Tiến Độ Thi Công Đào Đất
Tiến Độ Thi Công Đào Đất
A
Tường vây
đasad
13250 13250
26500 +0.000 +0.000
7500 8100 7500 3400 3750 4050 3750 1700 3750 4050 3750 1700
700
700
1400
1400
700
700
-11200
2250
2250
4500
2250
2250
4500
-10600 -9200
-7.900 -7.900
-9200 -9200
-7900
4150
4150
4150
4150
8300
8300
14505
14505
29010
29010
MẶT CẮT A-A - TL 1:200
14505
-10600
14505
-9200
SECTION A-A - RATE: 1/200
4150
4150
4150
4150
8300
8300
B B
-9300 B B +0.000
Tường vây
+0.000
-7900
3255
3255
6510
3255
3255
6510
-7.900 -7.900
-9200 -9200
600 6900 8100 4900 2600 3400 300 3450 4050 2450 1300 1700 300 3450 4050 2450 1300 1700
26500 13250 13250
3255 4150 4150 2250 700
14505
A
MẶT BẰNG MÓNG - TỶ LỆ 1:200 ĐÀO ĐẤT THỦ CÔNG - TỶ LỆ 1:200 ĐÀO ĐẤT CƠ GIỚI - TỶ LỆ 1:200 MẶT CẮT B-B - TL 1:200
FOUDATION SURFACE RATE 1:200 GROUND EXCAVATION CONSTRUCTION BY HAND - RATE: 1/200 GROUND EXCAVATION CONSTRUCTION BY MACHANIC - RATE: 1/200 SECTION B-B - RATE: 1/200
+0.000
ĐỔ BÊ TÔNG LÓT MÓNG
+0.000 +0.000
THÔNG SỐ MÁY THI CÔNG TRỤC DI CHUYỂN MÁY ĐÀO
1
2
Concreting foundation lining
CT - LẮP CỐT THÉP MÓNG
Erection steel for foundation
MOVING EXCAVATOR SHAFT
CONSTRUCTION MACHINE PARAMETERS TRỤC DI CHUYỂN XE CHỞ ĐẤT 3
VKĐ - LẮP VÁN KHUÔN ĐÀI MÓNG
Erection shuttering for foundation
MOVING AXIS EARRTH TRUCK
4 BTĐ - ĐỔ BÊ TÔNG ĐÀI MÓNG
PHẦN HỐ MÓNG ĐÃ ĐÀO Erection steel for foundation
DIGGED FOUNDATION PIT PART TVK - THÁO VÁN KHUÔN MÓNG
DUNG TÍCH GẦU 5 To remove shuttering
-7.900 -7.900
-7.900 -7.900 STANDARD DIGGING VOLUME PHẦN HỐ MÓNG CHƯA ĐÀO ĐÀO ĐẤT BẰNG CƠ GIỚI
6 Foundation excavation by excavator
-9200 -9200 BÁN KÍNH ĐÀO LỚN NHẤT
-9200 -9200 10,23(m) DON'T DIG FOUNDATION PIT PART ĐÀO ĐẤT THỦ CÔNG
-10600 -10600 MAXIMUM CUTTING RADIUS 7 Concreting foundation lining
-10600 -10600
CHIỀU SÂU ĐÀO ĐẤT LỚN NHẤT 6,6(m)
-11200
MAXIMUM DIGGING DEPTH
300 3450 4050 2450 1300 1700 3255 4150 4150 2250 700
TẢI TRỌNG
13250 14505 Q = 10,3 (tấn)
LOAD
HỆ SỐ SỬ DỤNG THỜI GIAN
XE VẬN CHUYỂN TIME FACTOR
MAN TGA HỆ SỐ SỬ DỤNG TẢI TRỌNG
MẶT CẮT B-B - TL 1:200 MẶT CẮT A-A - TL 1:200 LOAD COMBINATION FACTOR CÔNG TÁC
ID task
TIẾN ĐỘ ĐÀO MÓNG (ngày)
Excavation schedule (day)
VẬN TỐC TRUNG BÌNH
SECTION B-B - RATE: 1/200 SECTION A-A - RATE: 1/200 AVERAGE SPEED
40 (km/h) 1 2 3 4 5 6 7 8 9
ĐÀO CƠ GIỚI
By excavator
ĐÀO THỦ CÔNG
By manpower
6 7
4 110
TIẾN ĐỘ (ngày) - PROGRESS (day) TIẾN ĐỘ (ngày) - PROGRESS (day)
PHÂN ĐOẠN PHÂN ĐOẠN
Segment Segment
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
TIẾN ĐỘ THI CÔNG ĐÀO ĐẤT
