CODE SUMMARY 2007 MN STATE BUILDING CODE: 2006 INTERNATIONAL BUILDING CODE ADOPTED WITH STATE AMENDMENTS, CHAPTER

R 1305, EFFECTIVE JULY 10, 2007 2006 INTERNATIONAL RESIDENTIAL CODE ADOPTED WITH STATE AMENDMENTS, CHAPTER 1309, EFFECTIVE JULY 10, 2007 2000 GUIDELINES FOR THE REHABILITATION OF EXISTING BUILDINGS ADOPTED WITH STATE AMENDMENTS, CHAPTER 1311, EFFECTIVE MARCH 31, 2003 2008 NATIONAL ELECTRICAL CODE, CHAPTER 1315, EFFECTIVE SEPTEMBER 15, 2008 MINNESOTA ENERGY CODE CHAPTERS 1322 & 1323, EFFECTIVE JUNE 1, 2009 MINNESOTA ACCESSIBILITY CODE (2006 IBC, 2003 ICC/ANSI 117.1) ADOPTED WITH STATE AMENDMENTS, CHAPTER 1341, EFFECTIVE JULY 10, 2007 2006 INTERNATIONAL MECHANICAL & FUEL GAS CODES ADOPTED WITH STATE AMENDMENTS, CHAPTER 1346, EFFECTIVE OCTOBER 26, 2009 MINNESOTA STATE PLUMBING CODE, CHAPTER 4715, EFFECTIVE OCTOBER 23, 2009 2007 MN STATE FIRE CODE: 2006 INTERNATIONAL FIRE CODE ADOPTED WITH STATE AMENDMENTS, CHAPTER 7511, EFFECTIVE JULY 10, 2007 OCCUPANCY CLASSIFICATION RESIDENTIAL R-3 (310.1 RESIDENTIAL GROUP R, 2007 MINNESOTA STATE BUILDING CODE, ADOPTION OF THE 2006 INTERNATIONAL BUILDING CODE) RESIDENTIAL OCCUPANCY CONTAINING SLEEPING UNITS TO ACCOMMODATE 5 OR FEWER PERSONS. BUILDING HEIGHT & AREAS PROPOSED: 1 STORY & MEZZANINE, 462 SQFT BUILDING AREA, 194 SQFT MEZZANINE AREA ALLOWABLE: 2 STORY TYPE OF CONSTRUCTION PROPOSED: TYPE VB FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (HOURS) STRUCTURAL FRAME = 0 BEARING WALLS EXTERIOR & INTERIOR = 0 NONBEARING EXTERIOR WALLS & PARTITIONS = 0 NONBEARING INTERIORS & PARTITIONS = 0 FLOOR CONSTRUCTION = 0 ROOF CONSTRUCTION = 0 INTERIOR FINISHES CLASS C-FLAME SPREAD FIRE PROTECTION SYSTEMS AN AUTOMATIC SPRINKLER SYSTEM IS NOT REQUIRED (903.2.7 MSBC) MEANS OF EGRESS MAIN LEVEL: (1) SOUTH DOOR, 3' WIDE; (1) WEST DOOR, 3' WIDE MEZZANINE: (1) NORTH LOFT WINDOW, 3'-6" X 4'; (1) SOUTH LOFT WINDOW, 3'-6" X 4' ACCESSIBILITY ACCESSIBLE ROUTE FROM PARKING TO MAIN LEVEL. LOFT LEVEL IS NOT ACCESSIBLE BUT SLEEPING AMENITY PROVIDED ON MAIN LEVEL.
T001 T002 T003 T004 T005 T006 T007 A100 A101 A102 A103 A104 A105 A106 A107 A200 A201 A202 A203 A204 A205 A300 A301 A302 A303 A400 A401 A402

SHEET LIST
TITLE MATERIALS SCHEDULE PHPP LEED SHADING STUDIES DECEMBER SHADING STUDIES JUNE RENDERINGS SITE PLAN PLAN MAIN LEVEL PLAN LOFT LEVEL TREATED FLOOR AREAS PLAN ROOF FOUNDATION PLAN FRAMING PLANS DOOR AND WINDOW SCHEDULE ELEVATION SHADING STRUCTURE SOUTH ELEVATION SHADING STRUCTURE EAST ELEVATION SOUTH ELEVATION NORTH ELEVATION EAST ELEVATION WEST SECTION NORTH TO SOUTH LOFT SECTION NORTH TO SOUTH SECTION EAST TO WEST STAIRS SECTION WEST TO EAST FOUNDATION N + E DETAIL FOUNDATION S + W DETAIL FOUNDATION TO DOOR DETAIL A403 A404 A405 A406 A407 A408 A409 A410 A411 A412 A500 A501 A502 A503 A504 A505 A506 A600 A601 A602 A603 A604 E100 E101 M100 M101 M102 A700

SHEET LIST
FOUNDATION TO WINDOW DETAIL NORTH WEST & SOUTHWEST CORNER DETAIL DOOR TO WALL DETAIL WALL TO OPERABLE DETAIL WINDOW TO HEADER DETAIL FIXED WINDOW DETAIL LOFT TO WALL DETAIL ROOF RIDGE DETAIL ROOF TO WALL DETAIL ROOF TO WALL RAKE DETAIL INTERIOR ELEVATION KITCHEN INTERIOR ELEVATIONS EAST INTERIOR ELEVATIONS SOUTH & WEST INTERIOR ELEVATION STAIR NORTH INTERIOR ELEVATION STAIR SOUTH INTERIOR ELEVATIONS BATHROOM INTERIOR ELEVATION STAIR SECTION COUCH AXON INTERIOR LOFT RAILING AXON STAIR NORTH AXON STAIR SOUTH AXON LOFT RAILING ELECTRICAL ELECTRICAL DETAILS HVAC MAIN LEVEL & LOFT LEVEL MECHANICAL SECTION PLUMBING SUPPLY SPECIFICATIONS

T001
TITLE

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: PA-CS Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

INTERIOR FINISH SCHEDULE FLOOR 1" x 6" Oiled, Reclaimed T & G Pine at Loft Sealed Concrete at First Floor 2"x8" Joist INTERIOR FINISH Alt. #1: 1" x 4" Reclaimed Pine, Oiled Alt. #2: 1" x 4" Reclaimed Fir, Oiled Epoxy Sealed Concrete Panels with Glass Aggregate at Kitchen INTERIOR DOOR Solid Core Veneer Maple, Oiled CEILING Alt. #1: 1" x 4" Reclaimed Pine, Oiled Alt. #2: 1" x 4" Reclaimed Fir, Oiled INTERIOR STRUCTURE Alt. #1: 4" x 4" Reclaimed Douglas Fir Heavy Timber Columns Alt. #2: 4" x 4" Painted Parallam WINDOWS & DOORS Reclaimed Pine At Sill and Head, Oiled Reclaimed Pine At Jambs, Oiled (Cut One Piece to Fit Window Width) STAIRS & SHELVING Fixed Burlap Panel Framed with 2" x 2" Maple, Oiled 1/2" Galvanized Welded Wire Black Fabric set in a 2"x2" Unfinished Maple Frame 1" x 3" Maple Battens, Oiled 2" x 12" Maple Shelves, Oiled 1" x 12" Maple Stair Treads, Oiled 2" x 2" Maple, Oiled 2" x 18" Maple, Oiled CABINETRY Oiled Maple Plywood Provide Cut-Outs in Lieu of Hardware COUNTERTOPS Epoxy Sealed Concrete Countertop with Glass Aggregate 18" x 24" (LLV) Metal Workstation Bracket (stainless steel) KITCHEN Wolf Convection Microwave - model #: MWC24 with 30" trim kit (stainless steel trim) Wolf 30" Induction Cooktop - model #: CT30IU Frigidaire Top-Freezer Refrigerator - model #: LGUI1849LF (stainless steel) Kohler Faucet - model #: K-7505 (polished chrome) Kohler Sink - model #: K-3936 (stainless steel) BATHROOM Kohler Lavatory - model #: K-14293 (white) Kohler Faucet - model #: K-T14414-4 (polished chrome) Kohler Multi-Function Handshower - model #: K-10298 (polished chrome) Kohler Slider Bar - model #: K-9516 (polished chrome) Kohler Persuade Dual Flush Toilet - model #: K-3654 (white, polished chrome) Kohler Brevia Elongated Toilet Seat - model #: K-4664 (white) Freewill One-Piece Barrier-Free Transfer Shower Module - model #: K-12101-P (white) Freewill Shower Drain - model #: K-9132 (polished chrome) 36" Kohler Contemporary Style Grab Bar - model #: K-14564 (polished stainless steel) 18" Kohler Contemporary Style Grab Bar - model #: K-14561 (polished stainless steel) LIGHTING & ELECTRICAL ACCESSORIES See Notes on Electrical Drawings and Specifications MECHANICAL EQUIPMENT & ACCESSORIES See notes on Mechanical Drawings and Specifications

EXTERIOR FINISH SPECIFICATIONS SITE Concrete Raft Slab Aluminum Serrated Open Plank Grating EXTERIOR WALLS 1 " x 6" Reclaimed Lap Barn Siding /2 16" x 4" x 8" Gabions made from 1/2" Galvanized Welded Wire Fabric, filled with local rocks 1" to 3" in diameter 3 " Black Richlite Black (at Exterior Window Jambs) /8 3 " Black Richlite Black (at Exterior Window Jambs) /4 Bent Metal Black CLAD Flashing SHADING STRUCTURE 2" x 8" Cedar Wood, Oiled 1" x 4" Cedar Wood, Oiled 1" x 6" Cedar Wood, Oiled

WINDOWS & DOORS (See Window Sheet For More Details) Energate 1042 Tilt & Turn, triple glazed Energate 1042 Fixed, triple glazed Energate Full Tempered Glazed Main Entrance Swinging Door - model #: 2.001.1 Energate Fully Tempered Glazed Side Entrance Swinging Door - model #: 3.001.3 GLAZING Energate Solar Gain 1 Glass .55/.088, R-11.36 Energate Solar Gain 2 Glass .61/.113, R-8.85

T002
MATERIALS SCHEDULE

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: HB-CT Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

ROOF 1" x 6" x 12'-0" Cedar Roof Lap Bent Metal, Colored Flashing 3 " x 10" Richlite Black /4 Mill Finish Aluminum Plate 1/8" Thick

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

PASSIVE HOUSE PLANNING PACKAGE 2007

SPECIFIC SPACE HEAT DEMAND PRESSURIZATION TEST RESULTS TOTAL SPECIFIC PRIMARY ENERGY DEMAND HEATING LOAD COOLING LOAD

4.63 0.60 30.8 6.96 2.68

kBTU/(ft2yr) ARC50 kBTU/(ft2yr)

SPECIFIC HEAT DEMAND, MONTHLY METHOD 4.63 SPECIFIC HEAT DEMAND, ANNUAL METHOD 5.39 DESIGN AIR FLOW RATE AVERAGE AIR FLOW RATE AVERAGE AIR FLOW CHANGE RATE HEATING LOAD P H SPECIFIC HEAT LOAD P H/ATFA TOTAL PRIMARY ENERGY USE INTENSITY (WITH HOUSEHOLD APPLICATIONS) TOTAL EMISSIONS, CO 2-eQUIVALENT (WITH HOUSEHOLD APPLICATIONS) SPECIFIC PE DEMAND - MECHANICAL SYSTEM (WITHOUT HOUSEHOLD APPLICATIONS) 6.0 TOTAL EMISSIONS, CO 2-eQUIVALENT (WITHOUT HOUSEHOLD APPLICATIONS) 3.3 TRANSMISSION LOSSES WINDOWS HEAT GAINS SOLAR RADIATION 8817 59 34 0.41 4232 7.0

kBTU/(ft2yr) kBTU/(ft2yr) CFM CFM 1/HR BTU/hr BTU/hr.ft 2

9.0 5.0

kWh/(ft2yr) lb/(ft 2yr)

kWh/(ft2yr)

lb/(ft 2yr) kBTU/yr

T003
PHPP

13780 kBTU/yr

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: DA - DJ - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

BTU/(ft2hr) BTU/(ft2hr)

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

PHPP

Drawn by: DJ Date: 05/11/11

T004
LEED

Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

Drawn by: PA Date: 05/11/11

T005

SHADING STUDIES DECEMBER

Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

Drawn by: PA Date: 05/11/11

SHADING STUDIES JUNE

T006

Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

Drawn by: LW Date: 05/11/11

T007
RENDERINGS

Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

SITE WILL BE SELECTED FOR MAXIMUM SOUTHERN SOLAR GAIN AND APPROPRIATE SOIL CONDITIONS FOR RAFT SLAB PER PROPOSED DESIGN. ATTACHED SITE MAP SHOWS FOUR POTENTIAL SITE LOCATIONS THAT WERE IDENTIFIED FOR THE PASSIVE HOUSE LOCATION IN FALL 2010. A SOLAR AVAILABILITY DIAGRAM USING SOLAR PATH FINDER WILL BE NEEDED FOR SITE ANALYSIS FOR OPTIMAL SOUTHERN HEAT GAIN.SITE SURVEY SHOULD INCLUDE UTILITY LOCATIONS AND LOCATION, TYPE AND HEIGHTS OF VEGETATION. SOIL BORING ANALYSIS PER STRUCTURAL ENGINEER'S REQUIREMENTS WILL BE NEEDED AS WELL.

A100
SITE PLAN

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

A203 1

FOUNDATION 1 - BUCKET -8" REINFORCED CONCRETE SLAB -18" STYROFOAM HIGHLOAD 40P ROOF 2 - 16" SIP

2 A404

23'-8"
WALL 5

2"

23'-4" 14'-6" 1'-2"

1'-2"

2'-6"

4'
N KITCHEN FL1

2" 4"

-PINE FINISH -16" SIP WITH EPS, OSB BOTH SIDES -8" POLYISO -OSB -1x6" RECLAIMED CEDAR ROOFING WALL 3 - 14" SIP + 2" EPS -PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 4 - 14" SIP + 4" EPS -PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 5 - 14" SIP + 4"EPS + 3.5" CELLULOSE TO OUTSIDE OF EXT. INSUL.

7'-2"

1'-3"

FRIG
3'-10" 3'-10"

BATH
5'-4"
2

WALL 6

2"

5"

WALL 3
2'-9" 13' 5'-2"

4 1'-11"A505 1

KITCHEN
1'-11" 1'-6" 10' 1'-9"
SHELVES

2 A406

1'-10"
SHELVES

1 A500

A503 BUILT-IN TABLE

1'-4"

1 2'-9 _" 2

7'-2"

1
A303

4" CONCRETE SLAB

W KITCHEN FL1 B

11'-1"

SCREEN PORCH

3'-10"

4'

F
1'
BUILT-IN SHELVING

BUILT-IN WORK SURFACE BUILT-IN SHELVING

STUDY 1

4'

WORK AREA

2' DESK

E STUDY ONE FL1

-PINE FINISH -2 X 4 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 6 - 14" SIP + 2"EPS + 5.5" CELLULOSE -PINE FINISH -2 X 6 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4

2'-11"

3'

A302

UP

A506 DESK

1'

BUILT-IN SHELVING A501 1

6'-5"

1 A405
2"

D STUDY 2

MEC.

