PERHITUNGAN VOLUME

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021 & 2022
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume GAMBAR
Ø (mm) P (m) L (m) T (m) Luas (m2) kg

I PEKERJAAN ARSITEKTUR
PEKERJAAN ARSITEK LANTAI SATU
PEKERJAAN DINDING, PASANGAN DAN PLESTERAN
Benangan kusen 2 517.96 1035.92 m1 A - 003

Openingan
P.1 19 Unit 1.68 2.50 9.00 60.12
P.4 13 Unit 0.88 2.50 6.00 35.28
P.5 23 Unit 0.78 2.50 10.00 57.80
P.s 8 Unit 0.78 1.34 4.00 16.96
J.4a 4 Unit 2.12 2.20 4.00 34.56
J.6 10 Unit 2.92 2.20 5.00 51.20
J.7 7 Unit 4.80 2.20 4.00 56.00
J.8 7 Unit 5.40 2.20 3.00 45.60
J.9 34 Unit 1.97 1.70 18.00 132.12
J.10 8 Unit 1.84 1.70 4.00 28.32
J.11a 4 Unit 1.72 2.10 4.00 30.56
J.14 2 Unit 5.40 2.20 2.00 30.40
J.15 2 Unit 2.72 2.20 2.00 19.68
J.2a 4 Unit 4.36 1.70 4.00 48.48
J.3a 12 Unit 5.40 1.70 12.00 170.40
J.4a 12 Unit 2.12 1.70 3.00 22.92
BV.1 16 Unit 1.72 0.58 10.00 46.00

Benangan Kolom sisi 2097.60 m1 A - 003


As 2 3.80 4 7.00 106.40
As 3 3.80 4 7.00 106.40
As 4 3.80 4 7.00 106.40
As 5 3.80 4 3.00 45.60
As 6 3.80 4 6.00 91.20
As 7 3.80 4 6.00 91.20
As 8 3.80 4 6.00 91.20
As 9 3.80 4 8.00 121.60
As 9-1 3.80 4 4.00 60.80
As 10 3.80 4 10.00 152.00
As 11 3.80 4 10.00 152.00
As 12 3.80 4 10.00 152.00
As 12-1 3.80 4 4.00 60.80
As 13 3.80 4 8.00 121.60
As 14 3.80 4 6.00 91.20
As 15 3.80 4 6.00 91.20
As 16 3.80 4 6.00 91.20
As 17 3.80 4 3.00 45.60
As 18 3.80 4 7.00 106.40
As 19 3.80 4 7.00 106.40
As 20 3.80 4 7.00 106.40

TOTAL Benangan Kusen Lantai 2 3133.52 m1


PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021 & 2022
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg

I PEKERJAAN ARSITEKTUR
PEKERJAAN ARSITEK LANTAI SATU
PEKERJAAN DINDING, PASANGAN DAN PLESTERAN
Benangan kusen 2 661.84 1323.69 m1

Openingan
PJ.1 2 Unit 5.44 3.30 2.00 24.08
P.1 19 Unit 1.68 2.50 4.00 26.72
Pj.2 2 Unit 1.60 2.14 2.00 11.76
1.42 1.94 2.00 10.60
P.2 4 Unit 1.68 2.50 4.00 26.72
P.4 13 Unit 0.88 2.50 7.00 41.16
P.5 23 Unit 0.78 2.50 10.00 57.80
P.s 8 Unit 0.78 1.34 4.00 16.96
J.1 2 Unit 7.05 2.20 2.00 37.00
J.2 4 Unit 4.36 2.20 2.00 26.24
J.3 12 Unit 5.40 2.20 6.00 91.20
J.4 4 Unit 2.12 2.20 2.00 17.28
J.5 4 Unit 4.09 7.66 4.00 94.00
J.9 34 Unit 1.97 1.70 16.00 117.44
J.10 8 Unit 1.84 1.70 4.00 28.32
J.11 4 Unit 1.72 2.60 4.00 34.56
BV.1 16 Unit 1.72 0.58 6.00 27.60

Benangan Kolom sisi 2594.40 m1


As 2 4.70 4 7.00 131.60
As 3 4.70 4 7.00 131.60
As 4 4.70 4 7.00 131.60
As 5 4.70 4 3.00 56.40
As 6 4.70 4 6.00 112.80
As 7 4.70 4 6.00 112.80
As 8 4.70 4 6.00 112.80
As 9 4.70 4 8.00 150.40
As 9-1 4.70 4 4.00 75.20
As 10 4.70 4 10.00 188.00
As 11 4.70 4 10.00 188.00
As 12 4.70 4 10.00 188.00
As 12-1 4.70 4 4.00 75.20
As 13 4.70 4 8.00 150.40
As 14 4.70 4 6.00 112.80
As 15 4.70 4 6.00 112.80
As 16 4.70 4 6.00 112.80
As 17 4.70 4 3.00 56.40
As 18 4.70 4 7.00 131.60
As 19 4.70 4 7.00 131.60
As 20 4.70 4 7.00 131.60

TOTAL Benangan Kusen Lantai 1 3918.09 m1