Professional Documents
Culture Documents
PROJECT PROPOSAL
Contents
INTRODUCTION ............................................................................................................................................. 2
COMPANY PROFILE ................................................................................................................................... 2
PURPOSE, VISION, PRODUCTS AND SERVICES OFFERED BY RHEC ............................................................ 2
ORGANISATIONAL STRUCTURE ................................................................................................................. 2
TECHNICAL .................................................................................................................................................... 2
PROBLEM STATEMENT.............................................................................................................................. 3
PURPOSE OF PROJECT ............................................................................................................................... 3
PROPOSAL SOLUTIONS ............................................................................................................................. 3
BENEFITS TO CUSTOMER .......................................................................................................................... 4
MANAGEMENT.............................................................................................................................................. 4
MAJOR TASKS AND DELIVERABLES ........................................................................................................... 4
EQUIPMENT AND FACILITIES..................................................................................................................... 4
PROJECT SCHEDULES AND RESPONSIBILITY ASSIGNMENT MATRIX (RAM) .............................................. 5
COST .............................................................................................................................................................. 6
REFFRENCES .................................................................................................................................................. 8
INTRODUCTION
COMPANY PROFILE
The company is called Ray’s Health and Engineering Consultants (RHEC). It is a large group of
employees that was started in January 2018 by the CEO, Mr. Sim Ross. RHEC has its
headquarters in Pretoria CBD, Gauteng but has three other branches in Durban, Cape Town, and
Mpumalanga.
Since its formation in 2018, they have worked with close to ten companies, delivering all the
requirements in time. The vision of REHC is to help create proper Health Management Systems
of those huge companies that employee a lot of people by 2030.
ORGANISATIONAL STRUCTURE
The company has its CEO and founder, Mr. Sim Ross who is also a medical practitioner; the
accountant, Ms. Charl Ruqa and the manager and co-founder, Ms. Vee Ruth. All the branches of
REHC are divided into two departments. The first department has the Health Consultants and it
mostly employees medical professionals and health personnels. The second department has the
Engineering Consultants and mostly engineering professionals are employed in this section. Each
of these departments has a Head of Department (HOD), a Human Resources Manager (HR) and
a Departmental Manager (DM).
TECHNICAL
PROBLEM STATEMENT
Transnet is looking to appoint a qualified and competent Service Provider such as REHC to
achieve the provision of employee health management system (EHMS) foe a period of three
years. The Service Provider is to build a cloud-based system that can be used across Transnet
which should be able to deliver comprehensive accurate employee health status.
Transnet expects the Service Provider to be able to supply a centralized system that will be used
by 47 Transnet Clinics which provide health care service to about 50000 Transnet employees.
The Service Provider is supposed to provide support maintenance of the installed system for the
duration of the contract.
PURPOSE OF PROJECT
The purpose of this EHMS is to help with the tracing of medical health statuses of all Transnet
employees to be able to determine if or not they are suitable for the type od task appointed. The
project also aims to help with managing compliance to all the Occupational Health Regulations,
National Health Act and POPIA.
PROPOSAL SOLUTIONS
The following concept diagram to be followed was provided in the RFP from Transnet.
The first thing to do is the collection of information about all the Transnet employees that seek
services at each of the 47 clinics. This collection of data is to be done by the scrum master and
the assistants but to be done in one month of starting the project. The second step in completing
this project is to design the EHMS as an application that will hold a collection of services. This
stage of designing is to be handled by the Solution architect and his team. For the data to find a
good home in the cloud, the first and second developers are to decouple the data from the
application. The technical assistant and his team of three developers will then have to make sure
that the application to be designed optimizes communications between application components.
The solution architect will then have to model and design this application for performance and
scaling. Finally, the security system within the application should be created and tested by the
three developers. This Employee Health Management system is to be named the ‘EHMS’
application. (Linthicum, 2022)
The project manager and consultant will then review this EHMS application and create a
handover plan with the Transnet representative after seven-eight months.
BENEFITS TO CUSTOMER
The customer that will benefit from this project is Transnet. This EHMS will help them keep a
record of their employees’ health status. This project will help the Transnet employees to seek
medical assistance where necessary and in time.
MANAGEMENT
COST
The following cost analysis summary includes the labor, materials, documentation, overhead,
escalation cost which all fall under Supply and installation of the EHMS. The summary structure
is per requirements in the RFP provided by Transnet.
REFFRENCES
Linthicum, D., 2022. 5 steps to build s cloud-ready application architecture. [online] TechBeacon.com.
Available at: <https://techbeacon.com/enterprise-it/5-steps-building-cloud-ready-application-
architecture?amp> [Accessed 21 August 2022].