Date * os! apri'2023, fot Hava a300.STP2-099-2023,
M/s. Engineering Procurement & Project Management 5. (EPPM,
0, Box: 124, Postal Code: 132,
‘A Khoudh,Suitanat of Oman,
tn rs Sana About,
Project Manager
Project: Expansion of &'Seeb ST (Phase I) and Associated Works.
Contract + HAYAYI/2000102/2018:0090/2019,
diect ‘ceo/ci system Upgrade
‘This has ference to your eter Rel No ARLS-0/SA/ABG/027/2023 dated 6% Ap 2023, Ref to
‘AR13-39/SN/AE/O12/2003 dated 28 February 2023, Re: No ABLS-19/SVAE/OI4/2023 dated 7
Motch, 2023, Re No ARIS-I9/SA/NE/015/2023 dated. 11% Meh 2023, Ref: No. AMS.
158/A8/006/202 dated 11 Mare 223, Re: No R13-19)SA/AE020/2023 dated 19 March 2023
nd RefNo ARI3-19/54/42/02/2023 dated 22" March 2023 on the above mentioned subject On|
‘ths mate, we would keto update you with the flowing
1 We ae of the opinion that corsnistoning UF sytem according to contractual equirerent i
[vpn vesponsalty an EPs requced to take all necessary sctons to achieve he same
2 However, with 2 vow to moving forward onthe Projet, we agree to your proposal of EFM
evn aut cIO/CER este evap, atl, Boring changer, SAE Over avangerent
‘nodtetion and Oru Seren Removals tated in your above mentioned lets
2, EPPw lb equ to obtain NWS’ approval on the engineering aspects of ths work
[EPpMtahallcommence se works ter sisi of various Ceefitech confemation a requres
5 Prlorto proceeding withthe ste works, EPPM requredto pete a confmation that the above
‘ors wi pot hove ay negstive affect on the SP faces and EPPM shale responsible foram)
“Covetve ations that may be required to be eae ou duet these proposed changes.
By 12" Ap 2023, EP requestd to conf that future they wl not hol NWS esponible
incase o ny non-pertormance of UF syster.
11. Rementone inyour above refered, any payment related to GP/CEB revamp system wrk
‘ilbe made only after sce performance test ofthe entre UF system.
18, EPPM wil be required to achieve sabe operation ofthe ene UF system by 21° une 2023.nd
EPP wil be reulred to complete perfomance testo = project faites along with achieving
Project completion by 21° 2023
Yours seerey,
foram Water Sos
LQ ipe|oul ror?
‘a ap
Stir ren anager -ASeeb
cite antics
ante eet eae sa
Ra WASTER SEIMCES
ate je apr Sr Phase? Pre