VERTICAL
PRE-MIXER
OWNER'S MANUAL
PRODUCT DEVELOPMENT ENGINEERING - APRIL, 1998.VERTICAL PRE-MIXER EI MANA56
KEPLERIAIEBER | owner's MANUAL
LIST OF VALID PAGES
__PAGES PAGES MODE
COVER
LVo1 06/14/1998 A
PRESENTATION
INDEX
Gos
PCOS
PGO7
PGo8.
G09
PG10
PGIL
PGI2
PGI3
PGI4
PGIS
PGI6
PGIT
PGs
PGi9
Pa
Pa2i
Paz
Pas
PG24 6/11/1998 A
PG2S 06/11/1998 A
NOTE: CHECK THE TABLE ABOVE TO SEE IF YOUR MANUAL IS UPDATED.
EM PORTUGUES: El MAN 340
4000003347
DATE: 15.02.1999
NAME: LUCIANE KNEBELKAMP
SION Zreave X,
DATE: 06/11/1998 BY: ROBERTO PAULAVERTICAL PRE-MIXER EIMAN456
KEPLERINEBER’ PRESENTATION
Dear Customer,
At first, we would like to express you our pride in recording you among the
owners of a Vertical Pre-mixer, with our trade mark "KW".
In addition, we would like to congratulate you owing to your choice for an
‘equipment of the reknowed mark "KW", sine we can assure you that you
will be able to recognize its quality, as well as the efficiency of our
Permanent Technical Assistence, no matter when requested.
Next, we are going to present you the "Owner's Manual of the Vertical
Pre-mixer, which we are sure will greatly help you for its most efficient
performance, for its endurance and, above all, to help you to be acquainted
with all units and details of your Vertical Pre-mixer.
Yours faithfully,
KEPLER WEBER INDUSTRIAL S/A
Dates / / Modif.: By:VERTICAL PRE-MIXER
AEPLERINEBER’ wwoex
EIMAN456
1-Introducton
2 -Vertical Pre-mixer
3 -Table of capacities and dimensions.
4 - Operation...
4.1 - Installation of the machine.
5 - Maintenance.
5.1 - Structure. . 10
5.2 - Screw conveyor
53- V-Belts
5.4- Bearings
3.4.1 -Soun
5.4.2 -Temperature
5.4.3 - Lubrication
5.4.4 - Disassembly
5.4.5 - Assembly ... 4
5.5 - Bearings...
5.6 -Cleaning,
6- Drive
6.1 - Electric motor
6.2 - Lubrication of bearings of electric motor
6.3 - Replacement of bearings
7 - General recommendations
8- Spare parts
DATE: / / Moor. BY:VERTICAL PRE-MIXER EIMAN456
AEPLERINEBER' OWNER'S MANUAL 5
1
INTRODUCTION
The Owner's Manual of the Vertical Pre-Mixer, is to be referred with
extreme attention, since its advises and instructions will be very useful
for a perfect performance of the equipment.
Date:
/
Modif.: By:VERTICAL PRE-MIXER EI MAN456
KEPLERWEBER| omersuawn | «
2 -VERTICAL PRE-MIXER
Vertical Pre-Mixers models PMV - 15 and PMV - 30 were developed from the integrated
grinding system,warranting an efficient pre-mixing of all components to be grinded, not
submitted to initial granulometry, specific weight and percentage in composition of the formula.
This method enables a homogeneity of mixture of different materials ( grain and bulk ),
thus guaranteeing a more uniform performance of the mill and reducing the requirement of
operators.
Their strongness and easy maintenance distinguish them by means of serving many
market's demands with cycles of adequate and efficient pre-mixture, thus allowing a continuous
flow of the components to be grinded.
DATE: f / MODF. BY:VERTICAL PRE-MIXER ad
;
AEPUERIVEBER’) owner's MANUAL 7
3.- TABLE OF CAPACITIES AND DIMENSIONS
moos. | a | B | c | oD Far a con)
(oy) _| MAX. (un)
puv-15 | #1200 | 2700 | 1200 | 429¢ [o. 250] 304 | 7,5 15
puv-30 [#2005 [3000 | 1504 | 4794 | a. 250[ 290 15 30
DATE: / / MODF.: BY:VERTICAL PRE MIXER eee
KEPLER Wi EBER OWNER'S MANUAL 8
4- OPERATION
Discharge flow and maximum capacity of the Vertical Pre-mixer are
connected directly with its perfect feeding.
