You are on page 1of 2
JOB SAFETY ANALYSIS WORKSHEET all J las Gp z= Werk location: :J= iy-TP15 —TP18. Excavation & Assembling of the pipes sJeall cheng JSANo.:12 ralabhall plas gdyat oly Job Team teader: Saad Rahima :Jai 4 Jsim| Department: AFMithkal :ai memes a/a01 6 oe Sub-Tasks Potential Hazards Control Measures pombe ia dead cigs ‘eal ja sah dg ea ‘© = Make sure all workers have full PPE, ~ Ensure excavator operator will follow signals of flag maw/PIC = Make sure stir on ste. Sia feel niu) S aeasay (resauaes Complete excavate the trench | © para piel row © Prepare a fire extinguisher in the work site. oe cee d i as on design, Seal ee ain Checklist and Inspect equipment prior to use we Ecaaee @ “Make sure flag man on site Barricade on one sides of the trench 10 avoid dex unnecessary workers to entry. of, - Put a warning bar on both sides of the trench, Mae a = Ensure excavator operator will follow signals of 0) flag mawvPIC. 2- Personnel /Machines entry & © Inspect machines prior to use. SOE exit the site @) Personal injury Drive at limited speed ee Saad: © Follow the FOD Confined Space Entry Procedure. ie eh ‘The rubber gaskets installer and | @ Confined space conditions | (confined space rescue plan/gas standby person move into the | @ Personnel slip and fall into | __test/checklists/register) AL Mithkal trench, trench, © Barricade both sides of the trench, ae © Set stable safety entry & exit for operators = The rubber gaskets installer d Ni : , 03.0 clean and install the rubber | @ Personal injury (hand & : polt.o7 | Sea ae sere a © Make sure all operators have full PPE AL Mithical pipe in the trench, ‘© ensure rag man stand beside tne trencn and available to give signals to crane operator as well @ Personal hits (ones in rn TEX as to watch the operators in the trench. 5. The crane lifting and lower in trench) A s © Ensure both crane operator and operators in the | AL Mithkal e another pipe into trench. paras and pipes ete emU See aE © Lift the load carefully before proceeding, © Use tag line to control lower-in ‘© The standby person check installer’s condition ° cr eae vena frequently and let him take a break if necessary. 6. The installer move in the condition of installer. gaskets-installed pipe then © Uncertain atmosphere | ® Follow the FOD Confined Space Entry Procedure ena witness the assembling of two inside the pipe. (cor peace roecwe Pam gas i test/checklists/register) The efficient communication among, installer/standby person/signal man. pipes inside the pipe © Personal injury (when e assembling) (hand & head) © Prepare essential equipment for installer and standby person (torchilife line, etc.) AL Mithkal Prepare first aid pack on site 7. The installer moves out of the @ Installer is stuck and pipes from the opening side. cannot easily move out. | ISA Team Names hal datas coi JS tall 6L26% plaul sb) a mature (est) Saad Rahima HSE Zhao Men he. a RG Be New. Sami Pe set Hangs we ak MAR 02, en

You might also like