You are on page 1of 6
OUR HOMES REALTORS LLP Flat No. 409, Krishna Meadows, 8-3-33/K/1 to K/8, Srinagar Colony, Hyderabad, Telangana. - 500 073 LLPIN NO. AAM-9051 ‘WORK ORDER To 22.08.2022 UTRACON STRUCTURAL SYSTEMS PVT LTD. H.No-6-3-674/4/1/A,Durga Nagar Road Beside Joyalukkas Jewellery, Near Hyderabad Central Mall, Panjegutta, Hyderabad- 500082. Kind Attn: Mr. Kamala Kannan/Mr.AAR.Mahendiran Deer Sir, ‘Sub: Work Order for Post-Tensioning slabs for Vasavi Metropolis Residential Apartment at Uppal, Hyderabad. Ref: (1) your quotation USS/Q/22/1083/PT/RO finalized on 17.08.2022 with Mr.N.Ramesh Babu (V.P-Business Development &Technical Support). Further to the discussion we had with you, we would like to place the following Work order confirming the work of Post Tensioning for Vasavi Metropolis Residential Apartments At Uppal, Hyderabad. 1. Basis of this Work Order ‘This work order is based on your Post Tensioning Bonded System, the drawings issued, and the further discussions we had with you. 2. Scope of work Your scope includes supply of P.T.Components (HT Strand Anchorage, wedges and ducts) installation, stressing, grouting and production of shop drawings of Post Tensioning works and getting approval from Structural Consultant and execution of works under our supervision. Price The Price as per Annexure | attached herewith. Page 1 of 6 VASAVI GROUP Responsibility of Main contractor/Owner (to be provided at free of cost) * The platform required for PT works, safety ladder etc as required ,supply fabrication and fixing of anti spalling and bursting reinforcements (as per Utracon drawings) shall be Provided by us/Main contractor. Electricity, water and cement required for the grouting and cover blocks for Tendon supports shall be provided to you at free of cost. * Duration: The Duration of the project shall be 6 months from the date of work order. * UTRACON shall have to co ordinate and work with Main Contractor’s/Owners Schedule & Programme, Responsibilities of Utracon (PT Works ‘* Submission and getting approval of shop drawings for Post Tensioning related works only. ‘© Delivery of spe list Post Tensioning materials. (1) HTStrand, Anchorages with castings and wedges. (2) Galvanized corrugated sheets. * Providing all necessary equipment to carry the Post Tensioning works * Mobilization and Demobiliz of PT equipment and materials. Providing experienced and specialized Post Tensioning engineers and technicians. ‘+ Laying, stressing and grouting of PT cables as per the Utracon shop drawings © Preparation of as built drawings Placing of tender support bars as per Utracon drawings and Utracon’s Supervision Supervision and due clearance for Pre & Post Concreting, Shuttering and De-shutteri ‘© Integration with Main Contractor's /owner’s Schedule & Programme Page 2 of 6 §. Terms of Payment. Our terms of payment will be as follows: Upon Award of Contracts ~ 5 % on Contracts Value. Upon Delivery of Materials at site -70% on Contracts Value, Upon completion of Concreting -10% on Contracts Value Upon Completion of Stressing work -10% on Contracts Value. Upon Completion of Grouting -5% on Contracts Value. ‘Z.nsurance: + UTRACON has to arrange their own insurance for men, material, and equipment. ‘+ UTRACON insurance shall cover Post-Tensioning related works on site. Please liaise with our Structural consultants for submission of shop drawings and release of ‘approved drawings to site and arrange for mobilization of manpower and materials as per our Project Manager's instruction, 8, ALLOWABLE WASTAGES: Allowable Wastages for the Employer supplied materials shall be: i) Cement - &% S.SUBMITTALS: The Following documents mentioned (Ref to LO!) will become part ofthis work order. a, Baseline Schedule of the project Program for the Works Site Organization Chart (required professional experienced with Aluminium Formwork) Site