2 A406 D

24'-10"

W DOOR

2'

1 A204

2 A502

BUILT-IN COUCH

A205 1

3'-10"

10'-1"
1

4'-2"

2'-4"

7'

1 10'-2 _ " 2

E
5'-2"

LIVING ROOM

A504

A502 1

ENTRY

5'-8"

GRASS

1'-6"
BENCH

WALL 6

1'-2"

E
S LIVING ROOM FL1 A

E
S LIVING ROOM FL1 B

A
S DOOR

4" CONCRETE SLAB

5'-10"

1 A404

1 A405

WALL 3
4'-4"

1'-2" 2"

7'

7'
1 A201 SHADING

3'
2 A201 SHADING

4'

1'-2"

2"

GRASS PATH

A101
PLAN MAIN LEVEL

3'-9"

1 4'-1 _ " 2

1 4'-1 _" 2

1 4'-1 _" 2

1 4'-1 _ " 2

1 4'-1 _" 2

1 4'-1 _ " 2

1 4'-1 _ " 2

1 4'-1 _" 2

1 4'-1 _ " 2

3'-5"

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

MAIN LEVEL PLAN 1 1/4" = 1'-0"


1
A301 1 A202 1 A200

1
A300

BUILDING SHADING

Drawn by: AB - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

2'-11"

2"

W LIVING ROOM FL1 A

2"

13'-2"

24'-4"

TO OUTSIDE OF SIPS

4'

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

4"

A203 1

FOUNDATION 1 - BUCKET -8" REINFORCED CONCRETE SLAB -18" STYROFOAM HIGHLOAD 40P ROOF 2 - 16" SIP

2 A404
SIM

WALL 4

2 A408

2" 4"

N LOFT FL2

4"

1'-2"

13'-6"

4'

3'-6"

1'-2"

2"

-PINE FINISH -16" SIP WITH EPS, OSB BOTH SIDES -8" POLYISO -OSB -1x6" RECLAIMED CEDAR ROOFING WALL 3 - 14" SIP + 2" EPS -PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 4 - 14" SIP + 4" EPS -PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 5 - 14" SIP + 4"EPS + 3.5" CELLULOSE

WALL 3

7'-2"

TWIN BED OPEN BELOW LOFT

TWIN BED

7'-2"

4'

A303

E LOFT FL2 A

-PINE FINISH -2 X 4 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 6 - 14" SIP + 2"EPS + 5.5" CELLULOSE -PINE FINISH -2 X 6 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4

A302

3'

DN

1 A601

A501 2

2'

1 A204 E LOFT FL2 B

F
W LIVING ROOM FL2 A

LOFT OPEN BELOW TWIN BED

2 A406

A205 1

7'

WALL 3

S LIVING ROOM FL2 A

S LIVING ROOM FL2 B

S ENTRY FL2

1 A404
SIM

WALL 3

2"

1'-2"

7'

7'

3'-6"

3'-6"

1'-2"

2"

LOFT LEVEL PLAN 1/4" = 1'-0"

CEDAR LOUVER OVER ENTRY

A102
PLAN LOFT LEVEL

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011
1

1
A301

1
A300

A202

Drawn by: AB - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

7'

1'-2"

6'-2"

4'

2"

2"

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

10'

3 10'-1 _ " 4

3 9'-8 _ " 4

5 1'-11 _" 8

15 1'-9 __ " 16

LOFT
8'-2" 2'-10" 1 4'-0 _ " 4

3 9'-0 _" 4

KITCHEN WORK AREA


3 6'-1 _" 4 3 4'-3 _" 4 1 3'-10 _ " 4 1 10'-9 _" 2 1'-3" 1 2 _" 2

STUDY 1

3'-6" 1 3'-10 _ " 4 11 6 __ " 16

1 2'-10 _" 2

10'-3" 1'-6"

1 2'-4 _" 2

STUDY 2

MECH.
1 6'-2 _ " 4 5'-7"

FUNCTIONAL AREA 60% BUILDING ELEMENT AREA MECHANICAL STUDY TWO

12.10FT 2 4.31FT 2

1 2'-0 _" 4

7'

LIVING ROOM
3 14'-3 _" 4

3 9'-0 _" 4

3 9'-3 _" 4

ENTRY
1 6'-2 _" 4

5'-9"

1 6'-9 _ " 2

3 14'-3 _" 4

1 2'-8 _" 4

A103
TREATED FLOOR AREAS

MAIN LEVEL

LOFT LEVEL

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: DA - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

3 1'-7 _ " 8

3 5'-3 _ " 4

BATH

MAIN USABLE AREA BUILDING ELEMENT AREA BATH WORK AREA ENTRY KITCHEN LIVING ROOM LOFT STUDY ONE

50.95FT 2 56.85FT 2 37.08FT 2 113.92FT 2 141.58FT 2 186.16FT 2 11.39FT 2

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1
A301

1
A300

MILL FINISHED BENT ALUMINUM PLATE 1/8" THICK

NOTE: SCREEN PORCH STRUCTURE AND FOUNDATION TO BE REVIEWED BY ENGINEERS

1" X 6" CEDAR ROOF LAP SIDING

1
A303

1
A302

1X6 CEDAR RIDGE

1" X 6" X 12' CEDAR ROOF LAP SIDING

SOLAR PANEL (SEE MEC)

MILL FINISHED BENT ALUMBINUM PLATE 1/8" THICK

A104
PLAN ROOF

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

ROOF PLAN 1/4" = 1'-0"

Drawn by: PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

23'-3"

24'-3"

SIP WALLS

A105
2 MATS OF #5 REBAR 12"O.C. 1 1/2" CLEARANCE FROM ALL EDGES, MIN.
FOUNDATION 1 1/4" = 1'-0" FOUNDATION PLAN

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: JK - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

MULTI-PLY POST SPECIFIED BY SIP MFR

MULTI-PLY POST SPECIFIED BY SIP MFR

MULTI-PLY POST SPECIFIED BY SIP MFR

3 PLY 2"X8"

2 PLY 2"X8" 2 PLY 2"x12" 4"X4" POST MULTI-PLY POST SPECIFIED BY SIP MFR 3 PLY 2"X8" MULTI-PLY LVL HEADER SPECIFIED BY SIP MFR

MULTI-PLY LVL HEADER SPECIFIED BY SIP MFR

(2) 3X12" GLULAM TIMBER

2"X8" LEDGER, BLOCKING IN SIP AS SPECIFIED BY MFR

MULTI-PLY LVL HEADER SPECIFIED BY SIP MFR MULTI-PLY POST SPECIFIED BY SIP MFR

2"X8" JOIST 16" O.C.

3 PLY LVL POST OR AS SPECIFIED BY SIP MFR


1 LOFT FRAMING 1/4" = 1'-0"

MULTI-PLY LVL HEADER SPECIFIED BY SIP MFR

MULTI-PLY POST SPECIFIED BY SIP MFR

3 PLY LVL POST OR AS SPECIFIED BY SIP MFR


2 ROOF FRAMING 1/4" = 1'-0"

MULTI-PLY LVL HEADER SPECIFIED BY SIP MFR

MULTI-PLY POST SPECIFIED BY SIP MFR

A106
FRAMING PLANS

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: JK - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

MULTI-PLY LVL HEADER SPECIFIED BY SIP MFR

MULTI-PLY LVL HEADER SPECIFIED BY SIP MFR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

3'-6"

3'

2'-8"

3'

7'

7'

7'

7'

7'

7'

2.001.1 MAIN ENTRANCE DOOR


FULL TEMPERED GLASS INWARD OPENING 48.11/ 4ESG-18-4-18-4ESG/ug=0,5/g=50-52% INTERIOR AND EXTERIOR FINNISH SPRUCE -THREE BRONZE HINGES

3.001.3 SIDE ENTRANCE DOOR

SOLID CORE MAPLE VENEER DOOR


PROVIDE MIN 3/4" UNDERCUT -THREE STAINLESS STEEL HINGES -STAINLESS STEEL HANDLES

PINE MECH DOOR

1.021 FIXED WINDOW


TEMPERED GLASS SOUTH GAIN 2 GLASS, 0.61/0.113 WEST GAIN 1 GLASS, 0.55/0.088 52.12/ 6ESG-18-4-18-6ESG/ug=0,5 g=50-52% INTERIOR AND EXTERIOR FINNISH SPRUCE

FULL TEMPERED GLASS OUTWARD OPENING 48.11/ 4ESG-18-4-18-4ESG/ug=0,5/g=50-52% INTERIOR AND EXTERIOR FINNISH SPRUCE -THREE BRONZE HINGES

-STAINLESS STEEL HANDLES -THREE STAINLESS STEEL HINGES

4' 7' 4' 3'-6" 3' 2' 3' 3'-6"

PHPP NAME 1 E STUDY ONE FL1 2 E LOFT FL2 A 3 E LOFT FL2 B 4 S DOOR 5 S LIVING ROOM FL1 A 6 S LIVING ROOM FL1 B 7 S LIVING ROOM FL2 A 8 S LIVING ROOM FL2 B 9 S ENTRY FL1 10 W LIVING ROOM FL1 11 W LIVING ROOM FL2 12 W DOOR 13 W KITCHEN FL1 B 14 N KITCHEN FL1 15 N LOFT FL2

WINDOW TYPE F F F A E E G G I E E B F H H

A107
I
1.021 FIXED WINDOW
GLASS SOUTH GAIN 2 GLASS, 0.61/0.113 WEST GAIN 1 GLASS, 0.55/0.088 48.1 / 4-18-4-18-4 / ug=0,5 / g=50% INTERIOR AND EXTERIOR FINNISH SPRUCE

1.001 SINGLE TILT&TURN WINDOW


TEMPERED GLASS INWARD OPENING 48.11/ 4ESG-18-4-18-4ESG/ug=0,5/g=50-52% INTERIOR AND EXTERIOR FINNISH SPRUCE EXTERIOR SCREEN

1.021 FIXED WINDOW


GLASS SOUTH GAIN 2 GLASS, 0.61/0.113 WEST GAIN 1 GLASS, 0.55/0.088 48.1 / 4-18-4-18-4 / ug=0,5 / g=50% INTERIOR AND EXTERIOR FINNISH SPRUCE

1.021 FIXED WINDOW


GLASS 48.1 / 4-18-4-18-4 / ug=0,5 / g=50% INTERIOR AND EXTERIOR FINNISH SPRUCE

DOOR AND WINDOW SCHEDULE

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: DA - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 2 3 4 5 6 37'-7" 1 4'-1 _ " 2 7 8

SIMPSON STRONGTIE POST BASE

(2) - 2" X 8" TREATED POSTS

1" X 4" CEDAR LOUVERS COMPOSED AS SHADING PANELS SPACED 4" O.C. 1" X 6" CEDAR LOUVERS COMPOSED AS SHADING PANELS SPACED 6" O.C. 11 GAUGE STEEL CABLE

STRUCTURAL ENGINEERING REVIEW OF SHADE STRUCTURE AND FOUNDATION HAVE NOT BEEN CONDUCTED FOR SITE LOCATION AND ARE IMPERATIVE PRIOR TO CONSTRUCTION

2" x 8" TREATED WOOD AS BENCH

16" X 4" X 8" GABIONS

5 2 7 8 1

1'-3" 6'-11" 1 9'-5 _" 2 11'-10" 12' 1 14'-5 _" 2

A200
ELEVATION SHADING STRUCTURE SOUTH

Design Development
6
1 SHADING STRUCTURE SOUTH 1/4" = 1'-0"
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: MD - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

12' SONOTUBE (5') DEPTH WITH (2) #5 BARS

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

STRUCTURAL ENGINEERING REVIEW OF SHADE STRUCTURE AND FOUNDATION HAVE NOT BEEN CONDUCTED FOR SITE LOCATION AND ARE IMPERATIVE PRIOR TO CONSTRUCTION 3

1 4'-11" 2
6'

SIMPSON STRONGTIE POST BASE

(2) - 2" X 8" TREATED POSTS

1" _ 4'-4 2

3 1'-1"

1" X 4" CEDAR LOUVERS COMPOSED AS SHADING PANELS SPACED 4" O.C.

5
1" _ 11 2 '2

5
1" _ 11 2 '2

1 1 1 1' 1'-6 _ " 1'-9 _" 1'-5 _" 2 2 2 14'

1" X 6" CEDAR LOUVERS COMPOSED AS SHADING PANELS SPACED 6" O.C.

