STEEL AUTHORITY OF INDIA LIMITED
For systemic improvements required for time bound completion of project
formulation, appraisal, award and implementation, drawing from the
recommendations of the committees constituted to this effect, and learnings
from the practices of other CPSEs, the following Guidelines are to be
implemented at all Plants/Units:-
i) Timelines for Project formulation & finalisation as detailed at Annexure-I
ii) Annual prioritisation of projects to be done with involvement of CET.
iii) Weekly review by CGM (Projects)/ CGM (Shop) concerned, fortnightly
review by ED(Works)/ED(Projects) and monthly review by Director In-
charge of Plant
iv) Investment of more than Rs 30 Crore Projects to be scrutinised by a Cross
Functional Task Force Committee (TFC) headed by CGM/Head of Shop
* Broad Scope of the TFC - Finalising the Feasibility Report, layout,
shutdown, scope, alternative, TOP & Battery limits
* TEC in place from Concept to Closure
vy) Project owner shall ensure readiness of all documents (TS, EC etc)
required for NIT before initiating Stage I approval process
= Bidder profiling being done by the Consultant before finalizing
technical and financial eligibility to be shared with Plants
= Standing Committee to be constituted in each plant to finalise
Eligibility Criteria
vi) All soil investigation / survey / underground mapping / NDT, wherever
required, to be undertaken during feasibility studies / well in advance.
vii) Pre-NIT meetings to be conducted with the aim of framing tender terms
and conditions for eliciting wide response with nil/ minimum deviations
in bids. For Technology oriented projects, EOI-LTE mode may be
explored
viii) Preferably, not more than two (02) extensions to be given in a bid. In case
of less than X+2 offer (s), the bid(s) may be opened after due diligence.
ix) Similarly, time bound actions to be taken for finalising techno-
commercial recommendations during bid evaluation.
98 aia ah At td om,
380 or cape Minar Nr
Sig rea: year vy, eh se, af Ree 120008, MY: 011-24367481.86, sm: 24367015, $¥a :saleo@rsn.com, WaT : www.silco‘n
Registered Off: spat Bhawan, Lodi Road, New Delh-110 003, Phone : C11-24367481.86, Fax: 24367015, E-mail; saleo@vsnl com, Website: www sl.coin
PAN No. AAACS7062F
safe te, Bn, go sd 25 7, 01228 7658, weed
a ae aCe, eh 02 Pane: 245 7a 0.245 ender tede.le
ae Pooh ot Ratt & ger gon B der There's a little bit of SAIL in everybody's life»)
xi)
xii)
xiii)
xiv)
xv)
xvi)
Resubmission of drawings within 7-10 days. Maximum 02
resubmissions, thereafter, engineering meeting, if required, for across the
table approval of design drawings.
Hindrance register to be maintained at project sites for recording all
constraints / issues and reviewed regularly.
Any constraints / issues to be resolved by Project Manager in 7 days or
escalated to Task Force Committee / Higher Authority.
For every project, a unique email-id may be created, and all
communication done through that for easy retrieval of correspondence.
Structured meetings to be held with the party/parties every month. At the
end of every 3 months, an exercise of closing to be adopted wherein
various extra claims, project progress, delay analysis, ete. to be reviewed
and resolved to extent possible.
All unresolved issues to be brought to the notice of ED (Projects) of
concerned Plants.
CET to develop uniform digital system & protocol for all plants/projects,
till such time a common system is in place.
This issues with the approval of Competent Authority.
sian
(DV Jagannath)
ED (Projects)
Enclosure: As above
Dir (Comm), Dir (Fin), Dir(T,P & RM), Dir I/c (BSP), Dir l/c (BSL),
Dir I/e (RSP), Dir /e (ISP & DSP)
AEN
ED, ASP/SSP/VISL/RDCIS/CET/CFP/SRU/SPU_
ED (Projects), BSP/DSP/RSP/BSL/ISP
. CGM, Chairman Sectt.