Feed Vertical Pre-mixer only when helix is in movement.
To prevent from clogging, do not overload it
‘When in the beginning of operation, it is recommended to fill in the pre-mixer
without turning mill feeding on in order to proceed a perfect mixture of the ingredients.
Open mill feeding only after second loading of scale, providing its discharge after that.
Proceed in the same way successively to prevent pre-mixer to work with too little product
inside, thus decreasing its efficiency.
4.1 - INSTALLATION OF THE MACHINE
To have a perfect working condition, the Vertical Pre-mixer must be
assembled and fixed on a solid foundation.
Prior to the start up, some basic instructions are to be followed:
- Check the correct locking of the top cover, since this leads to a perfect
tightness. If necessary, adjust the snap fasteners.
- Check if the motor and bearings are correctly attached.
- Check if the feeding system is correctly assembled.
- Check the correct electric connection of motor and accessories.
= Check if V - belts of drive are correctly set on pulleys.
Date: / / Modif.: By:EIMAN456
KEPLERINEBER’ = cwnews manu | 9
5. - MAINTENANCE
WARNING:
"TO ACCOMPLSH ANY REPAIR, MAINTENANCE OR
CLEANING, ALWAYS REMOVE THE ELECTRIC FUSES
FROM CONTROL BOARD."
5.1 - STRUCTURE
For a higher durability of the structure, it is recommended to notice the
following items strictly:
- Rasp, sand and paint the rust parts on the bolted joints.
~ Check the outside and inside bearings
- Tighten screws when they are loose, and keep cover closed.
5.2 - HELIX
The following items should be noticed:
- Check wearing of helix periodically.
- When on maintenance, check for straw and strings around the inside bearing.
Date; / / Modif.: ByVERTICAL PRE-MIXER CUTTS
KEPLER WEBER’ OWNER'S MANUAL 10
5.3-V-BELTS
V-belts tend to stretch after a certain time of use, therefore they should
be inspected at regular intervals.
If the belts are seen to vibrate a lot or skidding on pulley, check their tension
and the alignement of the pulleys. To check proper belt tension, depress each belt with
the thumb at a point midway between pulleys forming an arrow with an approximate
deflection of 1/100 ( refer to fig. 4 ).
REMARK :
Deflection of 1 mm for each span of 100 mm. The deflection force should
be always perpendicular to span.
After the belts have been working for some hours, adjust the tension again.
To check the alignment of the belts, refer to fig. 5, Check if pulleys are firmly
set on the shafts. Belts should not operate in slack condition.
‘When replacing the belts, proceed as follows:
- Use always a set of "V" belts with same number, code and manufacturer.
- Untighten the screw jacks and pull the belts out.
- Clean off any oil, grease, rust and remove any roughness from the channels
of the pulleys prior to place the new ones.
- The new set of belts should be easy installed without any tool ( see figs. 6 and 7 )
= Tension the belts again and check their alignment ( refer to figs. 4 and 5 ).
Dates) / Modif. By:KEPUERINEBER cwnews wan. | 1
EI MAN456,
FIGURE 5
FIGURE 6 - WRONG. FIGURE 7- RIGHT
5.4- BEARINGS
Bearings assembled in machines where their stopping
cause serious harm should be checked regularly. Notice some cautions
during operation, as follow:
Date:
1] Modif. By:VERTICAL PRE-MIXER
KEPLERINEBER) owners manuat
EI MAN456
12
§.4.1- SOUND
Place a piece of wooden stick or a screw driver against the housing,
as close as possible to the bearing. Put an ear to the other end and listen. If all is
running well, a smooth sound should be heard. The sound of a damaged bearing
is quite different and may be irregular. If in doubt, disassemble and check the
bearing.
5.4.2 - TEMPERATURE
‘Check the temperature of the bearing by simply placing a hand
against the housing. If the temperature seems to be above regular, or ‘subject to
sudden changes, it should be taken as a hint that something is wrong. In that
case, disassemble the bearina and check it
5.4.3 - LUBRICATION
Bearings of the Vertical Pre-mixer are already furnished with an adequate
amount of grease. Replacement of grease should be done at each 4,000 running
hours or from 6 to 6 months.
‘The proceedings to replace grease are as follows:
- Untighten the screws from the cover and remove it.
- Remove all used lubricant from bearing.
- Thoroughly clean out bearing housing and bearing, preventing from
any foreign matter.