3 5'-5" 4 1 6_" 2

3 4

11 GAUGE STEEL CABLE

12' SONOTUBE (5') DEPTH WITH (2) #5 BARS

7 8

2" x 8" TREATED WOOD AS BENCH

2'-3"

1 7'-5 _" 2

7 1 1'-3"1'-5 _" 2 1 8 2'-8"

8"

2'-3"

16" X 4" X 8" GABIONS

A201
5'-2" 6 6
ELEVATION SHADING STRUCTURE EAST

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

SHADING STRUCTURE AT DOOR 3/8" = 1'-0"

SHADING STRUCTURE AT WINDOW 3/8" = 1'-0"

Drawn by: MD - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

2'-3"

12'

2'-3"

1 2'-4 _" 2

2'

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 2 3 4 5 6 7 8
1
A301

8" CONCRETE SLAB AT CABIN 16" 40 PSI EXTRUDED POLYSTYRENE 16" X 4" X 8" GABIONS: RUNNING BOND PH CERTIFIED WINDOWS AND DOORS: SEE WINDOWS AND DOORS SCHEDULE FOR DETAIL 6" PINE LAP SIDING SIMPSON STRONG-TIE ABU66 POST BASE (2)- 4" X 8" TREATED POSTS 4" CONCRETE SLAB THICKENED TO 12" AT EDGE OF SHADE STRUCTURE MILL FINISH BENT ALUMINUM PLATE 1/8" THICK

1
A300

10 1/2" X 6" x 12' CEDAR ROOF LAP


1 A410
SOLAR SKIES THERMAL COLLECTOR

10

11 3/4" RICHLITE 10" HEIGHT 12 SIMPSON STRONGTIE FLAT- PLATE CONNECTOR 13 3/8" RICHLITE 14 1" x 4" CEDAR LOUVERS COMPOSED

1 4'-8 _" 2

9 11

AS SHADING PANELS SPACED 4" O.C

15 EXHAUST PIPING: REFER TO M100 16 SUPPLY PIPING: REFER TO M100 17 CRUSHED GRAVEL

NOTE: SCREEN PORCH STRUCTURE AND FOUNDATION TO BE REVIEWED BY ENGINEERS

1 A411

G
S LIVING ROOM FL2 A

4 13

S LIVING ROOM FL2 B

S ENTRY FL2

1 A407

7'

A
4
S DOOR

S LIVING ROOM FL1 A

S LIVING ROOM FL1 B

A202
T.O. FLOOR 90'

2'

ELEVATION SOUTH

Design Development
1 A404

ELEVATION SOUTH 1/4" = 1'-0"

1 A403

2 1 A402 A402

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: JK - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

1 14'-9 _" 2

1'

3'

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 2 3 4 5 6 7 8 9
1
A300

8" CONCRETE SLAB AT CABIN 16" 40 PSI EXTRUDED POLYSTYRENE 16" X 4" X 8" GABIONS: RUNNING BOND PH CERTIFIED WINDOWS AND DOORS: SEE WINDOWS AND DOORS SCHEDULE FOR DETAIL 6" PINE LAP SIDING SIMPSON STRONG-TIE ABU66 POST BASE (2)- 4" X 8" TREATED POSTS 4" CONCRETE SLAB THICKENED TO 12" AT EDGE OF SHADE STRUCTURE MILL FINISH BENT ALUMINUM PLATE 1/8" THICK

10 1/2" X 6" x 12' CEDAR ROOF LAP


A301

11 3/4" RICHLITE 10" HEIGHT 12 SIMPSON STRONGTIE FLAT- PLATE CONNECTOR 13 3/8" RICHLITE 14 1" x 4" CEDAR LOUVERS COMPOSED
1 A410
AS SHADING PANELS SPACED 4" O.C

10

11 9

15 EXHAUST PIPING: REFER TO M100 16 SUPPLY PIPING: REFER TO M100


NOTE: SCREEN PORCH STRUCTURE AND FOUNDATION TO BE REVIEWED BY ENGINEERS

17 CRUSHED GRAVEL

1 A408

1 A411

N LOFT FL2

4 14'-4" 3'-6"
2 A408

13

H
3 2'-8"
DRAIN VENT

N KITCHEN FL1

2'

19'6"

A203
ELEVATION NORTH

T.O. FLOOR 90'

3'-6"

Design Development
1
ELEVATION NORTH 1 1/4" = 1'-0"
1 A400 2 A404

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: JK - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 2 3 4
1
A302

8" CONCRETE SLAB AT CABIN 16" 40 PSI EXTRUDED POLYSTYRENE 16" X 4" X 8" GABIONS: RUNNING BOND

PH CERTIFIED WINDOWS AND DOORS: SEE WINDOWS AND DOORS SCHEDULE FOR DETAIL 6" PINE LAP SIDING SIMPSON STRONG-TIE ABU66 POST BASE (2)- 4" X 8" TREATED POSTS 4" CONCRETE SLAB THICKENED TO 12" AT EDGE OF SHADE STRUCTURE MILL FINISH BENT ALUMINUM PLATE 1/8" THICK

1
A303

5 6

8 16 9

11 5 9 4'-11" 8'
1 A412 1 A412

10 1/2" X 6" x 12' CEDAR ROOF LAP 9 13 11 3/4" RICHLITE 10" HEIGHT 12 SIMPSON STRONGTIE FLAT- PLATE CONNECTOR 13 3/8" RICHLITE 14 1" x 4" CEDAR LOUVERS COMPOSED 15 EXHAUST PIPING: REFER TO M100
AS SHADING PANELS SPACED 4" O.C

F
4 E LOFT FL2 B 14'
2 A406 1 A406

3'-6"

F
4 E LOFT FL2 A

3'-6"

16 SUPPLY PIPING: REFER TO M100 17 CRUSHED GRAVEL

17 8' 3

F
E STUDY ONE FL1

4 3'-6"

2'-6"

T.O. FLOOR 90'

A204
ELEVATION EAST

8 17 1 2

1 A400

2 A404

Design Development
SIM

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

ELEVATION EAST 1/4" = 1'-0"

Drawn by: JK - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

10

12'

3'-6"

1'

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 2 3 4 5 6
1
A303

8" CONCRETE SLAB AT CABIN 16" 40 PSI EXTRUDED POLYSTYRENE 16" X 4" X 8" GABIONS: RUNNING BOND PH CERTIFIED WINDOWS AND DOORS: SEE WINDOWS AND DOORS SCHEDULE FOR DETAIL 6" PINE LAP SIDING SIMPSON STRONG-TIE ABU66 POST BASE (2)- 4" X 8" TREATED POSTS 4" CONCRETE SLAB THICKENED TO 12" AT EDGE OF SHADE STRUCTURE MILL FINISH BENT ALUMINUM PLATE 1/8" THICK

1
A302

7 8 9

1 A412

1 A412

10 11 9

10 1/2" X 6" x 12' CEDAR ROOF LAP 11 3/4" RICHLITE 10" HEIGHT 12 SIMPSON STRONGTIE FLAT- PLATE CONNECTOR 13 3/8" RICHLITE 14 1" x 4" CEDAR LOUVERS COMPOSED
AS SHADING PANELS SPACED 4" O.C

5 13 3'

15 EXHAUST PIPING: REFER TO M100 16 SUPPLY PIPING: REFER TO M100

G
1 A406

17 CRUSHED GRAVEL

W LIVING ROOM FL2 A

F
1 A406

W KITCHEN FL1 B

7'

B
4
W DOOR

E
4
1 A404
T.O. FLOOR 90'

W LIVING ROOM FL1 A

2 A404 1 A400
SIM

A205
ELEVATION WEST

1 A402

1 A405

8
1 A403
SIM

17

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

ELEVATION WEST 1/4" = 1'-0"

Drawn by: JK - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

14'4"

5'2"

1'

3'-6"

3'-6"

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

FOUNDATION 1 - BUCKET -8" REINFORCED CONCRETE SLAB -18" STYROFOAM HIGHLOAD 40P ROOF 2 - 16" SIP -PINE FINISH -16" SIP WITH EPS, OSB BOTH SIDES -8" POLYISO -OSB -1x6" RECLAIMED CEDAR ROOFING

1
A302

1
A303

WALL 3 - 14" SIP + 2" EPS -PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 4 - 14" SIP + 4" EPS -PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 5 - 14" SIP + 4"EPS + 3.5" CELLULOSE

1 A410

1 A411

1 A411

-PINE FINISH -2 X 4 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 6 - 14" SIP + 2"EPS + 5.5" CELLULOSE -PINE FINISH -2 X 6 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4

WALL 3 LOFT
3'

8'-1"
LOFT

1 A408

2'

WALL 4
1'

WALL 5 1 A402

7'

ENTRY

7'-8"

WORK AREA

BATH 9'-8" 1 A400

8" 1'-4"

A300
SECTION NORTH TO SOUTH LOFT
FOUNDATION 1

4" PERF DRAINTILE 8" MIN FREE DRAINING CLEAN MATERIAL

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

SOIL COMPACTED PER STRUCTURAL ENGINEERING REQUIRMENT

SECTION NORTH SOUTH LOFT 1/4" = 1'-0"

Drawn by: AB - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

ROOF 2

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

FOUNDATION 1 - BUCKET -8" REINFORCED CONCRETE SLAB -18" STYROFOAM HIGHLOAD 40P ROOF 2 - 16" SIP -PINE FINISH -16" SIP WITH EPS, OSB BOTH SIDES -8" POLYISO -OSB -1x6" RECLAIMED CEDAR ROOFING WALL 3 - 14" SIP + 2" EPS

1
A303

1
A302

1 A410

-PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 4 - 14" SIP + 4" EPS -PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4

ROOF 2 1 A411

WALL 5 - 14" SIP + 4"EPS + 3.5" CELLULOSE -PINE FINISH -2 X 4 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 6 - 14" SIP + 2"EPS + 5.5" CELLULOSE -PINE FINISH -2 X 6 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4

1 A411

WALL 3 1 A407

WALL 4

1 A408

KITCHEN WALL 5

7'

LIVING ROOM

1 A403

1 A400
1'-4" 8"

A301
FOUNDATION 1

SECTION NORTH TO SOUTH

Design Development
SECTION NORTH SOUTH NO LOFT 1/4" = 1'-0"
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: AB - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

2'

1'

3'

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

3'-6"

FOUNDATION 1 - BUCKET -8" REINFORCED CONCRETE SLAB -18" STYROFOAM HIGHLOAD 40P ROOF 2 - 16" SIP -PINE FINISH -16" SIP WITH EPS, OSB BOTH SIDES -8" POLYISO -OSB -1x6" RECLAIMED CEDAR ROOFING WALL 3 - 14" SIP + 2" EPS

1
A301

1
A300

-PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 4 - 14" SIP + 4" EPS

1 A412

ROOF 2

1 A412

-PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 5 - 14" SIP + 4"EPS + 3.5" CELLULOSE -PINE FINISH -2 X 4 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 6 - 14" SIP + 2"EPS + 5.5" CELLULOSE

WALL 3
NOTE: SCREEN PORCH STRUCTURE AND FOUNDATION TO BE REVIEWED BY ENGINEERS

12 TREADS @ 10-1/2"

3 A506

8'-1"

-PINE FINISH -2 X 6 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4

WALL 6

13 RISERS @ 7-1/16"

1 A409
7'-8"

1 A402

1 A400

2 A506

STUDY 2

A302
FOUNDATION 1

1'-4"

SECTION EAST TO WEST STAIRS

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

SECTION EAST WEST STAIRS 1/4" = 1'-0"

Drawn by: AB - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

7'

8"

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

9" 2'-

FOUNDATION 1 - BUCKET -8" REINFORCED CONCRETE SLAB -18" STYROFOAM HIGHLOAD 40P ROOF 2 - 16" SIP -PINE FINISH -16" SIP WITH EPS, OSB BOTH SIDES -8" POLYISO -OSB -1x6" RECLAIMED CEDAR ROOFING WALL 3 - 14" SIP + 2" EPS -PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 4 - 14" SIP + 4" EPS -PINE FINISH -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4

1
A300

1
A301

ROOF 2 1 A410 1 A410

-PINE FINISH -2 X 4 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -4" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4 WALL 6 - 14" SIP + 2"EPS + 5.5" CELLULOSE NOTE: SCREEN PORCH STRUCTURE AND FOUNDATION TO BE REVIEWED BY ENGINEERS -PINE FINISH -2 X 6 FRAMING WITH CELLULOSE -14" SIP WITH EPS, OSB BOTH SIDES -2" POLYISO -1.5" AIRSPACE -1x6" RECLAIMED CEDAR SIDING ON 2X4

WALL 3 1 A406

WALL 3

LOFT

1 A409

3'-6"

1 A400 WALL 6

STUDY 1

WORK AREA

KITCHEN
3'-6"

3'-6"

1 A406

3'-6"

1 A406

A303
SECTION WEST TO EAST
FOUNDATION 1

1'-4"

8"

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

SECTION WEST EAST WINDOWS 1/4" = 1'-0"

Drawn by: AB - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

WALL 5 - 14" SIP + 4"EPS + 3.5" CELLULOSE

1'

3'-6"

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

5 6 7 8 9 10 11 12 13

1 4" 3_" 2 16 14 INSECT SCREEN

1'-2"

14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING 17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR

NOTE: USE 4" INSULATION ON NORTH WALL; USE 2x6 IN PLACE OF 2x4. 3 25 7

11 12 TAPE SEAM OF AIR BARRIER 2'-6" 9 4

23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1/2" X 6" x 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION

TIE GABIONS TO FURRING STRIPS

8"

2"

1 5_" 2 7"

1 6_" 4 2

4"

2"

1 4_" 4

8"

15

A400
FOUNDATION N + E DETAIL

1'

4" PERFORATED DRAIN TILE FOUNDATION N + E 1 1 1/2" = 1'-0"

8"

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: AB Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 2 3 4

8" CONCRETE SLAB 16" 40 PSI EXTRUDED POLYSTYRENE 14" SIP (W/ 7/16" OSB) TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 2" X 6" TREATED SILL PLATE SILL SEALER VAPOR RETARDER/ AIR BARRIER COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 16" X 4" X 8" GABIONS ALUMINUM SERRATED OPEN PLANK GRATE BUILDING WRAP 2" POLYISO 2" X 6" DIM LUMBER

1 3_ " 2 16

1'-2"

5 6 7 8 9 10 11 12 13

15 14 3 11 12 20 19 18 6 1 INSECT SCREEN 4 TAPE SEAM OF AIR BARRIER

25 7

14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING 17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1/2" X 6" x 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION

7"

1 6_" 4 2 1'

4"

2"

1 4_" 4

8"

A401
FOUNDATION S + W DETAIL

Design Development
4" PERFORATED DRAIN TILE
1 FOUNDATION S 1 1/2" = 1'-0"
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: AB Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

8"

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 2 3 4

8" CONCRETE SLAB 16" 40 PSI EXTRUDED POLYSTYRENE 14" SIP (W/ 7/16" OSB) TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 2" X 6" TREATED SILL PLATE SILL SEALER VAPOR RETARDER/ AIR BARRIER COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 16" X 4" X 8" GABIONS ALUMINUM SERRATED OPEN PLANK GRATE BUILDING WRAP 2" POLYISO 2" X 6" DIM LUMBER

1 8" CONCRETE SLAB 2 16" 40 PSI EXTRUDED POLYSTYRENE 3 14" SIP (W 7/16" OSB) 4 TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 5 2" X 6" TREATED SILL PLATE 6 SILL SEALER 7 VAPOR RETARDER/ AIR BARRIER 8 COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 9 16" X 4" X 8" GABIONS 10 ALUMINUM SERRATED OPEN PLANK GRATE 11 BUILDING WRAP 12 2" POLYISO 13 2" X 6" DIM LUMBER 14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING 17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1" X 6" X 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION

12 15 16 33 25 7 27 30 28 22 26

INSECT SCREEN
29

29 10 22 5 30 6 7 1

15 2 __ " 16 8" 7"


21

1 6_" 4

1 5_" 2

A402
FOUNDATION TO DOOR DETAIL

Design Development
2

4"

DOOR TO FOUNDATION 3" = 1'-0"

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: DC Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

31 11

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

6 SILL SEALER 7 VAPOR RETARDER/ AIR BARRIER 8 COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 9 16" X 4" X 8" GABIONS 10 ALUMINUM SERRATED OPEN PLANK GRATE 11 BUILDING WRAP 12 2" POLYISO 13 2" X 6" DIM LUMBER 14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING 17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1" X 6" X 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION

23 30 7 26 27 6 5 18 28

1 3_" 2 8"

21

2 8

4"

A403
FOUNDATION TO WINDOW DETAIL

Design Development
WINDOW TO FOUNDATION 3" = 1'-0"
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: DC Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

29

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 8" CONCRETE SLAB 2 16" 40 PSI EXTRUDED POLYSTYRENE 3 14" SIP (W 7/16" OSB) 4 TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 5 2" X 6" TREATED SILL PLATE

1 2 3 4 5 6 7 8 9 10 11 12 13

8" CONCRETE SLAB 16" 40 PSI EXTRUDED POLYSTYRENE 14" SIP (W/ 7/16" OSB) TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 2" X 6" TREATED SILL PLATE SILL SEALER VAPOR RETARDER/ AIR BARRIER COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 16" X 4" X 8" GABIONS ALUMINUM SERRATED OPEN PLANK GRATE BUILDING WRAP 2" POLYISO 2" X 6" DIM LUMBER

11 1'-3 __ " 16

13 4 __ " 16 16 13

9 2'-6 __ " 16 12 15

33 7 5_" 8 3 3_" 8 28 28 23

17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1/2" X 6" x 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION

12 15

46 30

26

14 7

7 45 25

2
1 4_" 4 1'-2"

NORTHWESTCORNER 1 1/2" = 1'-0"

28 1 3_" 2

23 27

33

16 14 12 26 46 7 30 27 11 32 NOTE: ON SECOND FLOOR, WINDOWS ARE 5 LOCATED 1 __ " FROM 16 THE EXTERIOR EDGE OF SIP PANEL TO OUTSIDE FACE OF GLASS

5 1'-0 _" 8

3 4 __ " 16
3 2_" 4 5 __ " 2 16 1 3 2_" 2_" 4 4 1 1'-0 _" 2 1 3_" 2 28

NORTH WEST & SOUTHWEST CORNER DETAIL Design Development


North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

A404

SOUTHWEST CORNER 1 1/2" = 1'-0"

Drawn by: DC Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING

14 3 11 16

27

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

4 TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 5 2" X 6" TREATED SILL PLATE 6 SILL SEALER 7 VAPOR RETARDER/ AIR BARRIER 8 COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 9 16" X 4" X 8" GABIONS 10 ALUMINUM SERRATED OPEN PLANK GRATE 11 BUILDING WRAP 12 2" POLYISO 13 2" X 6" DIM LUMBER 14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING 17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1" X 6" X 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION 23 22 26 33 46 30 27

30 7 25 3

3 _" 4

1'-2"

32

1 4_" 4

15 16

14 12

11

28 22

A405
DOOR TO WALL DETAIL

DOOR TO WALL 3" = 1'-0"

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: DC Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 8" CONCRETE SLAB 2 16" 40 PSI EXTRUDED POLYSTYRENE 3 14" SIP (W 7/16" OSB)

16 3 16 15 15 12 12 11 7 33 28 14 11

4 TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 5 2" X 6" TREATED SILL PLATE 6 SILL SEALER 7 VAPOR RETARDER/ AIR BARRIER

8 COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 9 16" X 4" X 8" GABIONS 25 10 ALUMINUM SERRATED OPEN PLANK GRATE 11 BUILDING WRAP 12 2" POLYISO 13 2" X 6" DIM LUMBER 14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING 17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1" X 6" X 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION

26 46 7 30 27 24

INSECT SCREEN
29 28 27 7 46 30 26

27 7 30 26 46

24 33 28 3 25 29

2
33 25 16

WALL TO OPERABLE PLAN 3" = 1'-0"

15 11 12

A406
WALL TO OPERABLE DETAIL

Design Development
3

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

1'-2"

1 3_" 2

WALL TO OPERABLE 3" = 1'-0"

Drawn by: DC Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 8" CONCRETE SLAB 2 16" 40 PSI EXTRUDED POLYSTYRENE 3 14" SIP (W 7/16" OSB)

31

6 SILL SEALER 7 VAPOR RETARDER/ AIR BARRIER 8 COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 9 16" X 4" X 8" GABIONS 10 ALUMINUM SERRATED OPEN PLANK GRATE 11 BUILDING WRAP 12 2" POLYISO 13 2" X 6" DIM LUMBER 14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING 17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1" X 6" X 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION

16 15

25

12 11 33

INSECT SCREEN
46 30 7 27 28 23

LED LIGHTING
27 7 30 46 26

23 28 29 16

33

12 3 25

3 _" 4

1'-2"

9 4__ " 16

31

11 15 33

A407
WINDOW TO HEADER DETAIL

26

INSECT SCREEN
7 30 27 29 28 23

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

LED LIGHTING

1 1'-7 _ " 4

WINDOW TO HEADER 3" = 1'-0"

Drawn by: DC Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

26

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 8" CONCRETE SLAB 2 16" 40 PSI EXTRUDED POLYSTYRENE 3 14" SIP (W 7/16" OSB) 4 TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 5 2" X 6" TREATED SILL PLATE

12 15 12 15 11 3 16 33
INSECT SCREEN

16 13

6 SILL SEALER 7 VAPOR RETARDER/ AIR BARRIER 8 COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 7 9 16" X 4" X 8" GABIONS 10 ALUMINUM SERRATED OPEN PLANK GRATE 11 BUILDING WRAP 12 2" POLYISO 13 2" X 6" DIM LUMBER 14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING 17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1" X 6" X 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION 33 25 3 26 46 30 7 27 28 23 25

28

23

29

27

46

30

26 25 27 7 30 26 46 23 28 7

2
29

408 FIXED NORTH WALL PLAN 3" = 1'-0"

11 16 15 12

A408
NORTH SIDE USES 4" OF INSULATION; USE 2" OF INSULATION ON SOUTH, EAST AND WEST SIDES
FIXED WINDOW DETAIL

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

NORTH FIXED WINDOW 3" = 1'-0"

Drawn by: DC Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 8" CONCRETE SLAB 2 16" 40 PSI EXTRUDED POLYSTYRENE 3 14" SIP (W 7/16" OSB) 4 TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 5 2" X 6" TREATED SILL PLATE

6 SILL SEALER 7 VAPOR RETARDER/ AIR BARRIER 8 COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 9 16" X 4" X 8" GABIONS 10 ALUMINUM SERRATED OPEN PLANK GRATE 11 BUILDING WRAP 12 2" POLYISO 13 2" X 6" DIM LUMBER 14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING 17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1" X 6" X 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION 16 37 7

25

SIPS STRUCTURAL BLOCKING BY MFR

3/4" PLYWOOD

3 14

4 1/2" LAG SCREW 1 7 _" 4

36 12

JOIST HANGER

11

25

15

2"x6" STUD WALL 16" O.C.


45 7

A409
LOFT TO WALL DETAIL

Design Development
2" 1'-2" LOFT TO EAST WALL 1 3" = 1'-0" 1 5 _" 2
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

1 1 _" 2

Drawn by: JK Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 8" CONCRETE SLAB 2 16" 40 PSI EXTRUDED POLYSTYRENE 3 14" SIP (W 7/16" OSB) 4 TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 5 2" X 6" TREATED SILL PLATE

5 6 7 8 9 10 11 12 13

1X6 CEDAR RIDGE

43

39

17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1/2" X 6" x 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION SIP FASTENER
8"

44

44

7 25

34

33

SIP FASTENER

42 35

42

35

3'

A410
ROOF RIDGE DETAIL

Design Development
RIDGE 1 1 1/2" = 1'-0"
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: JK Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

14 2" X 4" DIM LUMBER 15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING

38

38

1'4"

1 _ 2"

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 2 3 4

8" CONCRETE SLAB 16" 40 PSI EXTRUDED POLYSTYRENE 14" SIP (W/ 7/16" OSB) TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 2" X 6" TREATED SILL PLATE SILL SEALER VAPOR RETARDER/ AIR BARRIER COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 16" X 4" X 8" GABIONS ALUMINUM SERRATED OPEN PLANK GRATE BUILDING WRAP 2" POLYISO 2" X 6" DIM LUMBER

1 _" 2

39

43

6 SILL SEALER 7 VAPOR RETARDER/ AIR BARRIER 8 COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 9 16" X 4" X 8" GABIONS 10 ALUMINUM SERRATED OPEN PLANK GRATE 11 BUILDING WRAP 12 2" POLYISO 13 2" X 6" DIM LUMBER 14 2" X 4" DIM LUMBER 13

7"
40

38

17 8" SONOTUBE 18 2" PEA ROCK

3 _" 4
1'4"

19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1" X 6" X 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION 41

15

44

12

11 7 14 33

16

A411
ROOF TO WALL DETAIL

25 3

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

1 1_" 2

2"

1'-2"

ROOF TO WALL 3" = 1'-0"

Drawn by: JK Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 8" CONCRETE SLAB 2 16" 40 PSI EXTRUDED POLYSTYRENE 3 14" SIP (W 7/16" OSB) 4 TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 5 2" X 6" TREATED SILL PLATE

8"

6 SILL SEALER 7 VAPOR RETARDER/ AIR BARRIER 8 COMPACTED FREE DRAINING MATERIAL- CLASS 5 GRAVEL 9 16" X 4" X 8" GABIONS 10 ALUMINUM SERRATED OPEN PLANK GRATE 11 BUILDING WRAP 12 2" POLYISO 13 2" X 6" DIM LUMBER 14 2" X 4" DIM LUMBER

1 _" 2

4 TREATED SILL PLATE (2" X 10" & CUT 2" X 6") 5 2" X 6" TREATED SILL PLATE

39

17 8" SONOTUBE 18 2" PEA ROCK 19 SIMPSON STRONGTIE POST BASE 20 (2)- 2" X 8" TREATED POSTS 21 4" CONCRETE SLAB THICKENED TO 12" AT EDGE 22 PASSIVE HOUSE CERTIFIED DOOR 23 PASSIVE HOUSE CERTIFIED FIXED PROFILE WINDOW 24 PASSIVE HOUSE CERTIFIED TILT AND TURN WINDOW 25 1" X 4" RECLAIMED PINE, OIL FINISH 26 RECLAIMED PINE BOARD 27 BUTYL TAPE 28 3/8" RICHLITE 29 BENT METAL BLACK COLOR CLAD FLASHING 30 PROSOCO R-GUARD FAST FLASH 31 HEADER SPECIFIED BY MANUFACTURER 32 COLUMN SPECIFIED BY MANUFACTURER 33 LVL SPECIFIED BY MANUFACTURER 34 10" SIP TAPE 35 4" X 4" POST 36 2" X 8" JOISTS AT 16" O.C 37 1" X 6" RECLAIMED PINE FLOORING 38 8" POLYISO OSB ADHERED TO TOP MECHANICAL FASTENERS 39 1" X 6" X 12' CEDAR ROOF LAP 40 MILL FINISH BENT ALUMINUM PLATE 1/8" THICK 41 3/4" RICHLITE 10" HEIGHT 42 3" X 12" GLULAM TIMBER 43 ICE & WATER SHIELD 44 16" SIP 45 DENSPAK CELLULOSE 46 SPRAY IN INSULATION 33

14

44

16

15

11

12

A412
ROOF TO WALL RAKE DETAIL

7 33 27 7 25 3

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

ROOF TO WALL RAKE 3" = 1'-0"

1'-2"

_ 2" 11 " 2

Drawn by: JK Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

15 1 1/2" AIR SPACE 16 6" PINE LAP SIDING

1 1'-6 _" 2

9"

38

41

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 8" CONCRETE SLAB 2 16" 40 PSI EXTRUDED POLYSTYRENE 3 14" SIP (W 7/16" OSB)

39

43

33

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK

1 1

4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED 5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED 8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED 9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH

11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH 12 2X8 16" O.C. FLOOR JOIST 13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 2X12 VENEER MAPLE SHELVING, OIL FINISH 15 BUILT-UP STRINGER 16 2X2 MAPLE GUARDRAIL W/ FIXED BURLAP PANEL

I 1 3 _" 2
SINK MW/ OVEN REF.

2' 1'

1 5

17 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE 18 2" X 2" MAPLE FRAMING UNIFINISHED 19 RIDGE BEAM 20 SHOWER SYSTEM

7 1/2" 8 1/4" 8 1/4" 2'-10" 6

21 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 22 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS 23 1" x 12" MAPLE STAIR TREADS, OILED 24 OILED MAPLE PLYWOOD

2'-5 1/2"

1' 5"

2' 6"

11"

2'-8 1/2"

24

2'

A500
INTERIOR ELEVATION KITCHEN

KITCHEN INTERIOR 1/2" = 1'-0"

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: MF Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK 4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED 5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED 8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED 9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH

F
4"

4'

9"
2 EAST INTERIOR LOFT LEVEL 1/4" = 1'-0"

9"

11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH 12 2X8 16" O.C. FLOOR JOIST 13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 BUILT-UP STRINGER 15 2X U-BRACKETS BOLTED AT HANDRAIL SLOPE

4'

16 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE


1'7"

17 2" X 2" MAPLE FRAMING UNIFINISHED 18 RIDGE BEAM 19 SHOWER SYSTEM

F
3
1 7 _" 2

1'-2"

D
2'-5"

20 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 21 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS 22 1" x 12" MAPLE STAIR TREADS, OILED

2'-8" 1'-4" 1 2'-7 _ " 2 1 3'-5 _ " 2

23 OILED MAPLE PLYWOOD 24 2X L-BRACKETS INVERTED

4'

4'

A501
1 EAST INTERIOR MAIN LEVEL 1/4" = 1'-0" INTERIOR ELEVATIONS EAST

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: MF Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK 4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED
A
4 4'

5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED 8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED

6" 3'

1 1'-2 _" 8

9 2" X 12" MAPLE SHELVES, OILED

SOUTH INTERIOR 1/4" = 1'-0"

10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH 11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH 12 2X8 16" O.C. FLOOR JOIST 13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 BUILT-UP STRINGER 15 2X U-BRACKETS BOLTED AT HANDRAIL SLOPE 16 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE 17 2" X 2" MAPLE FRAMING UNIFINISHED 18 RIDGE BEAM 19 SHOWER SYSTEM

20 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 21 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS

22 1" x 12" MAPLE STAIR TREADS, OILED 23 OILED MAPLE PLYWOOD

24 2X L-BRACKETS INVERTED

A502
INTERIOR ELEVATIONS SOUTH & WEST

E
4'
2'-10"

Design Development
6

2'

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

WEST INTERIOR 1/4" = 1'-0"