2 2
FOUNDATION CONSTRUCTION
1 1 NGƯỜI
(WORKER)
3 4 5 6 7 8 NGÀY (DAY)
20 NGÀY 20 10x1 NGÀY TRƯỜNG ĐẠI HỌC BÁCH KHOA - ĐHĐN PBL4: THIẾT KẾ BIỆN PHÁP TỔ
12x1 12x1
9x2 (DAY) 9x2 (DAY) KHOA QUẢN LÝ DỰ ÁN CHỨC THI CÔNG CÔNG TRÌNH
0 0 LỚP 19KXCLC1 PBL4: CONSTRUCTION ORGANIZATION MINI PROJECT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 DANANG UNIVERSITY OF TECHNOLOGY AND SCIENCE
FACULTY OF PROJECT MANAGEMENT THI CÔNG PHẦN NGẦM
CONTRUCTION FOUNDATION FORMWORK
CLASS 19KXCLC1
HUMAN OF RESOURCES CHART HUMAN OF RESOURCES CHART NHÓM 08: PHAN THỊ HOÀI THOA NGÀY GIAO HOÀN THÀNH KIỂM TRA
SINH VIÊN TH NGUYỄN VĂN NHẬT
START COMPLETE TEST
STUDENT NGUYỄN QUỐC TRUNG 02/2022 06/2022
TỔNG TIẾN ĐỘ THI CÔNG CÔNG TRÌNH
TOTAL TABLE LABOUR DEMAND
PHÂN PHÂN 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390
ĐỢT ĐOẠN
MÁI
32
1 12
3
KT MÁI
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 15
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 14
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 13
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 12
21 22 23 24 25 26 27 28
2 10 18 15 20 10 30 10 17
1
3
TẦNG 11
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 10
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 9
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 8
21 22 23 24 25 26 27 28
2 10 18 15 20 10 30 10 17
1
3
TẦNG 7
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 6
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 5
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 4
21 22 23 24 25 26 27 28
2 10 18 15 20 10 30 10 17
1
3
TẦNG 3
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 2
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
1
3
TẦNG 1
21 22 23 24 25 26 27 28 29
2 10 18 15 20 10 30 10 17 15
46
1 20
3
HẦM 1
TẦNG
21 22 23 24 25 26 27 28
2 10 18 15 20 10 30 10 17
1
3
31 33
HẦM 2
TẦNG
21 22 23 24 25 26 27 28 34 35
10 16
2 10 18 15 20 10 30 10 17 20 17
1
2
NGẦM
1 3 4 5 6 9 10 11 12 13 14 15 16 17 18 19 20 38 41 42
PHẦN
2 7 8 36 37 39 40 43 44 45
20 50 10 80 12 34 4 20 90 5 25 30 15 34 28 2 20 28 40 10 20 15 8 5 10 9 10 9 12 10
1
CÔNG KHÁC
VIỆC
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 47
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 10
NGƯỜI
(WORKER)
BIỂU ĐỒ NHÂN LỰC - HUMAN OF RESOURCES CHART
160
150
140
130
120X4
120 114x2 114x2
110 109 109x2 110x2
105 105 105 105
110
105x2
100X2
100 99x2
95 97x2 97x2 97x2 97x2 97x2 97 97x2 97 98x2
90 94x2 94
91 92 90 90 92
90 90x5 90x4
