In this phase, database structures are populated with data, equipment is purchased and
installed, employees are trained, and the system is documented.
This phase concludes with the roll-out of the new system and the termination of the old system
The process of converting from the old system to the new one is called the cutover.
A system cutover will usually follow one of three approaches:
- cold turkey,
- phased, or
- parallel operation.
E. Postimplementation Review
The final step in the implementation phase takes place some months later in a
postimplementation review.
The objective is to measure the system's success and the process after the dust has settled.