Drawn by: MF - PA Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH)

18

3'-8"

3'-8" 21

2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK

17

4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED

5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED

1'-8"

8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED 9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH 11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH 12 2X8 16" O.C. FLOOR JOIST 13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 BUILT-UP STRINGER

10 9 3'-6" 9 16 12 14 9 9 10 7 1 11 _" 8 1 11 _" 2 7 1/4" 9 11 9 3' 1 2'-4 _" 4 EQ EQ 4'-8 1/4" EQ 8

15 2X U-BRACKETS BOLTED AT HANDRAIL SLOPE 16 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE 17 2" X 2" MAPLE FRAMING UNIFINISHED 18 RIDGE BEAM 19 SHOWER SYSTEM 20 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 21 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS 22 1" x 12" MAPLE STAIR TREADS, OILED 23 OILED MAPLE PLYWOOD 24 2X L-BRACKETS INVERTED

A503
INTERIOR ELEVATION STAIR NORTH

Design Development
1 4'-2 _" 2 1 2'-7 _ " 2 21 1 3'-3 _" 2
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

STAIR NORTH 1/2" = 1'-0"

Drawn by: MF Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

1'-8"

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

21

18
1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK

8 1'-8"

4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED 5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS

4'-1 1/2" 3'-7"

8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED

1'-8"

9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH 11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH

10 5' 9 7

EQ EQ EQ 3'-6" 16

12 2X8 16" O.C. FLOOR JOIST 13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 BUILT-UP STRINGER 15 2X U-BRACKETS BOLTED AT HANDRAIL SLOPE 16 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE 17 2" X 2" MAPLE FRAMING UNIFINISHED 18 RIDGE BEAM

12 1 2'-4 _" 4 2'-3" 11" 14 21 1 11 _ " 8

19 SHOWER SYSTEM 20 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 21 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS 22 1" x 12" MAPLE STAIR TREADS, OILED 23 OILED MAPLE PLYWOOD 24 2X L-BRACKETS INVERTED

1'-9"

1 4'-7 _ " 2 13

A504
INTERIOR ELEVATION STAIR SOUTH

1'-4" 6" 1 10 _" 2 3'-3" 3'-3" 3'-3"


1 STAIRS SOUTH 1/2" = 1'-0"

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: MF Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

7 1"X3" MAPLE BATTENS, OILED

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 EQ

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK 4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED

5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE

MIRROR 3' 7'

EQ 19 EQ

6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED 8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED 9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH 11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH

EQ 2'-10" EQ 1 1'-2 _" 4


BATHROOM EAST 1 1/2" = 1'-0"

12 2X8 16" O.C. FLOOR JOIST

14 BUILT-UP STRINGER 15 2X U-BRACKETS BOLTED AT HANDRAIL SLOPE 16 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE

17 2" X 2" MAPLE FRAMING UNIFINISHED

1'
BATHROOM WEST 4 1/2" = 1'-0"

18 RIDGE BEAM 19 SHOWER SYSTEM 20 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 21 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS

22 1" x 12" MAPLE STAIR TREADS, OILED 23 OILED MAPLE PLYWOOD 24 2X L-BRACKETS INVERTED

4' 19

A505
INTERIOR ELEVATIONS BATHROOM

Design Development
3'-2"
2 BATHROOM NORTH 1/2" = 1'-0"

7'
3

3'-2"
BATHROOM SOUTH 1/2" = 1'-0"

2'-8"

1' 3 1/2"

1'-3 1/2"

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: MF Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK 4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED 5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED 8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED 9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH 11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH 12 2X8 16" O.C. FLOOR JOIST 13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 2X12 VENEER MAPLE SHELVING, OIL FINISH 15 BUILT-UP STRINGER 16 2X2 MAPLE GUARDRAIL W/ FIXED BURLAP PANEL 17 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE 18 2" X 2" MAPLE FRAMING UNIFINISHED 19 RIDGE BEAM 20 SHOWER SYSTEM 21 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 22 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS 23 1" x 12" MAPLE STAIR TREADS, OILED 24 OILED MAPLE PLYWOOD
7 1/16" 1 _" 2 1 11 _" 4 1 7_" 4 3 _" 4

1 X 6 OILED, RECLAIMED T & G PINE 3/4" PLY WOOD SUBFLOOR


1 2_" 4

1" X 3" MAPLE BATTENS 3 X 12 MAPLE STRINGER OILED 1 X 12 MAPLE STAIR TREADS, OILED SEALED CONCRETE FLOOR

3 4_" 4 11 1/4"

2 X 8 JOIST 2 PLY 2 x 12

3'-6" 13 RISERS @ 7-1/16" EA. 12 TREADS @ 10-1/2" EA. 8" 17 12


3 A506

15 7 3 22 2' 24 3 2'-4 _" 4 7'

A506
INTERIOR ELEVATION STAIR SECTION

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

2 A506

STAIR SECTION 1/2" = 1'-0"

Drawn by: CS Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

STAIR TO FLOOR CONNECTION 3/4" = 1'-0"

STAIR TO LOFT CONNECTION 3/4" = 1'-0"

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

13 BUILT-IN SEATING/BED W/ FIRM FOAM AND MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 1
3'-3"

1 9'-10 _ " 2 3'-3"

1'

4'-6"

3'-3"

3'-6"

1'-4"

CUSHIONS TAILOR TO FIT

6" 1'

1 1_ " 2

5
1-1/2"

5
3'-3"

4'-6"

1 1_" 2

MAPLE FRAME (4) AND TABLE INSERTS (5)

4
1 3'-1 _ " 4

3'-10"

A600
3'

COUCH AXON

5
1 3'-1 _ " 4 10-1/2"

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

COUCH AXON 1/2" = 1'-0"

Drawn by: CS Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK 4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED 5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED 8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED 9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH 11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH 12 2X8 16" O.C. FLOOR JOIST 13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 BUILT-UP STRINGER 15 2X U-BRACKETS BOLTED AT HANDRAIL SLOPE 16 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE 17 2" X 2" MAPLE FRAMING UNIFINISHED 18 RIDGE BEAM 19 SHOWER SYSTEM 20 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 22 1" x 12" MAPLE STAIR TREADS, OILED 23 OILED MAPLE PLYWOOD 24 2X L-BRACKETS INVERTED

7 1'-6 __ " 16 3 7_" 8 8 18

10 7 1'-5" 9-1/2" 9

1 3'-11 _" 2 7

10 9 7 20

3'-0"

3'-6" 14

16

1 2_" 2

16 12

12

21 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS

LOFT RAILING 1 1/2" = 1'-0"

A601
INTERIOR LOFT RAILING

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: CS Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

21

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK 4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED 5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED 8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED 9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH 11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH 12 2X8 16" O.C. FLOOR JOIST 13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 BUILT-UP STRINGER 15 2X U-BRACKETS BOLTED AT HANDRAIL SLOPE 16 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE 17 2" X 2" MAPLE FRAMING UNIFINISHED 18 RIDGE BEAM 19 SHOWER SYSTEM 20 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 21 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS 22 1" x 12" MAPLE STAIR TREADS, OILED 23 OILED MAPLE PLYWOOD 24 2X L-BRACKETS INVERTED
11 10 3 9 15 9 9 7 10 24

A602
1 STAIR AXON 1/4" = 1'-0" AXON STAIR NORTH

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: MF Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

22

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK 4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED 5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED 8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED 9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH
17 7 21

11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH 12 2X8 16" O.C. FLOOR JOIST 13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 BUILT-UP STRINGER 15 2X U-BRACKETS BOLTED AT HANDRAIL SLOPE 16 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE
15 9 14 24 10

17 2" X 2" MAPLE FRAMING UNIFINISHED 18 RIDGE BEAM 19 SHOWER SYSTEM 20 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 21 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS 22 1" x 12" MAPLE STAIR TREADS, OILED 23 OILED MAPLE PLYWOOD 24 2X L-BRACKETS INVERTED
3 9

13

A603
AXON STAIR SOUTH

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

STAIR AXON SOUTH 1/4" = 1'-0"

Drawn by: MF Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

1 1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH) 2 MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS 3 BUILT-IN MAPLE VENEER WORK DESK 4 BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED 5 EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE 6 4 X 3 1/2" MAPLE TAPERED SQUARE LEGS 7 1"X3" MAPLE BATTENS, OILED 8 FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED 9 2" X 12" MAPLE SHELVES, OILED 10 2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH 11 3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH FIXED BURLAP PANEL

17 1 8'-8 _ " 4

2X2 MAPLE GUARDRAIL

13 BUILT-IN SEATING/BED W/ FIRM FOAM AND VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT 14 BUILT-UP STRINGER 15 2X U-BRACKETS BOLTED AT HANDRAIL SLOPE 16 3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE 17 2" X 2" MAPLE FRAMING UNIFINISHED 18 RIDGE BEAM 19 SHOWER SYSTEM 20 1/2" GALVANIZED WELDED WIRE BLACK FABRIC SET IN 2" X 2" UNFINISHED MAPLE FRAME 21 4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS 22 1" x 12" MAPLE STAIR TREADS, OILED 23 OILED MAPLE PLYWOOD 24 2X L-BRACKETS INVERTED U-CLIP, METAL ANCHOR PLATE

4'-8"

4'-0"
LOFT FLOOR

3'-6"

7 8 17
2X2 MAPLE GUARDRAIL FIXED BURLAP PANEL 2X2 MAPLE GUARDRAIL 2X2 MAPLE POST

A604
AXON LOFT RAILING

U-CLIP METAL ANCHOR PLATE

Design Development
12
MAPLE GUARDRAIL W/FIXED BURLAP PANEL DETAIL

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: CS Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

12 2X8 16" O.C. FLOOR JOIST

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

GFI

GFI

GFI

FRIG

GFI

9 1'-5 __ " 16 7 10'-4 __ " 16 4' 4'-8" 6'-9" 3'-5" 2'-5"

5'-5"

7'

1'-5"

12
6'-7"

TO SWITCH ON MAIN LEVEL

13
3'-4"

TO FIXTURE ABOVE
9
3'-6"

1
LED FLEXTIBLE STRIP LIGHT FIXTURE SEE DETAIL (2/E101) FOR WINDOWS OTHERWISE UNDERSHELF MOUNT LED FLOOD LIGHT FIXTURE EDGE SCOPE LED (50 DEGREE SPREAD ANGLE) FJ-SCO-1-SN (SATIN NICKEL) LED BAR LIGHT FIXTURE EDGE NAUTILUS LED WALL WASH FJ-NAU-3-SN (SATIN NICKEL) LED LIGHT BULB FIXTURE SEE DETAIL (1/E101) SINGLE POLE/2-WAY LUTRON DIVA LED DIMMER MODEL # DVSCCL-153P-WH (WHITE) SINGLE POLE/3-WAY LUTRON DIVA LED DIMMER MODEL # DVSCCL-153P-WH (WHITE) WALL RECEPTACLE DUPLEX GFCI LEVITON 15-AMP SMARTLOCK MODEL # R62-00PJ8-00W (WHITE) WITH LEVITRON 1-GANG MIDWAY NYLON OUTLET WALL PLATE MODEL # R62-00PJ8-00W (WHITE) *GFI WHERE INDICATED FLOOR DUPLEX RECEPTACLE RACO 15-AMP NICKEL PLATED DECORATOR TAMPER RESISTANT - MODEL # 6239N1 ELECTRICAL PANEL KILL SWITCH ENCLOSED TO TERMINATE POWER TO ALL LIGHTS AND MECHANICAL SYSTEMS WITH EXECPTION OF COMFOAIR 200 AND REFRIDGERATOR WHICH WILL HAVE A SEPARATE KILL SWITCH

ELECTRICAL MAIN LEVEL 1/4" = 1'-0"


WARMLY YOURS SLAB HEATING CABLE MODEL # WSHC-120-0057 AND THERMOSTAT WITH SENSOR PROBE 10 FIREX 12000C SMOKE/CO FIRE ALARM WITH BATTERY BACK-UP MODEL # FADCM 11 FIREX 5000 SMOKE ALARM WITH BATTERY BACK-UP MODEL # FADC 12 ELECTRICAL METER 13 WATER METER NOTE: CARLTON 1/2IN. X 25FT. ELECTRICAL NON-METALLIC TUBING MODEL # 12005-25 EDGE 2" SQUARE FAST JACK POWER CANOPY FJP-2-SQ-LED-SN (SATIN NICKEL) FOR USE WITH EDGE LIGHTING FIXURES 9

E100
ELECTRICAL

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: AM Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

10
4'

11

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice. GFI

2'-2"

3 3 3

1 LED LIGHT BULB (7 WATT) 1 3 3 4 1 2 1.5" GALVANIZED METAL PIPIING 3 SHELVING STRUCTURE 4 METAL FASTENERS 5 LED FLEXIBLE STRIP LIGHT (0.72 WATTS) 6 CONDUIT RUNS

5 6

1 1'-7 _" 4

E101
ELECTRICAL DETAILS

Design Development
1 LED LIGHT BULB FIXTURE 2 LED FLEXIBLE STRIP LIGHT FIXTURE
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: AM Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

5
FRIG

24 CFM

FILTER 10 CFM 35 CFM

2 1 3

FILTER 10 CFM 30 CFM

9 CFM

HVAC MAIN LEVEL 1/4" = 1'-0"

SUPPLY DIFFUSER KE 125 REF 990 326 252 (MAIN LEVEL) REGISTER COVER ROMA (STAINLESS STEEL) REF 990 320 610 (LOFT) ZEHNDER COMFOSYSTEMS RETURN DIFFUSER STB-1-125 REF 705 512 521 FILTER125 MM REF 990 320 032 ZEHNDER COMFOSYSTEMS COMFOWELL SILENCERS CW-S 320

1 EXHAUST AIR PIPING INTERIOR TO EXTERIOR R-8 PER INCH INSULATION ZEHNDER COMFOSYSTEMS 2 OUTSIDE AIR PIPING INTERIOR TO EXTERIOR R-8 PER INCH INSULATION ZEHNDER COMFOSYSTEMS 3 ZEHNDER AMERICA COMFOAIR 200 SERIES PRE-HEAT AND POST-HEAT COILS 6" COMFOSYSTEMS PIPE ZEHNDER COMFOSYSTEMS WITH FILTER F7 MODEL # 400 100 018

4 7 DAY PROGRAMMABLE THERMOSTAT HONEYWELL MODEL # RTH7500D 5 EXTINGUISHER - CLEANGUARD

M100
HVAC MAIN LEVEL & LOFT LEVEL

NOTE: COMFOTUBE 75 VENTILATION TUBE REF 990 328 007 FOR NON INSULATED INTERIOR DUCTWORK

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: AM Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