87 87 87 87 88x2 88x4 84x5 88x2 81x5
80 82 82x3 82 82 82 82 82x3 82x3 82 82x8 83 82x3
79
80
75 73 73 74 72 72 77x2
72 72 74 72 72 74
72
77
72 72 74 72 72 77
72 73x6 73x2
78x4
73
75x5
71x5 62x5
Ntb=71
70 68x5
62 65x2 65x2 65x2 65x2 65x2 67 67 67 67 67 67 65x2
60 60 60 60 60 60x2
60 60x2 58 62
55 55x2 55x2 55 55 55 55 56 58 57 57x2 59 57 57 59 57x2 57 57 57 57
50x8 50x3 50x3 53 52x15 50X2
50 50 50 50 50 50 52 52 52x2 52 52 52x2 52
50 46
49
47
43
40
45
45 45 45 45 45
38 43
40 34 37
40x3 40 40 35x2
40x3 40 40 42 40 40 42 40 35 40 42 40 40 40 35 40 36x2 42 42 42x3 42 42 42 37
34x2
30 30 28 30 30 30 30 30 35 35
25 25 25 25 25 25 25 25 25 25 26
30
27 28 27
20x2 20x2 20 20 20 20 20 20x2
20 18x2 18x2
15x2 15 15 17 15 15 15x2
10 10 10x2 10 10x2 10 10 10 10 10 10X2
10
NGÀY (DAY)
0
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380
BẢNG TỔNG HỢP NHU CẦU NHÂN CÔNG - SUMMARY OF LABOR DEMAND THỨ TỰ CÔNG VIỆC
GHI CHÚ - NOTE
Ntb = =
S 27350
= 71
T 384
KHỐI NHU CẦU NHÂN CÔNG NHU CẦU KHỐI NHU CẦU NHÂN CÔNG NHU CẦU KHỐI NHU CẦU NHÂN CÔNG NHU CẦU
A WORK ORDER
K1 =
Nmax
Ntb
=
120
71
= 1.69
STT TÊN CÔNG VIỆC ĐVT STT TÊN CÔNG VIỆC ĐVT STT TÊN CÔNG VIỆC ĐVT
197,57
(công)
14,08
(người) (ngày)
20 2 33 TRÁT TRONG
Plastering for inside walls
m2
LƯỢNG
468,02
(công)
180,07
(người) (ngày)
16 6
B SỐ LƯỢNG NHÂN CÔNG THAM GIA
NUMBER OF WORKER
S
K2 = 1 =
S
6555 = 0.22
29623
2 THI CÔNG CỌC KHOAN NHỒI m3 50 10 18 ĐỔ BÊ TÔNG LÓT NỀN TẦNG HẦM 2 m3 404,2 61,2 28 2 34 LÁT NỀN m2 490,78 88,43 20 4
SỐ CÔNG NHÂN TRUNG BÌNH
Foundation excavation by excavator Concreting foundation Flooring CÓ MẶT TRÊN CÔNG TRƯ ỜNG
3 ĐÀO MÓNG BẰNG CƠ GIỚI m3 6113,9 10 4 19 CỐT THÉP NỀN TẦNG HẦM 2 tấn 14,69 135,51 40 3 35 BẢ MATIT TRONG m2 345,22 43,55 17 3 THE AVERAGE NUMBER
Foundation excavation by excavator Erection steell for floor Plastering inside walls by matic OF WORKERS ON SITE
4 ĐÀO MÓNG THỦ CÔNG
Foundation and repair excavation by hand
m3 229,3 80 2 20 BÊ TÔNG NỀN
Concreting floor
m3 289,6 260,5 10 1 36 TRÁT NGOÀI
Plastering for outside walls m2 57,01 14,82 20 2
5 ĐỔ BÊ TÔNG LÓT MÓNG THỦ CÔNG
Concreting foundation lining
m 3
26,04 12,8 12 1 21 CỐT THÉP CỘT, VÁCH
Shuttering for column
tấn 8,65 91,19 10 1 37 LẮP ĐẶT TẤM ALU NGOÀI
Install ALU outside
m 2
73,75 21,19 15 2
38 SƠN TRONG
2
6 LẮP ĐẶT CỐT THÉP MÓNG
Erection steel for foundation tấn 206,28 146,26 34 4 22 LẮP VÁN KHUÔN CỘT
Erection steel
100m 1,82 39,65 18 2 Painting for inside walls m2 476,94 28,62 8 4
7 XÂY TƯỜNG GẠCH 100m
2
4 2 23 ĐỔ BÊ TÔNG CỘT m 3
