You are on page 1of 3
PREQUALIFICATION DOCUMENT FOR Procurement Package No: XL2-JICA3 Name of Procurement Package: Construction of Vam Thom and Vam Nuoe Trong Sluices Project: Ben Tre Water Management Project Date of issuance: 2./QD/BQL9-KHTD of Hydraulic Project Investment Promulgated together with Dee 8 2 and Construction Management Board N.9 Consultant who prepares Employer bidding document BEN TRE WATER MANAGEMENT PROVEGT = NEQJEC. Consulting Services for Survey, Design & ‘Project Implementation Supervision Dr. Motoyoshi HIKASA - TL of JV Consultants SCI- CTI - NEWJEC - HECH UALIFICATION DOCUMENT for Procurement of Package XL2-JICA3: Construction of Vam Thom and Vam Nuoc Trong Sluices IFP No. Employer Country JICA Loan No. : Project Contract Name: : POXL2-JICA3 : Hydraulic Project Investment and Construction Management Board 9 (ICMB9) : The Socialist Republic of Vietnam VN17-P2 : Ben Tre Water Management Project Package XL2-JICA3: Construction of Vam Thom and Vam Nuoc Trong Sluices Invitation for Prequalification Date February 01, 2023 IFP No. PQXL2-JICA3 JICA Loan No. : VN17-P2 Project Name : Ben Tre Water Management Project Contract Name : Package XL2-JICA3: Construction of Vam Thom and Vam Nuoc Trong Sluices 1. The Socialist Republic of Vietnam has received a Loan from Japan Intemational Cooperation Agency (JICA) toward the cost of the Ben Tre Water Management Project and intends to apply part of the proceeds towards payments under the contract for Package 2: Construction of Vam ‘Thom and Vam Nuoc Trong Sluices, Ben Tre Water Management Project, resulting from the bidding for which this prequalification is conducted. 2. The Hydraulic Project Investment and Construction Management Board 9 (ICMB9) now intends to prequalify firms for the construction of Vam Thom and Vam Nuoc Trong sluices as part of the project. It is expected that Invitation for Bids will be made in May, 2023. 4. Prequalification will be conducted through procedures in accordance with the applicable Guidelines for Procurement under Japanese ODA Loans, and is open to all Applicants from eligible source countries, as defined in the Prequalification Document. 5. Interested Applicants may obtain further information from and inspect the Prequalification Document during office hours at: Hydraulic Project Investment and Construction Management Board 9 (ICMB 9) Person in Charge: Mr. Nguyen Van Hung, Director of ICMB 9 No. 2, Truong Sa Street, Ward 17, Binh Thanh District, HCMC Office Hour: 08:00 to 16:00 every day except on weekends and holidays Tel/Fax: 84.08.38990357/84.08,38401948 E-mail banjica3.9@gmail.com 6. The Prequalification Documents may be purchased by interested Applicants on the submission of a written Application to the address above and upon payment of a nonrefundable fee of $,000,000 VND. The method of payment will be in cash. The document will be delivered directly at ICMB9 from February 6, 2023 to Application submission deadline. 7. Applications for Prequalification must be delivered to the address above on of before 09:00 a.m on Mareh 28, 2023 8. The project has three international competitive sluice construction packages (XL-1, XL-2, XL-3) and construction period of those packages may overlap each other. If the Applicant is awarded to the multiple packages in the bidding stage after the Pre-qualification stage, financial capacity and construction capacity (main construction machinery, key personnel...) of the Applicant shall be combined in the bidding stage to evaluate if it is capable for executing multiple packages at the same time or not.

You might also like