CIC BIM Protocol - Introduction 10/11/2020

Standard Protocol for use in projects using


Building Information Models
First Edition 2013
CIC What is BIM
Protocol
Second Edition 2018
Produced by
BIM Protocol The BIM Protocol has been drafted by Beale &
Second Edition - 2018
Company on behalf of the Construction
Industry Council.

1 2

The Protocol makes the minimum changes


necessary to the pre-existing contractual
A supplementary legal agreement by means of
General arrangements on construction projects;
a simple amendment
principles The Protocol ensures that there is an obligation
Incorporated into contracts of professional
What is BIM on parties to provide defined elements of their
services and construction adopted in the works/services using models;
Protocol Creates additional rights and obligations for drafting of the
continued… The Protocol is a contractual document which
the client and contracted parties Protocol takes precedence over existing agreements;
But, no additional liabilities between - 1st Edition and;
contractors
The Protocol is flexible and should be suitable
for use on all Level 2 BIM projects.

3 4
CIC BIM Protocol - Introduction 10/11/2020

Obligation to provide and share specified


information using a Common Data
General Environment process and to comply with the Enable production of (appropriate) BIM models
Employer’s Information Requirements and BIM at defined stages of a project, and thereby
principles Execution Plan; Objectives of Support the production of deliverables for
adopted in the “data drops” at defined project states.
Requirement to comply with the Employer’s BIM Protocol
drafting of the security processes and procedures in providing - 1st Edition Appointment of an “Information Manager”
Protocol their work/services;
Encourages adoption of common standards
- 2nd Edition Incorporation Protocol into the contracts of all (e.g. PAS 1192-2)
the project team, creating a consistent
framework in respect of BIM

5 6

The Protocol, when completed: ‘The [Employer] and the [Contractor/ Consultant/
Subcontractor] shall:
puts into place specific contractual obligations
on the Employer and the Project Team Member 1. comply with their respective obligations set out
in connection with Specified Information and in the CIC Building Information Modelling Protocol,
Second Edition 2018, in the form attached at
Project Information; Appendix [X] (“BIM Protocol”);
Objectives of sets out the rights the Project Team Member Incorporation 2. have the benefit of any rights granted to them in
BIM Protocol and the Employer have to use that Specified the BIM Protocol; and
Clause
- 2nd Edition Information and Project Information and their 3. have the benefit of any limitations or exclusions
liability for such use; of their liability contained in the BIM Protocol.
identifies the information which members of The [Employer] and the [Contractor/ Consultant/
the Project Team are required to produce; and Subcontractor] agree that, subject to clause 1.4 of
can require compliance with security standards the BIM Protocol, this Agreement shall be amended
as set out in the BIM Protocol.’
and processes.

7 8
CIC BIM Protocol - Introduction 10/11/2020

Co-ordination – timetable of project coordination


Responsibility Matrix – Refer to or attach the meetings.

Appendix 1
Responsibility Matrix. This should identify the Inconsistency – any process/approach for resolving
Specified Information to be produced, shared and inconsistency in or between information.
published by the Project Team Member and the Standards, methods and procedures – the applicable
applicable Level of Definition (the Level of standards, methods and procedures, e.g. PAS 1192–2.
Information and/or Level of Model Detail). Asset Information Model – the information and
Appendices Employer’s Information Requirements (EIRs) – Appendix 2 assistance required in respect of the Asset Information
1&2 Refer to any EIRs (see PAS 1192–2) in Appendix 2. (further items) Model, including in connection with any applicable Soft
Landings process.
Appendix 2
BIM Execution Plan (BEP) – Refer to the agreed
BEP (see PAS 1192–2) which will apply to the Software – the agreed approach in respect of different
Project Team Member in Appendix 2. Set out the software formats/interoperability.
process for developing/amending the BEP. State Amendments – the extent to which Project Information
how any conflict between the EIRs and the BEP will can be amended (if at all).
be resolved. Specified Information – specify any additional Specified
Information

9 10

Application – state whether or not the Security Minded


Provisions in the Protocol apply. If nothing is included at
Appendix 3 or if it states “not used” the Security Minded
Provisions will not apply. Clause 10: Defined Terms
Sensitive Information – specify any project information Agreement/ Asset Information Model/ BIM/ Built
Appendix 3 which is “Sensitive Information” and therefore treated Definitions Asset Security Manager/ Execution Plan/ CDE/
(optional) differently to other information. Information Manager/ EIR/ Federated Model/
Information Model/ LOD/ Proprietary Material/
Employer’s Standards – identify the Employer’s general Permitter Purpose/ Responsibility Matrix
Security Requirements.
Project Specific Standards– identify the Security
Requirements specific to the Project.