45,06 48,01 5 1 39 LẮP ĐẶT THIẾT BỊ ĐIỆN NƯỚC 5 4
Erection shuttering for foundation Concreting for column Installation of electrical equipment
8 LẮP VÁN KHUÔN MÓNG
Erection shuttering for foundation
100m
2
1,43 43,24 20 2 24 THÁO VÁN KHUÔN CỘT
To remove formwork for column
100m
2
1,85 8,7 20 1 40 LẮP ĐẶT TRẦN THẠCH CAO
Install plaster ceiling
m2 453,12 58,91 10 6 TRƯỜNG ĐẠI HỌC BÁCH KHOA - ĐHĐN PBL4: THIẾT KẾ BIỆN PHÁP TỔ
9 ĐỔ BÊ TÔNG MÓNG m3 288,75 216.56 90 2 25 LẮP VÁN KHUÔN DẦM, SÀN, CẦU THANG 100m
2
9,43 37,75 10 4 41 LẮP DỰNG CỬA SỔ CỬA ĐI 9 2 KHOA QUẢN LÝ DỰ ÁN CHỨC THI CÔNG CÔNG TRÌNH
Concreting foundation Erection shuttering for beams, floor, stairs Door installation
10 THÁO VÁN KHUÔN MÓNG
To remove shuttering
100m
2
1,43 7.86 5 2 LẮP CỐT THÉP DẦM, SÀN, CẦU THANG
26 Erection steell for beams, floor, stairs tấn 17,56 212,72 30 4 42 LẮP DỰNG TAY VỊN, LAN CAN
Install balustrade
10 2 LỚP 19KXCLC1 PBL4: CONSTRUCTION ORGANIZATION MINI PROJECT
DANANG UNIVERSITY OF TECHNOLOGY AND SCIENCE
THI CÔNG BỂ TỰ HOẠI VÀ HỐ GA 27 ĐỔ BÊ TÔNG DẦM, SÀN, CẦU THANG 43 CHỐNG THẤM NHÀ VỆ SINH
2
11 100m 25 2 m 3
146,20 152,5 10 1 Waterfroof toilets
m 2
16,09 9 2 THI CÔNG PHẦN THÂN
Construction of septic tanks and manholes Concreting for beams, floor, stairs FACULTY OF PROJECT MANAGEMENT
28 THÁO VÁN KHUÔN DẦM, SÀN, CẦU THANG 44 ỐP LÁT NHÀ VỆ SINH
2
12 LẤP ĐẤT LẦN 1 m 3 583,9 41,63 30 2 100m 9,43 35,19 17 2 m 2
200,5 24,06 12 2 CLASS 19KXCLC1 CONTRUCTION BODY FORMWORK
The first backfill Remove formwork beams, floor, stairs Wall tiling toalets
13 LẮP VÁN KHUÔN GIẰNG MÓNG m3 0,92 25,17 15 2 LẮP DỰNG GIÀN GIÁO
29 Erecting 100m
2
15 2 45 LẮP ĐẶT THIẾT BỊ VỆ SINH 10 2
Spandrel beam concrete task scaffolding Installation of sanitary ware
LẮP ĐẶT CỐT THÉP GIẰNG MÓNG 30 CÔNG TÁC LANH TÔ m3 15 2 46 LẮP DỰNG KÍNH m2 GIẢNG VIÊN HD TS PHẠM THỊ TRANG CHỮ KÍ GVHD ĐỀ TÀI: TÒA NHÀ SHB ĐÀ NẴNG
14 Erection steel for foundation tấn 156,2 122,5 34 4 Making linen Install tempered glass
170,82 85,41 20 4 MASTER:
SUBJECT: SHB BUILDING DA NANG
LECTURER SIGNATURE
15 ĐỔ BÊ TÔNG GIẰNG MÓNG
Concreting foundation m 3
255,1 66,77 28 2 31 XÂY TƯỜNG, BẬC CẦU THANG
To build the wall, stairs
m2 83,24 10 9 47 DỌN VỆ SINH CÔNG TRÌNH
Cleaning 10 2
NHÓM 08: PHAN THỊ HOÀI THOA NGÀY GIAO HOÀN THÀNH KIỂM TRA
16 THÁO VÁN KHUÔN GIẰNG MÓNG 32 LÁNG NỀN, CHỐNG THẤM SÀN MÁI
2
100m 0,88 4,8 2 2 m 2
321,88 12 5 SINH VIÊN TH START COMPLETE TEST
To remove formwork Pulling nails Roof waterproofing NGUYỄN VĂN NHẬT
