5.0 square meter
(c) 7.5 square meter
(a) 2 m³ (d) 10 square meter
(b) 2.2 m³ Ans. (c)
(c) 2.5 m³
(d) 2.8 m³ 104. Partition of specified thickness is measured
Ans. (b) in _____.
120. The plinth area includes the area of the (a) 70 to 140 N/cm²
balcony which is protected by projection up to (b) 100 to 130 N/cm²
(c) 200 to 250 N/cm²
(a) 25% (d) 10 to 50 N/cm²
(b) 50% Ans. (a)
(c) 75%
(d) 100% 125. Pillars and painting are computed in _____.
Ans. (d)
(a) m and m respectively
(b) m² and m respectively
(c) m³ and m² respectively
(d) m² and m³ respectively
Ans. (c)
121. Temporary structure erected to facilitate 126. Unit of measurement for payment of door
the construction of walls when the height is and window's shutter is _____.
more than 1.5 m is known as _____.
(a) Cubic meter
(a) Scaffolding (b) Meter
(b) Formwork (c) Meter²
(c) Centring (d) None of the above
(d) Shoring Ans. (c)
Ans. (a)
(a) 0.001 m
(b) 0.002 m 127. What is the approximate cost of the labour
(c) 0.003 m as a percentage of the total cost of the building?
(d) 0.004 m
(a) 0.1
Ans. (b)
(b) 0.25
123. Wall dimensions : 4 m long, 4 m high, 30 cm (c) 0.4
thick. Calculate the quality of plastering for both (d) 0.05
side plastering Ans. (b)
(a) 100 mm
133. In the centre line method of working out
(b) 150 mm
volumes, for T junction of walls, what deductions
(c) 200 mm
must be made from the centre line length at each
i
(b) Ic = [(1 + i )n − 1]
i
(c) Ic = [(1 − i )n + 1]
i
(d) Ic = 144. When a property is purchased with an idea
[(1 + i )n + 1]
to sell it off at a profit is termed as _____.
Ans. (b)
(a) Monopoly value
140. Plastering is computed in _____. (b) Sentimental value
(c) Speculative value
(a) m (d) Reversionary value
(b) m² Ans. (c)
(c) m³
(d) m⁴ 145. Distress value is _____.
Ans. (b)
(a) When the property is sold at a higher
141. Gully traps are used for _____. value than market value
(b) When the property is sold at a lower
(a) preventing foul gases to escape value than market value
(b) receiving waste water from kitchen sinks (c) When the property is sold at the current
(c) disconnected house drain from public market value
(d) When the property remains unsold at any NOT included in which area of valuation _____.
price due to some reasons
(a) Plinth area
Ans. (b)
(b) Plot area
146. The unit of measurement is per quintal for (c) Carpet area
(d) Floor area
(a) Collapsible gate with rails Ans. (c)
(b) Rolling shutters
(c) Expanded metal wire netting 151. Method used to make an estimate is _____.
(d) Reinforcement of R.C.C works
(a) Thin wall and thick wall method
Ans. (d)
(b) Centre line method
147. What is the least window opening for 30 (c) Both (a) & (b)
m³ inside volume of the room? (d) Centre of gravity method
Ans. (c)
(a) 30 m²
(b) 3 m²
(c) 1 m²
(d) 10 m²
Ans. (b)
breadth
(c) Half the breadth on one side + half the
breadth on the other side
(d) Half the breadth on one side – half the
breadth on the other side
Ans. (c) (b − rd)²
1
(a) 2 × r−s
155. The cross-section of a road partly in
banking and partly in cutting is shown in the 1
(b) 3 ×
(b − rd)²
r−s
following figure, the area of the shaded portion
is _____. 1 (b + rd)²
(c) 2 × r−s
1 (b + rd)²
(d) 3 × r−s
Ans. (c)