You are on page 1of 7
Projek Jalan Ulu Skrang, Lubok Ant, Sarawak (Pasa 2) BILL NO. 3- SUNGAI AKUP BRIDGE obiasienasiates ; [Remo] ooaer Denon I a TC | F131 |xcaaic ts exh mail fom gel goon ole ma | 101 estes B_ | F1313 fccomteincart mae tom wig goundioe!erwing | = | ot frat | Fiat fescavatein exh mate m mi ground fer for ml] 1 arson ib p_ | F151 excasteincart materi commencing om rigial gone | ma | 196 eve for approached = | rise. fexeavateexsing road pavement os F | F1ss. fexcavacinrsety conte’ bantng commencing from eiginl] m3 | 200 round evel fo fomaton evel te ferm nani |Eilting, The elowing ites fr filing sal nid compaction, and aoa iting css by seems’ pecan to ondeying material 8 apis | F221 fosingsutabe excavate mera orang limits a er a3 | 460 speiteton oom embaahment Reet elude formation ech, [Landscaping ring eal dom to inclade Omen ck tops | rato [spor turing so tat areas and slope, Rate to ince peesng down | mz | 2.967 sh stakes, |CHOTECHNICAL WORK (ALL PROVISIONAL) cote and geogid re meassed nt, re to inlue fraps, iting, 2 1 | cans Poxroxosmroccsted gabon win PVConaedwice as pr | ma | 30 sesteston + | cama poxoszasmrcksie pion wi PVC-coated wie sper | ms | 5 svesieston x | 213 fronswoven gaterte Type as separator as perspeciteaion | m2] 105 [:aRTHt DRAIN (ALL PROVISIONAL L | quits [Escavatein cath nteal commencing fom exiting oma | m | 26 evel to cmbanken edn, at eect 1 3m M_ | ertt2 [Escaatein cath serial commencing tom exiting ground =| m | 1st ert to onside din, notexceting 150m PapeToa Cae Toca | ‘ta Stme tnt 17052023 a3 Projek Jalan Ulu Skrang, Lubok Antu, Sarawak (Faso 2) BILL NO, 4 -SUNGAI ENTABULUS BRIDGE FIs B | F321 F410 > | cui eB | oa F | a « | au a | oso 1 | q220 i ea [Excavate in ock by controlled blasting commencing fom original ground level to formation level to form Jembankment |The following items fr filling shall include compaction, |and additional filling necessitated by settlement or [penetration into underiying material as applicable. [Using suitable excavated material to grading limits as per [Specification to form embankaneat. Rate to include Formation of benches. Landscaping [Turfng shall deem to include 100mm thicle to sol Spot turfing to flat areas and slope. Rate to include pegging down with stakes | GEOTECHNICAL WORK (ALL PROVISIONAL) |Geocextle and seowrid are measured net, rate to inelude for laps, jointing, ete |Gabion 2.0 x 1.0 x 0.5m rock filled gabion wth PVC-coated wire Js pe specification .0 x 0.5 x 0.5m rock-filled yabion with PVC-coated wire as per specification }Non-woven geotextile Type I as separator as per specification |PARTH DRAIN (ALL PROVISIONAL) excavate in carth material commencing fem existing round level, to embankment te drain, wot exceeding 150m |SURFACE DRAIN (ALL PROVISIONAL) em for surface drains shall be deemed to include excavation, backfilling, lean concrete, reinforcement, formwork, cement jointing, shuttering, struts, weepholes and render smooth exposed surfaces Roadside drtin; reinforced concrete grade 25; 1000 mm side (internal) x S00 mm deep (minirnum) x 100mm thick |v-shape. [Bench and berm drains; reinforced concrete grade 20; 1250 mm wide x 300 mm deep (minimus) x 100 mm erick 8,000 ms | 4,600 mo | 3433 23 30 m3 5 m2] 106 a 4 m| a m | tos Rate Strep 1701203 Page Total Carried To Collection] 43 Projek Jalan Ulu Skrang, Lubok Antu Sarawak (Fast 2) BILL NO, 5 - SUNGAI BUAK BRIDGE Trem No, CodeNo. Description Unit [Qo [Rate | Amount (My [eine [The fllowing isms for filing shall inelude compaction, [and addtional filling necessitsted by setlement or Jpenetation nto underying material as applicable A | F321 fusing suitabie excavated material o grading