1. This document is a general arrangement drawing for a pontoon bridge.
2. It shows the layout of various components including an HDPE pipe, cable tray, and floating cube at specified dimensions.
3. The drawing also includes identifying information for the project such as the customer, date, revision number, and page number.
1. This document is a general arrangement drawing for a pontoon bridge.
2. It shows the layout of various components including an HDPE pipe, cable tray, and floating cube at specified dimensions.
3. The drawing also includes identifying information for the project such as the customer, date, revision number, and page number.
1. This document is a general arrangement drawing for a pontoon bridge.
2. It shows the layout of various components including an HDPE pipe, cable tray, and floating cube at specified dimensions.
3. The drawing also includes identifying information for the project such as the customer, date, revision number, and page number.
NOTE: ALL DIMENSION ARE IN mm, UNLESS OTHERWISE STATED
A A
B B
2000 1500
C HDPE PIPE 10" CABLE TRAY
C FLOATING CUBE
1500 30000
TITTLE GENERAL ARRANGEMENT DRAWING ORDER NO -
CONTRACT NO - JOB SECTION PONTOON BRIDGE TAG NO -
PT BUMI CAHAYA UNGGUL
D BCU Jl. Rawa Kepiting No. 3,Kawasan Industri Pulogadung,Rawa Terate-Cakung,Jakarta Timur, DKI Jakarta 13920-INDONESIA;Phone:021-2955 84 00, Fax:021-29 5584 99, E-mail: info@bcupt.id D CUSTOMER PT MAKMUR SEJAHTERA WISESA DRAWN BY JN 07.09.18 PROJECT - CHECKED BY YW END USER - APROVED BY YW REVISION NO: REVISION DATE: DRAWING STATUS: DRAWING NO: SCALE: PAGE: 0 07.09.18 FOR APPROVAL 2H0410-03-A-U-01 N/A 1 of 1