Logistic Plan Overall Equipment list Insurance policies je, Workmen's compensation insurance and other suitable insurance policies as per tender conditions. Resources (Man, material & machinery] Mobilization Schedule. Project Execution Plan & Invoicing Schedule, Project Quality Plan Jk Project Safety Plan k, Site Security personnel and the plan |. Cash flow chart for the project Any statutory requirement/obligation not limited to the above sad items has to be fulfilled by the Contractor 3 :10.RA BILL SUBMISSION AND PAYMENT: n. Contractor shall submit one RA Bill per month along with reconciliation of Employer supplied materials. Page 3 of 6 © RA Bill shall be submitted along with complete necessary document as per Engineer in charge. 70% Adhoc payment will be made in 7 Days after necessary deductions and the balance in 15 days from the date of certification of bills. P. Bill certification is deemed to complete if contractor has submitted all required documents for bill certification, ALLFINAL BILL AND PAYMENT: 4 Contractor shall submit the final bil after closure ofall scope of works including snag list Points and rectfications to the satisfaction of Engineer in charge. Payment shall be done 30 days from the submission of final bill with all necessary documents as instructed by Engineer in charge. 112. RETENTION MONEY: 5% amount of retention money shall be deducted from each RA Bill and 2.5% shall be released on handing over and balance 2.5 % shal be released after defects liability period of 12 Months. Best Sa ‘Accepted By For Utracon Structural system Itd ‘Authorized Signatory Name & Sign Page 4 of 6 ANNEXU Date 17.08.2022 Option: PT Beams USSONMS-CFP-003, REV:0, Dedstst Mar’ 2017, PAGE 10F2 uote ref uss/a/22/1083/PT/RO Project Name Residential Apartments At Uppal, Hyderabad. ‘Storey Location ity (exy/sam) | (KN/Sam) Loading SL Floors PT Oty Approx. (aty in Mit) Pirate | TotalAmount (Rs) ‘As Per Structural Consultant Drawings 177 Floor No Of PT Beams: 26 No's 5s 7,97,500 No OF PT Beams:26 No’s GST 18% 5.5. MT 7,897,500 1,43,550 Grand Total 941,050 HT strand landed cost is considered at Rs.65,000/MT(Including Transportation, loading and unloading at site, Excluding GST). If any rate Variation for HT strand either + or~ 5% shall be in contractors scope and beyond will be paid or deducted accordingly. 11. The Price is Valid for the loading and its respective areas as mentioned in Annexure | 2. If any additional PT beams in place of RCC beams, Higher Loading slabs like podium, Landscaping, Fire tender access path, Transfer Girders and cantilever slabs are to be. designed and executed as per the final design requirement, PT price will be revised mutually. 3. The PT quantities are based on the Tender proposal drawings attached herewith and may vary as per final GFC drgs at execution stage. PT price will be revised mutually in case. of any variation in loadings, layout plan & sizes. Mode of measurement: Measurement shall be taken from Anchorage to Anchorage with Profile Length 2%tstressing length (0.5m for single end&1.0m for double end). (Unit weight of Ht strand as per MTC Report). Page Sof 6 SCOPE OF WORKS ITEMS DESCRIPTION OF WORK SCOPE BY 1 ‘Supply of High Tensile Steel (15.2 mm dia Strand) Utracon d 2 Feed ‘Anchorages, GI Ducts, Wedges Utracon 4 __| Stressing of Tendons with Utracon’s equipment’s Utracon 6 Providing required Qualified Engineers, Technicians & Utracon oma —. 8 Supply and fabrication of Bursting Links Main contractor/Owner 10 | Fixing of Tendon supports a 7 Utracon 12 Filling of Recess pockets left out for stressing Main contractor/Owner ca | dawnt arses TSO | cate vs [Ramp anions wane | wan cnraeome Lifting & Shifting arrangements for materials & equipments Main contractor/Owner ‘Accepted By For Utracon Structural system Itd Authorized Signatory Name & Sign Page 6 of 6

You might also like