You are on page 1of 1

PRACTICE

Read the job posting. Then, mark the following statements as true (T)
or false (F).
1. _v__ Civil engineers help contractors make construction bids.
2. _v__ Candidates must have knowledge of building code standards.
3. __f_ Candidates need to have real estate experience.

Fill in the blanks with the correct words or phrases from the word
bank.
Contract walk-through crew bid phase break ground framing
1. The contractor submitted a low ____bid______ for the job.
2. Civil engineers do a ___Walk Through_______ two days before closing on
a property.
3. Sam rented twelve bulldozers to ____break ground______ on the new
gated community.
4. In the final ___phase_______ of the renovation, Christine selected paint
colors and new fixtures.
5. The builder signed a ___contract_______ to do three projects over three
years.
6. Michael hired his own construction _____crew_____ of six men.
7. Various types of lumber, including pine, spruce and fir, are used in
_________framing_.

You might also like