Security Post
Positioned at location near machinery and
personnel entrance
Sheltered and covered with direct sunlight
Adequate chair and table for security personnel
Well ventilated
Personnel wear proper uniform
PPE for visitor (minimum 3 set of safety hat,
reflective vest and safety boots)
Rest Area / Green Zone
Isolation / Cordon off from red zone (work area)
Green Zone set up on even and firm ground
Adequate shelter with chair and table for workers
Functioning water dispenser with adequate water
supply
Clean with specific rubbish bin for glass, plastic,
paper and domestic waste
Minimum 2 functioning fire extinguisher
12 Life Saving Rules poster displayed
Separate sanitary services for men and women
3
Date Issued: 4 September 2020
HSE-CHECKLIST-SA-REV00
Electrical Safety
Notified generator set with DOE
Generator set provided drip tray
Adequate earthing
Generator set isolated with hard barricade
Generator idling in normal condition
Carbon emission is contained with exhaust filter
Signage of electrical warning and authorised
personnel displayed
Designated personnel installing DB Board
Circuit breaker installed
Wire secured with cable tight
Cable extension weatherproof IP68
All wire hangs above head level >2m
Electrical danger signage displayed at all DB
board
Machinery
Lifting Activity (Mobile, Crawler)
WCF, Permit, JHA, Lifting Plan
Valid certificate of fitness (PMA)
Operator Competency
Lifting Supervisor
Signalman and banksman
Machinery guarding
Machinery daily inspection record and tagging
Hoisting appliances daily inspection record and
tagging
Lifting Warning Signage
Maintenance and inspection record (logbook)
Operator health declaration
Pressure Vessel (FMA Sect 19)
Valid certificate of fitness (PMT)
Machinery cordon / barricade
Machinery daily inspection and tagging
Lanyard at every hose connection
Maintenance and inspection record (logbook)
Forklift / Bobcat
Machinery daily inspection and tagging
Maintenance and inspection record (logbook)
Operator Competency
Operator health declaration
4
Date Issued: 4 September 2020
HSE-CHECKLIST-SA-REV00
5
Date Issued: 4 September 2020
HSE-CHECKLIST-SA-REV00
6
Date Issued: 4 September 2020
HSE-CHECKLIST-SA-REV00
Confined Space
WCF, Permit, JHA, Health declaration
Competent Personnel (AESP & AGTES)
Approval to enter work area from PIC
Pre task briefing conducted
Emergency evacuation briefed
Emergency safety appliances installed (tripod
stand, SCBA, First Aid, Fire Extinguisher & etc.)
Confined space warning signage displayed
Gas tester functioning with bump test conducted
Continuous gas test conducted and recorded
Adequate ventilation system
All electronic appliances examined to avoid fire
ignition
Communication devices tested before entering
Lock out Tag out system implemented when
entering confined space
Standing supervision by Entrance Supervisor
Lock Out Tag Out Test Out (LOTOTO)
WCF, Permit, JHA
Water, air pressure / electrical entrance identified
Isolation to 1 entry point to pressure / electrical
area
LOTOTO sign visible after turning off supply
End supply tested for double confirmation
Excessive product contained and disposed if
required
Hot Work
WCF, Permit, JHA
Fire Extinguisher & Fire blanket
Hoses and welding kit tested and functioning
Adequate earthing
Gas cylinder secured / chained tight with the
trolley
Gas cylinder placed >3m away from ignition
sources
Flashback arrestor installed
Regulator, hose, torch inspected to prevent leak
(soap test)
Ventilation prepared to remove fume
Vapour barrier installed (hazardous area)
Continuous gas testing conducted and recorded
Additional PPE Required prepared (Face mask,
welding glasses, leather glove, welding jacket /
apron & etc.)
7
Date Issued: 4 September 2020
HSE-CHECKLIST-SA-REV00
Working at Height
Suitable PPE (Body harness)
Safe working platform with edge protection
Provision of falling preventing and protection
Lifeline and anchorage PE design
WCF, Permit, JHA
Signage displayed
Safety, Health & Welfare
Adequate ingress and egress to work area without
obstruction
Safe access provided with overhead protection
cover
Adequate lighting
Safe ladder with handrail
Separate route for machinery and workers access
Adequate water and electrical supply to site
Unidentified water stagnant for potential mosquito
breeding
All floor opening is firm barricade with signage
All edge of work platform is firm barricade with
signage
Work area is free from construction waste and
debris
Available specific rubbish / dumping area for
construction waste and domestic waste
Traffic Management
Public Road
Approval from authority
Road closure and diversion checklist displayed
(based on JKR requirement)
Flagman trained and certified
Flagman provided whistle, full reflective PPE and
light baton / flag
Adequate reflective cone
Adequate blinker
Adequate signage
Site Traffic
Traffic route plan displayed at entrance
Designated access for vehicle
Flagman trained and certified
Speed limit signage displayed and visible
No vehicle left unattended
8
Date Issued: 4 September 2020
HSE-CHECKLIST-SA-REV00
● Any “X” recorded represents the potential breach of regulation or improvement needed and
details of nonconformity (NC) shall be recorded in the Remarks.
● The responsible personnel shall identify the root cause of NC and adopt appropriate
corrective/ preventive actions for mitigation. Confirmation of the effectiveness of the
corrective/ preventive actions shall be verified by contractor representative within an agreed
time.
Recommendation:
Inspected by:
Name Designation Signature Remark
Acknowledge by:
Name Designation Signature Remark
9
Date Issued: 4 September 2020
HSE-CHECKLIST-SA-REV00
10
Date Issued: 4 September 2020