SILENCER

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

10

13 11

12

16

14 17 6 15 18

3
MEC SECTION 2 1/2" = 1'-0"

9
1 MEC SECTION 3" = 1'-0"

1 SUPPLY DIFFUSER KE 125 REF 990 326 252 ZEHNDER COMFOSYSTEMS 2 EXHAUST AIR PIPING WITH INTERIOR TO EXTERIOR R-8 PER INCH INSULATION ZEHNDER COMFOSYSTEMS 3 OUTSIDE AIR PIPING WITH INTERIOR TO EXTERIOR R-8 PER INCH INSULATION ZEHNDER COMFOSYSTEMS 4 RETURN DIFFUSER STB-1-125 REF 705 512 521 FILTER125 MM REF 990 320 032 ZEHNDER COMFOSYSTEMS

5 ZEHNDER AMERICA COMFOAIR 200 SERIES WITH 6" COMFOSYSTEMS PIPE INTERIOR TO EXTERIOR R-8 PER INCH INSULATION ZEHNDER COMFOSYSTEMS WITH FILTER F7 MODEL # 400 100 018 5 POWERSTAR AE125 WHOLE HOUSE ELECTRIC TANKLESS WATER HEATER MODEL # PWSNAE125 6 SOLAR SKIES 60 GALLON STAINLESS STEEL SOLAR TANK W/ONE DOUBLE WALL COIL HEAT EXCHANGER & ELECTRIC ELEMENT MODEL # 915-016 7 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR QUANTITY 1 4' BY 8' PANEL MOUNTED ON ROOF 8 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR 5 GALLON DRAINBACK TANK

9 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR PUMP CIRCULATING PUMP 10 ELECTRICAL PANEL KILL SWITCH ENCLOSED WHICH TERMINATES POWER TO ALL LIGHTS, AND MECHANICAL SYSTEMS WITH THE EXCEPTION OF COMFOAIR 200 COMFOAIR TO HAVE INDIVIDUAL KILL SWITCH 11 ELECTRICAL METER 12 WATER METER 13 COMFOWELL SILENCER CW-S 320 14 SPRAY FOAM INSULATION
15 8" PIPE GLUED IN PLACE iNSULATATE W/ SPRAY FOAM ANY GAPS 16 TAPE AND SEAL OPENING 17 4" PIPE AND 6" DUCT 18 CAULK AND SEAL AND SPRAY FOAM GAPS

M101
MECHANICAL SECTION

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: AM Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

UTILITY WALL TO SEWER


12

4" WASTE 1 KITCHEN SINK FAUCET SUPPLY 2" WASTE - 1 1/4" VTR - 3/4" HW & CW 2 HANDHELD SHOWER FIXUTRE SUPPLY 2" WASTE - 1 1/4" VTR - 3/4" HW & CW 3 TOILET FIXTURE SUPPLY 2" WASTE - 3" VTR - 3/4" CW 4 BATHROOM SINK FAUCET SUPPLY 2" WASTE - 1 1/4" VTR - 3/4" HW & CW 5 MECHANICAL FLOOR DRAIN 1" DRAIN FOR COMFOAIR 200 6 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR 4' BY 8' PANEL MOUNTED ON ROOF 7 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR 5 GALLON DRAINBACK TANK 8 SS-32 SOLAR SKIES SOLAR THERMAL CIRCULATING PUMP 9 SOLAR SKIES 60 GALLON STAINLESS STEEL SOLAR TANK W/ONE DOUBLE WALL COIL HEAT EXCHANGER & ELECTRIC ELEMENT MODEL # 915-016 10 POWERSTAR AE125 WHOLE HOUSE ELECTRIC TANKLESS WATER HEATER MODEL # PWSNAE125 11 LIBERTY HOSE STAND WITH BIB MODEL # 693-2 12 3" VENT STACK IMPORTANT NOTE: ALL PIPING TO BE RUN WITHIN UTILITY WALL
PLUMBING MAIN LEVEL 1 1/4" = 1'-0"
6
FRIG

VENT
2 3 4

UTILITY WALL

HW SUPPLY
5 6 10 6

CW SUPPLY

M102
PLUMBING SUPPLY

Design Development
North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by: AM Date: 05/11/11

ITASCA PHPP PRE-CERT/STATE FAIR

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

DIVISION 00

PROCUREMENT & CONTRACTING REQUIREMENTS

00 01 01 PROJECT TITLE A. Itasca Faculty Cabin. Project Address: Itasca State Park, 36750 Main Park Drive, Park Rapids, MN 56470. 00 01 15 LIST OF DRAWING SHEETS A. Refer to Sheet T100 for drawing sheet index. 00 31 13 PRELIMINARY CONSTRUCTION SCHEDULE A. Construction Start shall be September 2011. Owner shall provide more specific schedule details. 00 31 32 GEOTECHNICAL DATA A. Refer to Geotechnical Report produced by geotechnical engineers for the Itasca Cabin project. B. Refer to Structural drawing sheets for additional requirements. DIVISION 01 GENERAL REQUIREMENTS

A. Preinstallation Meeting. All Contactors must attend an individual preinstallation meeting with the Owner and Architect before any Work begins to ensure quality control, LEED requirements, air barrier requirements, and other items are executed as specified. B. Site Mobilization Meeting. All Contractors involved in site work, excavation, geotechnical, utilities, earthwork, and foundation work, must attend a general site meeting with the Owner and Architect before any Work begins to ensure quality control, stormwater management, LEED requirements, and other items are executed as specified. 01 33 00 SUBMITTAL PROCEDURES A. 5 copies of all requested submittals for Product Data, Shop Drawings, Samples, LEED documentation, and other, shall be provided to the Owner, to be distributed to the Architect, for approval. All submittals shall be received by the Owner a minimum of 14 business days prior to the need for approval and without any impact on the agreed to construction schedule. 01 35 00 SPECIAL PROCEDURES A. Owner to provide any special procedure requirements including Owner Safety Requirements, Governmental Safety Requirements, Health Safety and Emergency Response Procedures, Environmental Procedures, and Security Procedures. 01 41 00 REGULATORY REQUIREMENTS A. See Sheet T001 B. All Work must comply with the 2002 University of Minnesota Construction Standards. C. Owner shall supply any additional Rules or Laws that are requirements. 01 42 00 REFERENCES A. PHPP for Itasca Cabin. B. LEED for Homes v2.2, administered by the U.S. Green Building Council. 01 50 00 TEMPORARY FACILTIES & CONTROLS A. Owner shall provide all information regarding the requirements for temporary facilities, controls, protection, and security. 01 60 00 PRODUCT REQUIREMENTS A. Owner shall provide all information regarding the requirements for Product Delivery, Product Storage, and Owner furnished products. 01 70 00 EXECUTION & CLOSEOUT REQUIREMENTS A. FIELD ENGINEERING a. The construction layout shall follow the Site Plan drawing sheets and shall be located on site by a professional surveyor. B. PROTECTION OF ADJACENT CONSTRUCTION a. All contractors are responsible for protecting the adjacent construction and land features, including, but not limited to: nearby cabins, trees, and utilities C. WASTE MANAGEMENT a. Provide waste management to meet the following LEED credit: i. MR Credit 3.2: 75% of all Construction Waste must be diverted from the landfill. Prior to the start of construction the Contractor shall identify types of construction materials for recycling, reuse, or storage, estimate quantities, coordinate with subcontractors, and confirm separation requirements for local recycling centers/contractors. Contractor

01 11 00 SUMMARY OF WORK A. Owner to provide information to Bidders regarding the work covered by contract documents verses the work covered by the Owner, all purchase contracts, and all price and payment procedures. 01 14 00 WORK RESTRICTIONS A. Access to Site is restricted. All bidders shall review the site access procedures with the Owner. B. Coordination with Occupants. All bidders shall review the coordination procedures required on campus with the Owner. C. Use of Site is limited. All bidders shall review the site use and boundaries with the Owner. See Site Plan drawing sheet for limitations, erosion control plan, and habitat protection plan. 01 21 00 ALLOWANCES A. Contractor to establish allowances with the Architect for the following items to be specified at a later date: a. Exterior and Interior Door pulls and levers. See section 08 71 00. b. Furnishings: chairs, couch, and bed frame c. Casework pulls and lock hardware d. Finish Aggregate Landscape Material and Installation. See section 07 71 00 and 32 15 00. 01 23 00 ALTERNATES A. Add Alternate #1: Use EPDM Compression Structural Gaskets or P Gaskets sealants at all Structurally Insulated Panel Splices in lieu of standard caulk sealant. See section 07 27 00 and 06 12 00. B. Add Alternate #2: Use Prosoco R guard MVP Air & Water Resistive Barrier in lieu of Jumbotex 01 31 13 PROJECT COORDINATION A. Project coordination will be done by the Owner: Itasca State Park, 36750 Main Park Drive, Park Rapids, MN 56470. 218.266.2100 01 31 19 PROJECT MEETINGS

A700
SPECIFICATIONS
Construction Documents Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by:HB - DJ Date: 05/04/2011

ITASCA FACULTY CABIN

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

D. E.

F.

G.

H.

shall implement these waste management procedures throughout the construction process. Contractor shall keep documentation as required by LEED for this credit and provide the Owner with this documentation. STARTING & CLOSEOUT PROCEDURES a. Contractors shall see the Owner for starting and closeout procedures. FINAL CLEANING a. Final cleaning requirements to be provided by Owner. Shall use Low Emitting Cleaning agents as required by LEED. INDOOR AIR QUALITY MANAGEMENT a. Upon installation seal all permanent ducts and vents to minimize contamination during construction. Remove all seals upon completion of all construction. Anyone who does not comply with this requirement will be held liable for LEED credit EQ 8.1. b. After all construction phases are complete, prior to occupancy, flush the home with fresh air according to the following guidelines to meet the LEED Credit 8.3. i. Flush the entire home, keeping all indoor doors open. ii. Flush for 48 hours, the hours may nonconsecutive if necessary. iii. Open all windows and use a fan (eg. HVAC Fan) continuously or flush the home with all HVAC fans and exhaust fans operating continuously at the highest flow rating. iv. Use additional fans to circulate air within the house. v. Replace or clean HVAC fan afterward if necessary. CLOSEOUT SUBMITTALS a. Provide all documentation as required by LEED as requested in other Divisions of this Specification. b. Provide the Owner with all Warranty Documentation, Product Instruction Manuals, and Spare Parts that accompany each building component or system or as called for elsewhere in this specification. DEMONSTRATION & TRAINING a. Demonstration and training shall be provided for the following, but limited to, building systems or components: i. Photovoltaic System. Installer shall provide one site visit before building occupancy to train the Owner in the use of the system. See electrical drawings and specification for further requirements. ii. Mechanical Ventilation System. Installer shall provide one site visit before building occupancy to train the Owner in the use of the system. See mechanical drawings and specification for further requirements. iii. Exterior doors and windows installer or manufacturer shall provide one site visit before building occupancy to train the Owner in the required maintenance and periodic adjustment of the doors so the thermal performance does not deteriorate. iv. This demonstration training will be at least one hour in length and will be accompanied by an operations and training manual to the home and will serve to educate the homeowner/tenant/building manager to meet the LEED Credits AE 1.1 and AE 2. v. The exhibition of this project at the Minnesota State Fair will meet the requirements for the LEED Credit AE 1.3 as long as it generates the following responses: 1. An open house on 4 weekends (the time it will be open at the State Fair far exceeds this requirement) 2. A news paper article on the project 3. Display LEED signage on the exterior of the building

b. All composite wood used on the interior of the building (defined as inside of the moisture barrier / weatherproofing system / waterproofing system) shall contain no added urea formaldehyde resins. This includes, but is not limited to: i. Particleboard, oriented strand board, plywood, wheatboard, strawboard, panel substrates, door cores, structural insulated panels, cabinetry and casework, shims, blocking, subfloors, electrical service areas. Any composite wood must be reviewed with the Architect and the material data sheet documentation presented to the Architect for approval prior to installation. Any contractor that does not comply with this requirement will be held liable for the loss of LEED Credit MR 2.2 B. This project is designed for LEED for Homes Platinum Certification. Please reference sheet T003 in the drawing set. The construction of this project must comply with the following LEED credits: a. Innovation and Design Process: (Total Points: 4) i. ID 1.1 Prerequisite Preliminary Rating ii. ID 1.2 Credit Integrated Project Team 1pt iii. ID 1.3 Professional Credentialed with respect to LEED for Homes 1pt iv. ID 1.4 Credit Design Charrette 1pt v. ID 1.5 Credit Building Orientation for Solar Design 1pt vi. ID 2.1 Prerequisite Durability Planning vii. ID 2.2 Prerequisite Durability Management viii. ID 2.3 Credit Third Party Durability Management Verification ?pts ix. ID 3 Credit Innovation or Regional Design ?pts

A701
SPECIFICATIONS
Construction Documents Design Development

01 81 13 SUSTAINABLE DESIGN REQUIREMENTS

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by:HB - DJ Date: 05/04/2011

ITASCA FACULTY CABIN

A. Indoor Environmental Quality. a. All paints and coatings used on the interior of the building (defined as inside the moisture barrier / weatherproofing / waterproofing system and applied on site) shall comply with the following criteria: i. Architectural paints, coatings and primers applied to the interior walls and ceilings: Do not exceed the VOC content limits in Green Seal Standard GS 11, Paints, First Edition, May 20, 1993. 1. Flats: 50 g/L 2. Non Flats: 150 g/L ii. Anti corrosive and anti rust paints applied to interior ferrous metal substrates: Do not exceed the VOC content limit of 250 g/L established in the Green Seal Standard GC 03, Anti Corrosive Paints, Second Edition, January 7, 1997. iii. Clear wood finishes, floor coatings, stains and shellacs applied to interior elements: Do not exceed the VOC content limits established in South Coast Air Quality Management District (SCAQMD) Rule 1113, Architectural Coatings, rules in effect on January 1, 2004. 1. Clear wood finishes: varnish 350 g/L; lacquer 550 g/L 2. Floor Coatings: 100 g/L 3. Sealers: waterproofing sealers 250 g/L; sanding sealers 275 g/L; all other sealers 200 g/L 4. Shellacs: Clear 730 g/L; pigmented 550 g/L 5. Stains: 250 g/L Any paint or coating to be applied on site must be reviewed with the Architect and the VOC rating documentation presented to the Architect for approval prior to installation. Any contractor that does not comply with this requirement will be held liable for the loss of LEED Credit MR 2.2

