You are on page 1of 3
Mounting and wing - continues Davis Wiring Decide during planning which function i tobe connected and where tis willbe, 1. Connect inputs and outputs Here ae the tables forthe example Remember the izelation amplifier signals are received from different controls, e.g, heat re «covery for one ofthe inputs, a galvanically insulated module be inserted Taf a] ain [eRe | spe tinonot the sich icons canbe seevinth at coin ese ron Fain [ww [wse655] | He terete in elrentones One pte baad two upto 159 an Tome eae? ea re a isentee Sposa fe) SS a or Se . Te fee] beemane sen [ Jom] felons $05 [ ewe — a sevomienes eee “ Capoctycontoler RS8GG602 © Danfoss 2015-03 NePCTBI Devils Mounting and witing- continued ‘The connections forthe example can be seen here 5 = Vianing 3) cS) Kenyan ce sepante fom ; Petar tonaane ‘The eeen on the pressure sranemier cable ust ony beconnected atthe endof the —~ i XS @ ‘he supply voltage fer the pressure tranemiter shoul be taken rom thesare module that reeves the presure signal oe os iy navrecepis| 2eeesese0 ey es roc S10] 210-4 foe eos aa — Oo g Zoo} a aeec 781 Capacity controller RSEGG502 © Danfoss 2015-03, 9 Dor 2. Connect LON communication network ‘The installation ofthe data communication must comply with ‘the requirements set outin dacument RCBAC. 3. Connect supply voltage 1524, and the supply mustnat be used by other controllers or devices The terminals must nat be earthed, 4, Follow light-emitting diodes ‘When the supply voltage is connected the controller will go through an internal check. The controller will be ready in ust, under one minute when the light-emitting diode "Status" starts Mashing slowly 5.When there is a network Set the address and activate the Service Pn 6.The controller is now ready to be configured. Seon ee Seton =08 50 capacity controller "5866602 © Danfoss 2015-03 AKPC7B1

You might also like