You are on page 1of 2
Flashing 2) Weep [0les A) Precasy sienie Coping 3) Horizontal ranforcing — ) Annchoviag sysdenn NDT oa ces 3)Vopor Sarniew DMosonry, Buick Vencev oe UW Testing Joints a) Matevial of roof membwanc “In preparation for this exercise, you should review pages 664 through 675 of the text. 1. The drawing below represents a concrete masonry wall supporting a precast concrete hollow-core plank roof deck and concrete masonry parapet. Complete this detail by drawing and labeling all of the components needed to finish the roof and parapet. Refer to “Base flashing and parapet coping” in the lecture note. Use a protected membrane roof as illustrated in the upper portion of Figure 16.13 of the text, using 2 inches insulation boards. 1 square = 2" Anchor red w] holt in voof slab Sidind ov o' Sona c Finish Lori 20 Dowel, os pev specs Concrete topping 1 Holtow cove e : Precast slay Texas verbo! reaar 2 2. A building separation joint in the roof structure of this building is shown below. Draw and label the roofing components at this joint. Refer to “Curb flashing at building expansion joint” in the lecture note. Use 2x 12s for the curbs. See Figure 16.27. Wood plates have already been attached to the concrete with powder-driven fasteners to start the detail for you. 1 square = 2" LAL wy ASO mm wide asbestos cement — Flot sheets, Aluminium plate. mila steel Liene, Tee. he ot Sintlay traktals La.

You might also like