STUDENT NGUYỄN QUỐC TRUNG 02/2022 06/2022
q (tấn/ngày)
10.55
BIỂU ĐỒ TIÊU THỤ CÁT HÀNG NGÀY
10
DAILY USING SAND CHART
8.68
TỔNG MẶT BẰNG THI CÔNG CÔNG TRÌNH - TỶ LỆ: 1/100
6.91 7
OVERALL CONSTRUCTION SITE PLAN SCAL: 1/100
1.28
1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28
1.6 1.6 1.6 1.6 1.68 NGÕ RỘNG 2M
1.19
1.19
1.19
1.19
1.19
1.19
1.19
1.19
1.19
1.19
1.19
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
N N N N N
0.49
N N N N
N N N N N N N
N N N N N
0.07
N
0.07
N
0.09
N
0
N
N
N N
N
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 t (ngày)
N
N N
N
N
N N
N
N
N N
N
N
N N
N
N
N N
N
N
N N
N
N
N
8
N
8 4 3
N
2
N
N
N
N
N
N N
6 10
N
D
N
593.29 1xe (2)
N
568.65 1xe (1)
N
D
N
D
N
593.29
590.96
N
557.5 1xe (1)
N
D
D
N
546.35 1xe (1)
N
D
535.2 1xe (3)
N
D
501.75 1xe (1)
N
D
D
N
D
N
D
q (tấn/ngày) 1
N
D
490.6 1xe (1)
N
D
D
N
550
N
D
N
(5) 457.15 1xe (1)
D
BIỂU ĐỒ DỰ TRỮ CÁT HÀNG NGÀY
N
D
D
N
D
N
D
N
D
D
500
N
D
N
D
N
D
D
N
D
N
D
N
D
DAILY SAND RESERING CHART
N
D
450
N
D
N
1xe
D
1xe 401.4
N
D
390.25
N
D
N
(1)
N
D
400
N
D
N
D
N
D
N
D
D
N
D
N
1323.35
D
(6)
N
D
350
INH
N
D
xe
D
3xe
N
CÔNG TRÌNH LÂN CẬN
525.84
D
588.65
D
33.45
584.24
N
580.32
577.66
586.2
569.26
D
N
1xe 278.75
D
564.22
560.86
508.48
(4)
551.88
R
D
D
N
300
D
D
1xe 256.45
N
1xe
AN CHÂU T
(2)
N
2xe
D
D
22.3
N
482.44
D
D
(3) 234.15
N
(2)
D
N
D
517.16
D
D
250
N
421.68
D
N
D
404.32
11.15
N
1xe 200.7
D
D
1xe
N
12
D
N
D
1xe
360.92
CÔNG VIÊN
N
(2)
D
1xe 178.4
N
200
D
D
N
N
D
(2)
(3) 156.1
D
300.16
N
D
D
ĐƯỜNG PH
N
269.32
D
N
262.92
D
13
1xe 122.65
251.72
N
248.52
245.32
D
D
240.52
N
150
229.32
226.12
D
222.92
N
216.52
75.21 xe (2100.35
208.52
1xe
N
D
D
(2)
195.72
190.92
N
187.72
184.52
D
D
174.92
N
171.72
N
D
D
152.52
)
53.16 xe (278.05
149.32
146.12
N
16
141.32
D
100
133.32
D
128.52
N
118.14
D
114.57
N
D
)
107.43
1xe 55.75
102.67
N
72.83 1
D
D
96.72
N
94.34
90.77
111 17
D
82.44
(2)
33.45
87.2
69.08
D
50.69 1
D
60.57
66.7
48.31
D
50
44.56
292xe (1)
D
22.9 11.75 10.551xe22.3
37.24
(1)
01xe11.15
29.92
27.36
40.9
26.17
25.63
D
15
(1)
D
10.55
D
33.45
D
22.3
D
11.15
D
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 t (ngày)
D
2.3
D
4.64
D
0.6
0.6
4.75
5.06
5.22
D
6.01
6.09
6.68
6.71
6.78
D
7.28
10.63
7.79
7.82
7.93
8.03
8.08
11.13
11.15
11.23
9.78
9.98
D
12.98
13.29
D
14.78
15.83
15.93
16.18
20
16.77
14
17.48
D
17.63
D
19.98
21.69
D
22.78
D
24.89
25.14
25.63
25.78
25.83
25.88
25.93
D
26.73
27.03
27.13
27.58
D
31.66
D
35.47
D
D
40
37.87
37.96
38.43
D
40.41
40.48
18
44.08
D
D
D
D
52.83
54.03
