“First Loss eC |
CSOT eT"
Renewable Energy ProjectsThe Scheme
IREDA “Innovative debt fund” & “First Loss Guarantee” scheme for Off Grid Renewable Energy
Projects with partial risk coverage to Banks/ Fis.
Background
‘An innovative concessional fund USD 100 mn is being set up with the debt contribution of USD 70
mn through IREDA/ Other Fis/ Multilateral / Bilateral Agencies and other investors and grant of USD
30 mn through Green Climate Fund (GCF). IREDA/ Fund Manager to provide a combination of
concessional debt fund and also partial risk cover towards “First Loss Guarantee” to Banks/ Fis
against payment default by end consumers i.e. Off Grid Companies.
ram
[ IREDA/Other Fis/ | ra ee
Multi/Bi-lateral_ >» | Off-grid
Institutions Energy
Innovative Companies
Debt Fund
——
Other Investors. ————> >
s “eal
poo First Loss Lends
ree Capital
eg (pues nr)Eligibility
The fund will be accessible to all Fls / Banks in India for all off grid renewable energy systems that
meet the objective of enabling energy access, including solar products, solar home systems, off grid
solar micro grids and solar based agricultural equipment in rural areas. In urban areas, residential
‘commercial and industrial rooftop solar systems are eligible to avail the facility.
Broad Terms & Conditions (Tentative)
1. Forconcessional Debt
Loan Amount
Promoters Contribution
Interest Rate
Loan Tenure
up to 70% of the total project cost
| Minimum 30% of the total project cost.
10.00 % - 11 %
5 ~7 years
|_Implementation Period
[ Moratorium
6 -12 months
3 months
2. Risk Coverage / Fees
upto 25% of loan o/s
@ 05% pa. of the risk cover of upto 10% of
loan o/s. and 1% in case of risk cover upto
20% of loan o/s. and 1.5% pa. in case of
25% risk cover.
All other "Terms and Conditions” as per IREDA's Financing Norms.Ss
S/ISC
SO/
Indian Renewable Energy Development Agency Limited
(A Govt. of India Enterprise)
‘A Mini Ratna PSU under Ministry of New and Renewable Energy
Core 4 A, 2nd Floor, India Habitat Centre, Lodhi Road,
New Delhi - 110003
wwewireda.govin