~ Put clean grease in the bearing. The amount of grease in the free
‘space (raceway of bearing) must be slightly less than one third from this space.
- lfnecessary, replace the felt rings. They should be dipped in hot oil
with a temperature until 80° C during some minutes before assembly. Be careful to
install them correctly in the grooves.
ete Baa /eae Modif. By:VERTICAL PRE-MIXER Se
KEPLERINEBER’ OWNER'S MANUAL 13
CAUTION:
Use always MAX LUB GP BARDAHL, NLGI 2 viscosity, lithium
grease or equivalent. Do not overgrease. Too much grease can be as harmful
for bearings as too litte.
5.4.4 - DISASSEMBLY
To disassemble the bearing, place a piece of pipe or a similar tool
against the securing nut and apply evenly spread blows until the bearing comes
free from its bushing. When the face of the securing nut is unreachable, the tool
should be applied to the face of the bearing's inside ring
Dats ae eee Modif. By:VERTICAL PRE-MIXER Eee
KEPLERINEBER’ OWNER'S MANUAL 14
5.4.5 - ASSEMBLY
‘The proceedings to assemble the bearing should be the following:
- Put the bushing on the shaff, in the place marked prior to disassembly. This
can be done easily if the split in the bushing is widened slightly with the help
of a screwdriver.
~ Mount the bearing and the lock washer on the bushing and screw on the
securing nut.
= The reduction of the internal play should be checked by turing the bearing
and disaligning the outside ring,
- When the nut arrives at the correct degree of tightness, it will be possible to
turn the ring easily, but there will start to be a certain resistence when trying to
disalign it.
REMARK:
In case of a new bearing, remove the ANTIRUST coating on it
prior to assembly.
5.5 - BEARING
FIGURE 11
Date: / / Modif By:VERTICAL PRE-MIXER Bur
KEPLERWEBER OWNER'S MANUAL 15
During assembly, bearings should not be blocked on shaft until housings
be attached firmly on support surface. Thus, the bearing will take its correct position
on shaft without any prejudice.
To prevent the possibility of damage to bearing due to harmful installation,
the bearing unit should be assembled according to the following instructions:
- Introduce the unit on shaft in a sliding way.
- Never hammer on the ends of the inside ring,
- Attach bearing on its proper place. Spin shaft with the hand to feel if it is
rotating freely.
5.6 - CLEANING
After a long stop of the Vertical Pre-mixer or when changing product, proceed a
general cleaning. Open the cover and start cleaning by removing the objects that block
up the flow, such as straw, string, etc.
Proceed also a cleaning of the outside of bearings and motor.
Do not give hazard a chance. So, never open the cover when the machine is
stil running.
Dates / / Modif.: By:VERTICAL PRE-MIXER eee
Ké PLER Wi EBER’ OWNER'S MANUAL 16
6- DRIVE
Drive of the Vertical Pre-mixer is made by an electric motor and it is
transmitted by pulleys and belts.
6.1 - ELECTRIC MOTOR
Voltage and amperage of electric motor should be checked during
operation of Vertical Pre-mixeri. Amperage should not exceed the nominal amperage
of the motor.
‘The sounds of the motor should be noticed at irregular intervals. With
practice, one’s ear can perfectly detect unusual sounds.
6.2 - LUBRICATION OF BEARINGS OF THE ELECTRIC MOTOR
Bearings in an electric motor are supplied with enough grease for a
long time. Under regular working conditions, greasing should be spaced in the
following intervals:
For six-pole motors:
4.5CV to 4.0CV = 20,000 hours
5.0CV to 7.5CV
16,000 hours
For four-pole motors:
7.5CV = 15,000 hours
40.0 CV = 10,000 hours
When executing these operations, caution is recommended so as
to avoid the slightest penetration of grit or dust that could damage the bearings.
Dates / / Modif. By:(KEPLERINEBER
VERTICAL PRE-MIXER
OWNER'S MANUAL
EIMAN456
17
If the motor does not have any nipple for greasing, it should be done
by the time of a general overhaul when all of the motors are going to be dismantled.
‘Once the motor has been stripped, and without taking the bearings off of the shaft,
all the grease should be cleaned off and the bearings washed in kerosene or
turpentine until totally clean. After washing, right away put clean grease into the
spaces between the balls or rollers and the bearing cages. Do not overgrease.
Too much grease can be as harmful for bearings as too little.