D
D
60 D
D
D
D
D
D
D
D
D
80 D
D
D
D
D
D
D
D
D
D
D D
D
D
D
D
D
D D
D
D
D
D
D
D
D D
D
D
90.09
D
D
D
D
D
D D
D
D
D
D
D
D D
D
D
D
D
100
D
D
D
D D
D
D
D
D
D
D
D D
D
D
D
D
D
D
D D
D
D
D
D
D
D
D D
D D D D D D D D
D
D
D
D
D
D
D
D
D
q (tấn/ngày)
D
D
7
D
5
D
D
11
D
D
D
D
D
4.39
D
BIỂU ĐỒ TIÊU THỤ XIMANG HÀNG NGÀY
D
D
D
D
D
D
D
19 D
D
D
D
D
D
D
D
D
3.24 3.24
1
DAILY CEMENT USING CHART
D
D
D
D
D
D
2.86 D
2.78 D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
9
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
VỈA HÈ 1,5M
D
D
D
D
D
D
D
D
D D
D
D
D
D
D
D
D D
D
D
D
D
D
D
D D
D
D
D D
D
D
0.98
0.81 0.81 0.81 0.81
0.52 0.52
0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43
0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
ỄN VĂN LINH
ĐƯỜNG NGUY
BIỂU ĐỒ DỰ TRỮ XIMANG HÀNG NGÀY 234.2
234.85
234.85
q (tấn/ngày)
)
1xe (2
) 223.68
3xe
1xe (1 195.72
27.96
1xe (1
200
)
1xe (1 186.4
177.08
18.64 2xe
1xe (1 158.44
)
1xe (2
D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D
9.32 1xe
1xe (1 149.12
150
)
1xe (1 139.8
1xe (1 130.48
)
1xe (1 111.84
)
1xe (1 102.52
217.1
200.89
191.17
)
181.45
100
1xe (1 93.2
176.29
173.05
)
1xe (1 83.88
166.57
163.33
156.85
153.61
1 6
140.65
127.69
124.45
HOIST CAGE
121.21
HOME GUARD
117.97
117.16
116.35
115.54
114.73
113.92
)
CRANE
55.92
112.3
109.06
108.25
99.34
98.53
96.1
50
87.19
79.9
1xe (1 37.28
1xe (2
70.99
70.18
12
69.37
71.8
SAND DUMP
)
1xe (1 27.96
53.17
52.36
51.55
50.74
48.31
)
e (1) 18.64
36.01
35.31
34.61
34.26
25.7
20.75
13 BÃI CHỨA ĐÁ
27.96 3xe
01xe (1) 9.32
3
17.28
16.93
16.15
15.37
15.02
13.46
11.55
4.39 1x
18.64 2xe
EDICAL STATION
4.39
4.39
9.32 1xe
100 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 t (ngày)
BATHROOM, TOILET ROCK DUMP
0.65
1.71
1.83
1.97
2.26
2.49
2.67
3.02
3.04
3.27
3.56
3.57
3.58
3.59
3.62
3.74
3.97
3.98
3.99
4.37
4.38
4.39
4.78
4.79
4.93
5.18
5.19
TRẠM BIẾN ÁP
6.01
6.42
6.43
7.09
7.21
7.24
7.61
9
8.86
10.68
9.32
12.08
12.09
10.8
12.48
12.49
13.32
13.35
12.1
13.75
4
12.5
14.13
14.25
14.25
14.94
14.95
15.35
17.75
17.79
18.19
18.59
19.43
TRANSFORMER STATION
19.91
20.23
21.03
21.43
21.83
23.47
22.79
23.59
23.15
29.95
BIỂU ĐỒ DỰ TRỮ ĐÁ HÀNG NGÀY BIỂU ĐỒ TIÊU THỤ ĐÁ HÀNG NGÀY 16 MÁY TRỘN BÊ TÔNG
CONCRETE MIXERS N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
ĐƯỜNG CẤP NƯỚC
WATER SUPPLY ROUTES
DAILY STONE RESERING CHART DAILY STONE USING CHART 17 BỂ NƯỚC DI ĐỘNG (2500x2500)
WATER TANK ĐƯỜNG CẤP ĐIỆN
45.5
q (tấn/ngày)
q (tấn/ngày) D D D D D D D D D D D D D D D D D D D D
17.13