limits as per | ma | 1,760 [Specification to form embankment. Rete to include formation of beaches idscaping [Turfing shall deem to include 100mm thick op soit 1B | F410 {spocrurting to Nat areas and slope Rate to include pegging} m2 | 3,259 [down with stakes | GEOTECHNICAL WORK (ALL PROVISIONAL) eocentite and geogrid are measured net, ate to include for laps, jini, ee |cabion © | Gaitt fpox1.0x0.smrocicfled gxbion with PVC-coated wire | m3 | 30 as per specification D_ | Gaitt 0x05: 0.smrockcfilled gabion wits PVC-coated wire | m3 5 Jesper spesification E | G213_ [Non-woven geotexile Type 1 a separator as per m2 | 106 specification [EARTH DRAIN (ALL PROVISIONAL) F | Q111t [Excavatein earth material commencing from existing m 3 ground level, to embankment toe dain, not exceeding 150m G | 1112 [excavate in eath material commencing fom existing m | 210 round teve, to roadside drain, not exceeding 10m | QUIL3 [excavate in earth material commencing from existing a 37 round level, to cascade dain, not exceeding 150m [ROAD worKs rade Preparation (Provisional) 1 | R110 Prepare, grade to fall and compact subgrade in earth m2} 633 sateral to receive road pavement |sub-Rase (Provisional Sub-basesball be deemed to include chamfer J | R221 [Granular material with 2 CBR value of more than 30, m2 | 599 |complying with Type B of Specification clause (4.1.2) in 300 mm thick. Page Total Carried To Collection) ‘Ue trang 17.05028 5B Proje Jalan Ula Skrang, Lubok Antu, Sarasiak (Fass 2) BILL NO. 6 SUNGAI MENGONG BRIDGE Code Ne. Deseripton Tait] 05 [Rate | Amount (Rvp Excavaten earth material rom original groundievel forwing | m3] 61 vat B | FI91.4 |Excavatein earth material from orginal round level for ma} 4 fransiton sib © | F131.6 [Excavat in earth material commencing from original ground | m3 | 168 evel for approach road Jeng [The flowing tems for filing sal include compaction, and sdeitionl filing necessitated by setiement or penetration into underlying material as applicable | Fa21_ fusing suitable excavated material to grading limits as per a3 | 2,026 Specification to form embankment, Rate to include formation o| benches. E | F222 _|Imperted suitable material fom Contractor's own source to fora] a3 | 7,504 Jermbarkment Rate to include formation of benches. |Landscaping [Turing shal deem t include 100mm thick ton sot F | F410. |spotturfing to at areas and slope. Rateto include pegging | m2 | 283, down with stakes | GEOTECHNICAL WORK (ALL PROVISIONAL |ccotestite and geogrid are measured net, rte to include for laps, jointing, ete |Gabion G | Gat1.t f20x1.0%0.5mrock-Ated gabion with PVC-conted wireas per] m3 | 30 specification | catit [20x05%0Smrockilled gahion with PVC-coated wire as per] m3 5 specification 1] 213 JNonwoven geoteile Type | as separator as per specification | m2 | 106 Page Total Carried To Collection) ase Bie 7.01205, “ Projek Jalan Ulu Skrang, Lubok Ant, Sarawak (Fasa 2) BILL NO. 7- SUNGATPENABUN BRIDGE Teem No Code No] Deseripti [Unit [Ou] Rate [Amount RM) A] Piss Jexcevateinrock by contolled lasting = | 3300 Jcommencing fram original ground level formation level to form enibaskment Jeiming Te following items for fling shall include Jcompaction, an addtional filing necessitated by seitement or penvtration into underlying |materal as applicabe. | F3211 fusing suitable excavated material to grading | m3 | 3,700 limits as pe Specification to form embankment Rate to include formation of benches. | F3212 |Using suitable excavated material to grading | m3 | 128 limits as per Specification to gabion wall D__ | F344 HImported granular free desining material as per | m3 | 1,184 Specification Landscaping [Turfing shall deem to include 100mm