11 12
CIC BIM Protocol - Introduction 10/11/2020

No Design related duties


The Protocol requires the Employer to appoint No clash detection and model coordination
a party to undertake the Information Responsibilities
Management Role. Managing the processes and procedures for
Information Information information exchange
Design Lead, Project Lead or Contractor
Manager Manager Initiating and implementing the Project
(1st Edition) May appoint different parties for different Continued … Information Plan and Asset Information Plan;
stages Assisting in the preparation of Project Outputs,
May appoint a standalone one such as data drops
Implementation of the BIM Protocol, including
the updating of the MPDT.

13 14

the person (or persons) appointed, initially by


the Employer or the owner of the built asset included at Appendix 2 to the Protocol so that
which is the subject of the Project, to perform a Project wide information requirements can be
role in connection with the Project which expressly incorporated into all Project Team
Information includes, amongst other things, the Member Agreements.
establishment and management of the Information define how a Model must be developed,
Manager processes, protocols and procedures set out in Requirements
(2nd Edition) although it will not change the substance of
the Information Particulars (i.e. the Appendix 2). what each party must provide
Information Manager is responsible to agree
There should be an information manager at all and issue the IR
times until the end of the project.

15 16
CIC BIM Protocol - Introduction 10/11/2020

the copyright provisions are now more flexible.


Clauses 6.2–6.4 (stating that the Project Team
Member retains copyright ownership and grants
a licence) only apply if the Agreement contains
no provisions regarding intellectual property; if
the document setting out responsibility for Intellectual the Agreement contains such provisions, they
Responsibility model or information production in line with Property will apply to the Material (Specified Information
Matrix defined Project stages as attached at or (Changes form the
and information prepared under the Agreement
referred to in Appendix 1. 1st Edition) comprised in or extracted from the Specified
Information). This means that the Protocol can
be used (unamended) even if the Project Team
Member will not retain ownership of its
intellectual property (because it will be
transferred to the Employer).

17 18

Clause 10.20
Clause 6.2 means a purpose related to the Project (and/or the
any rights (including but not limited to any construction, refurbishment, extension, operation,
copyright)….shall remain vested in the Project management and/or maintenance of the Project)
which is consistent with:
Team Member
(a) the applicable Level of Definition of the relevant
Intellectual Clause 6.3 Permitted
Project Information;
Property (b) the applicable status code of the Project
the Project Team Member grants to the Purpose Information in accordance with
continued… Employer a non-exclusive, royalty free and BS1192:2007+A2:2016;
irrevocable licence,… to transmit, copy and use (c) the applicable functional state of the Project
the Material and any proprietary work Information in accordance with
BS1192:2007+A2:2016; and
contained in or extracted from the Material for
the Permitted Purpose (d) the purpose for which the relevant Project
Information was prepared.

19 20
CIC BIM Protocol - Introduction 10/11/2020

6.4 Any licence and/or sub-licence granted in …the Project Team Member does not warrant,
clause 6.3 shall not include the right to: expressly or impliedly, that:
6.4.1 amend or modify the Material without the 5.1.1 any software used to prepare the Specified
Project Team Member’s written consent (not to Information; or
be unreasonably withheld), save where such
5.1.2 any software format in which the Specified
amendment or modification is:
Electronic Information is shared, published or otherwise
Use of Models (a) provided for in the Information Particulars; or issued in accordance with this Protocol and the
Data Exchange
(b) made for the Permitted Purpose following the Agreement,
termination of the Project Team Member’s is compatible with any software or software format
employment under the Agreement; or used by or on behalf of the Employer, the
6.4.2 reproduce any designs contained in the Employer’s Information Manager or any Other
Material for any extension of the Project. Project Team Member in connection with the
Project.

21 22

Clause 5.2
Save where it is a result of the Project Team
Member’s failure to comply with this
Protocol and/or the Agreement, the Project
Team Member shall have no liability to the
Electronic Employer in connection with any corruption
Data Exchange or unintended amendment, modification or
alteration of the electronic data (including,
without limitation, any software) in any
Discussion
Specified Information which occurs after it
has been shared, published or otherwise
issued through the CDE Process by the
Project Team Member.

23 24