ELECTRICITY SUPPLY ROUTES
18 KHO CHỨA DỤNG CỤ (4000x6000)
36.4 2xe
40
30
COVER PROTECTION OF RELIGIOUS SITE
11.3711.51
WARAHOUSES OF STEEL AND SHUTTERING
10
45.41
45.26
44.96
44.66
44.06
43.16
1xe (3)
18.2
20
36.4 2xe
5
17.13
17.13
10
18.2 1xe
TRƯỜNG ĐẠI HỌC BÁCH KHOA - ĐHĐN PBL4: THIẾT KẾ BIỆN PHÁP TỔ
2xe (1)
KHOA QUẢN LÝ DỰ ÁN
0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
0
1.07
1.44
LỚP 19KXCLC1
2.34
GIẢNG VIÊN HD MASTER: TS PHẠM THỊ TRANG CHỮ KÍ GVHD ĐỀ TÀI: TÒA NHÀ SHB ĐÀ NẴNG
18.2
20
SIGNATURE SUBJECT: SHB BUILDING DA NANG
LECTURER
NHÓM 08: PHAN THỊ HOÀI THOA NGÀY GIAO HOÀN THÀNH KIỂM TRA
SINH VIÊN TH NGUYỄN VĂN NHẬT
START COMPLETE TEST
STUDENT
28.37
NGÀY
(DAYS)
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 360
Máy
Machine
NGÀY
(DAYS)
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 360
Máy
Machine
NGÀY
(DAYS)
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 360
Máy
Machine
NGÀY
(DAYS)
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 360
Máy
Machine
NGÀY
(DAYS)
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 360
1. Máy trộn bê tông 2. Cần trục tháp 3. Máy vận thăng tải 4. Máy vận thăng lồng 6. Máy đầm dùi
Mã hiệu: ZC350 Mã hiệu: TC 5023PA Mã hiệu: TP-3 Mã hiệu: SC-100 Mã hiệu: ZN35 TRƯỜNG ĐẠI HỌC BÁCH KHOA - ĐHĐN PBL4: THIẾT KẾ BIỆN PHÁP TỔ
Dung tích xuất liệu: 350L Tải trọng nâng lớn nhất: 10T Sức nâng của máy: 0,8T Tải trọng cho phép: 1T Năng suất: 8m3/h KHOA QUẢN LÝ DỰ ÁN CHỨC THI CÔNG CÔNG TRÌNH
Chiều cao nâng lớn nhất: 180m Năng suất của máy: 35,28 tấn/ca Chiều cao nâng tối đa:150m Chiều sâu đầm: h=30m LỚP 19KXCLC1 PBL4: CONSTRUCTION ORGANIZATION MINI PROJECT
Chiều cao nâng cơ bản: 50m Tốc độ nâng: 33m/min Bán kính tác dụng: R=35m DANANG UNIVERSITY OF TECHNOLOGY AND SCIENCE
FACULTY OF PROJECT MANAGEMENT BIỂU ĐỒ DỬ DỤNG MÁY
1. Mixer machine 2. Crane 3. Hoist load 4. Hoist cage 6. Needle vibrator CLASS 19KXCLC1
MACHINE USING CHART
Code: ZC-350 Code: TC 5023PA Code: TP-3 Code: SC-100 Code: ZN35
Bucket: 350L Maximum bearing weight: 10T Bearing capacity: 0,8T Weight: 1T Productivity: 8m3/h GIẢNG VIÊN HD MASTER: TS PHẠM THỊ TRANG CHỮ KÍ GVHD ĐỀ TÀI: TÒA NHÀ SHB ĐÀ NẴNG
SUBJECT: SHB BUILDING DA NANG
Maximum bearing height: 180m Productivity: 35,28 tấn/ca Maximum bearing height: 150m Depth: h=30m LECTURER SIGNATURE
Height: 50m Bearing speed: 33m/min Radius: R=35m NGÀY GIAO HOÀN THÀNH KIỂM TRA
NHÓM 08: PHAN THỊ HOÀI THOA
SINH VIÊN TH NGUYỄN VĂN NHẬT
START COMPLETE TEST
STUDENT NGUYỄN QUỐC TRUNG 02/2022 06/2022