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

b. Locations and Linkages: (Total Points: 6) i. LL 2 Credit Site Selection 2pts ii. LL 3.1 Credit Edge Development 1pt iii. LL 3.3 Credit Previously Developed 1pt iv. LL 4 Credit Existing Infrastructure 1pt v. LL 6 Credit Access to Open Space 1pt c. Sustainable Sites: (Total Points: 14.5) i. SS 1.1 Prerequisite Erosion Controls During Construction ii. SS 1.2 Credit Minimize Disturbed Area of Site 1pt iii. SS 2.3 Prerequisite No Invasive Plants iv. SS 2.2 Credit Basic Landscaping Design 2pts v. SS 2.3 Credit Limit Conventional Turf 3pts vi. SS 2.4 Credit Drought Tolerant Plants 2pts vii. SS 2.5 Credit Reduce Overall Irrigation Demand 6pts viii. SS 3 Credit Reduce Local Heat Island Effects 1pt ix. SS 4.1 Credit Permeable Lot 4pts x. SS 4.2 Credit Permanent Erosion Controls 1pt xi. SS 5 Credit Pest Control Alternatives 1.5pts d. Water Efficiency: (Total Points: 10) i. WE 2.3 Credit Reduce Overall Irrigation Demand by 45% 4pts ii. WE 3.2 Credit Very High Efficiency Fixtures and Fittings 6pts e. Materials and Resources: (Total Points: 13) i. MR 1.1 Prerequisite Framing Order Waste Factor ii. MR 1.2 Credit Detailed Framing Documents 1 pt iii. MR 1.3 Credit Detailed Cut List and Lumber Order 1 pt iv. MR 2.1 Prerequisite FSC Certified Tropical Wood v. MR 2.2 Credit Environmentally Preferable Products 8pts vi. MR 3.1 Prerequisite Construction Waste Management Planning vii. MR 3.2 Credit Construction Waste Reduction 2.5pts f. Indoor Environmental Air Quality: (Total Points: 16) i. EQ 2.1 Prerequisite Basic Combustion Venting Measures ii. EQ 2.2 Credit Enhanced Combustion Venting Measures 2pts iii. EQ 4.1 Prerequisite Basic Outdoor Air Ventilation iv. EQ 4.2 Credit Enhanced Outdoor Air Ventilation 2pts v. EQ 4.3 Third Party Performance Testing 1pt vi. EQ 5.1 Prerequisite Basic Local Exhaust vii. EQ 5.2 Credit Enhanced Local Exhaust 1pt viii. EQ 5.3 Third Party Performance Testing 1pt ix. EQ 6.1 Prerequisite Room by Room Load Calculations x. EQ 6.2 Credit Return Air Flow/Room by Room Controls 1pt xi. EQ 7.3 Credit Best Air Filters 2pts xii. EQ 8.1 Credit Indoor Contaminant Control During Construction 1pt xiii. EQ 8.2 Credit Indoor Contaminant Control 1pt xiv. EQ 8.3 Credit Preoccupancy Flush 1pt xv. EQ 10.4 Credit Detached Garage or No Garage 3pts g. Awareness and Education: (Total Points: 2) i. AE 1.1 Prerequisite Basic Operations Training ii. AE 1.3 Credit Public Awareness 1pt iii. AE 2 Credit Education of the Building Manager 1pt

i. Total Points: 92 Platinum Rating


01 83 00 FACILITY SHELL PERFORMANCE REQUIREMENTS A. The entire building shall be Air Tight with an Air Infiltration measurement of 0.3 ACH50 or less. A Blower Door Test or Duct Blaster Test shall be executed, by a certified testing agency, after the entire Continuous Air Barrier is completed, but before Interior Finishes are installed. The entire building must be 0.3 ACH50 or less before any Interior Finishes or drywall is installed. If it does not meet this rate, the contractor is responsible for testing the Air Barrier with the Smoke Test Method or Infrared Testing to determine where the leaks in the Air Barrier are occurring and to seal those locations before commencing with any finish work. A second test shall be executed after substantial completion to ensure the Continuous Air Barrier was not punctured or damaged during the installation of the finishes. B. A Continuous Air Barrier System shall be installed without interruption. All system details including seams, overlapping locations, foundation to wall transitions, electrical and mechanical penetrations, and window and door details shall be reviewed with the Architect before construction begins to ensure compliance. All components of the air barrier must have a perm rating of less than 1.0 perms. Drywall and caulked baseboards do not meet the requirements for the Air Barrier. A Poly Vapor Barrier shall not be installed in locations where it will get punctured during construction with fasteners, or after construction. The execution of this system relates directly to the Air Infiltration Measurement, the Heating system performance, and condensation in the shell. There shall be a construction supervisor on site at all times that understands the system and its importance. C. On the North Wall: 2x14 SIP, 4 Polyiso Insulation, and dense packed cellulous insulation in 2x4 wall shall have a finished assembly performance of R 84.2. D. On the North Wall: 2x14 SIP and 4 Polyiso Insulation shall have a finished assembly performance of R 72.1.

A702
SPECIFICATIONS
Construction Documents Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by:HB - DJ Date: 05/04/2011

ITASCA FACULTY CABIN

h. Energy and Atmosphere: (Total Points: 27) i. EA 2.1 Prerequisite Basic Insulation ii. EA 2.2 Credit Enhanced Insulation 2pts iii. EA 3.1 Prerequisite Reduced Envelope Leakage iv. EA 3.3 Credit Minimal Envelope Leakage 3pts v. EA 4.1 Prerequisite Good Windows vi. EA 4.3 Credit Exceptional Windows 3pts vii. EA 5.1 Prerequisite Reduced Distribution Losses viii. EA 5.3 Credit Minimal Distribution Losses 3pts ix. EA 6.1 Prerequisite Good HVAC Design and Installation x. EA 6.3 Credit Very High Efficiency HVAC 4pts xi. EA 7.1 Credit Efficient Hot Water Distribution System 2 pts xii. EA 7.2 Credit Pipe Insulation 1 pt xiii. EA 7.1 Credit Efficient Domestic Hot Water Equipment 3pts xiv. EA 7.2 Credit Pipe Insulation 1pt xv. EA 7.3 Efficient Domestic Hot Water Equipment 3pts xvi. EA 8.1 Prerequisite ENERGYstar Lights xvii. EA 8.3 Credit Advanced Lighting Package 3pts xviii. EA 9.1 Credit High Efficiency Appliances 2pts xix. EA 11.1 Prerequisite Refrigerant Charge Test xx. EA 11.2 Credit Appropriate HVAC Refrigerants 1pt

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

D. Door handle meet handicap accessible requirements with exterior key cylinder. E. Window Installer and Manufacturer responsible for the Air Tightness of the Window Unit and its installation. Unit Air Tightness shall be 0.001 cfm/sf. Installed unit shall pass a Blower Door Test and be 0.3 ACH50 or less. F. All Adhesives or Sealants applied on site must comply with LEED credit MR 2.2 Low Emitting Materials. G. All touch up paints or coatings applied on site must comply with LEED credit MR 2.2 Low Emitting Materials. H. Use Shim Screws and Gap Gasket to fasten windows into rough opening, in lieu of nailing flange or traditional wood shim spacers. Creates void between window unit and rough opening that can be filled with gap gasket spray foam or mineral wool. See section 07 21 00 and 07 27 00. No thermal bridge shall be created with the window fastening method. 08 52 00 WOOD WINDOWS A. See Architectural Drawing Sheets, Window and Door Schedule, for additional requirements. B. All window units shall be wood by the following manufacturer or approved equal: 1. Energate. 1.800.594.9871 2. This window complies with LEED Credits EA 4.1 and 4.3 C. Exterior and Interior Finish shall be approved by architect and owner. D. No muntins or dividers. E. Shop drawings shall be provided for approval. I. Window Installer and Manufacturer responsible for the Air Tightness of the Window Unit and its installation. Unit Air Tightness shall be 0.001 cfm/sf. Installed unit shall pass a Blower Door Test and be 0.43 ACH50 or less. J. All Adhesives or Sealants applied on site must comply with LEED credit MR 2.2 Low Emitting Materials. K. All touch up paints or coatings applied on site must comply with LEED credit MR 2.2 Low Emitting Materials. L. Use Shim Screws and Gap Gasket to fasten windows into rough opening, in lieu of nailing flange or traditional wood shim spacers. Creates void between window unit and rough opening that can be filled with gap gasket spray foam or mineral wool. See section 07 21 00 and 07 27 00. No thermal bridge shall be created with the window fastening method. 08 71 00 DOOR HARDWARE A. See Architectural Drawing Sheets, Window and Door Schedule, for additional requirements. B. See Allowances Section 01 21 00. 08 74 00 ACCESS CONTROL HARDWARE A. See Architectural Drawing Sheets, Window and Door Schedule, for additional requirements. B. See Allowances Section 01 21 00. C. See Electrical Drawing Sheets for additional requirements. 08 75 00 WINDOW HARDWARE A. Refer to section 08 54 00. 08 81 00 GLASS GLAZING A. Refer to sections 08 16 00 and 08 54 00 for glazing requirements. DIVISION 09 FINISHES

09 93 00 STAINING AND TRANSPARENT FINISHING A. At interior exposed concrete floor use an enhancer/sealer. Provide the following product or approved equal: 1. BioShield Hard Oil #9. 800.621.2591 2. Apply evenly following the manufacturers instructions. B. Concrete countertops sealer. Provide the following product or approved equal: 1. Bees Wax. Apply a thin layer in random spots on surface before applying epoxy. 2. Envirotex Kite Epoxy. Apply evenly over Bees Wax. Following the manufacturers instructions. C. Casework and wood door sealer. Use the following product of approved equal: 1. BioShield Hard Oil #9. 800.621.2591 2. No stripping or sanding required. Hard Oil should be reapplied to the entire door 1 2 times per year. Apply evenly following the manufacturers instructions. D. Provide material, installation, and documentation that complies to the following LEED credits: 1. Low Emitting Materials, MR Credit 2.2. Only use Paints, Coatings, Sealants and Adhesives that meet this requirement. 09 97 23 CONCRETE & MASONRY COATINGS A. See section 09 93 00. DIVISION 10 SPECIALTIES

10 00 00 Performance Criteria A. The following information is data entered into PHPP and the performance results of the cabin. 10 28 13 TOILET ACCESSORIES H. See drawings for grab bar locations and sizes. 10 44 16 FIRE EXTINGUISHERS A. See architectural drawing sheets for location. See architectural code summary for requirements. Contractor to coordinate product selection and installation with fire marshal. DIVISION 11 EQUIPMENT

11 31 13 RESIDENTIAL KITCHEN APPLIANCES A. See drawings for appliance schedule and locations. a. Provide documentation that contributes to the following LEED credits: i. Energy & Atmosphere, EA Credit 9.1. Use ENERGY STAR labeled refrigerator ii. Indoor Environmental Quality EQ Credit 2.1, all combustion appliances must be vented b. Follow manufactures installation instruction B. Provide 30 trim kit with convection microwave a. Follow manufactures installation instruction DIVISION 12 FURNISHINGS

12 22 00 CURTAINS AND DRAPES A. Use at guardrails in lofts and loft windows. B. Recycled burlap fabric. C. 10 oz. per yard, 15 threads per inch

A707
SPECIFICATIONS
Construction Documents Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by:HB - DJ Date: 05/04/2011

ITASCA FACULTY CABIN

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

D. Natural color with randomly colored print labels and images E. Provide documentation that contributes to the following LEED credits: Innovation points 12 32 00 MANUFACTURED WOOD CASEWORK. See Casework section 06 41 00. 12 36 00 COUNTERTOPS. A. In kitchen and bathroom 1. Shall be made with 20% concrete and 80% recycled glass. Recycled glass is to be broken into maximum 1x1pieces. 2. Galvanized welded wire mesh reinforcing. See section 03 22 20 Welded Wire Fabric. 3. See section 09 93 00 for transparent finish B. Provide products and documentation that contributes to the following LEED credits: 1. Recycled Content, MR Credit 2.2. Verify percentage. 2. LEED Innovation points??? 12 46 33 WASTE & RECYCLING RECEPTACLES 12 48 19 ENTRANCE FLOOR GRATINGS. See section 05 53 00. 12 62 19 STACKING CHAIRS See allowance for furnishings, section 01 21 00. 12 64 00 BOOTHS & TABLES See allowance for furnishings, section 01 21 00. 12 93 00 SITE FURNISHINGS A. Trash & recycling receptors by owners. DIVISION 22 PLUMBING

I. Slope mechanical floor minimally towards drain. J. Train owner for efficient use of all systems and provide guidelines for a regular maintenance program to clean components, purge mold and mildew growth and change filters. K. All hot water pipes must be insulated to comply with LEED Credit 7.2. 23 13 00 FACILITY SANITARY SEWERAGE A. Provide backflow prevention device for sewage system. 22 32 00 DOMESTIC WATER FILTRATION EQUIPMENT A. Test for water chemical make up, minerals and organic matter. Provide water quality consultant to evaluate water quality and suggest type of central water purification and treatment. B. Provide the following as necessary and after review by Owner: RO system, Iron filter, Water softener, Distiller 22 30 00 PLUMBING FIXTURES A. See drawings for appliance and fixture lists. B. Metallic gas and water lines shall have dielectric unions when they are in contact with any electrical appliance, if permitted by code. 22 33 13 INSTANTANEOUS ELECTRIC DOMESTIC WATER HEATER A. See Electrical drawing sheets. B. The water heating equipment must be designed with closed combustion to meet the requirements of LEED Credit EQ 2.1 C. The water heating equipment must comply with LEED Credit 7.1 for efficient hot water distribution and equipment. 22 33 30.23 COLLECTOR to TANK, SOLAR ELECTRIC DOMESTIC WATER HEATER A. See Electrical drawing sheets.

22 0 GENERAL NOTES A. Plumbing and heating shall consist of a complete system including the service connections, drain waste, vent lines, hot and cold water lines, hookup of hot water heater, all excavation and backfill required and the installation of all fixtures and appliances. The system shall meet the requirements of the State Board of Health and any local Codes and Regulations. Remove all existing pipes, ducts, radiators and other plumbing and mechanical system components and provide all new. B. Contractor shall provide connection to existing sewage system or septic system as needed. C. All waste and water lines will be as follows: 1. All supply lines Wirsbo Aquapex, Cross linked Polyethylene or PEX. 2. All waste and vent pipes may be code approved plastic. D. Contractor shall install (1) hose bibs at approximately 14 above grade per owner location. E. Contractor shall inspect all fixtures prior to installation and reject damaged goods. Protect all accepted goods from damage until completion of the job. F. When trenching for plumbing services, backfill and compact all services with earth or other suitable material, free of rocks and debris, in 6 layers. G. Review selections for plumbing fixtures with owner and architect. H. Wherever plumbing penetrates the Continuous Air Barrier System, the interior finished surface shall be sealed. See Section 07 27 00.

