You are on page 1of 6

 

the switch for this is in URRCTRLSWITCH : RSVDBIT1_BIT22


(SRB_RESET_RL_SETUP_SWITCH) , RSVDBIT1_BIT23 ( UL_RLFAIL_RL_SETUP_SWITCH) ,
RSVDBIT1_BIT24
RSVDBIT1_BIT24 ( CS Re-establishm
Re-establishmentent Switch ) , RSVDBIT1_BI
RSVDBIT1_BIT25 T25 ( PS Re-establishment
Re-establishment Switch ) ,
RSVDBIT1_BIT26 ( UE_SRB_RESET_RL_SETUP_SWITCH) and RSVDBIT1_BIT28 (
CS_RL_RESTORE_Timer_SWITCH
CS_RL_RESTORE_Timer_ SWITCH ) By using this parameter set and some more we can reduce the
CS and PS drop to a large extent , also attached
attached is
 is the DOC for
DOC for the same.

Call Re-establishment feature in WCDMA

By using call reestablishment feature in the WCDMA we can reduce the


call drop in CS and PS domain. This feature enables us to successful
reestablish the call after the abnormal release indication has been sent
by the RNC.

In this doc study we will cover the below details:

1. Impact of Call Reestablishment on Network in NBH ,DBH and cell


BBH Hour.

2. Detailed parameter description and impact analysis of call


reestablishment.

3. UE Signaling analysis for CS and PS domain.

4. Further scope of improvemen


improvement.
t.

5. Suggestions required.
1.1 Impact of Call Reestablishment on Network in NBH ,DBH and cell BBH

By using call reestablishment feature in the WCDMA we can reduce the call drop in CS and PS domain.
This feature enables us to successful reest ablish the call after the abnormal release indication has been
sent by the RNC.

The re-establishment procedure allows MS to resume a connection in progress after a radio link failure,
possibly in a new cell or in a new location area (re-establishment in a new location area initiates no
location updating).
Below trend provides the details of C SV Drop (NBH) , HS+PS Drop (DBH) and Erlang Minutes per drop
(NBH) : Improvement observed in the CSV Drop and Erlang Minutes per drop.
CSV Drop Rate(NBH) HS+PS Drop Rate(DBH) Erlang Minutes per Drop(NBH)

1.8 800

1.6 700

1.4 E
600 r
l
D 1.2 a
r 500 n
o g
1
p
400 m
r i
0.8
a n
t 300
e 0.6 d
r
200 o
0.4 p
Low Traffic due to

0.2 Diwali Holidays 100


Parameter changes Parameter changes
implemented in Jaipur RNC implemented in Ajmer and

0 0

The below trend provide the details of improvement observed in the cell BBH for the KPI CSV call drop
rate and HS+PS Drop Rate.
CSV Drop Rate 2% HS+PS Drop Rate 2%

98

%
96

94
o
f  92
c
c
r  90
e
i
l 88
t
l
e
86

m
i 84
e
a
e
82
t Parameter changes done in
i
80 Parameter changes done Ajmer and Jodhpur RNC
n
in Jaipur RNC
g 78

76

Axis Title

This drop rate improvement has been observed n t he cell BBH level and indicates that the cell KPI has
improved overall as far as the CS V and PS drop rate is considered. Beside no major impact seen on othe r
KPIs due to this parameter changes.

nd
On the trial basis the parameter changes were firstly performed in the Jaipur RNC o n 22  Nov 2012 and
th
in Ajmer and Jodhpur RNC the changes were implemented on 27  Nov 2012.

2.1 Detailed parameter description and impact analysis of call re-establishment


The CS call drop analysis is as shown below the basic counter responsible for the call drops are as
mentioned :

1. VS.RAB.AbnormRel.CS.IuAAL2
2. VS.RAB.AbnormRel.CS.OLC
3. VS.RAB.AbnormRel.CS.OM
4. VS.RAB.AbnormRel.CS.Preempt
5. VS.RAB.AbnormRel.CS.RF
6. VS.RAB.AbnormRel.CS.RF.SRBReset
7. VS.RAB.AbnormRel.CS.RF.ULSync
8. VS.RAB.AbnormRel.CS.RF.UuNoReply
9. VS.RAB.AbnormRel.CS.UTRANgen

From the above counter list the major pegged counters are the point no. 5 , 6 and 7.

CSV Call Drop rate(%) VS.RAB.NormRel.AMR

0.8 50000

45000
0.7
40000
R
D 0.6
r 35000 A r
B
o 0.5 e
30000
p l
N
0.4 25000 e
o
R a
20000 r
a 0.3 s
m
t 15000 e
a
e 0.2
10000 l

0.1
5000

0 0

The below graph indicates the RAB abnormal release analysis for the major pegged counters in the CS
domain , it can clearly be seen that the CS Call drop rate due to SRB reset and UL sync has dipped a large
volume thus impacting the overall CS call drop rate :
In this section we will discuss the relevant further analysis and modification needed for the CS and PS
call drop rate improvement

1. Further modification of counters and timers to improve the call drop rate.
2. These changes were made on the RNC level and cell level further changes need to be performed
on the cell level for the in synsc and out sync parameters.
3. RSVDBIT1_BIT27 testing to be done at RNC level , in this part we need to check the pre and post
changes after the RSVDBIT1_BIT27 enable and disable

5.1 Suggestions required.

Request readers for further suggestions and proposals for making furt her improvement in the
KPIs.