Never spin dry bearings after washing. For inspection purposes, apply
a few drops of light oil.
FIGURE!s
The follwing table shows the recommended greases to use in bearings
of electric motors and the specific manufacturer:
GREASES RECOMMENDED FOR MOTOR BEARINGS
(Working temperature from - 20 to 130° C)
MANUFCT.| GREASE | MANUFCT.| GREASE
Esso Beacon 2 Atlantic Lithoiine 2
Shell Aivania R2 Ipiranga | Isaflex EP2
Petrobras | LubraxGMA2 | Texaco ‘Multitak 2
TABLE2
Date: / / Modif.:
By:VERTICAL PRE-MIXER
KEPLERIVEBER OWNER'S MANUAL
EIMAN466
18
6.3 - REPLACEMENT OF THE BEARINGS
Disassembly of a motor to replace a bearing should be done by
qualified personnel only.
Therefore, if a bearing replacement of a motor is required, call for
the Technical Assistance.
Date: / / Modif. By:KEP LER W. EB ER’ OWNER'S MANUAL
VERTICAL PRE-MIXER
EIMAN456
19
7- GENERAL RECOMMENDATIONS
We take for sure that any customer has his own maintenance system.
In such case, to have an efficient and saving maintenance, we recommended to
pay attention to the points focused until now.
Bearings are initially lubricated by the manufacturer with a high quality
grease. The manufacturer advises periodic lubrication. Check the fixings of the
bearings periodically.
Regarding to wearing, never allow any part to wear completely. When
finding out that a'part will last only for a short period, it is worth to substitute it at
once than wait for a breakage, possibly during processing period.
‘An unprogrammed breakage is more expensive than a preventive
change, since it stops the grain processing completely.
The fact of changing wearing parts is not always the best solution. After
the replacement, the following items should be noticed:
- Bearings should be lubricated correctly.
= Never run the equipment without a correct lubrication.
Atlast, a overhaul once a year results in a correct positioning about the
equipment conditions, thus guaranteeing a perfect performance as well as its
conservation.
ee Modif. By:AEPLERINEBER’
VERTICAL PRE-MIXER
OWNER'S MANUAL
ET MANA56
20
8- CODES OF SPARE PARTS
CODE DESCRIPTION
8110536717 | 7.5 CV TRIPHASIC MOTOR:
9116182516 | 15 CV TRIPHASIC MOTOR
9114157832 | DP 450 -3A DF 40 PULLEY
9116182338 | DP 560 - 2A DF 40 PULLEY
1108011052 | A 150- V- BELT
1108011583 }| A 158- V- BELT
1128520114 | 32008X BEARING
1128040090 | 1209K BEARING
1128752090 | _H209 ATTACHMENT BUSHING
DATE: / / MODF.: BY:EIMAN456
KEPLERINEBER) owners anus | 2!
* FOR ANY ADDITIONAL EXPLANATION, THE TECHNICAL DEPARTMENT OF KEPLER
WEBER INDUSTRIAL S/A WILL BE ALWAYS AT YOUR DISPOSAL TO SOLVE ANY
DOUBT YOU HAVE. *
THIS MANUAL WITH TECHNICAL DESCRIPTION AND INSTRUCTIONS OF
OPERATION AND MAINTENANCE WAS ACCOMPLISHED BY THE ENGINEERING
DEPARTMENT OF KEPLER WEBER INDUSTRIAL S/A. ALL DRAWINGS AND
INFORMATION HERE INCLUDE ARE PROPERTY OF KEPLER WEBER INDUSTRIAL SIA.
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, STORED IN A RETRIEVAL
SYSTEM, OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC,
MECHANICAL, PHOTOCOPYING, RECORDING OR OTHERWISE, WITHOUT OUR PRIOR
WRITTEN PERMISSION, IN ACCORDANCE TO THE LAW.
Date: / of Modif.: By:KEPLERINEBER' THE CUSTOMER EIMAN 456
22
KEPLER WEBER
‘The Engineering Department of Kepler Weber Industrial S/A elaborated
this technical manual to elucidate any doubt you could have concerning to the operation,
and to give you directions on how to install and maintain the purchased equipment.
We hope we have reached our goal.
‘The evaluations and suggestions that you may add to this manual will be of
highly importance to us to update it and to raise its quality.