22 41 13.13 RESIDENTIAL WATER CLOSET A. See Plumbing drawing sheets. B. Follow manufacturers installation instructions. C. Provide documentation that contributes to the following LEED credits: a) Water Efficiency, WE Credit 3.2. Use Dual Flush Toilet b) Water Efficiency, WE Credit 3.2. Average flow rate for toilet must be equal to or less than 1.3 gmf. 22 41 23 RESIDENTIAL SHOWERS A. See Plumbing drawing sheets. B. Follow manufactures installation instructions C. Provide documentation that contributes to the following LEED credits: a) Water Efficiency, WE Credit 3.2. Average flow rate for shower must be equal to or less than 1.75 gmp. 22 41 39 RESIDENTIAL FAUCETS, SUPPLIES, & TRIM

A708
SPECIFICATIONS
Construction Documents Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by:HB - DJ Date: 05/04/2011

ITASCA FACULTY CABIN

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

A. See Plumbing drawing sheets. B. At kitchen sink a. Provide low flow kit of 1.59 gpm b. Provide documentation that contributes to the following LEED Credits: 1. Water efficiency, WE Credit 3.2. Average flow rate of lavatory faucets must be less than or equal to 2.00 gpm C. At bathroom lavatory use the following product or approved equal: a. Stain chrome finish b. 8 spout reach D. Follow manufactures installation instructions a. Provide documentation that contributes to the following LEED credits: (1) Water Efficiency, WE Credit 3.2. Average flow rate for lavatory faucet must be equal to or less than 1.5 gmp.

DIVISION 23

HEATING, VENTILATING, and HVAC

23 01 00 OPERATION & MAINTNEANCE OF HVAC SYSTEMS A. Dedicated outdoor air to air heat exchanger with energy recovery ventilator (ERV) or HRV to meet ASHRAE Std 62.2. 1. Complies with LEED Credit EQ 4.2 B. Maintain pressurization of house as recommended by ASHRAE 62.2 and ventilation system manufacturer. 1. Complies with LEED Credit EQ 5.1 D. Testing of the flow hoods must be done to measure room air flows, imbalances of flows, imbalances of total air handler flow and supply and return, and to find duct leakage. Refer to the article Accuracy of Flow Hoods in Residential Applications by Wray, Walker, and Sherman for more detailed information. The table below is taken from page 3 of Accuracy of Flow Hoods in Residential Applications. 1. Complies with LEED Credit 6.2

23 50 00 CENTRAL HEATING EQUIPMENT A. See drawings for heating equipment and notes. a. The equipment must comply with the requirements of LEED Credit EA 6.1 and EA 6.3 for very high efficiency HVAC equipment. B. Provide ventilation system, review location with architect before installation. C. Provide Heat Recovery Ventilator. 23 73 00 Indoor Central Station Air Handling Units C. Exhaust Air Valves 1. Install Zehnder Comfosystems Exhaust Air Mushroom Valve D. Supply Air Valves 1. Install Zehnder Comfosystems Supply Air Mushroom Valve E. Provide air handling valves and documentation that contributes to the following LEED credits: 1. Regional Materials, MR Credit 2.2. Manufacture and distribute air handling units within 500 miles of the project address. 23 72 00 AIR to AIR ENERGY RECOVERY EQUIPMENT a. See drawings for equipment and notes

A709
SPECIFICATIONS
Construction Documents Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by:HB - DJ Date: 05/04/2011

ITASCA FACULTY CABIN

23 00 GENERAL NOTES A. Plumbing and heating shall consist of a complete system including the service connections, drain waste, vent lines, hot and cold water lines, hookup of hot water heater, all excavation and backfill required and the installation of all fixtures and appliances. The system shall meet the requirements of the State Board of Health and any local Codes and Regulations. Remove all existing pipes, ducts, radiators and other plumbing and mechanical system components and provide all new. B. MECHANICAL SYSTEM ZONING & EQUIPMENT 1. See drawings for mechanical equipment and notes. C. See drawings for list of mechanical equipment. D. The space heating equipment must be designed with closed combustion to meet the requirements of LEED Credit EQ 2.1 E. The installation methods described in this specification as well as illustrated in the drawings complies with LEED Credits EA 5.1 and EA 5.3. F. No Refrigerants shall be used in any systems to comply with LEED Credits EA 11.1 and EA 11.2.

E. Use the Nailor Flow Measuring Station model: 36FMS to test the average airflow of round ducts. Adjust and fix the airflow of the ducts as required to comply with manufactures recommended airflow range. F. Use the The Energy Conservatory Exhaust Fan Flow Meter with DG 700 Pressure and Flow Gauge to test the exhaust devices. Adjust and fix the airflow as required to provide a balanced system. G. Kitchen and mechanical space to exhaust locally per ASHRAE 62.2 standard. Provide switch off timers on exhaust fans. Outdoor air intake should be 6 distant from exhaust systems in the house. See drawings. 1. Complies with LEED Credit 5.2. H. All exterior wall penetrations for air intakes and venting and utility connections must be discussed and located carefully with the Architect's review and approval. I. The ventilation system shall continuously ventilate to comply with LEED Credit 4.1. J. Upon completion of construction, a third party performance test will be conducted to comply with LEED Credit EQ 4.3, and EQ 5.3 K. Install sir filters that are >MERV 13 to comply with LEED Credit 7.3.

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

25 15 16 WALL SENSORS and DATA LOGGER A. Provide temperature and moisture monitoring sensors in the following locations: a. Install (1) in wall sensor in each wall (N, E, S, and W) b. Install (1) sensor on loft level c. Install (1) sensor on main level d. Verify locations with Architect before installation B. Provide data logger to gather information from sensors as well as water, electricity, and LPG consumption. The data shall be accessible from an online control interface. DIVISION 26 ELECTRICAL 26.0 GENERAL NOTES A. Electrical work shall consist of a complete wiring system including services, meter loop, panel board, outlets, wall switches, and installation of lighting fixtures, appliances, fans and like accessories. Remove all existing wiring and electrical components and provide all new system. B. The entire installation shall be in strict accordance with the latest rules and regulations of the National Board of Fire Underwriters, the National Electric Codes, and all local rules, codes, and regulations. The Contractor shall pay all inspection fees, if any, and deliver certificates of completion and inspection to the Owner. Materials shall have Underwriters Laboratories label. C. Voltage drop shall not exceed 3% from the main panel board to any outlet under maximum load. D. The Contractor shall install all facilities for underground services as directed by the Utility Company. The Contractor shall pay the cost of such services charged for the installation by the Utility Company or arrange to pay this fee through the client. Meter socket shall be box type, heavy duty. E. Panel boards mounted on exterior walls shall be rain tight. The main breaker, 200 Ampere type with circuit breaker protection, shall be circuited according to local requirements. F. Locations and models of specific lighting fixtures shall be verified by Owner and Architect prior to installation. G. Electrical Contractor to review all fixture, switch and outlet locations with Owner before installation. H. Bonding screws shall be removed from the neutral bus of all subpanels per manufacturer's instructions. J. It is the responsibility of the electrical contractor to locate and eliminate net current. K. Refrigerator and microwave (and any other appliances that need it) shall be on a dedicated circuit. L. All utilities (gas & water) shall enter the building on the East side at the mechanical room exterior wall and shall be located in close proximity to each other and neatly composed on the wall surface. Locations should be reviewed with architect before installation. 26 05 13 MEDIUM VOLTAGE CABLES A. Wiring to be copper, 3 wire, with ground. Switch upper receptacles where appropriate. Verify specific locations with Owner. B. The ganging of neutral wires from different branch circuits is prohibited. C. Edison circuits are prohibited. 26 05 33.16 BOXES FOR ELECTRICAL SYSTEM OUTLETS: A. See Electrical drawings. B. All wall and floor receptacles to be flush mount.

C. Provide outlets to code, including ground fault outlets at bath and kitchen. 26 05 33.23 SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS A. Install raceway along south and west wall within the void between the window and the clearstory windows a. Carlon electrical non metallic tubing b. Provide electric raceway tubing and documentation that contributes to the following LEED credits: i. Regional Materials, MR Credit 2.2. Manufacture and distribute Electrical raceway tubing within 500 miles of the project address 26 09 23 LIGHTING CONTROL DEVICES A. Review numbers and locations of dimmers, 2 way & 3 way switches with owner and architect. See drawings. B. Wall switches shall be located as per plan and located 4' 0 o.c. above the finished floor. Where more than one switch occurs at the same location, they shall be ganged in one plate. White electrical and switch plates shall be used unless otherwise specified by Owner. C. Use the following manufacturer or approved equal: Leviton D. Provide electrical outlets, covers, documentation that contributes to the following LEED credits: 1. Regional Materials, MR Credit 2.2. Manufacture and distribute Electrical outlets and covers within 500 miles of the project address. 26 24 00 SWITCHBOARDS AND PANELBOARDS A. Configure panels and subpanels to cancel hot and neutral fields. B. Following panels are acceptable: Siemens EQIII, standard load center electrical panel, subpanels with split neutral. C. Hot and neutral wires from the same run to be installed adjacent to one another. D. Wire lengths shall be equal. 26 50 00 LIGHTING A. For all information regarding fixture, bulb, switching location, number and types please refer to plans. B. Locations and models of specific lighting fixtures shall be verified by Owner and Architect on site prior to installation. C. 80% of lamps must be ENERGY STAR CFLs to comply with LEED Credit EA 8.3. DIVISION 28 ELECTRONIC SAFETY & SECURITY 28 30 00 ELECTRONIC DETECTION AND ALARM A. See drawings for locations & types. B. Provide smoke detectors per Code requirements (313.2.1). Smoke and carbon monoxide detectors should be provided hardwired with battery backup. Provide interconnected smoke detectors in every

A710
SPECIFICATIONS
Construction Documents Design Development

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by:HB - DJ Date: 05/04/2011

ITASCA FACULTY CABIN

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.

sleeping area, outside of sleeping area and at every level. Carbon Monoxide detectors shall be provided within 10' of each sleeping area, as well as in the kitchen on the first floor. 1. Installation of the carbon monoxide detectors complies with the requirements of LEED credit EQ 2.1. DIVISION 31 EARTHWORK

31 12 00 SELECTIVE CLEARING 31 13 00 SELECTIVE TREE & SHRUB REMOVAL & TRIMMING 31 14 00 EARTH STRIPPING & STOCKPILING 31 22 00 GRADING A. Grade site for positive drainage. . 31 23 00 EXCAVATION & FILL

b. Surface Water Management SS Credit 4.2 Permanent Erosion Controls, by planting trees, shrubs, and groundcover c. Surface Water Management SS Credit 4.1Permeable Lot by providing for the following percentages of ground cover: i. 10% Vegetative Landscaping ii. 10% permeable Paving iii. 80% Impermeable Surfaces directed to infiltration features d. Regional Materials MR Credit 2.2. All paving and groundcover materials located within 500 Miles of project site e. SS Credit 3 reduce local heat island effects by locating tress and planting to provide shade for 50% of the hardscape 32 84 00 PLANTING IRRIGATION A. No built in irrigation systems shall be used for site plantings. All installed plants shall not require long term irrigation. B. The prior instruction complies with the LEED Credit SS 2.5, and Credit WE 2.3. 32 91 00 PLANTING PREPARATION A. Site planting preparation shall be specified by Owner. B. For Platinum Certification comply with and provide documentation for the following LEED credits: 1. SS Credit 2.1 No invasive plants will be introduced into the site environment 2. SS Credit 2.2 Add mulch or soil amendments as appropriate, and all compacted soil must be tilled to six inches. 3. SS Credit 2.4 All plantings must be drought tolerant 4. SS Credit 5, Install landscaping so that mature plants are 24 from home. 32 92 00 TURF & GRASSES A. Turf Grass surrounding proposed building shall be specified by Owner. It shall with stand heavy foot traffic, be maintenance free and shall not require long term irrigation. B. For Platinum Certification comply with and provide documentation for the following LEED credits: 1. Landscaping SS Credit 2.1: All new grasses must be Native or Adapted plants which are indigenous to the locality or cultivars of native plants that are adapted to the local climate and are not considered invasive species or noxious weeds. 2. Regional Materials MR Credit 2.2. Plant material and Nursery located within 500 miles of the project site. 3. SS Credit 2.1 Any turf must be drought tolerant, do not turf in densely shaded area, and do not turf areas that have a slope greater than 25%. 4. SS Credit 2.3 Limit the use of conventional turf in the designed landscape by 100%. 32 93 00 PLANTS A. Any new plants or trees installed at the proposed building site shall be specified by Owner and approved by the Architect. The plants shall not require long term irrigation and shall require the least possible amount of maintenance. B. For Platnium Certification comply with the following LEED credits: 1. Landscaping SS Credit 2.4 Drought Tolerant Plants: 50% of installed plants must be classified as being drought tolerant, that is plants that do not require regular watering. 2. Reduce Local Heat Island Effects SS Credit 3 by locating trees and plantings to provide shade for 50% of hardscapes.

31 35 00 SLOPE PROTECTION 31 36 00 GABIONS A. Shall be 16 x 4 x 8 galvanized welded wire fabric (See section 03 22 20) filled with local rock material with diameter size 1 to 3. B. Tie gabion blocks together and to wood furring with galvanized wire. C. Provide material, installation, and documentation that complies to the following LEED credits: 1. Environmentally Preferable Products MR Credit 2.2. Materials and supplies located within 500 miles of the project site. DIVISION 32 EXTERIOR IMPROVEMENTS 32 15 00 AGGREGATE SURFACING. A. See allowance for finished aggregate, section 01 21 00. B. Any new groundwork and surfacing installed at the proposed building site shall be specified by Owner and approved by the Architect. C. For Platinum Certification comply with the following LEED Credits: a. Surface Water Management SS Credit 4.3 Management of Runoff from Roof by installing permanent stormwater controls to manage runoff from the home. This point can be combined with the rainwater harvesting system installed.

A711
SPECIFICATIONS
Construction Documents Design Development

3. Regional Materials MR Credit 2.2. Plant material and Nursery located within 500 miles of the project site.

North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011

Drawn by:HB - DJ Date: 05/04/2011

ITASCA FACULTY CABIN

31 25 00 EROSION & SEDIMENTATION CONTROLS A. During Construction the following erosion controls with be followed to comply with LEED Credit SS 1.1: a. Stock pile and protect disturbed topsoil from erosion b. Control path and run off with slit fencing or equivalent c. Protect sewer inlets, streams, and lakes with straw bales, slit fencing, etc d. Provide swales to divert surface water from hillsides e. Use tiers, erosion blankets, compost blankets, etc on sloped areas

NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice.