PROGRAMACIÓN DE OBRA

PROYECTO: MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION DE LA I.E.I. N° 787 DE VILCALLAMAS ABAJO DEL DISTRI
CLIENTE: MUNICIPALIDAD DISTRITAL DE PISACOMA
UBICACION: VILCALLAMAS ABAJO
FECHA BASE: 2022-07-23
MONEDA: SOLES

Item Partida Duración


SP: ESTRUCTURAS 41
1 ESTRUCTURAS 41
1.1 TRABAJOS PRELIMINARES 1
1.1.1 TRANSPORTE DE EQUIPOS Y MATERIALES A OBRA 1
1.2 OBRAS PRELIMINARES 5
1.2.1 LIMPIEZA MANUAL DE TERRENO 4
1.2.2 TRAZO Y REPLANTEO DE EJES Y NIVELES 1
1.3 MOVIMIENTO DE TIERRAS 19
1.3.1 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 5
1.3.2 RELLENO MANUAL CON MATERIAL PROPIO 1
1.3.3 ACARREO DE MATERIAL PROCEDENTE DE EXCAVACIONES D=30M 4
1.3.4 ELIMINACION DE MATERIAL EXCEDENTE C/ESPONJAMIENTO, MANUAL (DI 4
1.4 OBRAS DE CONCRETO SIMPLE 9
1.4.1 CIMIENTO CORRIDO; CONCRETO C:H, 1:10 + 30% P.G. MAX. 8" 3
1.4.2 SOBRECIMIENTO DE CONCRETO F´C=175 KG/CM2 1
1.4.3 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 8
1.5 OBRAS DE CONCRETO ARMADO 40
1.5.1 COLUMNAS 18
1.5.1.1 CONCRETO F'C=210 KG/CM2 1
1.5.1.2 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS 11
1.5.1.3 ACERO CORRUGADO F´Y = 4200 KG/CM2 6
1.5.2 VIGAS DE CONFINAMIENTO 23
1.5.2.1 CONCRETO F'C=210 KG/CM2 1
1.5.2.2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONFINAMIENTO 5
1.5.2.3 ACERO CORRUGADO F´Y = 4200 KG/CM2 2
1.6 JUNTAS 3
1.6.1 JUNTA DE CONSTRUCCION 3
1.7 SEGURIDAD Y SALUD EN OBRA 12
1.7.1 EQUIPOS DE PROTECCION INDIVIDUAL 12
1.7.2 EQUIPOS DE PROTECCION COLECTIVO 1
SP: ARQUITECTURA 46
2 ARQUITECTURA 46
2.1 MUROS Y TABIQUES DE ALBAÑILERIA 13
2.1.1 MURO DE LADRILLO KK TIPO IV, CARAVISTA ASENTADO DE SOGA 13
2.2 REVOQUES, ENLUCIDOS Y MOLDURAS 19
2.2.1 TARRAJEO EN SOBRECIMIENTO CON MORTERO C:A 1:5, e=1.5 cm (CERC 6
2.2.2 TARRAJEO DE COLUMNAS E=1.5CM, MEZCLA 1:5 9
2.2.3 TARRAJEO DE VIGAS DE CONFINAMIENTO MEZ. C:A 1:5 e=1.5cm. 8
2.3 CARPINTERIA METALICA 1
2.3.1 PUERTA DE METAL PARA INGRESO PRINCIPAL 1
2.4 PINTURA 16
2.4.1 PINTURA SATINADA EN COLUMNAS Y VIGAS 2 MANOS 11
2.4.2 PINTURA CON BARNIZ EN LADRILLO CARAVISTA 12
OBRA
VILCALLAMAS ABAJO DEL DISTRITO DE PISACOMA, PROVINCIA CHUCUITO-PUNO

Inicio Fin Predecesora Cuadrilla Rendimiento Unidad


15-09-2022 25-10-2022
15-09-2022 25-10-2022
15-09-2022 15-09-2022
15-09-2022 15-09-2022 7CC 1 1.00 GLB
15-09-2022 19-09-2022
16-09-2022 19-09-2022 7 1 40.00 M2
15-09-2022 15-09-2022 1 500.00 M2
16-09-2022 04-10-2022
16-09-2022 20-09-2022 6CC 4 4.00 M3
04-10-2022 04-10-2022 19 1 7.00 M3
18-09-2022 21-09-2022 9FC-3d 4 5.00 M3
19-09-2022 22-09-2022 11FC-3d 4 5.00 M3
18-09-2022 26-09-2022
18-09-2022 20-09-2022 21FC-4d 1 25.00 M3
26-09-2022 26-09-2022 16 1 12.00 M3
18-09-2022 25-09-2022 14FC-3d 1 16.00 M2
16-09-2022 25-10-2022
16-09-2022 03-10-2022
03-10-2022 03-10-2022 20 1 12.00 M3
22-09-2022 02-10-2022 21 1 14.00 M2
16-09-2022 21-09-2022 9CC 1 250.00 KG
03-10-2022 25-10-2022
25-10-2022 25-10-2022 24 1 12.00 M3
20-10-2022 24-10-2022 34 1 14.00 M2
03-10-2022 04-10-2022 20 1 250.00 KG
03-10-2022 05-10-2022
03-10-2022 05-10-2022 19CC 1 20.00 ML
15-09-2022 26-09-2022
15-09-2022 26-09-2022 7CC 1 1.00 UND
15-09-2022 15-09-2022 29CC 1 1.00 GLB
07-10-2022 21-11-2022
07-10-2022 21-11-2022
07-10-2022 19-10-2022
07-10-2022 19-10-2022 15FC+10d 3 9.50 M2
26-10-2022 13-11-2022
26-10-2022 31-10-2022 23 2 10.00 M2
28-10-2022 05-11-2022 36FC-4d 2 9.00 M2
06-11-2022 13-11-2022 37 2 6.50 M2
14-11-2022 14-11-2022
14-11-2022 14-11-2022 38 1 1.00 UND
06-11-2022 21-11-2022
06-11-2022 16-11-2022 37 2 12.00 M2
10-11-2022 21-11-2022 42FC-7d 2 15.00 M2
18 sep 2022 25 sep 2022
Metrado PU Parcial J V S D L M M J V S D L M M J
58,527.76
58,527.76
5,028.16
1.00 5,028.16 5,028.16
595.20
160.00 1.76 281.60
160.00 1.96 313.60
4,108.65
70.00 15.75 1,102.50
7.00 9.60 67.20
78.75 12.60 992.25
78.75 24.72 1,946.70
20,004.40
60.00 199.29 11,957.40
8.87 419.91 3,724.60
118.26 36.55 4,322.40
26,541.15
20,137.20
11.50 437.99 5,036.89
149.73 28.52 4,270.30
1,449.80 7.47 10,830.01
6,403.95
4.68 443.87 2,077.31
62.49 28.52 1,782.21
340.62 7.47 2,544.43
538.20
46.00 11.70 538.20
1,712.00
12.00 121.50 1,458.00
1.00 254.00 254.00
50,622.24
50,622.24
33,764.37
351.20 96.14 33,764.37
6,656.08
118.26 19.06 2,254.04
149.73 16.64 2,491.51
92.43 20.67 1,910.53
3,000.00
1.00 3,000.00 3,000.00
7,201.79
242.16 15.15 3,668.72
351.20 10.06 3,533.07
25 sep 2022 02 oct 2022 09 oct 2022 16 oct 2022 23 oct 2022 30 oct 2022
V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
30 oct 2022 06 nov 2022 13 nov 2022 20 nov 2022
J V S D L M M J V S D L M M J V S D L