thick for soit | F410 |Spotturfing tofatarcasand slope. Rateto | m2 | 2,323 nctude pegging down with stakes | GEOTECHNICAL WORK (ALL |PROVISIONAL) |Geotextle and geogrid ate measured net, rate to include for laps, jointing, ete |einforced Gabion Wall F | Gan foxtoxosmroceriiedgrbion withPvC- | ma | 332 [poet wire as per specification G | 6580 }Reinfoccement geogrid Type 2 including m2 | 2030 lbodkin joint as per specitsation | 6213. fNonwoven gootentile Type 1 as separatoras | m2 | 410 pe specification ~—! Page Total Carried To Collection] (tsp ge BQ 17.03.2023 1” Proje Jalan Ulu Skrang, Lubok Antu, Sarawak (Fasa2) BILL NO, 8 - SUNGATMENIUAU BRIDGE TemNo,] Code No, a | pa Ba | rr co | rss > | Fao e | ou F | Gsso co | aus a | am 1 | ont i | aus [Eine [The fllowing items for filling shall inelude compaction, land addional filling necessitated by setlement or penetration into underlying material as applicable Using suitable excavated mesial to grading limits as por Specification to form embankment. Rate to inckade Formation of benches. imported earthfill from Contracter’s own source to gabion walt imported granular free draining material as per Specification [Landscaping ustng shall dem to include 100mm thick top soi [Spot turfing to fat areas end slope. Rate to include pegging [down with takes |GHOTECHNICAL WORK (ALL PROVISIONAI |Gcotextile and seogrid are measured nett, rate to include for laps, jointing, ete Reinforeed Gabion Wall [2.0.x 1.0 x 0.5m rock-flled gabion with PVC-coated wire as er specification Reinforcement geogrid Type 2 including bodkin joint as per specification ]Non-woven geotetile Type | as separator as per specification Icabion }2.0 x 1.0x 0.5m rock-flled gabion with PVC-costed wire as per specification 2.005 x 0.5m rock-filed gabon with PVC-coated wire as per specification Non-woven geotetile Type 1 a separator as per specification Tai 3 m3 ms m2 nS ey m2 oy 2,500 soz 1,399 205 30 5 106 Tate am @y asin Bike 12052025 88 Total Carried To Collection rojek Jalan Ulu Skrang, Lubok Ants, Sarawak (Fasa 2) BILL NO. 9 - SUNGAI PAYA BRIDGE Trem No] Code Description Oy [Rate | Amount a | FisL7 in earth material commencing from or 8 eround level for approach road B | F132 [excavate existing oad pavement m | 6 C | F133 fexcavate in rock by controlled blasting commencing } m3 | 200 om orginal ground level to formation level to form embankment ting The following items fr iling shal include compaction, and additonal fling necessitated by settlement or penetration into underlying material as noticable D | 321.1 JUsing suitable excavated material wo grading Limits as] m3 | 2,680 per Specification to form embankment. Rate to include formation of beaches EB | F3212 JUsing suitable excovated material to grading Himits as] m3] 6 per Specification to gabion wall F | F344 flmporied granular fre draining materi as per ms | so ISrecitication Landscaping urtng shall dem to include 100mm thick top soil G | F410. fpocturfing to Mat areas and slope. Rateto include | ma | 942 Jocaing down with takes |GEOTECHNICAL WORK (Al [pRovistoNar) Geotetie and peop are measured net, rate to include for laps, jointing, te forced Gabion Wall H | Gai fox10xosmrockfied gabion with PVC-costed| m3 | 181 vite as per spesifiation 1 | G80 [Reinforcement geogrid Type? including bodkin | m2 | 1,040 cnt as per specification |Gabion 4 | Gata f20x1.0x0.5mroctfiled gabion with PVC-coated| m3 | 30 wie as per specification | catia [2.0x05%x0.smrockeflleé gobion with PVC-coated | m3 ) vite as pr spesitication L_ | 6213 JNonwoven geotextile Type | as separators per | m2 | 106 epesification Page Total Carried To Collection ‘Uasem ie BQ 17082005 98

You might also like