QUESTIONNAIRE:
Company
Address
Name
Occupation
Telephone/Fax for contact,
Model of Machine ———
4) Display
a) Shape:
( ) Adequate ( ) Small ( ) Big
b) Concerning to handling:
( ) Excellent ( ) Good ( ) Awtul
c) Durability of the stuff:
( ) Excellent ( ) Good ( ) Awful
2) Arrangement:
a) The chapters (general data, components, start up proceedings, operation and
adjustment, cleaning and maintenance, spare parts ) are:
( ) Correct (_) Chapters are missing (_) More titles per chapter
b) The approach to the dividing system is:
( ) Easy ( ) Fair ( ) Hard
Date; / /
Modif.: By:EI MAN 456
KEPUERINEBER) oes 2s
KEPLER WEBER
3) Content:
a) Related to comprehension of the text:
( Easy (Fair (Hard
b) Does the technical information elucidate all your doubts ?
( Yes (No
Ifyour answer is "No" , please check the precarious item(s) and describe the problem you
are experiencing:
) General data
) Components
) Start up proceedings
) Operation and Adjustment
) Cleaning and Maintenance
) Spare parts
c) Does the illustrations present the items mentioned on this manual clearly ?
( Yes (No ( )Some
If your answer is " Some * , please describe the problems you are experiencing :
Date: / / Modif By:THE CUSTOMER Eee
KEPLERIVEBER) cnt cocn 24
4) Are the connections of the items with the illustrations clear?
( )Yes (No ( ) Some
IFyour answer is " Some " , please describe the problems you are experiencing:
e) Do you miss any illustration to explain a specific item?
( )Yes ()No ( ) Some
If your answer is " Yes " or Some " , please describe the problems you are experiencing:
‘Thanks for taking your time to fill out this questionnaire. Please send it to us by fax or mail
to the following address:
Kepler Weber Industrial S/A
clo Engineering Department
‘Ay. Adolfo Kepler Junior, 1500
98280-000 Panambi-RS
Brazil
Fax; 55 (055) 375 - 1546
Date: osit1r1998 Modif: a By: ROBERTOyy THE CUSTOMER ae
KEPLERINEBER’ a i
KEPLER WEBER
Panambi - Factory No.1 ‘S40 Paulo
Rua Hermann Meyer, 43 - Cx. Postal 2 Alameda Olga, 177
Telephone 55 (055) 375 4000 Barra Funda
Fax 55(055) 375 4055 Telephone 55(011) 825 7433
CGC 87.288.940/0001-06 Fax 55(011) 67 2002
Inser. Est. 090/0016116 CGC 87.288.940/0018-54
Panambi - Factory No.2
Av. Adolfo Kepler Jtinior, 1500
Telephone 55 (055) 375 3212
Fax 55(055) 375 3166
98280-000 - Panambi- RS
CGC 87.288.940/0002-97
Inser. Est. 090/0016124
Panambi - Parts and Service Dept.
Rua Gaspar Martins, 459
Telephone 55 (055) 375-4000
Fax 55(055) 375 4277
98280-000 - Panambi - RS
CGC 87.288.940/0003/78
Inser, Est, 090/0016132
Porto Alegre
Av. Andarai, 566
Telephone 55 (051) 341 1044
91350-1 10 - Porto Alegre - RS
CGC 87.288.940/0011-88
Inscr. Est. 096/2029645
Cascavel
Av. Presidente Tancredo Neves, 1643
Telephone 55(045) 225 1099
85804-260 - Cascavel - PR
CGC 87.288,940/0005-30
Inscr. Est. 41.007.959-A
Inscr. Est. 113.603.879.115
Goiania
Rua S-1, 260
Quadra 146 - Lote 21
Setor Bela Vista
Telephone 55 (062) 255 7888
Fax 55(062) 255 5205
74823-310 - Goiania - GO
CGC 87.288.940/0007-00
Inser. Est. 10.179.438-9
Campo Grande
Av. Eduardo Alias Zahran, 126
Jardim Paulista
Telephones §5 (067) 742 3013 and 742 1114
Fax 55(067) 742 3113
79050-010 - Campo Grande - MS
CGC 87.288.940/0004-59
Cuiaba
Rua 57, n? 90
Boa Esperanga
Telephones 55 (065) 627 1087 and 627 3382
Fax 55(085)627 1885
78068-530 - Cuiaba - MT
CGC 87.288.940/0006-10
Inscr. Est, 13.038.135-7
www.keplor.ind.br
marketing@kepler.com.br
Date : 06/11/1998 Modif.: A
By: Roberto Dill Paula