You are on page 1of 5

PT.

ALTRAK 1978

LAPORAN
KESELAMATAN DAN KESEHATAN KERJA

PERIODE: BULAN OKTOBER 2022

PROYEK BCA New Data Center


Alamat : Jl. Irian 1 kawasan MM2100
PT. ALTRAK 1978
HSE MOUNTHLY REPORT
PROYEK BCA NEW DATA CENTER
Periode Oktober

DATE
NO MAN POWER MAN HOUR Total Man Hours
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Muhammad Iqbal S 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
2 Redy Agustik 0 0 0 8 8 8 0 0 0 0 0 0 0 0 0 0 0 0 0 24
3 Ahmad 8 0 0 0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 16
4 Virgiawan 8 0 8 8 8 8 8 8 0 8 8 8 8 0 0 0 8 0 0 96
5 Bayu Dwi WK 0 0 0 0 0 8 8 8 0 8 8 8 8 8 8 0 8 0 0 80
6 Fajar Teja 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
7 Bambang 8 0 8 8 8 8 0 0 0 0 0 0 0 0 0 0 0 0 0 40
8 Sugino 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
Pekerja Zona A 0 0 0 0 0
9 Agit Mustofa 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
10 Andi Fathurohman 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 0 0 0 112
11 Anwar Sanusi 8 0 8 8 0 8 8 8 0 0 8 8 8 8 8 0 0 0 0 88
12 Asep Abdul Majid 8 0 8 8 0 8 8 8 0 8 8 8 8 8 8 8 8 0 0 112
13 Roham 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
14 Kosim Suganda 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15 Enrico 8 0 8 8 8 8 8 8 0 8 8 8 0 0 0 0 0 0 0 80
16 Sunarto 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
17 Doni Setyawan 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
18 Nur Riski Abdillah 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
19 Muhammad Faizal 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
20 Agus Setyawan 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
Pekerja Zona B 0 0 0 0 0
21 Andika Dwi Prasetya 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
22 Ipin Fahruddin 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
23 Muhammad Zaenudin 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
24 Ahmad Manaf 8 0 8 8 8 8 8 8 0 8 8 8 8 8 8 8 8 0 0 120
Bulan ini 2208
Bulan Lalu 14232
S/D Bulan Ini 16440

Jumlah
No Uraian Total Man Power No Uraian
Bulan Ini
1 Project Manager 1
2 Site Manager 1 1 Man Power 24
3 Site Engineer 1
4 Drafter 1
5 HSE/Safety 2 2 Man Hours 2208
7 Supervisor 2
8 Pekerja 16
Total 24

Disetujui Bekasi, Oktober 2022


Dibuat Oleh

M.Iqbal Syarif Bayu Dwi WK


Project Manager Safety Officer
REKAPITULASI EVALUASI LAPORAN K3 BULANAN
Periode : 2022

Bulan : Agustus
Uraian Ket
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
A Jumlah pekerja rata-rata per hari 3 3 3 3 3 3 0 3 3 6 6 6 6 0 6 6 7 7 7 7 0 8 8 8 9 9 9 0 9 9 9
B KECELAKAAN KERJA
(yang menyebabkan hilangnya jam kerja)
1 Meninggal Dunia 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Cacat Permanen Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 Cacat Permanen Sebagian 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 Tidak mampu bekerja sementara 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Jumlah B 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
C KECELAKAAN KERJA ( RINGAN )
(yang tidak menyebabkab hilangnya jam kerja)
1 Kondisi Lingkungan Kerja Hujan/Lembab 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Kena Paku 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 Kejatuhan Batu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 Tergelincir 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 Terpeleset 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6 Kena Aliran Listrik 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 Terkena Palu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 Tumpahan Oli Bekas 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 Terjatuh 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Jumlah C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Jumlah B+C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Bekasi, September 2022


Mengetahui , Dilaporkan Oleh ,

M. Iqbal Syarif Fajar teja


Project Manager HSE Officer
PROGRAM K3L
Proyek BCA New Data Center
2022
JAN FEB MAR APR MEI JUN JUL AGS SEP OKT NOV DES
No ACTIVITY PIC REMARKS
w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4
1 Harian HSE Inspector
House Keeping x x x x pastikan area kerja rapi dan bersih
TBM Pagi x x x x Tbm awarennes tentang 3 point contact
Observasi K3 x x x x
Inspeksi lingkungan kerja x x x x memastikan area kerja aman
2 Mingguan
Safety Talk x x x x Pengenalan kepada pekerja tentang unsafe action dan unsafe condition
Buletin K3 x x x x Informasi mengenai kasus K3L via papan mading
Inspeksi APAR x x x x inspect monthly apar all area
Inspeksi Peralatan Kerja x x x x tagging alat kerja hand tools by total
Inspeksi APD x x x x check apd pekerja masih layak pakai atau tidak
3 Bulanan perencanaan metode K3L dalam setiap pekerjaan
Meeting Internal x x x x

Bekasi, September 2022


Keterangan : X = rencana Dibuat, Diperiksa,

X = aktual pelaksanaan

X = tidak ada pelaksanaan

X = Progress HSE OFFICER PROJECT MANAGER

R1-Rn = Status revisi


Proyek : BCA New Data Center
Periode : 1 September 2022 SD 30 September 2022
SUMMARY SAFETY PATROL

NO FOTO SEBELUM FOTO SESUDAH AREA TANGGAL IDENTIFIKASI MASALAH TINDAKAN PERBAIKAN TARGET WAKTU PIC STATUS

Dibuat Disetujui

HSE Inspector Project Manager

You might also like